ML19210E628

From kanterella
Jump to navigation Jump to search
Forwards LER 79-098/01T-0
Date released: 08/12/2019 Download: ML19210E628


LER 79-098/01T-0:on 791115,steam Exhaust Check Valve F040 Failed Leak Test.Caused by Sheared Bolt & Nut Lodged in Seat of Reactor Core Isolation Cooling Steam Exhaust Isolation Valve F001.Bolt & Nut Removed.Leak Test Successful
ML19210E630
Person / Time
Site: Brunswick 
Issue date: 11/28/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19210E630 (2)
Forwards LER 79-098/01T-0
ML19210E627
Person / Time
Site: Brunswick 
Issue date: 11/28/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19210E627 (1)