Revised LER 79-038/03X-1:on 790611,during Cold Shutdown Surveillance Revealed Calibr Instrument for Main Steam Tunnel High Temp Switches Could Not Be Calibr.Caused by Instrument 02-TIC-200 Drift.Alternate Instrumentation Used
ML19309B215
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/27/1980
From: W. Verne Childs
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19309B209 List:
References
LER-79-038-03X, LER-79-38-3X, NUDOCS 8004030278
Download: ML19309B215 (2)


Text

'W NF4; FORM 366 (777)

U. S. NUCLE AR REGULATORY COMMISSION

, .s LICENSEE EVENT REPORT

/ i kj (PLE ASE PRINT OR TYPE ALL REQUIRED INFORMATioN)

CONTROL BLOCK: l 1

l l l 1 l lh 6

l0 l 6t 7l lN IY lJ l A lF l1 l@l 0 l0l-l0 le 15

!O10l0l-lOl010l@lhl1l1l1!1l@l uCENSE w vBER M 26 L; CENSE TvPE JJ I

$1 4 A I id l@

7 LICENSEE COCE CON'T l0lII ," l L @l015 l0 l0 l0 l3 l3 l3 G10 69l 6 i EVENT fad 1 l 11719 DATE l@l 0131217 74 75 REPCRT DATE l 8 l o l@ 18 0 J 8 60 61 COCK ET NUVSER EVENT DESCRIPTION AND PAC 8A8LE CONSECUENCES h 10121 10urina cold shutdown surveillance revealed that the instrument used for  !

tol3} l calibration of main steam tunnel high temoerature switches could not be 1 1

1014 l l calibrated. As a result main steam tunnel temoerature instruments could

, 10 I 3 l Inot be demonstrated operable per TS Table 4.2-1. No hazard existed. I 1016IISee attachment for details. I I

1017] I I

10181l 80 7 8 3 Sv5 TEM CAUSE CAust COMP VALVf CCCE COCE SUSCODE COMPONENT CODE SU8CCDE suSCCOE lol9l lC lD l@ lE l@ y@ l ll Nl Sl Tl Rl Ul@ l C l@ ]@ 18 is 20 7 4 9 to 11 12 13 SEQU EN TI AL OCCU R R E NCE REPORT REVISION (gg gg EVENTYEAR REPOR T NO. COOE TvPE NC.

@ 4tg I 7l 9ln l-l l 0 l 3 l 81 1/l l0l3l lX l l__j l1l u

_v 22 24 ;6 2r 2a 29 ao 3i AKE AC ON ON PL NT ET HOURS $8 i FOR V8. $U PP LI E VA UFACT RER lX l@lJ4 Zl@ l Zl@ l36 Zl@ l 0l Ol 0l 0l l Yl@

41 lNl@ lAl@ l P ] 4 ] 2 ] 7 lt 44 47 3J 34 31 40 42 43 CAUSE OESCRIPTION AND CORRECTIVE ACTIONS l i 101 lDri f t of ins trument 02-TIC-200 caused oroblem. Alternate instrumentation was I lilijlused to show main steam tunnel high temOerature switches within TS limits. I l i 171 INo additional action reauired. See attachment for details. I 9

It i 21 l I i

DTTI I Sc 7 8 3 5 5  % PCWE R OTHE R $TA TUS ISCOV V O!SCOVERv CESCRIP"CN l' 15 l IG l@ l 0 l O l O lhl NA l lB l@l Surveillance Test j ACTivtiv CO TENT RELE ASED OF RELE ASE AMOUNT CF ACTIVITY LOCATIO'4 0F RELE ASE 1

li 161 LzJ @ 10Lzl@l e i I e 7 6 3 11 44 45 80 PERSONNEL EXPOSURES NOUSER TYPE DEscrit PTION W l i j 7 } l 0 l 0 l 0 !@l Z lhl NA l

' * * ' 53

,ER: ONNE'L i uu'R'IEs NuvnER cEsCniPriON@

li 143 9ll0l0!Olhl 7 11 12 NA

$C l

LCO$ 0F QR D AMAr,E TO F ACILITY ,

Tvrg O E SC rip riON

'  ! NS ,. , !t ,

4 > m ovuuv -

sa 1550F0 DE CR+PMGN

i. quei s i !isiiiiiiiJi 4 3 TO

'a d i. e 50

' ~

NAYE CF 3REPMED Pw C N E.

W.

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT DOCKET NO. 50-333 ATTACHMENT TO LER 79-038/03X-1 Page 1 of I While in a cold shutdown condition, during the calibration of Instrument 02-TIC-200, the instrument could not be demonstrated to be within calibration. Since the referenced instrument provided Indication and control of the sixteen (16) Main Steam Line Tunnel High Temperature Detectors, these instruments could not be demonstrated fully operable as required by Technical Specifications Appendix A, Table 4.2-1.

On-site calibration of the controller was not possible and attempted off-site calibratloa did not yield satisfactory results. Accordingly, the calibration of the Main Steam Tunnel High Temperature Detectors was verified by changing the Instrument Surveillance Procedure to allow the use of other equipment. Proper operation was verified on August 24, 1979 (prior to plant startup on September 3,1979) by completion of F-ISP-45 titled " Main Steam Line High Temperature" to meet the requirements of Technical Specifications Table 4.2-1. No additional corrective action is required.

NOTE: Revision 1 of this LER is submitted to provide additional Information with respect to corrective action.

4 1

1 1