05000325/LER-1979-098-01, /01T-0:on 791115,steam Exhaust Check Valve F040 Failed Leak Test.Caused by Sheared Bolt & Nut Lodged in Seat of Reactor Core Isolation Cooling Steam Exhaust Isolation Valve F001.Bolt & Nut Removed.Leak Test Successful

From kanterella
(Redirected from ML19210E630)
Jump to navigation Jump to search
/01T-0:on 791115,steam Exhaust Check Valve F040 Failed Leak Test.Caused by Sheared Bolt & Nut Lodged in Seat of Reactor Core Isolation Cooling Steam Exhaust Isolation Valve F001.Bolt & Nut Removed.Leak Test Successful
ML19210E630
Person / Time
Site: Brunswick 
Issue date: 11/28/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19210E628 List:
References
LER-79-098-01T, LER-79-98-1T, NUDOCS 7912050438
Download: ML19210E630 (2)


LER-1979-098, /01T-0:on 791115,steam Exhaust Check Valve F040 Failed Leak Test.Caused by Sheared Bolt & Nut Lodged in Seat of Reactor Core Isolation Cooling Steam Exhaust Isolation Valve F001.Bolt & Nut Removed.Leak Test Successful
Event date:
Report date:
3251979098R01 - NRC Website

text

(7 77)J LICENSEE EVENT REPORT CONTROL BLOCK: l l

l l

l lh (PLCASE PRINT OR TYPE ALL REQUIRED INFORMATIONI I

6 fo ITl lN lC l Bl El Pl 1l@l0 l0 l-l0 l0 l0 0l 0 -l 0l 0l@l 4l 1l 1l 1l 1l@l lg 7

8 9 LICENSEE CODE 14 15 LICENSE NUMSER 25 26 LICENSE TYPE 40 57 CAT 58 CON'T [TlT) y'og l L @l 0 l 5 l 0l -l 0l 3l 2l 5 @l1 1 l1 5 l7 l9 l@

l l

l l

l@

7 8

60 61 DOCKET NUM8ER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROB ABLE CONSEQUENCES h g

On October 19, 1979, the RCIC turbine failed to start due to a sheared bolt on the l

g l steam exhaust check valve F040 (LER 1-79-74).

The unit resumed power operation with l

lthe RCIC system under an LCO condition while avaiting repair parts.

On November 15 j

o,

p;;7;p 1979, the valve was repaired and a leak test was performed. A pressure could not be l

g [ maintained during this leak rate test.

l ITTT1i Technical Specifications 3.6.1.2b, 6.9.1.8b l

Lo_L8J l I

7 8 9 80 E

CODE S SC E COMPONENT CODE SUS ODE SU E

lC lE lh bh bh l Vl Al Ll Vl El Xl@ lX l@ lD l@

o 9

7 8

9 10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LE RiRo EVENT YE AR REPORT NO.

CODE TYPE No.

@ ~aEg l217l9l l-l Ol 9l 8l l/l l0l1 l Tl l-l W

y 22 23 24 26 27 3

29 30 31 32 KN #

0 ON PLANT Ea HOURS S8 i FOR 8.

SU P,LI E MANUFACTURER l Xl@l Zl@

l_ C_J@ l Z l@

0 l 0l 1l 2l l Yl@

Yj@

lAl@

lA 3l9l5l@

JJ 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h Li_LO_j lAn investigation revealed that the sheared bolt and its accompanving nut had become I

l lodged in the seat of the RCIC steam exhaust isolation valve F001. The bolt and nut l

i,

l vere removed, the valve seat and disk were inspected for damage (none was found), and l lthe leak rate test completed satisfactorily. As in this event, an extensive effort l

gwill be made to locate all missing parts on any future event.

(Cont'd) l 7

8 9 80 ST S

% POWER OTHER STATUS DIS RY DISCOVERY DESCRIPTION

(,C_J@ l 0l0 l0l@lN/A I

(_Aj@l Leak Rate Test l

i s

A!TiviTv COeENT ITT-l [_Z_] @D OF RELEASElZl@lN/A l

l N/A l

RELEASE AMOU47 OF ACTIVITY LOCATION OF RELEASE

',ERSON~ELEx,OSSES OESCR,1,0~@

sum 8ER Tv,E y l0l0l0l@lZl@l N/A l

,ERSO~~EL mu'4ES omR,P1,0~e 1494 260

~mMSER L'_EJ l o I o I o l@l N/A l

7 8 9 11 12 80

'r d*E "o E SCE,'r'ON' '' " h

^

(Z_j@l N/A l

9 7

8 9 to 60 DEscHiPTION O 7 912 050 73 g NR use ONtY ISSUE L2_LaJ LN @l 'l/A J

lllll llllll l_

7 a S 10 68 69 80 5 A. C. Tollison..Ir.

919 - 457-9521 NAME OF PREPARER PHONE:

\\.

LER CONTINUATION - RO# 1-79-98 Facility:

BSEP Unit No. 1 Event Date:

11-15-79 An engineering review of any missing part not located will be performed on any containment or safety system before operation of that system or associated systems is allowed. Maintenance

  • procedures will be revised to address these actions.

1494 261 e

e e

-- m