05000325/LER-1980-050-03, /03L-0:on 800605,while Performing Reactor Bldg Ventilation Radiation Monitoring Sys Test,Monitor D12-RM-N010B Failed to Trip Ventilation Sys & Start Standby Gas Trains.Caused by Stuck Relay 3BA

From kanterella
(Redirected from ML19318D033)
Jump to navigation Jump to search
/03L-0:on 800605,while Performing Reactor Bldg Ventilation Radiation Monitoring Sys Test,Monitor D12-RM-N010B Failed to Trip Ventilation Sys & Start Standby Gas Trains.Caused by Stuck Relay 3BA
ML19318D033
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 06/27/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19318D032 List:
References
LER-80-050-03L, LER-80-50-3L, NUDOCS 8007070237
Download: ML19318D033 (1)


LER-1980-050, /03L-0:on 800605,while Performing Reactor Bldg Ventilation Radiation Monitoring Sys Test,Monitor D12-RM-N010B Failed to Trip Ventilation Sys & Start Standby Gas Trains.Caused by Stuck Relay 3BA
Event date:
Report date:
3251980050R03 - NRC Website

text

_ - -_______________

1.lCENSEE EVENT REPORT O

CONTROL BLOCK: l*

l l

l l

l lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6

fEIIllNlClBlElPl 1 l@l 0 l 0 l

! 0 l 0 l 0 l 0 l 0 l-l 0 l 0 l@26l4l1l1l1l1l@l l

7 8 9 UCENSEE CODE 14 15 LICENSE NUMBER 25 LICENSE TYPE JO Si CAT 68 con'T

" "[ l L l@l o l 510 l - 1013 l 2 l 5 !@l 01610 l 5 l 8 l O l@l o l 6 l 2 l 71 R l 0 !h 8 i

$ RC 7

8 60 St DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT D8!SCRIPTION ANO PROBABLE CONSEQUENCES h a 2 l While performing PT 4.1.1, Reactor Building Ventilation Radiation Monitorine Svstem l

y 3 l Test, radiation monitor D12-RM-N010B failed to trip the ventilation system and start I

~

l the standby gas trains. D12-RM-N010A was tested satisfactorily during this PT.

I o 4 O s !

I l

er s-l 0 7 l

l l Technical Specifications 3.3.2, 6.9.1.9b l

, 3 80 7

  • 8 9 SYSTEM

CAUSE

CsVSE COMP.

VALVE CoOE CODE SUSCODE COMPONENT CODE SUSCODE SU8 CODE l Bl Blh Wh *Wh l R l E l L l A l Y l X'lh l A lh W h O 9 t

7 8

9 10 13.

n 11 18 19 20 SEQUENTIAL OCCU R R E NCE REPORT REVISION

,_EVf NT YE AR REPOPT NO.

COOE TYPE NQ.

O,"LER/ROl al 0l

[_-j l 013l 0l 1/1 10 1 3__ l ltl

[-,j l_qj

=

_ 28 22 13 24 26 27 28 29 J0 38 32 t

KN ACTO

  • ON Pl.A T M

HOURS S8 1 F L1 8.

S Ll MA UF CTURER LA_J@l z l@

Lz_J@

L;;.j@

IO101010I W@

lY l@

I N l@

l c 101810 l@

.3 34 25 M

37 40 di 42 43 44 47 CAUSE DESCRIPTIO*' APO CORRECTIVE ACTIONS h g l Relay 3BA was found to teru.echanically stuck in the nonalarm. position, thus preventing l l the tonitor from properly working. The relay was replaced from stock and the i

r l instrument tested satishetorily,- As this instrument 1.s. checked monthly and does not l i 7 l have a history :f failure, this is considered an isclared.cvent.

l t 4 l

l j

j 7

8 9 80

$iEOERY

's#'2NE sPOwER oTNER STATUS NA l

lBl@l.

DISCOVERY DESCRIPTION 1

[_H_j@ l 0 l 0 l 0 l@l Periodic Test l

i. s

  1. TlVITY CO TENT F:ELEASED OP RELEASE AMOUNT OF ACUVITY LOCATION OF RELEASE

@ l Zl@l NA l

l NA l

i 6 7

8 9 10 ft 44 45 R0 PERSONNEL EXPOSURES kJUM8E R DESCRIPTION 39 l 0 l 0 l 0 lhlTYPEZ lhl NA l

t 7 PE RSONN A'iN;ULS DESCRiPnC~@

NUMBER l 0101 Ol@l NA l

i. +

7 8 9 11 12 80 LOSS OF OR DAMAGE TO FACILITY Q TYPE

DESCRIPTION

U NA l

[_Z_j@l i 9 7

8 9 10 80

"""'EESCRiPnCN @

80 07070 M7 NRC USE ONW l

ISSUE NA l

llllllllIlIll2 hl l

2 O j' 7 8 9 IO 68 69 80 1; A. C. Tollison, Jr.

PHONE:

NAME OF PREPARER