05000325/LER-1979-051-03, /03L-0:on 790820,position 12 on Rod 06-43 Was Not Indicating.Caused by Short in Prototype Inlet Piping Probe of Notch 12 Reed Switch.Problem Will Be Corrected at First Outage of Sufficient Length to Enter Drywell

From kanterella
(Redirected from ML19249C943)
Jump to navigation Jump to search
/03L-0:on 790820,position 12 on Rod 06-43 Was Not Indicating.Caused by Short in Prototype Inlet Piping Probe of Notch 12 Reed Switch.Problem Will Be Corrected at First Outage of Sufficient Length to Enter Drywell
ML19249C943
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 09/17/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19249C939 List:
References
LER-79-051-03L-01, LER-79-51-3L-1, NUDOCS 7909190316
Download: ML19249C943 (1)


LER-1979-051, /03L-0:on 790820,position 12 on Rod 06-43 Was Not Indicating.Caused by Short in Prototype Inlet Piping Probe of Notch 12 Reed Switch.Problem Will Be Corrected at First Outage of Sufficient Length to Enter Drywell
Event date:
Report date:
3251979051R03 - NRC Website

text