05000293/LER-1979-031-01, /01T-0:on 790816,during Seismic Event W/Or W/O Loca,Unit Transformer Breakers A505 & A605 May Not Be Tripped Open Automatically by Existing Trip Signals.Caused by Auxiliary Trip Relays Not Being Seismically Qualified

From kanterella
(Redirected from ML19249B377)
Jump to navigation Jump to search
/01T-0:on 790816,during Seismic Event W/Or W/O Loca,Unit Transformer Breakers A505 & A605 May Not Be Tripped Open Automatically by Existing Trip Signals.Caused by Auxiliary Trip Relays Not Being Seismically Qualified
ML19249B377
Person / Time
Site: Pilgrim
Issue date: 08/28/1979
From: Fulton J
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19249B370 List:
References
LER-79-031-01T, LER-79-31-1T, NUDOCS 7909040345
Download: ML19249B377 (1)


LER-1979-031, /01T-0:on 790816,during Seismic Event W/Or W/O Loca,Unit Transformer Breakers A505 & A605 May Not Be Tripped Open Automatically by Existing Trip Signals.Caused by Auxiliary Trip Relays Not Being Seismically Qualified
Event date:
Report date:
2931979031R01 - NRC Website

text