MONTHYEARML23180A1512023-06-29029 June 2023 LLC, Request for Exemption to the Reporting Requirements of 10 CFR 50.46(a)(3) ML21102A3072021-04-15015 April 2021 OEDO-21-00155 - Lessons-Learned from the Design Certification Review of the NuScale Power, LLC, Small Modular Reactor ML21050A4312021-02-19019 February 2021 LLC - Lessons-Learned from the Design Certification Review of the NuScale Power, LLC Small Modular Reactor ML20247J5642020-09-11011 September 2020 Standard Design Approval for the NuScale Power Plant Based on the NuScale 600 Standard Plant Design Certification Application ML20231A8042020-08-28028 August 2020 Final Safety Evaluation Report for the NuScale Standard Plant Design ML20224A4602020-08-25025 August 2020 OEDO-20-00292-Response to the Advisory Committee on Reactor Safeguards Letter on NuScale Power, LLC, Report on the Safety Aspects of the NuScale Small Modular Reactor ML20231A5982020-08-25025 August 2020 OEDO-20-00285_NuScale Area of Focus - Boron Redistribution ML20210M8902020-07-29029 July 2020 Area of Focus - Boron Redistribution ML20195A5872020-07-13013 July 2020 LLC - Submittal of Draft Operator Licensing and Examination Standard for NuScale Small Modular Reactors ML20195C7662020-07-13013 July 2020 LLC Request for Standard Design Approval Based on the NuScale Standard Plant Design Certification Application ML20192A3262020-07-10010 July 2020 LLC, Submittal of Environmental Report: Revision Status ML20198M3932020-07-0202 July 2020 LLC Submittal of Revised Packing Slip for Submittal of the NuScale Standard Plant Design Certification Application, Revision 4.1, Dated June 19, 2020 ML20174A3472020-07-0101 July 2020 OEDO-20-00220 - Area of Focus - Probabilistic Risk Assessment and Emergency Core Cooling System Valve Performance ML20184A2872020-07-0101 July 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Boron Redistribution and General Design Criterion 33, PM-0720-70785, Revision 0 ML20181A4322020-06-22022 June 2020 Final SER for NuScale TR-0516-49416 NON-Loss-of-Coolant Analysis Model, Rev 3 (Letter) ML20181A2702020-06-22022 June 2020 Final SER for NuScale TR-0516-49422 Loss-of-Coolant Analysis Model, Rev 2 (Letter) ML20198M3922020-06-19019 June 2020 LLC - Submittal of the NuScale Standard Plant Design Certification Application, Revision 4.1 ML20171A7312020-06-19019 June 2020 LLC, Submittal of Riser Flow Hole Methodology and Associated Changes to Final Safety Analysis Report Incorporating Its Use ML20157A2232020-06-0303 June 2020 Letter to NuScale Requesting -A for TR-0716-50350 ML20150C5172020-05-29029 May 2020 LLC Submittal of Presentation Materials Entitled NRC Public Meeting Presentation: Boron Redistribution and Associated Design and DCA Changes, PM-0620-70336, Revision 0 ML20150E1772020-05-29029 May 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Extended Dhrs Operation and RCS Boron Redistribution (Closed Session), PM-0620-70243, Revision 0 ML20150C8812020-05-29029 May 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Boron Redistribution and Associated Design and DCA Changes, PM-0620-70244, Revision 0 ML20149M1192020-05-28028 May 2020 LLC Summary of Impacts to Erai 8930 Response and Discussion on the Exemption from General Design Criterion 33 ML20141L8082020-05-20020 May 2020 LLC Submittal of Containment Response Analysis Methodology Technical Report, TR-0516-49084, Revision 3 ML20141N0122020-05-20020 May 2020 LLC Submittal of Changes to Final Safety Analysis Report, Section 6.2, Containment Systems, Section 6.3, Emergency Core Cooling System, and Technical Report TR-0516-49084, Containment Response Analysis Methodology Technical Report ML20141M7642020-05-20020 May 2020 LLC Submittal of Nuclear Steam Supply System Advanced Sensor Technical Report, TR-0316-22048, Revision 3 ML20141L7872020-05-20020 May 2020 LLC, Submittal of Second Updates to Standard Plant Design Certification Application, Revision 4 ML20141L8162020-05-20020 May 2020 LLC, Submittal of Long-Term Cooling Methodology, TR-0916-51299, Revision 3 ML20141M1142020-05-20020 May 2020 LLC Submittal of NuScale Instrument Setpoint Methodology Technical Report, TR-0616-49121, Revision 3 ML20141L8042020-05-20020 May 2020 LLC Submittal of Technical Specifications Regulatory Conformance and Development, TR-1116-52011, Revision 4 ML20128J3162020-05-18018 May 2020 OEDO-20-00167 - Response to the ACRS Letter on Combustible Gas Monitoring ML20133K0882020-05-12012 May 2020 LLC, Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution (Closed Session), PM-0420-69512, Revision 0 ML20133J9142020-05-11011 May 2020 LLC Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution, PM-0420-69511, Revision 0 ML20112F4552020-05-0101 May 2020 LLC, Design Certification Application Phases 5 and 6 Review Status ML20107F8492020-05-0101 May 2020 OEDO-2000140 - NuScale Area of Focus - Helical Tube Steam Generator Design ML20104A0792020-04-27027 April 2020 OEDO-20-00115 - Safety Evaluation Report for Topical Report TR-0516-49416, Revision 2, Non-Loss-of-Coolant Accident Analysis Methodology ML20099H0802020-04-0808 April 2020 LLC - Submittal of Presentation Materials Entitled NRC Public Meeting: Revisions to Nuscale'S EPZ Sizing Methodology Topical Report, PM-0420-69598, Revision 0 ML20098G2372020-04-0707 April 2020 Nuscale Power, LLC Submittal of Remaining Closure Items for the Emergency Core Cooling System Valve Failure Mode Effects Analysis Audit Items ML20097F1922020-04-0606 April 2020 Nuscale Power, LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: Nuscale Topic - Hydrogen/Oxygen Monitoring, PM-0420-69518, Revision 0 ML20094H6742020-04-0303 April 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation NuScale Topic-Probabilistic Risk Assessment with a Focus on Emergency Core Cooling System Analysis PM-0420-69559, Revision 0 ML20092L8992020-04-0101 April 2020 LLC - Submittal of Updates to Standard Plant Design Certification Application, Revision 4 ML20072M6682020-03-30030 March 2020 Response to NuScale Letter Dated February 24, 2020, on Planned SDA Application Content ML20072H3332020-03-0909 March 2020 LLC - Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution, PM-0320-69218, Revision 0 ML20057D9002020-03-0606 March 2020 Submittal of Errata to Final SE for NuScale Power, LLC TR-1010-859-NP-A, Quality Assurance Program Description for the NuScale Power Plant ML20062F7262020-03-0505 March 2020 Request for Withholding Information from Public Disclosure for Nuscale Power, LLC Letter Public ML20069A1572020-03-0404 March 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report-Rod Ejection Accident Methodology, PM-0320-69146, Revision 0 ML20069A1772020-03-0404 March 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report-Non-Loss-of-Coolant Accident, PM-0320-69141, Revision 0 ML20069A9632020-03-0404 March 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report, Loss-of-Coolant Accident Evaluation Model, PM-0320-69138, Revision 0 ML20066G2802020-03-0303 March 2020 LLC, Submittal of Presentation Materials Entitled ACRS Subcommittee Presentation: NuScale Topic - Hydrogen Monitoring, PM-0220-69071, Revision 0 ML20066G2882020-02-28028 February 2020 LLC Submittal of Presentation Materials Titled ACRS Full Committee Presentation: NuScale - Steam Generator Design (Closed Session), PM-0220-69053, Revision 0 2023-06-29
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARRAIO-0420-69855, LLC, Submittal of Corrected Response to NRC Request for Additional Information No. 284 (Erai No. 9225) on the NuScale Design Certification2020-04-30030 April 2020 LLC, Submittal of Corrected Response to NRC Request for Additional Information No. 284 (Erai No. 9225) on the NuScale Design Certification ML19332A1202019-11-27027 November 2019 LLC Supplemental Response to NRC Request for Additional Information No. 484 (Erai No. 8930) on the NuScale Design Certification Application ML19304B4712019-10-31031 October 2019 LLC Supplemental Response to NRC Request for Additional Information No. 466 (Erai No. 9482) on the NuScale Design Certification Application ML19296D8052019-10-23023 October 2019 LLC Response to NRC Request for Additional Information No. 526 (Erai No. 9719) on the NuScale Design Certification Application ML19283E5302019-10-10010 October 2019 LLC Supplemental Response to NRC Request for Additional Information No. 522 (Erai No. 9681) on the NuScale Design Certification Application ML19260G7352019-10-0707 October 2019 Summary of Public Meeting with NuScale to Discuss Response to RAI 9681 ML19266A5872019-09-23023 September 2019 LLC Supplemental Response to NRC Request for Additional Information No. 518 (Erai No. 9659) on the NuScale Design Certification Application ML19262G9742019-09-19019 September 2019 LLC - Submittal of Changes to Final Safety Analysis Report, Tier 1, Section 3.11, Reactor Building and Section 3.13, Control Building, and Tier 2, Section 3.8.4, Design of Category I Structure and Section 14.3, Certified ... ML19262G5762019-09-19019 September 2019 LLC - Submittal of Changes to Final Safety Analysis Report, Section 14.2, Initial Plant Test Program, Table 14.2-2, Pool Cleanup Systems Test #2, and Table 14.2-50, Module Assembly Equipment Test #50 ML19259B8102019-09-16016 September 2019 LLC Supplemental Response to NRC Request for Additional Information No. 205 (Erai No. 9044) on the NuScale Design Certification Application ML19259A0922019-09-16016 September 2019 LLC Response to NRC Request for Additional Information No. 525 (Erai No. 9705) on the NuScale Design Certification Application ML19238A3722019-08-26026 August 2019 LLC Supplemental Response to NRC Request for Additional Information No. 197 (Erai No. 9051) on the NuScale Design Certification Application ML19238A3662019-08-23023 August 2019 LLC - Response to NRC Request for Additional Information No. 523 (Erai No. 9682) on the NuScale Design Certification Application ML19215A0032019-08-0202 August 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 202 (Erai No. 8911) on the NuScale Design Certification Application ML19215A0062019-08-0202 August 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 441 (Erai No. 9485) on the NuScale Design Certification Application ML19212A7622019-07-31031 July 2019 LLC Response to NRC Request for Additional Information No. 523 (Erai No. 9682) on the NuScale Design Certification Application ML19212A3752019-07-31031 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 483 (Erai No. 9516) on the NuScale Design Certification Application ML19212A7992019-07-31031 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 427 (Erai No. 9408) on the NuScale Design Certification Application ML19212A6892019-07-31031 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 205 (Erai No. 9044) on the NuScale Design Certification Application ML19210D1592019-07-29029 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 401 (Erai No. 9447) on the NuScale Design Certification Application ML19210D7342019-07-29029 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 520 (Erai No. 9642) on the NuScale Design Certification Application ML19210E1462019-07-29029 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 197 (Erai No. 9051) on the NuScale Design Certification Application ML19207B3812019-07-26026 July 2019 LLC - Response to NRC Request for Additional Information No. 427 (Erai No. 9408) on the NuScale Design Certification Application ML19207A5342019-07-26026 July 2019 LLC - Response to NRC Request for Additional Information No. 523 (Erai No. 9682) on the NuScale Design Certification Application ML19207B8522019-07-25025 July 2019 LLC Response to NRC Request for Additional Information No. 194 (Erai No. 8884) on the NuScale Design Certification Application ML19203A3152019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 325 (Erai No. 9268) on the NuScale Design Certification Application ML19203A3212019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 333 (Erai No. 9282) on the NuScale Design Certification Application ML19203A3092019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 54 (Erai No. 8837) on the NuScale Design Certification Application ML19203A3422019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 154 (Erai No. 8938) on the NuScale Design Certification Application ML19200A2482019-07-19019 July 2019 LLC Response to NRC Request for Additional Information No. 522 (Erai No. 9681) on the NuScale Design Certification Application ML19200A2082019-07-19019 July 2019 LLC - Response to NRC Request for Additional Information No. 524 (Erai No. 9691) on the NuScale Design Certification Application ML19199A1172019-07-18018 July 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 484 (Erai No. 8930) on the NuScale Design Certification Application ML19198A3252019-07-17017 July 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 249 (Erai No. 9135) on the NuScale Design Certification Application ML19196A3682019-07-15015 July 2019 LLC Response to NRC Request for Additional Information No. 516 (Erai No. 9647) on the NuScale Design Certification Application ML19191A2202019-07-10010 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 197 (Erai No. 9051) on the NuScale Design Certification Application ML19184A6152019-07-0303 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 386 (Erai No. 9316) on the NuScale Design Certification Application ML19176A5802019-06-25025 June 2019 LLC Supplemental Response to NRC Request for Additional Information No. 232 (Erai No. 9113) on the NuScale Design Certification Application ML19170A3702019-06-19019 June 2019 LLC Supplemental Response to NRC Request for Additional Information No. 232 (Erai No. 9113) on the NuScale Design Certification Application ML19168A2442019-06-17017 June 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 325 (Erai No. 9268) on the NuScale Design Certification Application ML19164A1452019-06-13013 June 2019 LLC - Submittal of Containment Response Analysis Methodology Technical Report, TR-0516 -49 08 4, Revision 1 ML19157A3262019-06-0606 June 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 232 (Erai No. 9113) on the NuScale Design Certification Application ML19154A6222019-06-0303 June 2019 LLC Supplemental Response to NRC Request for Additional Information No. 202 (Erai No. 8911) on the NuScale Design Certification Application ML19154A6052019-06-0303 June 2019 LLC Response to NRC Request for Additional Information No. 514 (Erai No. 9645) on the NuScale Design Certification Application ML19151A8372019-05-31031 May 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 377 (Erai No. 9380) on the NuScale Design Certification Application ML19140A4592019-05-20020 May 2019 LLC Supplemental Response to NRC Request for Additional Information No. 401 (Erai No. 9447) on the NuScale Design Certification Application ML19137A2902019-05-17017 May 2019 LLC Supplemental Response to NRC Request for Additional Information No. 156 (Erai No. 9031) on the NuScale Design Certification Application ML19137A2872019-05-15015 May 2019 LLC Response to NRC Request for Additional Information No. 519 (Erai No. 9656) on the NuScale Design Certification Application ML19126A2942019-05-0606 May 2019 LLC Supplemental Response to NRC Request for Additional Information No. 26 (Erai No. 8840) on the NuScale Design Certification Application ML19122A5092019-05-0202 May 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 494 (Erai No. 9548)on the Design Certification Application ML19121A6002019-05-0101 May 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 202 (Erai No. 8911) on Design Certification Application 2020-04-30
[Table view] |
Text
RAIO-0119-64116 January 11, 2019 Docket No.52-048 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738
SUBJECT:
NuScale Power, LLC Supplemental Response to NRC Request for Additional Information No. 489 (eRAI No. 9534) on the NuScale Design Certification Application
REFERENCES:
- 1. U.S. Nuclear Regulatory Commission, "Request for Additional Information No. 489 (eRAI No. 9534)," dated June 15, 2018
- 2. NuScale Power, LLC Response to NRC "Request for Additional Information No. 489 (eRAI No.9534)," dated August 30, 2018
- 3. NuScale Power, LLC Supplemental Response to "NRC Request for Additional Information No.489 (eRAI No. 9534)" dated October 2, 2018 The purpose of this letter is to provide the NuScale Power, LLC (NuScale) supplemental response to the referenced NRC Request for Additional Information (RAI).
The Enclosure to this letter contains NuScale's supplemental response to the following RAI Question from NRC eRAI No. 9534:
06.04-4 This letter and the enclosed response make no new regulatory commitments and no revisions to any existing regulatory commitments.
If you have any questions on this response, please contact Carrie Fosaaen at 541-452-7126 or at cfosaaen@nuscalepower.com.
Sincerely, Zackary W. Rad Director, Regulatory Affairs NuScale Power, LLC Distribution: Gregory Cranston, NRC, OWFN-8H12 Omid Tabatabai, NRC, OWFN-8H12 Samuel Lee, NRC, OWFN-8H12 : NuScale Supplemental Response to NRC Request for Additional Information eRAI No. 9534 NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvalis, Oregon 97330, Office: 541.360.0500, Fax: 541.207.3928 www.nuscalepower.com
RAIO-0119-64116 :
NuScale Supplemental Response to NRC Request for Additional Information eRAI No. 9534 NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvalis, Oregon 97330, Office: 541.360.0500, Fax: 541.207.3928 www.nuscalepower.com
Response to Request for Additional Information Docket No.52-048 eRAI No.: 9534 Date of RAI Issue: 06/15/2018 NRC Question No.: 06.04-4 Regulatory Basis:
10 CFR 52.47(a)(2) requires that a standard design certification application include a final safety analysis report (FSAR) that describes the design of the facility including the principal design criteria for the facility, for which NuScale used the 10 CFR Part 50, Appendix A, "General Design Criteria for Nuclear Power Plants."
General Design Criterion (GDC) 19 requires that a control room be provided with adequate radiation protection to permit access and occupancy of the control room under accident conditions without the personnel receiving radiation exposures in excess of 0.05 Sv (5 rem) total effective dose equivalent (TEDE) for the duration of the accident.
Question:
The applicant's response to request for information (RAI) 9079 discusses the basis for the dose analysis modeling assumption that after 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> (after the control room habitability system (CRHS) is exhausted) the normal control room heating ventilation and air conditioning system (CRVS) is assumed to operate in supplemental filtration mode. The discussion of the CRVS reliability and operability is mainly focused on isolation and filtration component capabilities and backup power. The RAI response did not discuss augmented quality with respect to the capability to recover the CRVS for reasons other than loss of power. NuScale does not consider failure of the CRVS to operate post-72 hours concurrent with a design basis accident (DBA) to be within the design basis for evaluation of the radiological consequences of DBAs. However, if recovery of the CRVS supplemental filtration mode capability within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is not sufficiently and reliably shown to be ensured for accident conditions, then the FSAR Chapter 15 dose analysis assumptions on filtration and removal of radioactive material in the control room NuScale Nonproprietary
ventilation intake are not justified and the dose results may exceed the dose criterion of GDC 19.
Considering that the NuScale FSAR does not include technical specifications for the CRVS, specific testing and inspection requirements for the CRVS are left to the combined license (COL) applicant (COL Item 9.4-1), and the CRVS is not classified as Seismic Category I except for the components that isolate the control room, the staff requires additional information regarding the CRVS supplemental filtration capability to limit dose to control room operators under accident conditions. Specifically, the staff requests the following information in order to complete its review by fully evaluating the importance of the post-72 hours operation of the CRVS supplemental filtration mode on the NuScale design ability to meet the requirements of GDC 19:
Provide a sensitivity analysis, including both a qualitative and quantitative assessment, evaluating the effect on the control room operator dose for DBAs for the case where after the CRHS is exhausted, the CRVS supplemental filtration mode is not recovered within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> as assumed in the DBA control room dose analyses described in FSAR Chapter 15.0.3. Describe the analysis assumptions and inputs, as well as the dose results. For this sensitivity case, would the GDC 19 dose criterion of 5 rem TEDE be met for all DBAs without credit for CRVS filtration after the CRHS is exhausted?
NuScale Response:
Background:
NuScale agreed to submit a supplemental response during a meeting on September 9, 2018 to address the following NRC requests for clarification regarding sensitivity analysis provided in the original response.
- Clarify the assumptions used for the source term sensitivity analysis.
- Clarify the following sentence in the response, It is further noted that the calculation revisions necessitated by this sensitivity study incorporated updated primary coolant source term input to the applicable steam generator tube failure, main steam line break, and small line break DBA evaluations.
- Clarify the assumptions used for the 3 MHA cases. For example, what was used for the aerosol deposition coefficients, and also, what coolant activity concentration were used, and what were the iodine spiking values?
NuScale Nonproprietary
The original response was supplemented to reflect these clarifications (reference RAIO-1018-62021, October 2, 2018).
In a subsequent meeting on November 13, 2018, NuScale agreed to provide follow-on information and evaluate the need for a second supplemental response to address the NRC request for clarification regarding the inleakage assumption of 5 cfm applied in the sensitivity analyses provided in the original response.
Specifically, NuScale was requested to provide justification for the assumed total non-CRHS air intake of 5 cfm ingress/egress inleakage for the sensitivity analyses in comparison with the minimum breathing air supply flow rate value of 80 cfm prescribed in FSAR Table 6.4-1 in order to maintain acceptable levels of CO2 in the control room.
NuScale investigated specifics of the airflow assumption including use of the minimum breathing air supply flow rate value of 80 cfm for breathability listed in FSAR Table 6.4-1 and compared this value with other control room habitability CO2 concentration estimates. It is noted that 80 cfm is the bounding required air supply value, which is based on Equation 3-1 of ASHRAE 62.1, and assumes 20 personnel in the control room envelope (CRE).
In comparison, information on control room habitability from NUREG-0800 SRP 6.4, page 6.4-10, 2, Control Room Personnel Capacity, states that The air inside a 2,830 m3 (100,000 ft3) control room would support five persons for at least 6 days. This CO2 buildup in an isolated emergency zone is not normally considered a limiting problem.
Therefore the required ventilation rate for 20 personnel in the NuScale CRE could alternatively be determined as follows:
This SRP-guidance-based calculation is a better estimate of minimum air supply value than the 80 cfm value which is developed for the purpose of a bounding CRHS performance specification.
NuScale Nonproprietary
A maximum occupancy time until unsafe CO2 buildup for the NuScale control room can be determined using the NuScale design-specific control room volume of 74,680 ft3 and the SRP-based minimum breathable air requirement as follows:
Given these derived values, an alternative inleakage scenario can be assumed wherein after 1.1 days of 5 cfm inleakage/exhaust due to ingress/egress, and otherwise stagnant airflow, the trip of a CO2 high-level alarm prompts a nonspecific action, such as propping open a door, to restore 46.3 cfm of unfiltered airflow to maintain acceptable levels of CO2 in the control room.
However, it is noted that an alternative inleakage flow rate and activation time such as the one discussed here does not have a specific attributable technical basis. It is also noted that in considering alternative airflow sources to support habitability for beyond-design-basis conditions, one might in kind assume nonspecific operator action is taken to restore an alternative source of clean, uncontaminated air to maintain acceptable levels of CO2 in the control room for an accident duration, e.g., filtered airflow from the door or bringing in outside clean bottled air.
Therefore, NuScale asserts the 5 cfm inleakage to the CRE constitutes a credible scenario for operator dose evaluation and is a reasonable and appropriate assumption as applied in the provided sensitivity analyses for the following reasons:
- The sensitivity analyses provided are beyond-design-basis scenarios, i.e., considered to already transcend credibility notwithstanding the assumed CRE air inflow.
- Consideration of an alternative inflow of unspecified origin would represent an additional layer of beyond-design-basis perturbation crediting operator action to a beyond-design-basis sensitivity scenario which is a level of modeling complexity unnecessary to demonstrate safety.
- Similar operator physical limitations to that of CO2 toxicity are not typically addressed in precedence, e.g., evaluating for sufficient drinking water.
- Operator action could be taken in the event of uninhabitable temperatures or atmospheric conditions to preclude the need for supplemental airflow in a beyond-design-basis sensitivity scenario similar to actions described in the response to eRAI 9079/06.04-1 (reference RAIO-1017-56676, October 18, 2017) As added protection against overexposure to radiation, the control room is equipped with area radiation NuScale Nonproprietary
monitors. If the radiation level should exceed preset limits, which will be determined by the licensee in accordance with their radiation protection program, the operators would trip any operating reactors, initiate decay heat removal and containment isolation, and vacate the control room. Each reactor module would then reach safe shutdown conditions without operator action.
Impact on DCA:
There are no impacts to the DCA as a result of this response.
NuScale Nonproprietary