LER 79-027/01T-0:on 790817,noted That Recent Pipe Hanger Installation Power Operated Relief Valve Cooling Water Lines Would Have Prevented Proper Installation of Pipe Spools. Caused by Pipe Ends Changing Alignment
ML19207C267
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 08/31/1979
From: Gahm J
PUBLIC SERVICE CO. OF COLORADO
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19207C268 List:
References
LER-79-027-01T, LER-79-27-1T, NUDOCS 7909100575
Download: ML19207C267 (1)


Text

(7 77)

. LICENSEE EVENT REPORT (PLEASE PRINT OR TiPE ALL REQUIRED INFORMATION)

CONTROL BLOCK: ,

1 l l l l \

lh 6

o t l C l 0LICENSEE l F l COOE S l V ] 14l l@l15 0 l 0 l- l 0 0 0 l 0 l 0 l- l 0 l 0 25l@l 264 1LICENSE l1 l2TYPE0l@l l j@

57 CATta LICENSE NUM8ER 30 7 8 9 CON'T O 1 ERCE "

l L hj 0 l 5 l 0 l 0 l0 l 2 l 6 68l 7 69@l0 EVENT l8 l1DATE l7 [ 7 l9 74

@]075 l8REPORT l311 l 7 l980l@

DATE 7 8 60 61 DOCK ET NUMB E R EVENT OESCRIPTION AND PROB ABLE CONSEQUENCES h 0 2 lOn August 17, 1979, while operating at app roximate lv 50% of rated power it was deter- l 0 3 l mined that a recent pipe hanger installation on the PCRV cooling water lines would l 0 4 l have prevented proper installation of pipe spools to the high temperature filter ad-O s I sorber coolers. These are required to be installed and operable within 1 1/2 hours ofl 0 s lan extended loss of forced circulation. This does not meet the recuirements of Fort j 0l7 lSt. Vrain Technical Specifications LCO 4.2.18 and is reportable per AC 7.5.2(a)S. I I

a s i SYSTEM CAUSE CAUSE COMP. VA LV E CODE COOE SUSCODE COMPONENT CODE SUSCODE SUSCOOE O 9 I Cl s l@ Is j@ lC [@ l Sl Uj Pl 0l Rl Tl@ A[@ g @ 20 7 8 9 10 11 12 IJ 18 19 SEQUENTI AL CCCURAENCE REPORT REVISION gg m .RO EVENT YE AR REPORT NO. COOE TvPE N O.

@ ,R&Pg 7 l 9l l- l 01 2l 7l l/l l Ol1l lT l -l 0

,,_ 21 22 23 24 26 27 28 29 30 31 32 TAKEN A T ON ON PLA T MET O HOURS S 8 : FoR 9. SUP LI E R MANUFAC RER lJJB [gl34A]@ l33Z l@ l36 Zl@ 31 0l 0l 0 0l 40 y@

41 l42N l@ l43Nl@ 44 G

0 l6 l3 47[@

CAUSE DESCRIPTION AND CORRECTIVE ACTIONS i 0 [ Hanger additions to the system pioing caused the oice ends to change alignment and l lij1 l l =ade the spool pieces inoperable. The spool pieces were modified to fit on the  !

, ml available purification train and will be modified on the other train af ter it is re- l There was no affect on public safety or health.

3 l moved f rom service.

1 e l 7 8 3 90 STA  % POW E R OTHER STATUS Dis O RY OISCOVERY OESCRIPT ON 1 5 lE @ l0l3l0l@l" N/A l lC l@l In House Audit l ACTiviTv CO TENT AMOUNT CF ACTIVITY LOCATION OF RELEASE 1 6 lZl ASED@OF RELE 10 N/A RELEASE lZl@

44 lN/A 45 30 l

7 8 9 11

  1. ERSONNEL f *POSURES NUVSER TYPE O E SCRIPTIC N J 1 2 l0l0l0j@lZl@l N/A l PERSONNEL mu'R5 ES NUMBER DESCR'PTION .h i Ia 0l0l0l@l N/A l d 3 11 12 , 80 W'.*E "fSRPT O

N/A J " @ 7909100675 7

1 9 8 9 12l@l 10 30 e

o ISSUE @DE N/A CRIPTION l ll ll l l l l l l t l}

~

' PHONE:

NAVE OF PREPARER