05000293/LER-1979-047-03, /03L-0:on 791117 & 20,fire Brigade Reduced to Less than Required by Tech Specs.Caused by Security Shift Supervisory Personnel Changing Priorities of Assigned Tasks & Contradicting Directives Issued by Chief of Security

From kanterella
(Redirected from ML19260C396)
Jump to navigation Jump to search
/03L-0:on 791117 & 20,fire Brigade Reduced to Less than Required by Tech Specs.Caused by Security Shift Supervisory Personnel Changing Priorities of Assigned Tasks & Contradicting Directives Issued by Chief of Security
ML19260C396
Person / Time
Site: Pilgrim
Issue date: 12/17/1979
From: Mathis C
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19260C393 List:
References
LER-79-047-03L, LER-79-47-3L, NUDOCS 7912260281
Download: ML19260C396 (1)


LER-1979-047, /03L-0:on 791117 & 20,fire Brigade Reduced to Less than Required by Tech Specs.Caused by Security Shift Supervisory Personnel Changing Priorities of Assigned Tasks & Contradicting Directives Issued by Chief of Security
Event date:
Report date:
2931979047R03 - NRC Website

text

NRC FORM 366

. h.

1 (7 77)

LICENSEE EVENT REPORT CONTROL BLOCK: l l

l l

l l

lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6

@ l Ml Al Pl P Sl 1l@l 0 l 0 l 0l 0 l 0 l 0 l 0 l 0 l 0 l 0 l 0 l@l 4 l 1 l 1 l 1l 1l@l l

lg 7

8 9 LICENSEE CODE 14 15 LICENSE NUM8ER 25 26 LICENSE TYPE Jo Si CAT $8 CON'T

$$RCE l L@l 0l 5l 0

- l 0 l 21 9 l 3 @l 1 l 1 l 1 7l 719 l@l ll 2 l 1l 7l 7 9@

o 1

7 8

60 61 DOCKET NUMBER 68 69 EVENT OATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h O

2 l On November 17 and again on November 20, 1979, the fire brigade was reduced to l

o 3 l less than that required by Technical Spacifications 6.2.B.6 for a period of ap-l o

4 l proximately four hours. The fire brigade was not required during this time, l

o 5 l therefore, the health and safety of the public were not affected.

l 0

s i

O 7

i O

8 I

I 80 7

8 9 E

CODE SUSC E COMPONENT CODE SU8C DE S

E

@ lZlZlZlZlZlZlh

@ lZ l@

ITF51

'l Zl Z @ l Al@

Z F

7 8

9 10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LE RiRO EVENT YEAR REPORT NO.

CODE TYPE N O.

O REP g 1719 l-l l

l l

l l/

0 l3 l lL l

[.--j 0l yUg 21 22 23 24 26 27 28 29 30 31 32 K N A ON ON PL NT ME HOURS 22 SB 1 FOR 8.

SUPPLIE MANUFACTURER lHl@lZl@

lZl@

lZl@

l0l0l0l0j l N l@

lNl@

lZl@

Zl9l9l9l@

33 34 35 36 31 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h 1

O l The cause of this event was security shift supervisory personnel changing priorities l i

i l of assigned tasks and contradicting directives issued by the Chief of Security.

I i

2 l The requirements to maintain fire brigade requirements have been re-emphasized.

l i 3 l

l i 4 1

7 8 9 80 ST S

% POWER OTHER STATUS DIS O RY DISCOVERY DESCRIPTION

]@

1l0 0l@l N.A.

l lAl@l Operational Event j

i 5

ACTIVITY CO TENT RELEASED OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE

@ dj@

N.A.

l N.A.

l 1 6 7

8 9 10 11 44 45 80 PERSONNEL E (POSURES NUMBER TYPE

DESCRIPTION

y l0l0l0l@lZl@l N.A.

l PERSONNE L INJURIES NUMBER

DESCRIPTION

y l0 0l0l@l N.A.

7 8 9 11 12 80 LOSS OF OR DAMAGE TO FACILITY TYPE

DESCRIPTION

l Zl@l N.A.

l 1 9 7

8 9 10 A

rp p

80 ISSUE @DE CRIPTION S-m N.A.

l lllllll1IllIl l

c 2 0 7

8 9 10 l

68 69 80 3 617-746-7900 NAME OF PREPARER % rl^" T V?th M P SONE: