05000265/LER-2018-001-01, Two Main Steam Isolation Valves (Msivs) Closure Times Exceeded

From kanterella
(Redirected from ML19115A142)
Jump to navigation Jump to search
Two Main Steam Isolation Valves (Msivs) Closure Times Exceeded
ML19115A142
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 04/25/2019
From: Ohr K
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
SVP-19-025 LER 2018-001-01
Download: ML19115A142 (5)


LER-2018-001, Two Main Steam Isolation Valves (Msivs) Closure Times Exceeded
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications

10 CFR 50.73(a)(2)(ix)(A)

10 CFR 50.73(a)(2)(iv)(A), System Actuation

10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor

10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat

10 CFR 50.73(a)(2)(v), Loss of Safety Function

10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown

10 CFR 50.73(a)(2)(vii), Common Cause Inoperability

10 CFR 50.73(a)(2)(i)
2652018001R01 - NRC Website

text

Exelon Generation SVP-19-025 April 25, 2019 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Quad Cities Nuclear Power Station, Unit 2 Renewed Facility Operating License No. DPR-30 NRC Docket No. 50-265 10 CFR 50.73

Subject:

Licensee Event Report 265/2018-001-01 "Two Main Steam Isolation Valves (MSIVs)

Closure Times Exceeded" Enclosed is Licensee Event Report (LER) 265/2018-001-01, "Two Main Steam Isolation Valves (MSIVs) Closure Times Exceeded," for Quad Cities Nuclear Power Station Unit 2.

This report is submitted in accordance with 1 O CFR 50.73 (a)(2)(i)(B) which requires the reporting of any operation or condition that was prohibited by the plant's Technical Specifications.

There are no regulatory commitments contained in this letter.

Should you have any questions concerning this report, please contact Mark Humphrey at (309) 227-2800.

Re:::¥ Kenneth S. Ohr Site Vice President Quad Cities Nuclear Power Station cc:

Regional Administrator - NRC Region Ill NRC Senior Resident Inspector-Quad Cities Nuclear Power Station

NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0104 EXPIRES: 03/31/2020 (04-2018)

Estimated burden. per response to comply with this mandatory collection request: 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />.

~~c-,"')..RR£ac,.('f)'0$1 Reported lessons learned are incorporated into the licensing process and fed back to industry.

'~

LICENSEE EVENT REPORT (LER)

Send comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S.

Nuclear Regulatory Commission,. Washington, DC 20555-0001, or by e-mail to lnfocollects.

'-+.,

~~l (See Page 2 for required number of digits/characters for each block)

Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0104), Office of Management and Budget, Washington, DC 20503. If a means (See NUREG-1022, R.3 for instruction and guidance for completing this form used to impose an information collection does not display a currently valid OMB control number, the http://www.nrc.qov/readinq-rm/doc-collections/nureqs/staff/sr1022/r3/)

NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.

3. PAGE Quad Cities Nuclear Power Station Unit 2 05000265 1 OF 4
4. TITLE Two Main Steam Isolation Valves (MSIVs) Closure Times Exceeded
5. EVENT DATE
6. LER NUMBER
7. REPORT DATE
8. OTHER FACILITIES INVOLVED I

SEQUENTIAL I REV FACILITY NAME DOCKET NUMBER MONTH DAY YEAR YEAR NUMBER NO.

MONTH DAY YEAR N/A N/A FACILITY NAME DOCKET NUMBER 03 19 2018 2018 -

001 01 04 25 2019 N/A N/A

9. OPERATING MODE
11. THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR §: (Check all that apply)

D 20.2201 (bl D 20.2203(a)(3)(i)

D 50. 73(a)(2)(ii)(A)

D 50. 73(a)(2)(viii)(A)

D 20.2201 (d)

D 20.2203(a)(3)(ii)

D 50. 73(a)(2)(ii)(B)

D 50. 73(a)(2)(viii)(B) 4 D 20.2203(a)(1 l D 20.2203(a)(4)

D D

50. 73(a)(2)(iii) 50.73(a)(2)(ix)(A)

D 20.2203(a)(2)(i)

D 50.36(c)(1 )(i)(A) 0 50.73(a)(2)(iv)(A)

D 50. 73(a)(2)(x)

10. POWER LEVEL D 20.2203(a)(2)(ii)

D 50.36(c)(1 )(ii)(A) 0 50.73(a)(2)(v)(A)

D 73.71 (a)(4)

D 20.2203(a)(2)(iii)

D 50.36(c)(2) 0 50.73(a)(2)(v)(B)

D 73. 71 (a)(5) 0 20.2203(a)(2)(iv)

D 50.46(a)(3)(ii) 0 50.73(a)(2)(v)(C)

D 73.77(a)(1) 000 0 20.2203(a)(2)(v) 0 50.73(a)(2)(i)(A)

D 50.73(a)(2)(v)(D)

D 73. 77(a)(2)(i) 0 20.2203(a)(2)(vi)

C8J 50.73(a)(2)(i)(B)

D 50.73(a)(2)(vii)

D 73.77(a)(2)(ii) 0 50.73(a)(2)(i)(C)

D OTHER Specify in Abstract below or in SEQUENTIAL NUMBER 001 REV NO.

01 Updated Final Safety Analysis Report (UFSAR) Section 6.2.4.1 provides the valve closure time for the main steam line being based on the main steam line break accident discussed in Section 15.6. UFSAR Section 15.6 states that the maximum MSIV closure time of 10.5 seconds limits the total amount of liquid and steam lost from the primary system to prevent the core from being uncovered, and ensures the radiological doses are well below the guidelines set forth in 1 O CFR 100. The TS upper limit MSIV closure time of less than or equal to five seconds provides margin to ensure sufficient coolant remains in the reactor vessel to provide adequate core cooling.

Proper adjustment of the MSIV closure times prevents operation outside of the operational and design limits.

Safety Impact Technical Specification 3.6.1.3.6 and the In-Service Testing program require the MSIVs to close in a three to five second time range. Five seconds is fast enough to prevent a gross release of fission products, and three seconds is slow enough to minimize the severity of the pressure transient resulting from isolating the main steam lines during full power operation. Slow MSIV stroke times would challenge the steam release limits of a steam line break outside of containment should the corresponding outboard valve simultaneously fail to close.

The two Unit 2 MSIVs failed to close within the required Technical Specification limit of less than or equal to five seconds. The closure times for those two MSIVs were 5.3 and 5.6 seconds, respectively. However, the two MSIVs closed inside the UFSAR limit of less than or equal to 10.5 seconds. Although the required five second Technical Specification limit was not met for these two MS IVs, the MSIVs were capable of performing the required UFSAR safety function during the operating cycle prior to 02R24.

Furthermore, since the MSIVs were not required to be operable or available at the time of discovery, this condition did not create any actual plant or safety consequences as the unit was not in an accident or transient condition requiring the use of the main steam line isolation valves during this period of time.

Risk Insights The closure times for the two MS IVs were 5.3 and 5.6 seconds and recorded as slow, but the MS IVs did fully close.

The MSIV success criterion in the Plant Probabilistic Risk Assessment (PRA) model, however, does not depend on closure time. Therefore, a difference of a fraction of a second between actual MSIV closure time and the acceptance criterion for the Technical Specification closure time has no effect on the PRA model. As a result, there is no effect on Core Damage Frequency (CDF) or Large Early Release Frequency (LERF).

In conclusion, the failure of the two MSIVs to close within the required time would not have caused the station to exceed the inventory and dose release limits. Furthermore, the impact on risk of this event is negligible. Therefore, the overall safety significance of this event was minimal.

E.

CORRECTIVE ACTIONS

Immediate:

1. Both MSIVs had their airpack manifolds replaced during the outage, 02R24 in 2018.
2.

Both MSIVs were adjusted for proper as-left closure times and retested satisfactorily.

Follow-up:

1. The MSIV lubrication surveillance will be revised to provide additional information on the amount of Super 0-Lube to be used in the airpack manifold solenoid 0-Rinqs.

F.

PREVIOUS OCCURRENCES

SEQUENTIAL NUMBER 001 REV NO.

01 The station events database, LERs, and INPO ICES were reviewed for similar events at Quad Cities. Based on the cause of this event and associated corrective actions, the event listed below, assisted with the resolution of this event.

LER 2017-002-01 Four Main Steam Isolation Valves (MSIVs) Closure Times Exceeded (03/27/2017) - Four Unit 1 MS IVs closed slowly due to an inadequate procedure on how to apply Super 0-Lube to the airpack manifold bottom 0-Ring and environmental conditions in the MSIV Room. Therefore, LER 2017-002-01 provided useful insights associated with this event.

G.

COMPONENT FAILURE DATA

The airpack manifold solenoid is manufactured by Automatic Valve Nuclear (formerly AVCO) [A613] model #C6930-010.

This event has been reported to ICES. Page _4_ of _4_