ML20008E032
From kanterella
Jump to navigation
Jump to search
Letter Sequence Other | |
|---|---|
TAC:42588, (Open) | |
Administration Results Other: A01024, Forwards Info Re Five Addl TMI-2 Related Requirements Applying to Operating Reactors Per 800507 Request.Integrated Assessment of Collective Impact of All Requirements Should Be Conducted, A02589, Forwards Addl Info Re safety-related ECCS Tank Outages, Provided Verbally on 821220 in Response to NUREG-0737, Item II.K.3.17, A03501, Requests Addl Time to Provide Info Re 6-inch Containment Purge & Vent Valve Operability.Info Will Be Provided by 831026, ML19210D037, ML19254F792, ML19256A718, ML19256F452, ML19262B985, ML19275A926, ML19310A971, ML19340E921, ML20004B640, ML20008E032, ML20008E564, ML20008F134, ML20054E184, ML20076A987, ML20078N847 | |
MONTHYEARML18078A4061978-11-11011 November 1978
[Table View]Forwards Comments in the Form of Redraft of Commission Paper Re Proposed Fed Register Notice Abnormal Occurrence Event, Loss of Containment Integrity W/Encl Draft Notice of Issuance Project stage: Draft Other ML19256A7181979-01-0303 January 1979 Discusses Unlimited Purging Re Possible Failure of Automatic Isolation of Large Diameter Containment Purge Penetrations Used During Power Operations.Concludes That Bypass & Override Conditions Can Be Identified Project stage: Other ML20076A9871979-04-27027 April 1979 Forwards Proposed Revision to Tech Specs to Allow Unlimited Containment Purges.Revisions Deal W/Containment Isolation Valves Project stage: Other ML19254B3631979-08-29029 August 1979 Forwards Request for Addl Info Re Override of Containment Purge Isolation Project stage: RAI ML19275A9261979-10-18018 October 1979 Forwards Commitment to Meet Requirements of NUREG-0578. Intends to Meet Requirements & Schedules Set Forth in NRC Project stage: Other ML19250A7591979-10-18018 October 1979 Forwards Response to 790913 Request for Commitment to Comply W/Requirements of NUREG-0578.Optimum Method of Addressing Concern,In Recognition of plant-unique Features, Proposed Project stage: Request ML19254F7921979-10-30030 October 1979 Requests Util Commitment to Comply W/Encl Interim Position Re Containment Purge & Vent Valve Operation Pending Resolution of Isolation Valve Operability.Commitment Needed within 45 Days Project stage: Other ML19210D0371979-11-13013 November 1979 Responds to NRC Re Containment Purging & Venting. Vent & Purge Valves at Three Units Qualify W/Nrc Guidelines to Extent Guidelines Apply Project stage: Other ML19211A4411979-11-19019 November 1979 Forwards Request for Addl Info to Complete Evaluation of Electrical Override/Bypass Aspects of Containment Purge Sys Project stage: RAI ML19256F4521979-11-19019 November 1979 Forwards Addl Info Required for Completion of NRC Evolution of Electrical Override/Bypass Aspects of Containment Isolation Matter.Criteria Encl Project stage: Other ML19260C2221979-12-11011 December 1979 Forwards Criteria Re Electrical Override/Bypass for Use in Review of Operating Reactors.Maintaining Purge Valves Closed Does Not Resolve NRC Concern W/Purge Valve Circuitry Project stage: Approval ML19310A9711979-12-27027 December 1979 Requests Preliminary Evaluation of Licensee Response to NRC 791023 Interim Position for Containment Purge & Vent Valve Operation Pending Resolution of Isolation Valve Operability, Generic Item B-24.Evaluation Form Encl Project stage: Other ML19262B9851980-01-16016 January 1980 Responds to NRC 791211 Request Re Containment Purge Sys & Engineered Safety Equipment Component Design.Sys Design & Procedures Utilized for Operation Provide Acceptable Degree of Safety Project stage: Other A01024, Forwards Info Re Five Addl TMI-2 Related Requirements Applying to Operating Reactors Per 800507 Request.Integrated Assessment of Collective Impact of All Requirements Should Be Conducted1980-06-10010 June 1980 Forwards Info Re Five Addl TMI-2 Related Requirements Applying to Operating Reactors Per 800507 Request.Integrated Assessment of Collective Impact of All Requirements Should Be Conducted Project stage: Other ML20008E0321980-10-0606 October 1980 Amend 61 to License DPR-65 Authorizing Cycle 4 Operation at 2,700 Mwt W/Mixed Core w/one-third Westinghouse Fuel & two- Thirds CE Fuel & Modified Guide Tubes for Control Element Assemblies Project stage: Other ML19340E9211980-12-31031 December 1980 Forwards Rept on post-TMI Requirements in Response to NUREG-0737 & NRC Project stage: Other ML20008E5641981-02-27027 February 1981 Provides Justification for Min Containment Pressure Used to Initiate Containment Isolation for Facility,Per NRC 801231 Request Re NUREG-0737.Present Containment Isolation Setpoint Is Adequate & No Reduction in Setpoint Is Warranted Project stage: Other ML20008F1341981-03-0404 March 1981 Forwards ECCS Outage Rept for Facilities for 1980,in Response to NUREG-0737,Item II.K.3.17.No Sys or Tech Spec Mods Are Required Project stage: Other ML20004B6401981-05-20020 May 1981 Advises That No Mods Will Be Made to TMI Action Plan Item II.E.4.2 Re Containment Isolation Dependability.Signals Used for Containment Isolation Are Redundant & Diverse & Adequate to Ensure Safe Operation Project stage: Other A01845, Forwards Info Re NRC Orders Confirming Licensee Commitments on post-TMI Related Issues.Issues Have Been Addressed.If NRC Does Not Allow Util to Reserve Request for Hearing,Ltr Should Be Treated as Hearing Request1981-08-10010 August 1981 Forwards Info Re NRC Orders Confirming Licensee Commitments on post-TMI Related Issues.Issues Have Been Addressed.If NRC Does Not Allow Util to Reserve Request for Hearing,Ltr Should Be Treated as Hearing Request Project stage: Request ML20054E1841982-04-16016 April 1982 Forwards Responses to Generic Ltr 82-05 Re post-TMI Requirements Implementation.Continued Safe Operation Assured W/Existing Implementation Status Project stage: Other A02589, Forwards Addl Info Re safety-related ECCS Tank Outages, Provided Verbally on 821220 in Response to NUREG-0737, Item II.K.3.171982-12-29029 December 1982 Forwards Addl Info Re safety-related ECCS Tank Outages, Provided Verbally on 821220 in Response to NUREG-0737, Item II.K.3.17 Project stage: Other A03035, Forwards Response to NRC Request for Addl Info Re Operability of 6-inch Butterfly Containment Purge & Vent Valves.Based on Analyses,Adequate Justification Does Not Exist to Warrant Mods to Equipment1983-03-28028 March 1983 Forwards Response to NRC Request for Addl Info Re Operability of 6-inch Butterfly Containment Purge & Vent Valves.Based on Analyses,Adequate Justification Does Not Exist to Warrant Mods to Equipment Project stage: Request A03501, Requests Addl Time to Provide Info Re 6-inch Containment Purge & Vent Valve Operability.Info Will Be Provided by 8310261983-10-12012 October 1983 Requests Addl Time to Provide Info Re 6-inch Containment Purge & Vent Valve Operability.Info Will Be Provided by 831026 Project stage: Other ML20078N8471983-10-27027 October 1983 Forwards Response to NRC 830902 Comments on Unresolved Items Re Containment Purge/Vent Review.No Addl Tech Specs or Equipment Mods Warranted.Operability Requirement Met W/Compliance W/Tmi Item II.E.4.2 Project stage: Other A03992, Requests Informal Appeal Meeting W/Nrc to Review Requested Mod of Hydrogen Purge Valves to Close on High Radiation Signal,Per Generic Ltr 84-08 & NUREG-0737,Item II.E.4.2.71984-05-15015 May 1984 Requests Informal Appeal Meeting W/Nrc to Review Requested Mod of Hydrogen Purge Valves to Close on High Radiation Signal,Per Generic Ltr 84-08 & NUREG-0737,Item II.E.4.2.7 Project stage: Meeting 1980-10-06 |
| ML20008E032 | |
| Person / Time | |
|---|---|
| Site: | Millstone (DPR-65-A-061, DPR-65-A-61) |
| Issue date: | 10/06/1980 |
| From: | Clark R Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20008E033 | List: |
| References | |
| TAC-42588, NUDOCS 8010240098 | |
| Download: ML20008E032 (55) | |
Similar Documents at Millstone | |
|---|---|
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20008E032&oldid=4660688"