05000325/LER-1980-039-03, /03L-0:on 800417,during Normal Plant Operations, Containment Atmosphere Analyzer Would Not Remain Running After Starting.Caused by Disconnected Wire.Loose Wire Reconnected

From kanterella
(Redirected from ML19309H952)
Jump to navigation Jump to search
/03L-0:on 800417,during Normal Plant Operations, Containment Atmosphere Analyzer Would Not Remain Running After Starting.Caused by Disconnected Wire.Loose Wire Reconnected
ML19309H952
Person / Time
Site: Brunswick 
Issue date: 05/15/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19309H949 List:
References
LER-80-039-03L, LER-80-39-3L, NUDOCS 8005200702
Download: ML19309H952 (1)


LER-1980-039, /03L-0:on 800417,during Normal Plant Operations, Containment Atmosphere Analyzer Would Not Remain Running After Starting.Caused by Disconnected Wire.Loose Wire Reconnected
Event date:
Report date:
3251980039R03 - NRC Website

text

._

U.S. NUCLEAR REGULATORY COMMISSION NRC FORg 3C6 mni Q

UCENSEE EVENT REPORT S0052 00 7D CONTROL BLOCK: l l

l l

l l lh (PLE ASE PRINT OR TYPE ALL REQUIRED INFOHMATION) 1 6

lolil l N! CJ Bl El Pl 1l@l 0 l 0 ] - l 0 l 0 l 0 l 0 l 0 l-l 0 l 0 l@l 4 l1 l1 11 I l l@l l

l@

7 8 3 LICE *.;EE %GE 14 IS LICENSE NVYnER n

26 LICENSE TYPE JO

$ 7 t. A r 58 CON'T A

sO,"' I Ll@l 01 s l 0 ! - 101312 Isl@lola11 17Ia In l@l01511 l 51810 l@

7 8

60 61 DOCK ET Nu??S ER 6d 69 EVENT oATE 74

??

REPORT QATE do EVENT DESCRIPTION AND PROBA8LE CONSEQUENCES h I o i 21 l During normal plant operations the containment cteosphere analyzer 1-CAC-AT-1263 1

would not renain running after starting. When the start button was released the I

50,3, ;

io j,; l analyzer motor stopped.

In no way was the health and safety of the public affected I by this event.

[

o 3 g l

lo lo l l l'

1917! I Technical Specification 3.3.5.3, 6.9.1.9b l

l 0 la l l 7

C DE CO E SLSC CE CCYPCNENT CODE SLBC E S

O E

! TIT)

.lSlEl @ W@ W@ l Il Nl Sl Tl Rl Ulh l S lh lZ l@

7 8

9 10 11 12 13 18 19 20 SECLENTIAL OCCUR R* ENC &

REPORT REVISloN LER RO EVENTYEAR RE' ORT No.

CODE TYPE No.

O sgg 18 1 01 l-l l 013 19 I lel IoI,I Lt J I-I L1J a

22 23 24 26 27 29 29 30 31 32 TIC'f CN PLA T

  • E MoVR$

$$ IT FCR 1 8.

$L PLIE

?. TAN F T ER T K A

lEl@lZl@

l Z l@

l Zl@

l 0l 0l 010l d@

W@

W@

lrl0l4lcl(

33 -

34 35 36 31 40 di 42 43 44 47 CAUSE OESCRIPTION AND CORRECTIVE ACTIONS The analyzer motor stop switch was open due to a disconnected wire which de-energizeq li ;o l ]

[i j i l l the notor run relay. The wire connector had a loose retainer screw. The loose wire, was reconnected to the stop switchand the analyzer restarted satisf actorily. Other

, 7 l

connections on this monitor as well as other monitors were checked with all connectigns ml i i i., i ;

found satisfactory.

l 80 7

8 9 STA

% POWER oTHER STATUS 5o RY DISCov Y DESCRIPTION

~ 11 15 I [JJ@ l 0 l 3 l 0 lgl N/A l

l A [gl OperatorSurveil" lance l

ACTivlTY CC TENT RELEASE AVouNT oF ACTIVITY LOCATION oF RELEASE I 1 l 61 [_?] @D OF nELEASE[Z_j@l N/A l

l N/A l

persons'Et ExPosMEs DESCdiPTICN TYPE @l NUY8ER l

N/A l

l1 l 7 l l Ol 0l 0l@lZ PERscNst t iN;LRiEs cEsCRiPTies@

u NuveE R fit 1 10 l0 10 l@l N/A l

30 7

8 9 11 12 LOSS of oR CAVAGE To FACILITY Q TYPE C E SCRiPTioN N/

I ' l o l l Zl@l N/A l

60 7

8 9 10 Om IS$UE n@lCESCRIPTIoN

[,3 j ws l

[llllllllllllj 2 o 68 69 ab3 F

4 9 to m g3,,

PH RE1

%~M A. C. Tollison, Jr.