ML19250A461

From kanterella
Jump to navigation Jump to search
LER 79-037/03L-0:on 790919,during Normal Operation,Liquid Radwaste Release Was Made in Noncompliance W/Limiting Conditions for Operation.Caused by Operator Failure to Reset Flow Switch to New Required Flow Rate.Operators Admonished
ML19250A461
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 10/19/1979
From: Gahm J
PUBLIC SERVICE CO. OF COLORADO
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19250A460 List:
References
LER-79-037-03L, LER-79-37-3L, NUDOCS 7910230469
Download: ML19250A461 (1)


Text