Letter Sequence RAI |
|---|
|
Results
Other: A01024, Forwards Info Re Five Addl TMI-2 Related Requirements Applying to Operating Reactors Per 800507 Request.Integrated Assessment of Collective Impact of All Requirements Should Be Conducted, A02589, Forwards Addl Info Re safety-related ECCS Tank Outages, Provided Verbally on 821220 in Response to NUREG-0737, Item II.K.3.17, A03501, Requests Addl Time to Provide Info Re 6-inch Containment Purge & Vent Valve Operability.Info Will Be Provided by 831026, ML19210D037, ML19254F792, ML19256A718, ML19256F452, ML19262B985, ML19275A926, ML19310A971, ML19340E921, ML20004B640, ML20008E032, ML20008E564, ML20008F134, ML20054E184, ML20076A987, ML20078N847
|
MONTHYEARML18078A4061978-11-11011 November 1978 Forwards Comments in the Form of Redraft of Commission Paper Re Proposed Fed Register Notice Abnormal Occurrence Event, Loss of Containment Integrity W/Encl Draft Notice of Issuance Project stage: Draft Other ML19256A7181979-01-0303 January 1979 Discusses Unlimited Purging Re Possible Failure of Automatic Isolation of Large Diameter Containment Purge Penetrations Used During Power Operations.Concludes That Bypass & Override Conditions Can Be Identified Project stage: Other ML20076A9871979-04-27027 April 1979 Forwards Proposed Revision to Tech Specs to Allow Unlimited Containment Purges.Revisions Deal W/Containment Isolation Valves Project stage: Other ML19254B3631979-08-29029 August 1979 Forwards Request for Addl Info Re Override of Containment Purge Isolation Project stage: RAI ML19275A9261979-10-18018 October 1979 Forwards Commitment to Meet Requirements of NUREG-0578. Intends to Meet Requirements & Schedules Set Forth in NRC Project stage: Other ML19250A7591979-10-18018 October 1979 Forwards Response to 790913 Request for Commitment to Comply W/Requirements of NUREG-0578.Optimum Method of Addressing Concern,In Recognition of plant-unique Features, Proposed Project stage: Request ML19254F7921979-10-30030 October 1979 Requests Util Commitment to Comply W/Encl Interim Position Re Containment Purge & Vent Valve Operation Pending Resolution of Isolation Valve Operability.Commitment Needed within 45 Days Project stage: Other ML19210D0371979-11-13013 November 1979 Responds to NRC Re Containment Purging & Venting. Vent & Purge Valves at Three Units Qualify W/Nrc Guidelines to Extent Guidelines Apply Project stage: Other ML19211A4411979-11-19019 November 1979 Forwards Request for Addl Info to Complete Evaluation of Electrical Override/Bypass Aspects of Containment Purge Sys Project stage: RAI ML19256F4521979-11-19019 November 1979 Forwards Addl Info Required for Completion of NRC Evolution of Electrical Override/Bypass Aspects of Containment Isolation Matter.Criteria Encl Project stage: Other ML19260C2221979-12-11011 December 1979 Forwards Criteria Re Electrical Override/Bypass for Use in Review of Operating Reactors.Maintaining Purge Valves Closed Does Not Resolve NRC Concern W/Purge Valve Circuitry Project stage: Approval ML19310A9711979-12-27027 December 1979 Requests Preliminary Evaluation of Licensee Response to NRC 791023 Interim Position for Containment Purge & Vent Valve Operation Pending Resolution of Isolation Valve Operability, Generic Item B-24.Evaluation Form Encl Project stage: Other ML19262B9851980-01-16016 January 1980 Responds to NRC 791211 Request Re Containment Purge Sys & Engineered Safety Equipment Component Design.Sys Design & Procedures Utilized for Operation Provide Acceptable Degree of Safety Project stage: Other A01024, Forwards Info Re Five Addl TMI-2 Related Requirements Applying to Operating Reactors Per 800507 Request.Integrated Assessment of Collective Impact of All Requirements Should Be Conducted1980-06-10010 June 1980 Forwards Info Re Five Addl TMI-2 Related Requirements Applying to Operating Reactors Per 800507 Request.Integrated Assessment of Collective Impact of All Requirements Should Be Conducted Project stage: Other ML20008E0321980-10-0606 October 1980 Amend 61 to License DPR-65 Authorizing Cycle 4 Operation at 2,700 Mwt W/Mixed Core w/one-third Westinghouse Fuel & two- Thirds CE Fuel & Modified Guide Tubes for Control Element Assemblies Project stage: Other ML19340E9211980-12-31031 December 1980 Forwards Rept on post-TMI Requirements in Response to NUREG-0737 & NRC Project stage: Other ML20008E5641981-02-27027 February 1981 Provides Justification for Min Containment Pressure Used to Initiate Containment Isolation for Facility,Per NRC 801231 Request Re NUREG-0737.Present Containment Isolation Setpoint Is Adequate & No Reduction in Setpoint Is Warranted Project stage: Other ML20008F1341981-03-0404 March 1981 Forwards ECCS Outage Rept for Facilities for 1980,in Response to NUREG-0737,Item II.K.3.17.No Sys or Tech Spec Mods Are Required Project stage: Other ML20004B6401981-05-20020 May 1981 Advises That No Mods Will Be Made to TMI Action Plan Item II.E.4.2 Re Containment Isolation Dependability.Signals Used for Containment Isolation Are Redundant & Diverse & Adequate to Ensure Safe Operation Project stage: Other A01845, Forwards Info Re NRC Orders Confirming Licensee Commitments on post-TMI Related Issues.Issues Have Been Addressed.If NRC Does Not Allow Util to Reserve Request for Hearing,Ltr Should Be Treated as Hearing Request1981-08-10010 August 1981 Forwards Info Re NRC Orders Confirming Licensee Commitments on post-TMI Related Issues.Issues Have Been Addressed.If NRC Does Not Allow Util to Reserve Request for Hearing,Ltr Should Be Treated as Hearing Request Project stage: Request ML20054E1841982-04-16016 April 1982 Forwards Responses to Generic Ltr 82-05 Re post-TMI Requirements Implementation.Continued Safe Operation Assured W/Existing Implementation Status Project stage: Other A02589, Forwards Addl Info Re safety-related ECCS Tank Outages, Provided Verbally on 821220 in Response to NUREG-0737, Item II.K.3.171982-12-29029 December 1982 Forwards Addl Info Re safety-related ECCS Tank Outages, Provided Verbally on 821220 in Response to NUREG-0737, Item II.K.3.17 Project stage: Other A03035, Forwards Response to NRC Request for Addl Info Re Operability of 6-inch Butterfly Containment Purge & Vent Valves.Based on Analyses,Adequate Justification Does Not Exist to Warrant Mods to Equipment1983-03-28028 March 1983 Forwards Response to NRC Request for Addl Info Re Operability of 6-inch Butterfly Containment Purge & Vent Valves.Based on Analyses,Adequate Justification Does Not Exist to Warrant Mods to Equipment Project stage: Request A03501, Requests Addl Time to Provide Info Re 6-inch Containment Purge & Vent Valve Operability.Info Will Be Provided by 8310261983-10-12012 October 1983 Requests Addl Time to Provide Info Re 6-inch Containment Purge & Vent Valve Operability.Info Will Be Provided by 831026 Project stage: Other ML20078N8471983-10-27027 October 1983 Forwards Response to NRC 830902 Comments on Unresolved Items Re Containment Purge/Vent Review.No Addl Tech Specs or Equipment Mods Warranted.Operability Requirement Met W/Compliance W/Tmi Item II.E.4.2 Project stage: Other A03992, Requests Informal Appeal Meeting W/Nrc to Review Requested Mod of Hydrogen Purge Valves to Close on High Radiation Signal,Per Generic Ltr 84-08 & NUREG-0737,Item II.E.4.2.71984-05-15015 May 1984 Requests Informal Appeal Meeting W/Nrc to Review Requested Mod of Hydrogen Purge Valves to Close on High Radiation Signal,Per Generic Ltr 84-08 & NUREG-0737,Item II.E.4.2.7 Project stage: Meeting 1980-10-06
[Table View] |
Text
.
'gn *
70, UNITED STATES y
,5q g
NUCLEAR REGULATORY COMMISSION E
WASHINGTON, D. C. 20555 N
NOV 1 9 1079 HEMORANDUM FOR:
R. Reid, Chief, Operating Reactors Branch #4, 00R FROM:
G. Lainas, Chief, Plant Systems Branch, D0R
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION - CONTAINMENT PURGE SYSTEM - ARKANSAS NUCLEAR ONE, UNIT 2 (TAC 10212)
Plant Name: Arkansas Nuclear One, Unit 2 Docket No.:
50-268 Project Manager:
G. Vissing Review Status: Awaiting Information Plant Systems Branch has identified the enclosed additional information as being required in order that we can complete our evaluation of the electrical override / bypass aspects of the containment purge matter.
G. Lainas, Chief Plant Systems Branch Division of Operating Reactors
Enclosure:
As stated
Contact:
R. Scholl X-27162 cc w/ enclosure:
D. Eisenhut D. Shum W. Ganmill J. Kerrigan 1607 34)~
L. Nichols G. Knighton G. Lainas V. Noonan E. Reeves F. Witt E. Adensam J. Zudans G. Vissing R. Scholl D. Tondi V[u p t 6 0 l T b
\\
ENCLOSURE g
i REQUEST FOR ADDITIONAL INFORMATION FOR CONTAINMENT PURGE SYSTEM AND CONTAINMENT VENTING SYSTEM FOR ARXANSAS NUCLEAR ONE, UNIT 2
_Dy '.ET NO. 50-368 1.
Your response does not adequately address the following areas.
Please discuss how your design confonns with each:
1 - The overriding
- of one type of safety actuation signal (e.g., radiation) should not cause the blocking of any other type of safety actuation signal (e.g., pressure) to the isolation valves.
2 - Sufficient physical features (e.g., key lock switches) should be provided to facilitate adequate administrative controls.
3 - The system-level annunciation of the overridden status should be provided for every safety system impacted when an override is active.
4 - Diverse signals should be provided to initiate isolation of the containment ventilation system. Specifically, containment high radiation, safety injection actuation, and containment high pressure should automatically initiate Containment Ventilation Isolation (CVI).
5 - The instrumentation and control systems provided to initiate CVI should be designed and qualified as safety-grade equipment.
6 - The overriding or resetting
- of the isolation actuation signal should not cause the automatic reopening of any isolation / purge valve.
2.
Provide the schematic drawing of your purge and vent systen.
- The following definitions are given for clarify of use in this issue:
Override - the signal is still present, and it is blocked in order to perfonn a function contrary to the signal; Reset - the signal has come and gone, and the circuit is being cleared to return to the nonnal condition.