ML19246A274

From kanterella
Jump to navigation Jump to search

COL Docs - Acceptance Review of Southern Nuclear Operating Company’S Reinforcement Changes for Wall L and Wall 7.3
ML19246A274
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/03/2019
From:
NRC
To:
NRC/NRO/DLSE/LB4
References
Download: ML19246A274 (3)


Text

1 Vogtle PEmails From:

Rankin, Jennivine Sent:

Tuesday, September 3, 2019 12:39 PM To:

Agee, Stephanie Y.

Cc:

Vogtle PEmails; Patel, Chandu; Dixon-Herrity, Jennifer

Subject:

ACCEPTANCE REVIEW OF SOUTHERN NUCLEAR OPERATING COMPANYS REINFORCEMENT CHANGES FOR WALL L AND WALL 7.3 (EPID NO. L-2019-LLA-0181)

Mr. Brian H. Whitley, Director Regulatory Affairs Southern Nuclear Operating Company, Inc.

3535 Colonnade Parkway BIN B237 Birmingham, AL 35243

SUBJECT:

ACCEPTANCE REVIEW OF SOUTHERN NUCLEAR OPERATING COMPANYS REINFORCEMENT CHANGES FOR WALL L AND WALL 7.3 (EPID NO. L-2019-LLA-0181)

Dear Mr. Whitley:

By letter dated August 22, 2019 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML19234A327), Southern Nuclear Operating Company (SNC) submitted a request for a license amendment to Combined License (COL) Number NPF-92, for the Vogtle Electric Generating Plant Unit 4. The requested amendment proposes changes to Tier 2* information in the Updated Final Safety Analysis Report, to change the provided area of horizontal steel reinforcement for VEGP Unit 4 Wall L and Wall 7.3 from elevation 117-6 to 135-3.

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission staffs acceptance review of these requests. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the staff to complete its detailed technical reviews. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of the 10 CFR, an amendment to the license must fully describe the changes requested, and follow as far as applicable, the form prescribed for original applications. Section 52.79 of the 10 CFR addresses content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to complete its detailed technical review and make an independent assessment regarding the acceptability, of the proposed amendment, in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the staffs detailed technical review by separate correspondence.

2 SNC has requested staff approval of this LAR by February 23, 2020. The staff intends to complete this action by May 23, 2020. However, the staff will try to expedite its review to have it completed by February 23, 2020, unless we agree to a different date at a later time due to circumstances beyond our control. The staff estimates that it may take 210 hours0.00243 days <br />0.0583 hours <br />3.472222e-4 weeks <br />7.9905e-5 months <br /> to complete this licensing action.

If you have any questions, please contact me at (301) 415-1530 or Jennivine.rankin@nrc.gov.

Jennie Jennie Rankin, Project Manager Licensing Branch 2 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors

Hearing Identifier:

Vogtle_COL_Docs_Public Email Number:

476 Mail Envelope Properties (BY5PR09MB43769BD4F672E4BB85B2D4BF98B90)

Subject:

ACCEPTANCE REVIEW OF SOUTHERN NUCLEAR OPERATING COMPANYS REINFORCEMENT CHANGES FOR WALL L AND WALL 7.3 (EPID NO.

L-2019-LLA-0181)

Sent Date:

9/3/2019 12:39:02 PM Received Date:

9/3/2019 12:39:05 PM From:

Rankin, Jennivine Created By:

Jennivine.Rankin@nrc.gov Recipients:

"Vogtle PEmails" <Vogtle.PEmails@nrc.gov>

Tracking Status: None "Patel, Chandu" <Chandu.Patel@nrc.gov>

Tracking Status: None "Dixon-Herrity, Jennifer" <Jennifer.Dixon-Herrity@nrc.gov>

Tracking Status: None "Agee, Stephanie Y." <SYAGEE@southernco.com>

Tracking Status: None Post Office:

BY5PR09MB4376.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3389 9/3/2019 12:39:05 PM Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received: