ULNRC-06496, Nuclear Property Insurance Reporting

From kanterella
(Redirected from ML19085A296)
Jump to navigation Jump to search
Nuclear Property Insurance Reporting
ML19085A296
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/25/2019
From: Wink R
Ameren Missouri, Union Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC-06496
Download: ML19085A296 (5)


Text

Amer MISSOURI en Callaway Plant March 25, 2019 ULNRC-06496 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50.54(w)(3)

Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

RENEWED FACILITY OPERATING LICENSE NPF-30 NUCLEAR PROPERTY INSURANCE REPORTING In accordance with the nuclear property insurance reporting requirements of 10 CFR 50.54(w)(3), the attached report provides the present level of insurance and the sources of insurance that are applicable to the Callaway Plant.

This letter does not contain new commitments.

If there are any questions concerning this letter, contact Roger Wink at 573-310-7025.

Sincerely, ger Wink, Regulatory Affairs Manager DRB Enclosure

::::::::::::: :H. :. :::::.:::::; ::::.

8315 County Road 459 : Steedman, MO 65077  : AmerenMissouri.com

ULNRC-06496 March 25, 2019 Page 2 of 3 cc: Mr. Scott A. Morris Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. L. John Kios Project Manager, Callaway Plant Office ofNuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 09E3 Washington, DC 20555-0001

ULNRC-06496 March 25, 2019 Page 3 of 3 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 6100 Western Place, Suite 1050 FortWorth,TX 76107 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:

F. M. Diya T. E. Herrniann B. L. Cox F. J. Bianco S. P. Banker R. C. Wink T. B. Elwood Corporate Communications NSRB Secretary Mrs. Collette Linder, REP Manager (SEMA)

STARS Regulatory Affairs Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittman LLP)

March 25, 2019 Mr. T. B. Elwood:

Re: Nuclear Property Insurance NRC Property Rule 10 CFR 50.54 (W)

Reporting Requirements The subject NRC reporting requirement stipulates that on April 1 of each year, the licensee for each commercial nuclear reactor site provide to the NRC a description of the nuclear property insurance in force.

Attached is a schedule I have prepared for the current years filing. I understand that all correspondence to the NRC is to be logged via your established numbering system and distribution of copies made according to your established procedure. Accordingly, please file the original at the appropriate time and make the necessary distribution of copies.

Scott J. Wibbenmeyer Attachment cc with attachment:

D. R. Brownawell M. E. Blair

UNION ELECTRIC COMPANY CALLAWAY PLANT NUCLEAR PROPERTY INSURANCE April 1,2018 -

10 CFR 50.54(W) REPORTING REQUIREMENTS I_n accordance with established federal nuclear property insurance reporting requirements [10 CFR 50.54(W)], this is to advise that on April 1, 2019, Union Electric Company will have in force the below listed coverages which are applicable to its Callaway Nuclear Plant.

Non Nuclear Nuclear Events Events 1 . Primary Nuclear Property Insurance

a. Nuclear Electric Insurance, Ltd. $1,460,000,000 $1,460,000,000
b. European Mutual Association for $40,000,000 $40,000,000 Nuclear Insurance
2. Excess Nuclear Property Insurance
a. Nuclear Electric Insurance, Ltd. 1,250,000,000
b. NEIL Specialty Insurance Co. 750,000,000
c. European Mutual Association for Nuclear Insurance 450,000,000 450,000,000
d. NEIL Specialty Insurance Co. 50,000,000 Grand Total $3,200,000,000 $2,750,000,000 Scott Wibbenmeyer Manager Insurance Risk Management