ML19249D811

From kanterella
Jump to navigation Jump to search
LER 79-063/03L-0:on 790824,daily Core Parameter Check Hat Revealed That Linear Heat Generation Rate Was 13.69 Kw/Ft or Greater than Allowable Max of 13.4 Kw/Ft.Caused by Not Completing All Preventive Measures of LER 1-79-022
ML19249D811
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 09/20/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19249D809 List:
References
LER-79-063-03L-01, LER-79-63-3L-1, NUDOCS 7909250430
Download: ML19249D811 (1)


Text