ML19249C939

From kanterella
Jump to navigation Jump to search
Forwards LER 79-051/03L-0
Date released: 09/20/2019 Download: ML19249C939


LER 79-051/03L-0:on 790820,position 12 on Rod 06-43 Was Not Indicating.Caused by Short in Prototype Inlet Piping Probe of Notch 12 Reed Switch.Problem Will Be Corrected at First Outage of Sufficient Length to Enter Drywell
ML19249C943
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 09/17/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19249C943 (1)
Forwards LER 79-051/03L-0
ML19249C938
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 09/17/1979
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19249C938 (1)