Notice of No Objection for Preliminary Amendment Request Revised (PAR-19-016-2)
ML19302F200
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 11/12/2019
From: Mark King
NRC/NRR/VPOB
To: Whitley B
Southern Nuclear Operating Co
Rankin J, NRR/VPO
References
EPID L 2019 LLA 0181
Download: ML19302F200 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 12, 2019 Mr. Brian H. Whitley, Director Regulatory Affairs Southern Nuclear Operating Company, Inc.

3535 Colonnade Parkway, Bin N-226-EC Birmingham, AL 35243

SUBJECT:

NOTICE OF NO OBJECTION FOR PRELIMINARY AMENDMENT REQUEST (LAR-19-016-2), REINFORCEMENT CHANGES FOR WALL L, FOR THE VOGTLE ELECTRIC GENERATING PLANT UNIT 4 (EPID: L-2019-LLA-0181)

Dear Mr. Whitley:

By letter dated October 25, 2019, Southern Nuclear Operating Company (SNC) submitted Preliminary Amendment Request (PAR) 19-016-2 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19298D449). SNC also submitted License Amendment Request (LAR)19-016 on August 22, 2019 (ADAMS Accession No. ML19234A327), to change the provided area of horizontal reinforcement for the Vogtle Electric Generating Plant (VEGP) Unit 4 Wall L and Wall 7.3. LAR-19-016 was revised by LAR-19-016R1 on October 25, 2019 (ADAMS Accession No. ML19298D420), to change the provided area of vertical reinforcement for VEGP Unit 4 Wall L in addition to the horizontal reinforcement. By PAR-19-016-2, SNC notified the U.S. Nuclear Regulatory Commission (NRC) that, absent NRC objection, pending the outcome of the NRCs detailed technical review of LAR-19-016 dated August 23, 2019, as revised by letter dated October 25, 2019, SNC will proceed with construction activities outlined in Section 7 of the Enclosure to PAR-19-016-2.

As required by License Condition 2.D(1), the NRC has received LAR-19-016 and revised LAR-19-016R1. LAR-19-016R1 was referenced in PAR-19-016-2. The staff has evaluated the license amendment documentation supporting LAR 19-016 and has determined that there is sufficient information to accept LAR-19-016 for detailed technical review (ADAMS Accession No. ML19246A274).

The NRC staff has determined that PAR-19-016-2 contained sufficient information on the impact of the proposed plant change on associated Inspections, Tests, Analyses and Acceptance Criteria. In addition, the NRC staff has reviewed the scope of PAR-19-016-2 and found that it is consistent with the changes from the current licensing basis as requested in LAR-19-016R1.

Therefore, the NRC has no objection to SNC proceeding with the construction of the proposed plant change identified in PAR-19-016-2 pending the outcome of the NRCs detailed technical review of LAR-19-016, as revised by LAR-19-016R1. SNC acknowledges that if LAR-19-016R1 is denied, SNC will return the plant to its current licensing basis as required by License Condition 2.D.(1)(b).

B. Whitley If you have any questions or comments concerning this matter, please contact the Project Manager, Jennie Rankin, at 301-415-1530 or via e-mail at Jennivine.Rankin@nrc.gov.

Sincerely,

/RA/

Mike F. King, Director Vogtle Project Office Office of Nuclear Reactor Regulation Docket No.: 52-026 cc: See next page

B. Whitley

SUBJECT:

NOTICE OF NO OBJECTION FOR PRELIMINARY AMENDMENT REQUEST (LAR-19-016-2), REINFORCEMENT CHANGES FOR WALL L, FOR THE VOGTLE ELECTRIC GENERATING PLANT UNIT 4 (EPID: L-2019-LLA-0181) DATED: November 12, 2019 DISTRIBUTION:

Public NRR_VPO Distribution RidsAcrsAcnwMailCenter RidsOgcMailCenter RidsRgn2MailCenter CPatel Vhall Rbutler Tfredette ADAMS Accession No. ML19302F200 *via email NRO-008 OFFICE NRR/VPO/PM NRR/VPO/LA NRR/VPO/ROE* NRR/VPO/PM NAME Jrankin Rbutler Tfredette Cpatel DATE 10/30/19 10/30/19 10/29/19 11/7/19 OFFICE NRR/VPO/BC NRR/VPO/D NAME Vhall Mking DATE 11/7/19 11/12/19 OFFICIAL AGENCY RECORD

Vogtle Mailing List (Revised 11/12/2019) cc:

Resident Manager Resident Inspector Oglethorpe Power Corporation Vogtle Plant Units 3 & 4 Alvin W. Vogtle Nuclear Plant 8805 River Road 7821 River Road Waynesboro, GA 30830 Waynesboro, GA 30830 Mr. Barty Simonton Office of the Attorney General Team Leader 40 Capitol Square, SW Environmental Radiation Program Atlanta, GA 30334 Air Protection Branch Environmental Protection Division Southern Nuclear Operating Company 4244 International Parkway, Suite 120 Document Control Coordinator Atlanta, GA 30354-3906 3535 Colonnade Parkway Birmingham, AL 35243 Brian H. Whitley Regulatory Affairs Director Anne F. Appleby Southern Nuclear Operating Company Olgethorpe Power Corporation 3535 Colonnade Parkway, BIN N-226-EC 2100 East Exchange Place Birmingham, AL 35243 Tucker, GA 30084 Mr. Michael Yox County Commissioner Site Regulatory Affairs Director Office of the County Commissioner Vogtle Units 3 & 4 Burke County Commission 7825 River Road, Building 302 (ESB)

Waynesboro, GA 30830 Bin 6031 Waynesboro, GA 30830 Mr. Wayne Guilfoyle Commissioner District 8 Augusta-Richmond County Commission 4940 Windsor Spring Rd Hephzibah, GA 30815 Gwendolyn Jackson Burke County Library 130 Highway 24 South Waynesboro, GA 30830 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Atlanta, GA 30334 Page 1 of 3

Vogtle Mailing List Email aagibson@southernco.com (Amanda Gibson) acchambe@southernco.com (Amy Chamberlian) awc@nei.org (Anne W. Cottingham) becky@georgiawand.org (Becky Rafter) bhwhitley@southernco.com (Brian Whitley)

Bill.Jacobs@gdsassociates.com (Bill Jacobs) corletmm@westinghouse.com (Michael M. Corletti) crpierce@southernco.com (C.R. Pierce) dahjones@southernco.com (David Jones) david.hinds@ge.com (David Hinds) david.lewis@pillsburylaw.com (David Lewis) dlfulton@southernco.com (Dale Fulton) ed.burns@earthlink.net (Ed Burns) edavis@pegasusgroup.us (Ed David)

G2NDRMDC@southernco.com (SNC Document Control)

George.Taylor@opc.com (George Taylor) harperzs@westinghouse.com (Zachary S. Harper) james1.beard@ge.com (James Beard)

JHaswell@southernco.com (Jeremiah Haswell) jim@ncwarn.org (Jim Warren)

John.Bozga@nrc.gov (John Bozga)

Joseph_Hegner@dom.com (Joseph Hegner) karlg@att.net (Karl Gross) kmstacy@southernco.com (Kara Stacy) kroberts@southernco.com (Kelli Roberts)

KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh) markus.popa@hq.doe.gov (Markus Popa) mdmeier@southernco.com (Mike Meier) media@nei.org (Scott Peterson)

Melissa.Smith@Hq.Doe.Gov (Melissa Smith) mike.price@opc.com (M.W. Price)

MKWASHIN@southernco.com (MKWashington) mphumphr@southernco.com (Mark Humphrey)

MSF@nei.org (Marvin Fertel) nirsnet@nirs.org (Michael Mariotte)

Nuclaw@mindspring.com (Robert Temple)

Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette) ppsena@southernco.com (Peter Sena,III) r.joshi15@comcast.net (Ravi Joshi) rwink@ameren.com (Roger Wink) sabinski@suddenlink.net (Steve A. Bennett) sara@cleanenergy.org (Sara Barczak)

Page 2 of 3

Vogtle Mailing List sblanton@balch.com (Stanford Blanton)

Shiva.Granmayeh@hq.doe.gov (Shiva Granmayeh) sjackson@meagpower.org (Steven Jackson) sjones@psc.state.ga.us (Shemetha Jones) skauffman@mpr.com (Storm Kauffman) slieghty@southernco.com (Steve Leighty) sroetger@psc.state.ga.us (Steve Roetger) syagee@southernco.com (Stephanie Agee)

TomClements329@cs.com (Tom Clements)

Vanessa.quinn@dhs.gov (Vanessa Quinn) wayne.marquino@gmail.com (Wayne Marquino) weave1dw@westinghouse.com (Doug Weaver)

William.Birge@hq.doe.gov (William Birge)

X2edgran@southernco.com (Eddie R. Grant) x2gabeck@southernco.com (Gary Becker)

X2hagge@southern.com (Neil Haggerty)

X2wwill@southernco.com (Daniel Williamson)

Page 3 of 3