ML19249A537

From kanterella
Jump to navigation Jump to search
LER 78-078/03X-1 on 781005:false Position Superimposed on Actual Rod Position When Core Position Display Selected. Caused by Grounded Switch on RPI Sys Probe.Switch Wrapped in Fiberglass Tape to Clear Ground
ML19249A537
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/20/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19249A533 List:
References
LER-78-078-03X, LER-78-78-3X, NUDOCS 7908230547
Download: ML19249A537 (1)


Text