Letter Sequence RAI |
---|
|
|
MONTHYEARML19168A2312019-07-0505 July 2019 NRC Response to Energy'S Final Response to March 12, 2012, Request for Information Letter Regarding Near-Term Task Force Recommendations 2.1, 2.3 and 9.3 Project stage: RAI 2019-07-05
[Table View] |
|
---|
Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000293/20240022024-08-21021 August 2024 NRC Inspection Report No. 05000293/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24129A1042024-05-26026 May 2024 Preapplication Readiness Assessment Plan for the Holtec Decommissioning International License Termination Plan ML24135A3212024-05-14014 May 2024 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2023 ML24136A2382024-05-14014 May 2024 Annual Radiological Environmental Operating Report for 2023 IR 05000293/20240012024-05-0707 May 2024 NRC Inspection Report No. 05000293/2024001 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 L-24-010, Request for Preapplication Readiness Assessment of the Draft License Termination Plan2024-04-22022 April 2024 Request for Preapplication Readiness Assessment of the Draft License Termination Plan L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) IR 05000293/20230032024-02-29029 February 2024 NRC Inspection Report Nos. 05000293/2023003 and 05000293/2023004 L-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary – November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 And Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23300A0022023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 ML23143A0872023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 And Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 2024-09-18
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555.0001 July 5, 2019 Mr. Brian R. Sullivan Site Vice President Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508
SUBJECT:
PILGRIM NUCLEAR POWER STATION - NRG RESPONSE TO ENTERGY'S FINAL RESPONSE TO THE MARCH 12, 2012, REQUEST FOR INFORMATION LETTER REGARDING NEAR-TERM TASK FORCE RECOMMENDATIONS 2.1, 2.3, AND 9.3 (EPID L-2019-JLD-0003)
Dear Mr. Sullivan:
By letter dated March 12, 2012 (Agencywide Documents Access and Management System (ADAMS Accession No. ML12053A340), the U.S. Nuclear Regulatory Commission (NRC) issued a request for information pursuant to Section 50.54(f) of Title 1O to the Code of Federal Regulations (10 CFR) (hereafter referred to as the 50.54(f) letter), to all nuclear power reactor licensees and construction permit holders in response to lessons-learned from Japan's March 2011 earthquake and subsequent tsunami. Enclosures 1 through 4 to the 50.54(f) letter include information requests regarding Near-Term Task Force (NTTF) Recommendations 2.1 and 2.3 for seismic and flooding hazard actions, and Enclosure 5 includes NTTF Recommendation 9.3 for emergency preparedness, as part of the response to the "Near-Term Task Force Recommendations for Enhancing Reactor Safety in the 21st Century" report, issued July 12, 2011 (ADAMS Accession No. ML111861807). The 50.54(1) letter requests licensees to perform seismic and flooding walkdowns and hazard re-evaluations, and perform emergency preparedness communication and staffing evaluations for prolonged loss of power events.
By letter dated June 10, 2019 (ADAMS Accession No. ML19161A033), Entergy Nuclear Operations, Inc. (Entergy, the licensee) submitted a letter certifying permanent cessation of power operations of Pilgrim Nuclear Power Station (Pilgrim), per 10 CFR Subpart 50.82(a)(1 )(i) and certified that the fuel has been permanently removed from the Pilgrim reactor vessel and placed in the spent fuel pool, per 10 CFR Subpart 50.82(a)(1)(ii). Entergy acknowledged in its letter that, once these certifications are docketed, the Pilgrim license will no longer authorize operation of the reactor, or placement or retention of fuel in the reactor vessel.
By letter dated June 19, 2019 (ADAMS Accession No. ML19170A391 ), Entergy submitted its final response to the 50.54(f) letter regarding NTIF Recommendations 2.1, 2.3, and 9.3.
B. Sullivan In the June 19, 2019, letter, Entergy reaffirmed that Pilgrim is no longer an operating plant, and is a permanently shut down and defueled reactor. Therefore, the licensee considers the requests of the 50.54(f) letter to no longer be applicable to Pilgrim, and no longer plans on proceeding with any further implementation of the requests in the 50.54(f) letter or any alternative approach for NTTF Recommendations 2.1, 2.3 and 9.3.
The NRC staff verified that the Pilgrim certifications are docketed and that the license is no longer authorized for operation of the reactor or placement or retention of fuel in the reactor vessel. Further, the NRC staff has reviewed the licensee's responses to the information requests described in Enclosures 1 through 5 of the 50.54(f) letter and have determined that the requests are no longer necessary for Pilgrim.
No further responses or actions associated with the 50.54(f) letter are necessary for Pilgrim since the licensee is no longer authorized to load fuel into the vessel and potential fuel-related accident scenarios are limited to the spent fuel pool. Unlike the reactor, the safety of fuel located in the spent fuel pool is assured for an extended period through maintenance of pool structural integrity, which preserves coolant inventory and maintains margin to prevent criticality.
Small changes in the flooding hazard elevation would not threaten the structural integrity of a flooded pool. In addition, the staff considered insights from NUREG-2161, "Consequence Study of a Beyond-Design-Basis Earthquake Affecting the Spent Fuel Pool for a U.S. Mark I Boiling Water Reactor" (ADAMS Accession No. ML14255A365). This NU REG concluded that spent fuel pools are robust structures that are likely to withstand severe earthquakes without leaking, and that spent fuel pools accidents are a small contributor to overall risk.
Based on the discussion above, the safety of the fuel stored in spent fuel pools would not be substantially affected by potential changes in the flooding or seismic hazard levels.
Furthermore, within a few months following permanent shutdown of the reactor, the decay heat levels present in the pool become very low. As such, the progression of any accident due to a beyond-design-basis external event would be very slow, and recovery and mitigation actions could be completed over a longer period of time. Thus, spent fuel pool beyond-design-basis accident scenarios at decommissioning reactor sites do not require the enhanced communication and staffing that may be necessary for the reactor-centered events the 50.54(f) letter addresses.
If you have any questions regarding this letter, please contact Mr. Joseph Sebrosky at 301-415-1132 or Joseph.Sebrosky@nrc.gov.
Sincerely, Louise Lund, Director Division of Licensing Projects Office of Nuclear Reactor Regulation Docket No. 50-293 cc: Distribution via Listserv
- " ML19168A231 *concurred via e-mail OFFICE ! NRR/DLP!PBMB/PM NRR!LA ! NSIR/DPR/RLB/BC NRR!DLP/PBMB!BC NAME JSebrosky Slent JAnderson* BTitus*
' DATE 6/21/2019 6/21/2019 6125/2019 7/1/2019
, OFFICE OGC (NLO) NRR/DLP!D j NAME BHams* Llund DATE 7/1/2019 7/5/2019