Response to Item 6 of IE Bulleting 75-04A, Provide Information Re Schedule for Accomplishment of Revision to Policies & Procedures, & Summary Reports Detailing Monthly Progress, as Required
ML18219C426
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/30/1976
From: Hunter R
American Electric Power Service Corp
To: James Keppler
NRC/RGN-III
References
IEB-75-004A
Download: ML18219C426 (6)


Text

ACTION ROUTING 'AND TRANSMITTALSLIP TO (Ãnmo, olllcn Tynrnor or loca((on) INI TI ALT CIRCVIATC XE Chief, FOSB XE Chief, EC@ZB O AIL COOND'IIIATION XE:H 4 IH ~ TIALS rltc Lice'nsing(4)

D e ra es OATC INroRMAYIOH J. Rizzo OMXPC 'I IALS NOTC ANO IHI NCTIIRN C. Poslusny, PSB OAT L pcn coN Region"X VCRSAYION Re ion XX I II I T I ALS O'CC MC PDR Local PDR OATC SICNATORC NSXC REhlARKS TXC R. Callen R. Vollen AMERXCAN ELECTRXC POHER SERVXCE CORPORATXON IN)XANA . GAN POHER COMPANY DE C CONC PLANT UNXT 8'1 DOCKET NO,-, 0-315 At:t:ached is a copy of licensee's reply dat:ed March 30, 1976, to XE Bulletin 75-04A.

Do NO'f'sc this form a.. a RECORD of approvals, concurrences, disapprovals, clealances, and similar actions FROht (rvnnror ollirn nyrnbol or location) OAT C G. Eiorelli, XE:XXX 04/05/76 nnoNc OPTIOHAL FORhl 41 ~ IS IO SISSI-I SS2 IO2 am 5QCI-tot ALICVST 15 55 CSA IIPMIZ I A1CIIA) 100 11 COO

.F

'l

ANEHtCtAP4 ELECTRIC PQWVER Servi cc Corporati on 2 F3rnadway, ¹i'.M> )orl', ¹ V. l0005 (252) i522.r5800 IIOI31 13 T S. FI<'FKTFell Vice 5<rcci<iene-<V<<clear En5<ineering<

March 30, 1976 Donald C. Cook Nuclear Plant Docket No. $ 0-315 DPR No. g8 U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region Roosevelt III Road 799 Glen Ellyn, Illinois 60137 Attention: Mr. J. G. Keppler Regional Director Gentlemen:

Item 6 of IE Bulletin 75-04A requires a schedule for accomplishment of any revision to our p'olicies and procedures and any proposed changes to the facility, to assure that consideration'for alternate methods for accomplishing an orderly plant shutdown and cooldown are provided in case of loss of normal and preferred alternate shutdown and cooldown systems at the Donald C- Cook Nuclear Plant. Our letter to you dated tune 27, 1975 provided this schedule.

In addition, Item 6 requests summary reports detailing our monthly progress. This letter is the, ninth such monthly report.

'I All 'required changes to air-operated valves are to be made during the next scheduled outage which starts

'April 10, 1976.

Mechanical and electrical drawings for the local shutdown panels are to be completed by the third week in April 1976. These are to be forwarded to our-

4 I

J. G. Keppler March 30, 1976 vendor for panel fabrication. Panel hardvare such as indicators, breakers, transformers and pover supplies have various scheduled delivery dates but none are later than June 1, 1976. The completed panels are expected be shipped to the plant shortly after this date.

'o Installation would begin immediately upon receipt. 'owever, an outage is required to make electrical connections to one of the three panels-Therefore, ve cannot expect all vrork on these changes to be finished until the first extensive unit outage after delivery of the panels. The connections to this last panel and subsequent testing vill complete the cwork.

Very truly yours, R. S. Hunter Vice President-Nuclear Engineering RSH:mam cc: G. Charnoff R. C. Callen P ~ lf. Steketee R. Nalsh R. J. Vollen R. M. Jurgensen - Bridgman J ~ A- Tillinghast

1