Letter Sequence RAI |
|---|
|
Results
Other: A01024, Forwards Info Re Five Addl TMI-2 Related Requirements Applying to Operating Reactors Per 800507 Request.Integrated Assessment of Collective Impact of All Requirements Should Be Conducted, A02589, Forwards Addl Info Re safety-related ECCS Tank Outages, Provided Verbally on 821220 in Response to NUREG-0737, Item II.K.3.17, A03501, Requests Addl Time to Provide Info Re 6-inch Containment Purge & Vent Valve Operability.Info Will Be Provided by 831026, ML19340E921, ML20004B640, ML20008E564, ML20008F134, ML20054E184, ML20076A987, ML20078N847
|
MONTHYEARML20076A9871979-04-27027 April 1979 Forwards Proposed Revision to Tech Specs to Allow Unlimited Containment Purges.Revisions Deal W/Containment Isolation Valves Project stage: Other A01024, Forwards Info Re Five Addl TMI-2 Related Requirements Applying to Operating Reactors Per 800507 Request.Integrated Assessment of Collective Impact of All Requirements Should Be Conducted1980-06-10010 June 1980 Forwards Info Re Five Addl TMI-2 Related Requirements Applying to Operating Reactors Per 800507 Request.Integrated Assessment of Collective Impact of All Requirements Should Be Conducted Project stage: Other ML19340E9211980-12-31031 December 1980 Forwards Rept on post-TMI Requirements in Response to NUREG-0737 & NRC Project stage: Other ML20008E5641981-02-27027 February 1981 Provides Justification for Min Containment Pressure Used to Initiate Containment Isolation for Facility,Per NRC 801231 Request Re NUREG-0737.Present Containment Isolation Setpoint Is Adequate & No Reduction in Setpoint Is Warranted Project stage: Other ML20008F1341981-03-0404 March 1981 Forwards ECCS Outage Rept for Facilities for 1980,in Response to NUREG-0737,Item II.K.3.17.No Sys or Tech Spec Mods Are Required Project stage: Other ML20004B6401981-05-20020 May 1981 Advises That No Mods Will Be Made to TMI Action Plan Item II.E.4.2 Re Containment Isolation Dependability.Signals Used for Containment Isolation Are Redundant & Diverse & Adequate to Ensure Safe Operation Project stage: Other A01845, Forwards Info Re NRC Orders Confirming Licensee Commitments on post-TMI Related Issues.Issues Have Been Addressed.If NRC Does Not Allow Util to Reserve Request for Hearing,Ltr Should Be Treated as Hearing Request1981-08-10010 August 1981 Forwards Info Re NRC Orders Confirming Licensee Commitments on post-TMI Related Issues.Issues Have Been Addressed.If NRC Does Not Allow Util to Reserve Request for Hearing,Ltr Should Be Treated as Hearing Request Project stage: Request ML20054E1841982-04-16016 April 1982 Forwards Responses to Generic Ltr 82-05 Re post-TMI Requirements Implementation.Continued Safe Operation Assured W/Existing Implementation Status Project stage: Other A02589, Forwards Addl Info Re safety-related ECCS Tank Outages, Provided Verbally on 821220 in Response to NUREG-0737, Item II.K.3.171982-12-29029 December 1982 Forwards Addl Info Re safety-related ECCS Tank Outages, Provided Verbally on 821220 in Response to NUREG-0737, Item II.K.3.17 Project stage: Other A03501, Requests Addl Time to Provide Info Re 6-inch Containment Purge & Vent Valve Operability.Info Will Be Provided by 8310261983-10-12012 October 1983 Requests Addl Time to Provide Info Re 6-inch Containment Purge & Vent Valve Operability.Info Will Be Provided by 831026 Project stage: Other ML20078N8471983-10-27027 October 1983 Forwards Response to NRC 830902 Comments on Unresolved Items Re Containment Purge/Vent Review.No Addl Tech Specs or Equipment Mods Warranted.Operability Requirement Met W/Compliance W/Tmi Item II.E.4.2 Project stage: Other A03992, Requests Informal Appeal Meeting W/Nrc to Review Requested Mod of Hydrogen Purge Valves to Close on High Radiation Signal,Per Generic Ltr 84-08 & NUREG-0737,Item II.E.4.2.71984-05-15015 May 1984 Requests Informal Appeal Meeting W/Nrc to Review Requested Mod of Hydrogen Purge Valves to Close on High Radiation Signal,Per Generic Ltr 84-08 & NUREG-0737,Item II.E.4.2.7 Project stage: Meeting 1981-05-20
[Table View] |
Text
.
'gn *
70, UNITED STATES y
,5q g
NUCLEAR REGULATORY COMMISSION E
WASHINGTON, D. C. 20555 N
NOV 1 9 1079 HEMORANDUM FOR:
R. Reid, Chief, Operating Reactors Branch #4, 00R FROM:
G. Lainas, Chief, Plant Systems Branch, D0R
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION - CONTAINMENT PURGE SYSTEM - ARKANSAS NUCLEAR ONE, UNIT 2 (TAC 10212)
Plant Name: Arkansas Nuclear One, Unit 2 Docket No.:
50-268 Project Manager:
G. Vissing Review Status: Awaiting Information Plant Systems Branch has identified the enclosed additional information as being required in order that we can complete our evaluation of the electrical override / bypass aspects of the containment purge matter.
G. Lainas, Chief Plant Systems Branch Division of Operating Reactors
Enclosure:
As stated
Contact:
R. Scholl X-27162 cc w/ enclosure:
D. Eisenhut D. Shum W. Ganmill J. Kerrigan 1607 34)~
L. Nichols G. Knighton G. Lainas V. Noonan E. Reeves F. Witt E. Adensam J. Zudans G. Vissing R. Scholl D. Tondi V[u p t 6 0 l T b
\\
ENCLOSURE g
i REQUEST FOR ADDITIONAL INFORMATION FOR CONTAINMENT PURGE SYSTEM AND CONTAINMENT VENTING SYSTEM FOR ARXANSAS NUCLEAR ONE, UNIT 2
_Dy '.ET NO. 50-368 1.
Your response does not adequately address the following areas.
Please discuss how your design confonns with each:
1 - The overriding
- of one type of safety actuation signal (e.g., radiation) should not cause the blocking of any other type of safety actuation signal (e.g., pressure) to the isolation valves.
2 - Sufficient physical features (e.g., key lock switches) should be provided to facilitate adequate administrative controls.
3 - The system-level annunciation of the overridden status should be provided for every safety system impacted when an override is active.
4 - Diverse signals should be provided to initiate isolation of the containment ventilation system. Specifically, containment high radiation, safety injection actuation, and containment high pressure should automatically initiate Containment Ventilation Isolation (CVI).
5 - The instrumentation and control systems provided to initiate CVI should be designed and qualified as safety-grade equipment.
6 - The overriding or resetting
- of the isolation actuation signal should not cause the automatic reopening of any isolation / purge valve.
2.
Provide the schematic drawing of your purge and vent systen.
- The following definitions are given for clarify of use in this issue:
Override - the signal is still present, and it is blocked in order to perfonn a function contrary to the signal; Reset - the signal has come and gone, and the circuit is being cleared to return to the nonnal condition.
1607
$46