Other: ML19210D037, ML19248D525, ML19249B824, ML19254F785, ML19254F792, ML19256A718, ML19256A807, ML19256F452, ML19262B985, ML19275A926, ML19310A971, ML19352A969, ML20002A542, ML20008E032, ML20027E669, ML20027E675, ML20055A436, ML20062E590, ML20077Q266, ML20082H504, ML20107J281, ML20134G852, ML20138N067
|
MONTHYEARML18078A4061978-11-11011 November 1978 Forwards Comments in the Form of Redraft of Commission Paper Re Proposed Fed Register Notice Abnormal Occurrence Event, Loss of Containment Integrity W/Encl Draft Notice of Issuance Project stage: Draft Other IR 05000321/19780361978-11-29029 November 1978 IE Insp Repts 50-321/78-36 & 50-366/78-45 on 781106-09. Noncompliance Noted in Following Areas:Failure to Conduct Maint on safety-related Equipment & Failure to Submit a 30- Day Rept Project stage: Request ML20062E5901978-11-29029 November 1978 Discusses Possible Dangers of LOCA in Containment Purging During Normal Plant Oper.Requests Either Commitment to Limit Purging or Justification for Continuing.W/Encl ANO: 7812080207 Project stage: Other ML19256A7181979-01-0303 January 1979 Discusses Unlimited Purging Re Possible Failure of Automatic Isolation of Large Diameter Containment Purge Penetrations Used During Power Operations.Concludes That Bypass & Override Conditions Can Be Identified Project stage: Other ML19256A8071979-01-0909 January 1979 Responds to NRC .Review Underway Is Expected to Justify Unlimited Purging During Normal Plant Operation. Study to Be Completed by 790416 Project stage: Other ML19249B8241979-04-30030 April 1979 Summary of Review of Design of All Safety Actuation Signal Circuits Which Incorporate Manual Override Feature Project stage: Other ML19248D5251979-08-10010 August 1979 Responds to 790720 Request & Forwards Addl Info Re IE Bulletin 79-08.Standing Order Issued 790515 as Interim Means of Implementing Reporting Requirements of Item 9 of Bulletin Project stage: Other ML19249B8211979-08-29029 August 1979 Forwards Addl Response to 781129 Request for Info Re Vent & Purge Design & Operation.Rept Summary of Review of Design of All Safety Actuation Signal Circuits Which Incorporate Manual Override Feature Encl Project stage: Request ML19254B3631979-08-29029 August 1979 Forwards Request for Addl Info Re Override of Containment Purge Isolation Project stage: RAI ML19250A7591979-10-18018 October 1979 Forwards Response to 790913 Request for Commitment to Comply W/Requirements of NUREG-0578.Optimum Method of Addressing Concern,In Recognition of plant-unique Features, Proposed Project stage: Request ML19275A9261979-10-18018 October 1979 Forwards Commitment to Meet Requirements of NUREG-0578. Intends to Meet Requirements & Schedules Set Forth in NRC Project stage: Other ML19254F7851979-10-22022 October 1979 Requests Util Commitment to Comply W/Encl Interim Position Re Containment Purge & Vent Valve Operation Pending Resolution of Isolation Valve Operability.Commitment Needed within 45 Days Project stage: Other ML19254F7921979-10-30030 October 1979 Requests Util Commitment to Comply W/Encl Interim Position Re Containment Purge & Vent Valve Operation Pending Resolution of Isolation Valve Operability.Commitment Needed within 45 Days Project stage: Other ML19260B9881979-11-0606 November 1979 Forwards Request for Addl Info About Containment Purge & Vent Sys Re Util Plans for Unlimited Purging Project stage: RAI ML19210D0371979-11-13013 November 1979 Responds to NRC Re Containment Purging & Venting. Vent & Purge Valves at Three Units Qualify W/Nrc Guidelines to Extent Guidelines Apply Project stage: Other 05000321/LER-1979-081, Responds to 790927 Request for Expedited Implementation of Valve Qualification Program.Potential Problems Noted W/ Containment Purge & Vent Valves,Reported as LER 79-81.Valve Operator to Be Modified & Program Implemented1979-11-15015 November 1979 Responds to 790927 Request for Expedited Implementation of Valve Qualification Program.Potential Problems Noted W/ Containment Purge & Vent Valves,Reported as LER 79-81.Valve Operator to Be Modified & Program Implemented Project stage: Request ML19256F4521979-11-19019 November 1979 Forwards Addl Info Required for Completion of NRC Evolution of Electrical Override/Bypass Aspects of Containment Isolation Matter.Criteria Encl Project stage: Other ML19211A4411979-11-19019 November 1979 Forwards Request for Addl Info to Complete Evaluation of Electrical Override/Bypass Aspects of Containment Purge Sys Project stage: RAI ML19257A2931979-12-10010 December 1979 Forwards Request for Addl Info Re Util 790109 & 0829 Responses to NRC Re Containment Purging. Electrical Review Criteria Encl.Requests Reply within 60 Days Project stage: RAI ML19260C2221979-12-11011 December 1979 Forwards Criteria Re Electrical Override/Bypass for Use in Review of Operating Reactors.Maintaining Purge Valves Closed Does Not Resolve NRC Concern W/Purge Valve Circuitry Project stage: Approval ML19310A9711979-12-27027 December 1979 Requests Preliminary Evaluation of Licensee Response to NRC 791023 Interim Position for Containment Purge & Vent Valve Operation Pending Resolution of Isolation Valve Operability, Generic Item B-24.Evaluation Form Encl Project stage: Other ML19211C9021980-01-0909 January 1980 Submits Info in Response to NRC Requesting Commitment to Meeting Interim Position for Containment Purge & Vent Valve Operation. Interim Position Will Be Met Upon Completion of Bypass Line Wiring Mod Project stage: Meeting ML19262B9851980-01-16016 January 1980 Responds to NRC 791211 Request Re Containment Purge Sys & Engineered Safety Equipment Component Design.Sys Design & Procedures Utilized for Operation Provide Acceptable Degree of Safety Project stage: Other ML20055A4361980-02-28028 February 1980 Electrical,Instrumentation & Control Sys Support, Interim Rept Project stage: Other ML20008E0321980-10-0606 October 1980 Amend 61 to License DPR-65 Authorizing Cycle 4 Operation at 2,700 Mwt W/Mixed Core w/one-third Westinghouse Fuel & two- Thirds CE Fuel & Modified Guide Tubes for Control Element Assemblies Project stage: Other ML20002A5421980-11-0404 November 1980 Confirms Util Commitments to Interim Position on Containment Purging & Venting,Pending Resolution of Isolation Valve Operability.Commitment Will Remain in Effect Pending NRC long-term Review Project stage: Other ML19352A9691981-05-21021 May 1981 Provides Summary of Valve Qualification Efforts Resulting from NRC 790927 Effort.Valve Vendor Analysis Verified That Valve Actuator Has Sufficient Torque Capability to Overcome Forces That Resist Closure Subsequent to Design Basis LOCA Project stage: Other ML20027E6751982-10-0101 October 1982 Submits Info Re Status of Containment Purge & Vent Sys,In Response to NRC .Design Acceptable Since Weather at Plant Site Cannot Be Termed Severe Project stage: Other ML20027E6691982-11-0909 November 1982 Forwards Re Status of Containment Purge & Vent Sys.Original Submittal Apparently Never Received by NRC Project stage: Other ML20070E4031982-12-13013 December 1982 Advises That Specific Containment & Purge Valves Identified in NRC Are Not Applicable to Facilities.Meeting Requested to Determine Status of Remaining Issue Re Purging & Venting Project stage: Meeting ML20028C6081983-01-0606 January 1983 Notification of 830119 Meeting W/Util & Bechtel in Bethesda, MD to Discuss Status of Remaining Issues Re Review of Purging & Venting During Normal Operations Project stage: Meeting A03035, Forwards Response to NRC Request for Addl Info Re Operability of 6-inch Butterfly Containment Purge & Vent Valves.Based on Analyses,Adequate Justification Does Not Exist to Warrant Mods to Equipment1983-03-28028 March 1983 Forwards Response to NRC Request for Addl Info Re Operability of 6-inch Butterfly Containment Purge & Vent Valves.Based on Analyses,Adequate Justification Does Not Exist to Warrant Mods to Equipment Project stage: Request ML20071P0991983-05-31031 May 1983 Application for Amend to Licenses DPR-57 & NPF-5,revising Dose Equivalent Iodine Tech Specs to Reflect Current Requirements.Info Resolving Outstanding Purge & Vent Valve Operability Issues Encl Project stage: Request ML20071P1221983-05-31031 May 1983 Proposed Changes to Dose Equivalent Iodine Tech Specs & Preliminary Proposed Tech Specs for Drywell & Suppression Chamber Purge Sys Project stage: Request ML20024A6511983-06-15015 June 1983 Proposed Changes to Tech Specs 3/4.6-2,B 3/4 6-6 & Added 3/4.6-46 for Unit 2 & 3.7-10a,3.7-34,3.7-34a & Adding 3.7-10b & 3.7-34b for Unit 1 Re Purge & Vent Valve Operability Project stage: Request ML20024A6451983-06-15015 June 1983 Application for Amend to Licenses DPR-57 & NPF-5 Changing Tech Specs 3/4.6-2,B 3/4 6-6 & Adding 3/4.6-46 for Unit 2 & 3.7-10a,3.7-34,3.7-34a & Adding 3.7-10b & 3.7-34b for Unit 1 Re Purge & Vent Valve Operability Project stage: Request ML20077Q2661983-09-0101 September 1983 Provides Addl 10CFR50.92 Justification for 830531 & 0615 Applications for Amends to Tech Specs Re Change in Dose Equivalent Iodine & Change in Purge Valve Operability Specs Project stage: Other ML20082H5041983-11-22022 November 1983 Proposed Tech Spec Changes Re Dose Equivalent Iodine in Reactor Coolant Sys Project stage: Other ML20082H4861983-11-22022 November 1983 Application for Amend to Licenses DPR-57 & NPF-5,changing Tech Specs Re Dose Equivalent Iodine in Reactor Coolant Sys. Original Amend Submitted on 830531.Class III License Amend Fee Encl Project stage: Request ML20107J2811985-02-0404 February 1985 Amends 106 & 44 to Licenses DPR-57 & NPF-5,respectively, Revising Tech Specs to Reduce Equilibrium Activity Concentration Limit for Reactor Coolant for Unit 1 & to Reduce Offgas Activity Release Rate for Unit 2 Project stage: Other ML20134G8381985-08-20020 August 1985 Application for Amends to Licenses DPR-57 & NPF-5,adding Surveillance Requirements for fast-acting Dampers in Standby Gas Treatment Sys Installed During Recent Refueling Outage Project stage: Request ML20134G8521985-08-20020 August 1985 Proposed Tech Specs,Adding Surveillance Requirements for fast-acting Dampers in Standby Gas Treatment Sys Installed During Recent Refueling Outage Project stage: Other ML20138N0751985-12-11011 December 1985 Safety Evaluation Supporting Amends 118 & 58 to Licenses DPR-57 & NPF-5,respectively Project stage: Approval ML20138N0671985-12-11011 December 1985 Amends 118 & 58 to Licenses DPR-57 & NPF-5,respectively, Revising Tech Specs to Eliminate Time Restriction on Opening Purge & Vent Isolation Valves During Operating Modes 1,2 & 3 Project stage: Other 1980-01-16
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
ERA c
>R #f Cg*
/
o UNITED STATES E ^
i TJUCLEAR REGULATORY COMMISSION
-p WASWNGTON, D. C. 20555
\\/
OCTOBER 2 2 1979 Docket Nos. 50-321 and 50-366 Mr. Charles F. Whitmer Vice President - Engineering Georgia Power Company P. O. Box 4545 Atlanta, Georgia 30302
Dear Mr. Whitmer:
RE: Containment Purging and Venting During Normal Operation By letter dated November 29, 1978, the Commission (NRC) requested all licensees of operating reactors to respond to generic concerns about containment purging or venting during normal plant operation. The generic concerns were twofold:
(1) Events had occurred where licensees overrode or bypassed the safety actuation isolation signals to the containment isolation valves.
These events were determined to be abnomal occurrences and reported to Congress in January 1979.
(2) Recent licensing reviews have required tests or analyses to show that containment purge or vent valves would shut without degrading con-tainment integrity during the dynamic loads of a design basis loss of coolant accident (DBA-LOCA).
The NRC position of the Noverber 1978 letter requested that licensees take the following positive actions pending completion of the NRC review:
(1) prohibit the override or bypass of any safety actuation signal which would affect another safety actuation signal; the NRC Office of Inspection and Enfortement would verify that administrative controls prevent improper manual defeat of safety actuation signals, and (2) cease purging (or venting) of containment or limit purging (or venting) to an absolute minimum, not to exceed 90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> per year. Licensees were requested to demonstrate (by test oi by test and analysis) that containment isolation valves would shut under r Atulated DBA-LOCA condition. The NRC positions were amplified by citation (and an attachad copy) of our Standard Review Plan (SRP) 6.2.4 Revision 1 and the associated Branch Technical Position CSB 6-4, which have effectively classed the purge and vent valves as
" active" invoking the operability assurance program of SRP 3.9.3.
The NRC staff has made site visits to several facilities, has met with licensees at Bethesda, Maryland, and has held telecon conferences with many other licensees and met with some valve manufacturers. During these discussions, the NRC staff has stressed that positive actions must be taken as noted above to assure that containment integrity would be maintained in the event of a DBA-LOCA.
1353 271 7911190 O E P
Mr. Charles F. Whitmer As a result of these actions, we have learned from several licensees that at least three valve vendors have reported that their valves may not close against the ascending differential pressure and the resulting dynamic loading of the design basis LOCA. All identified licensees who are affected have proposed to maintain the valves in the closed position or to restrict the angular opening of the valves whenever primary containment integrity is required until a re-evaluation is provided which shows satisfactory valve perfomance under the DBA-LOCA condition.
Recently, a report under 10 CFR Part 21 was received by the NRC from the manufacturer of butterfly valves which are installed in the primary containment at the Three Mile Island Unit 2 Nuclear Station. These butterfly valves are used for purge and exhaust purposes and are required to operate during accident conditions. The report discusses the use of an unqualified solenoid valve for a safety-related valve function which requires operation under accident conditions. The solenoid valve is used to pilot control the pneumatic valve actuators which are installed on the containment ventilation butterfly valves at this facility. Your re-evaluation of valve perfomance for conditions noted in the previous paragraph must consider the concerns identified in IE Bulletin 79-01A.
As the NRC review progresses, ifcensees which might have electrical override circuitry problems are being advised not to use the override and to take compensatory interim measures to minimize the problem.
In light of the information gained during our reviews of your submittals dated January 9, 1979 and August 29, 1979, and the infomation cited above, we believe an interim commitment from you is required at this time. This is the case, even though you may have proposed Technical Specification changes or other long or short-tem measures, which we are reviewing.
For your use, we have provided as an attachment an interim NRC staff position.
In addition, our recently developed " Guidelines for Demonstration of Operability of Purge and Vent Valves" were provided by separate letter to licensees of each operating reactor. This letter in no way relaxes any existing licensing requirements for your facility.
Because of the potential adverse effects on the public health and safety which could result from the postulated, DBA-LOCA while operating with open purge or vent valves, we believe your prompt response to this letter is required.
In accordance with 10 CFR 50.54(f), you are requested i353 272
Mr. Charles F. Whitmer to inform us in writing within 45 days of receipt of this letter of your commitment to operate in conformance with the enclosed interim position and to provide us with information which demonstrates that you have initiated the purge and vent valve operability verification on an expedited basis. The information provided in your response will enable us to determine whether or not your license to operate Hatch Unit Nos.1 and 2 should be modified, suspended, or revoked.
Sincerely, I'$
Thomas
. ppolito, Chief Operating Reactors Branch #3 Division of Operating Reactors
Enclosure:
Interim Position for Containment Purge and Vent Valve Operation cc: w/ enclosure See next page 1353 273
Mr. Charles F. Whitmer Georgia Power Company cc:
G. F. Trowbridge, Esquire Shaw, Pittman, Potts and Trowbridge 1800 M Street, N. W.
Washington, D. C.
20036 Ruble A. Thomas Vice President P. O. Box 2625 Southern Services, Inc.
Birmingham, Alabama 35202 Ozen Batum P. O. Box 2625 Southern Services, Inc.
Birmingham, Alabama 35202 Mr. William Widner Georgia Power Company Power Generation Department P. O. Box 4545 Atlanta, Georgia 30302 Mr. L. T. Gucwa Georgia Power Company Engineering Department P. O. Box 4545 Atlanta, Georgia 30302 Appling County Public Library Parker Street Baxley, Georgia 31413 Mr. R. F. Rogers U. S. Nuclear Regulatory Commission P. O. Box 710 Baxley, Georgia 31513 i353 2/4
i INTERIM POSITION FOR CONTAINMENT PURGE AND VENT VALVE OPERATION PENDING RESOLUTION OF ISOLATION VALVE OPERABILITY Once the conditions listed below are met, restrictions on use of the containment purge and vent system isolation valves will be revised based on our review of your responses to the November 1978 letter justifying your proposed l
operational mode. The revised restrictions can be established separately for each system.
1.
Whenever the containment integrity is required, emphasis should be placed on operating the containment in a passive mode as much as possible and on limiting all purging and venting times to as low as achievable.
To justify venting or purging, there must be an established need to improve working conditions to perfom a safety related surveillance or safety related maintenance procedure.
(Examples of improved working conditions would include deinerting, reducing temperature *, humidity *,
and airborne activity sufficiently to permit efficient perfomance or to significantly reduce occupational radiation exposures), and 2.
Maintain the containment purge and vent isolation valves closed whenever the reactor is not in the cold shutdown or refueling mode until su::h time as you can show that:
a.
All isolation valves greater than 3" nominal diameter used for containment purge and venting operations are operable under the most severe design basis accident flow condition loading and can close within the time limit stated in your Technical Specifications, design criteria or operating procedures. The operability of butter-fly valves may, on an interim basis, be demonstrated by limiting the valve to be no more than 30' to 50' open (90* being full open). The maximum opening shall be determined in consultation with the valve supplier. The valve opening must be such that the critical valve parts will not be damaged by DBA-LOCA loads and that the valve will tend to close when the fluid dynamic forces are introduced, and b.
Modifications, as necessary, have been made to segregate the containment ventilation isolation signals to ensure that, as a minimum, at least one of the automatic safety injection actuation signals is uninhibited and operable to initiate valve closure when any other isolation signal may be blocked, reset, or overridden.
- Only where temperature and humidity controls are not in the present design.
1353 275