MONTHYEARIR 05000335/20230102024-01-26026 January 2024 NRC Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000335/2023010 and 05000389/2023010 L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) IR 05000335/20230042024-01-24024 January 2024 Integrated Inspection Report 05000335/2023004 and 05000389/2023004 L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23332A1772023-11-28028 November 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals IR 05000335/20230032023-11-0606 November 2023 Integrated Inspection Report 05000335/2023003 and 05000389/2023003 ML23270B8882023-10-23023 October 2023 Regulatory Audit Summary Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structure, Systems, and Components for Nuclear Power Reactors EPID L-2022-LLA-0182 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A1102023-10-0202 October 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1432, Revision 5 L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report IR 05000335/20233012023-09-20020 September 2023 NRC Operator License Examination Report 05000335/2023301 and 05000389/2023301 L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 ML23219A0042023-09-0101 September 2023 Transmittal Letter - Safety Evaluation Related to the SLRA of St. Lucie Plant, Units 1and 2, Revision 1 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 IR 05000335/20230022023-08-0707 August 2023 Integrated Inspection Report 05000335/2023002 and 05000389/2023002 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23212B2652023-07-27027 July 2023 Operator Licensing Written Examination Approval 05000335/2023301 and 05000389/2023301 L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches ML23200A1232023-07-21021 July 2023 Transmittal Letter for the St. Lucie SLRA Review L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) ML23184A0352023-06-30030 June 2023 Notification of St. Lucie Units 1 & 2 Focused Engineering Inspection (FEI) 05000335/2023010 and 05000389/2023010 and Initial Information Request L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) IR 05000335/20234032023-06-29029 June 2023 Security Inspection Report 05000335/2023403 and 05000389/2023403 IR 05000335/20234022023-06-20020 June 2023 Security Baseline Inspection Report 05000335/2023402 and 05000389/2023402 L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal IR 05000335/20234012023-05-16016 May 2023 Cyber Security Inspection Report 05000335/2023401 and 05000389/2023401 (Cover Letter) IR 05000335/20230012023-05-0909 May 2023 Integrated Inspection Report 05000335/2023001 and 05000389/2023001 ML23109A1132023-04-30030 April 2023 SLRA Change Schedule Letter L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response ML23097A1642023-04-17017 April 2023 Summary of March 23, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report 2024-01-08
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARL-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 ML23275A1142023-10-0202 October 2023 Improved Technical Specifications Conversion, Chapter 2.0, Safety Limits, Revision 1 - Volume 4 L-2023-126, Enclosure 1: Contents of Improved Technical Specifications (ITS) Submittal2023-10-0202 October 2023 Enclosure 1: Contents of Improved Technical Specifications (ITS) Submittal ML23275A1262023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 5.0, Administrative Controls, Revision 2 - Volume 16 ML23275A1252023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 4.0, Design Features, Revision 2 - Volume 15 ML23275A1242023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.9, Refueling Operations, Revision 2 - Volume 14 ML23275A1232023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.8, Electrical Systems, Revision 2 - Volume 13 ML23275A1222023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.7, Plant Systems, Revision 2 - Volume 12 ML23275A1212023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.6, Containment Systems, Revision 2 - Volume 11 ML23275A1192023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.4, Reactor Coolant System, Revision 2 - Volume 9 ML23275A1202023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.5, Emergency Core Cooling Systems, Revision 2 - Volume 10 ML23275A1182023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.3, Instrumentation, Revision 2 - Volume 8 ML23275A1162023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.1, Reactivity Control Systems, Revision 2 - Volume 6 ML23275A1172023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.2, Power Distribution Limits, Revision 2 - Volume 7 ML23275A1152023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.0, LCO and SR Applicability, Revision 2 - Volume 5 ML23275A1102023-10-0202 October 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1432, Revision 5 ML23275A1112023-10-0202 October 2023 Improved Technical Specifications (ITS) Revision 2 Submittal Volumes 1 Through 16 ML23275A1122023-10-0202 October 2023 Improved Technical Specifications Conversion License Amendment Request Self-Identified Administrative Changes - Volume 2 L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2022-175, Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-0202 December 2022 Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-154, Subsequent License Renewal Application Revision 1, Supplement 42022-09-22022 September 2022 Subsequent License Renewal Application Revision 1, Supplement 4 L-2022-046, Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal2022-04-13013 April 2022 Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal L-2022-043, Subsequent License Renewal Application Revision 1 - Supplement 12022-04-0707 April 2022 Subsequent License Renewal Application Revision 1 - Supplement 1 ML22010A0962022-01-0505 January 2022 Trp 010 St Lucie SLRA - Boricacidcorrbreakoutq - Makar ML21285A1072021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1 ML21285A1082021-10-12012 October 2021 Enclosure 1: St. Lucie Nuclear Plant, Units 1 and 2, Subsequent Licensee Renewal Application, Revision 1 ML21285A1112021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report L-2021-192, Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report2021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report L-2021-142, Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 20212021-08-0303 August 2021 Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 2021 ML21215A3152021-08-0303 August 2021 Application for Subsequent Renewed Facility Operating Licenses ML21215A3162021-08-0303 August 2021 Enclosure 1: Subsequent License Renewal Application Enclosures Summary ML21215A3192021-08-0303 August 2021 Appendix E - Applicant'S Environmental Report for St. Lucie L-2021-192, Westinghouse, Report LTR-REA-21-1-NP, Revision 1, St. Lucie Units 1 & 2 Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 20212021-05-26026 May 2021 Westinghouse, Report LTR-REA-21-1-NP, Revision 1, St. Lucie Units 1 & 2 Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 2021 L-2020-164, License Amendment to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements2020-12-21021 December 2020 License Amendment to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements L-2020-020, License Amendment Request for RCS Pressure/ Temperature Limits and LTOP Applicable for 55 Effective Full Power Years2020-02-18018 February 2020 License Amendment Request for RCS Pressure/ Temperature Limits and LTOP Applicable for 55 Effective Full Power Years L-2019-091, License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements2019-10-0909 October 2019 License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements L-2019-147, Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG2019-07-19019 July 2019 Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG L-2018-161, License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation2018-12-20020 December 2018 License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation L-2018-182, License Amendment Request Iodine Removal System Elimination2018-11-0909 November 2018 License Amendment Request Iodine Removal System Elimination L-2018-201, Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2018-11-0909 November 2018 Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-2018-147, Submittal of License Amendment Request to Remove the Site Area Map from Technical Specifications2018-08-0202 August 2018 Submittal of License Amendment Request to Remove the Site Area Map from Technical Specifications L-2018-121, License Amendment Request to Reduce the Number of Control Element Assemblies2018-06-29029 June 2018 License Amendment Request to Reduce the Number of Control Element Assemblies L-2018-120, License Amendment Request to Remove the Site Area Map from the Technical Specifications2018-06-25025 June 2018 License Amendment Request to Remove the Site Area Map from the Technical Specifications L-2018-111, Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2018-06-0707 June 2018 Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-2018-049, Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications2018-05-29029 May 2018 Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications L-2018-031, License Amendment Request Focused Adoption of NEI 99-01. Revision 6 Unusual Event Fire-Related Emergency Action Level Scheme2018-01-31031 January 2018 License Amendment Request Focused Adoption of NEI 99-01. Revision 6 Unusual Event Fire-Related Emergency Action Level Scheme L-2017-155, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2017-12-19019 December 2017 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors L-2017-139, License Amendment Request to Add New Required Actions for an Inoperable Auxiliary Feedwater Pump Steam Supply2017-09-14014 September 2017 License Amendment Request to Add New Required Actions for an Inoperable Auxiliary Feedwater Pump Steam Supply 2023-06-14
[Table view] |
Text
AEC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM)
CONTROL NO:
FILE'ROM Plorida Power 6 Light Co DATE OF DOC DATE REC'D LTR TWX RPT OTHER Miami, Pla. 33101 TO: ORIG CC OTHER SENT, AEC PDR A. Giambusso 3 signed SENT LOCAL PDR CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:
70 50 389 DESCR IPTION: ENCLOSURES:
Ltr re their 10-31-74 submittal. Notes Please place this cover sheet with adv that their submittal consist of the submittal dated 10-31-74 and Pinancial Info, ~ will be designated Designated Amdt II'22. ~ ~ ~ ~ ,~~~
hereafter;as Amdt II'23, ,.to the
~ ~ ~
Application... ~ .notarized 11-5-74
'iKKXQWLEDGED SAME DIST AS CONTROL 811254 PL'ANT NAME: St Lucie 02 FOR ACTION/INFORMATION BUTLER (L) SCHWENCER (L) Zl EMANN (L) BEGAN (E)
W/ Copies W/ Copies W/ Copies W/ Copies CLARK (L) STOLZ (L) DICKER (E) LEAR (L)
W/ Copies W/ Copies W/ Copies w/ copies iDQ NQT REjgQ~s
&PARR (L) VASSALLO (L) KNIGHTON (E)
W/+Copies W/ Copies W/ Copies W/ Copies KNIEL (L) PURPLE (L) YOUNGB LOOD (E)
W/ Copies W/ Copies W/ Copies W/ Copies INTERNAL DISTR I BUTION REG FIL TECH REVIEW<' DENTON LIC ASST A/T IND g GRIMES BRAITMAN OGC, ROOM P-506A MUNTZING/STAFF'MACCARY SCHROEDER r GAMMILL
/KASTNER DI GGS (L)
GEAR IN (L)
SALTZMAN B. HURT
,.CASE v KNIGHT BALLARD GOULBOURNE (L)
GIAMBUSSO + PAW LICK I SPANG LE R KREUTZER (E) PLANS BOYD JSHAO LEE (L) MCDONALD MOORE (L) (BWR) i'STELLO ENVIRO MAIGRET (L) CHAPMAN DEYOUNG (L) (PWR) J'HOUSTON ~- .'MULLER REED (E) DU BE w/input SKOVHOLT (L) PNOVAK DICKER SERVICE (L) E. COUPE GOLLER (L)
P. COLLINS
/ ROSS
>IPPOLITO KNIGHTON YOUNG BLOOD SHEPPARD (L)
SLATER (E) D. THOMPSON (2)
DENISE 'TEDESCO e s 'EGAN SMITH (L) KLECKER r
AREG OPR FILE 5 REGION (3)
MOR R IS
/LONG I LAINAS J'ENAROYA
~
~se HAR
.Hsr.
PROJECT LDR LESS W TEETS (L)
WI LLIAMS (E)
',WILSON (L)
EISENHUT STEE LE g VOLIMER EXTERNAL DISTRIBUTION LOCAL PDR 'Pt ~ Pierce', Pla.
+1 TIC (ABERNATHY~W(2)(~NATIONALLABS~lNL 1 PDR-SAN/LA/NY v 1 NSIC (BUCHANAN) 1 ASLBP(E/W Bldg, Rm 529) yr 1 BROOKHAVEN NAT LAB v'1 ASLB 1 W. PENNINGTON, Rm E-201 GT 1 G. ULRIKSON, ORNL 1 Newton Anderson 1 BSM SWINEBROAD, Rm E-201 GT 1 AGMED (RUTH GUSSMAN)
/16 ACRS fZRXNEGL Sent to 1 CONSULTANTS Rm B-127 GT Wilson NEWMARK/BLUME/AGBABIAN 1 R. D. MUELLER, Rm E-201 11-8-74 GT
y!)-,'- it f. 1 4 I I
~ if:r" V 4
IE
~ <<4 I
4
~ ~ ~ ~ ~ i- l' .
'l'>
4 Et f r. PP
)
~ ~ ~ ~ ~ ~ ~ ~ ~
4.4
~ ~
4.'f<<" )
4.'4 .r),
~ ..4'4
- 4) 4
')I'D;-
']f',,, 't 4':
',h
',P'L
':))') r!',)
4'a)
')o......P'
<J 4 f,);It,f;4*'d
.Shre ~
'f'r.',". f I ~
Lf,4. '.,
"c < ~
Venom OI <<oaon@G ~ ~ ~ ~ f4~Pl.~<<f".! r .." 4
) I Ill Pl PI ~
D I EP I 4 4 ~
d Pr 4~ V
~
~ "r, 4 J"4
~ r.) 'f)9'4 'i ~ 4 PE
P. O. B~ 013100, MIAMI, FLORIDA 33101
~
8le
'9eyilatoa 'LORIDA oolt;et 9oo POWER 8E LIGHT COMPANY November 5, 1974 Mr. Angelo Giambusso, Deputy Director for Reactor Projects e Directorate of Licensing @gal(p Office of Regulation U. S. Atomic Energy Commission Washington, DE C. 20545 10'l
+41 I "I jg
Dear Mr. Giambusso:
A+11~
Re: Docket No. 50-389 - St. Lucie Plant Unit No. 2 Amendment 23 to the Ap lication for Licenses In a letter dated Oct:ober 31, 1974, Florida Power 6 Light Company transmitted an amendment to the Application for Licenses Document which contained additional financial information requested by Mr. Olan D.
Parr in his letter of October 16, 1974. That amendment is hereafter designated as Amendment 23 to the Application for Licenses for St.
Lucie Plant Unit No. 2.
Yours very truly, Robert E. Uhrig Vice President 6'IOCIIHBI gAEO REU: td gQ'lt 8 CECggDN cc: Mr. Jack R. Newman gI IL CEClIQII CQIIK PCCIIEI H
3.2438, HELPING BUILD FLORIDA
~ 0 4
STATE OF FLORIDA )
) ss COUNTY OF DADE )
ROBERT E. UHRIG, being first duly sworn, deposes and says:
That he is a Vice President of Florida Power s Light Company, the Applicant herein; That he has executed the foregoing instrument; that the statements made in this said instrument are true and correct to the best of his knowledge, information and belief; and that he is authorized to execute the instrument on behalf of said Applicant.
Robert E. U rig Subscribed and sworn to before me this ~jk day of l974 Notary P lic in and for the County of Dade, State- of Florida
~
IIOTARY PUBLIC, STATE ot FLORIDA at lARGE Jg COMMISSION EXPIRES APRIL My Commission expires ~u ~y~
80IIttKD eau ~YNAhQ sollON4 go 2, 1976
~ ~
/
(
d 1
c 1
AEC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM)
FILE' ROM: Florida Power & Ligh DATE 'OF DOC DATE REC'D LTR TWX RPT OTHE R Miami, Fla/R.E. Uhr ig 10-31-74 11-2-74 TO: A. Giambusso ORIG CC OTHER SENT AEC PDR Yes 3
CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:
. 50-389
~ DESCRIPTION Ltr dtd & notarized 10-31-74 ENCLOSURES:
AMDT $i 22 to the application (Part A.
trans the following fin, info. re: our dtd, notarized 10-31-74.
1tr dtd 10-16-74. ~ ~ ~
& ~ ~ .consisting of EXHIBITS- 1 thru 7 ' . .
~ ~
(3) signed & 25 cys. ~ ~ ~ ~
NOTE: APPLICANT REQUESTED TO SUBMITT NEW AMDT TO rEFLECT AMDT g 22 ~ ~ ~ ~ ~
PL'ANT NAME: St, Lucie Unit '2 Zu/et~ q.
FOR ACTION/INFORMATION BUTLER (L) SCHWENCER (L) Zl EMANN (L) REGAN (E)
W/ Copies W/ Copies W/ Copies W/ Copies CLARK (L) STOLZ (L) DICKER (E) LEAR (L)
W/ Copies W/ Copies W/ Copies W/ Copies
~ARR (L) VASSALLO (L) KNIGHTON (E)
W/copies W/ Copies W/ Copies W/ Copies KNIEL (L) PURPLE (L) YOUNGBLOOD (E)
W/ Copies W/ Copies W/ Copies W/ Copies"
'NTERNAL DISTR I BUTION EG Fl TECH REVIEW DENTON LIC ASST A/T IND R G R I MES P BRAITMAN
~OGC, ROOM P-506A SCHROEDER GAMM ILL DIGGS (L) SALTZMAN
~ CASE MUNTZ N G/STA F F I MACCARY KNIG HT KASTNER BALLARD GEAR IN (L)
GOULBOURNE (L)
Q>Me4fBCT( PETERSON G I AMBUSSO PAWLICKI SPANGLER KREUTZER (E) PLANS BOYD SHAO LEE (L) MCDONALD MOORE (L) (BWR) STELLO ENVI RO MAIGRET (L) CHAPMAN DEYOUNG (L) (PWR) HOUSTON MULLER REED (F) DUSE w/input SKOVHOLT (L) NOVAK DICKER SERVICE (L) E. COUPE GOLLER (L) ROSS KNIG HTON SHEPPARD (L)
P. COLLINS IPPOLITO YOUNG B LOOD SLATER (E) D. THOMPSON (2)
DENISE TEDESCO P REGAN C /Q SMITH (L) KLECKER REG OPR LONG PROJECT LDR TEETS (L) EISENHUT FILE 5 REGION (3) LAINAS St ~ Mary e ~ ~ ~ ~ WILLIAMS(E)
MOR RIS BENAROYA HAR LESS WILSON (L)
STEELE VOLIMER EXTERNAL DISTRIBUTION
~1 LOCAL POR~ Pierce, Fle.
~~ TIC (ABERNATHY) (1)(2)(10) NATIONAL LABS NSIC (BUCHANAN) ~1 ASLBP(E/W Bldg, Rm 529)
W. PENNINGTON, Rm E-201 GT 1
1 PD R-SAN/LA/NY BROOKHAVEN NAT LAB G. ULRIKSON, ORNL 1 AS LB 1 1 Newton Anderson BSM SWINEBROAD, Rm E-201 GT+1 AGMED (RUTH GUSSIVIAN) i-
1 ACRS HOLDING 1
1 CONSULTANTS R.
Rm B-127 GT 3 .NEWMARK/BLUME/AGBABIAN 1 GT D. MUELLER, Rm E-201
n c a
~i~. ~6+
6' FLORIDA POWER 8I LIGHT COMPANY O~ October 31, 1974
+o~rC C
+~deegg~ W pi& ~
0)
Mr. Angelo Giambusso, Deputy Director for Reactor Projects Directorate of Licensing Office of Regulation U. S. Atomic Energy Commission Washington, D. C. 20545
Dear Mr. Giambusso:
Re: Docket No. 50-389 - St. Lucie Plant Unit No. 2 Amendment to. the A lication for Licenses Document Florida Power,6 Light Company hereby submits for your review three (3) signed originals and twenty-five (25) copies of this Amendment to the Application for Licenses Document .fox St. Lucie Plant Unit No. 2 in accordance with 10 CFR 50.33(f) and Appendix C thereto, and 10 CFR 50.71(b).
This amendment consists of additional financial information requested by Mr. Olan D. Parr in his letter of October 16, 1974, and reports an increase in the cost of construction of St. Lucie Unit No. 2 from
$ 488,000,000 (per my letter of August 8, 1974, to Mr. William H. Regan, Jr.)
to $ 536,000,000. This cost increase, resulting from experience with the St. Lucie Unit No. 1 cost figures, consists of approximately $ 20,000,000 increase in contingency allowance, approximately 920,000,000 allowance for changes beyond the scope of the initial contracts and the associated intexest and escalation related to the increase in these two allowances.
Yours ver truly, Robert E. Uhxig Vice President REU:AES:nch Enclosures cc: Mr. Jack R. Newman 1125'>
HELPING BUILD FLORIDA
s
/
Pi
'Jq 1
4W
STATE OF FLORIDA )
.) Ss COUNTY OF DADE )
ROBERT E. UHRIG, being first duly sworn,,deposes and says:
That he is a Vice President of Florida Power & Light Company, the Applicant, herein; That he has executed the foregoing inst:rument; that the statements made in this said instr'ument are true and correct to the best of his knowledge, information and belief; and that he is authorized to execute the'nstrument on behalf of said Applicant.
Robert E. Uhrig Subscribed and sworn to,before.me this '
day of 1974 Nota :Public in,and.for t e County of Dade, Stat of Florida NOTARY PUBLicat Ce oi i iorida at Large My Corrimissio>> expires August 24, 1979 soodco ly Av ro oivrisas IHsuRANcE My Commission expires
S
="n t
I I
II
y , Regulatory Docket No. 50-389 - St. Lucie Plant Unit No.
Financial Information) 2'Additional Amendment to A lication for Licenses Document October 31 1974 This amendment with the enclosed information is provided in response to your request for additional data in support of our application for a Construction Permit for St. Lucie Plant Unit No. 2. The information provided in this Amendment updates and supersedes the information submitted in Amendment ll to the Application for Licenses dated April ll, 1974; The responses in this amendment are keyed to the question numbers in the enclosure to Mr. Olan D. Parr's letter of October 16, 1974.
40.1 Exhibit 1 attached provides the most recent cost estimates for the subject facility grouped as follows: (a) total nuclear production costs; (b) transmission, distribution and general plant costs; and (c) nuclear fuel inventory cost for the first core. Exhibit 2 attached is the completed schedule titled, "Plant Capital Investment Summary",
using the most'recent cost estimates.
40.2 St. Lucie Plant Unit No. 2 is to be financed as an integral part of FPL's total construction program in the same general manner as other additions to its generating facilities. Therefore, as requested, the completed schedule titled, "Sources of Funds for System-Wide Construction Expenditures During
Period of Construction of Subject Nuclear Power Plant",
is attached hereto as Exhibit 3.
40.3 'PL has executed a letter of intent and is currently in the process of negotiating a contract for the purchase of nuclear fuel for St. Lucie Plant Unit No. 2 from Combustion Engineering.
40.4 As stated in the initial License Application, the earliest estimated date for completion of construction of this facility is September 1, 1978 and the latest estimated date for completion of construction is July 1, 1981.
40.5 A copy of the FPL preliminary prospectus dated October 30, 1974 is included in the FPL Registration Statement on Form S-7 attached as Exhibit 4.
40.6 The information requested under this paragraph is set forth in Exhibit 4 (Form S-7):
(a) Income Statenients for 12 months ended September 30, 1974 and for 12 months ended December 31, 1973 are shown
'n page 7 of Exhibit 4.
(b) Retained Earnings Statements for 12 months ended September 30, 1974 and for 12 months ended December. 31, 1973 are shown on page 28 of Exhibit 4.
(c) Balance Sheets for 12 months ended September 30'974 and for 12 months ended December 31, 1973 'are shown on pages 26 and 27 of Exhibit 4.
40.7 Exhibit 5 is a copy of the most recent FPL Bond Application which includes an Officer's Certificate.
Included in this Bond Application is a Net Earning Certificate showing interest coverage for the twelve month period ended February 28, 1974. There is no debt ratio limitation in FPL's Mortgage and Deed of Trust applicable to the issuance of first mortgage bonds. The applicable provisions of the Mortgage and Deed of Trust concerning limitation on the issuance of additional first mortgage bonds are set forth on page 2 of Exhibit 6 attached discussed in 40.8.
40.8 Calculations of net earnings and interest coverage for the most recent twelve month's period (September 30, 1974) using the definitions of net earnings and annual interest requirements (on debt presently outstanding) set forth in the mortgage bond indenture are shown on Exhibits 6 and 7 attached. The above calculations for net earnings and interest are subject to matters set forth under the second paragraph under "Financing Program" on .page 5 of FPL's Preliminary'rospectus dated October 30, -1974 included i.n FPL's
Registration Statement on Form S-7 attached as Exhibit 4.
The provisions of the Mortgage and Deed of Trust concern-ing limitations on the issuance of first mortgage bonds (Exhibit 6, p.2) contain two alternative methods for determining the permissable amount of additional first mortgage bonds which may be issued. Other provisions of the Mortgage and Deed of Trust limit the amount of first mortgage bonds which can be issued by requiring that the value of Property Additions be 166% of the value of the bonds sought to be issued.
As of September 30, 1974 bondable Property Additions totaled $ 515,281,481 which would support the issuance of $ 309,181,256 in first mortgage bonds. Consequently, although calculations under the second alternative in the provisions of .the Mortgage,and Deed of Trust would indicate that the issuance of an additional $ 1,165,367,920
.in first mortgage bonds would be permitted (Exhibit 6),
the amount of available bondable Property Additions as of Septembe'r 30, 1974 limits the amount of bonds which could be issued to $ 309,181,256. Assuming an interest rate of 11%, a rate considered realistic by FPL, this additional $ 309,181,256 principal amount of first mortgage ~
bonds could be issued based on the interest coverage limitation contained in the first alternative in the provisions of the Mortgage and Deed of Trust (See Exhibit 7).
0 October 31, 1974 FLORIDA POHER 6 LIGHT COMPANY ST. LUCIE UNIT NO. 2
. Re'gulatory File Cp.
Estimate of Construction Costs
'Bacelvod w/Ltt'ated Total Nuclear Production Plant C osts ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ $ 536,000,000 (Note 1)
Transmission, Distribution, and General', Plant 'Cos ts 250,GOO (Note 2)
Nuclear, Fuel Inventory Cost for First Core .26,000,000 (Note 3)
(Note 1) The nuclear production plant cost is based on (1) a contract with Combustion Engineering and estimated escalation, (2) a contract with Ebasco providing a firm price for engineer-ing and home office services, (3) engineering estimates of labor, materials, and construction costs including escalation, (4) Applicant's estimated costs for engineering, consulting services, training, startup, and sales tax, and (5) a firm price contract with Westinghouse Electric Corporation for a turbine-generator. In accordance with Applicant's established policy, 'the cost of land is excluded.
(Note 2) No additional. "Transmission", "Distribution",
Plant" facilities are required beyond, those supplied and'General for St. Lucie Unit No. 1 except for the addition of a third switchyard bay.
(Note 3) Nuclear fuel inventory costs for first core are estimated for'he supply of a complete core including uranium, enrichment and fabrication. No special nuclear material leased from the Atomic Energy Commission will be utilized in the plant.
'Exhibit 1
alsol((((4 (((a( (,(~
- R~gul jtorjj'ife Cv.
October 31, 1974 PLA!sT CAPXTAL XNVES i.!ENT Sl99!ARY BASIC DATA Name of plant (St. LuCie Unit 2 Cost basis.'at stazt of construction Net capacity 810 . 10$ (e) $ 536i555<000 Reactor type Location Hutchinson Is an . T e of ooolin
. Run of river Desi n and construction neriod Natural d raf t e cooling towers Honth, year MSSS order. lfechanical draft placed Oc~t~2 cooling .towers Month, year of cormercial (
operation Dec. 1979 pipeline intake with canal; Length of workweek 40 hrs wk. .canal dischaxge to off shore Interest rate, interest pipeline.
during cons truction 8 5%/year COST SIF:""!ARY Account Number. Account Ti tie Votal Cost
{thousand dollars)'0 DXRECT COSTS Land and land rights.........,...,,...,.
PIIYSXCAL.PLANT 21 Structures and site facilities..
22 Reactor plant equipment......... ~ ~ ~ ~ ~ ~ ~ e 124 537 23 Turbine plant equipment......... ~ ~ ~ ~ ~ ~ ~ ~ 44 180 24 E3.ectric plant equipment..'...... 36,436 25 Hisc. plane equipmcnt.......;... ~ ~ ~ ~ ~ ~ ~ e 4,858 Subtotale ~ ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 4 316 891 Spa e parts allovance........,.. ~ e ~ ~ ~ ~ ~ ~
Contingency allowance........... ~ ~ ~ ~ ~ ~ ~ ~ 55,689
.Subtotal.....-,.......... ~ ~ ~ ~ ~ ~ ~ ~ 0 372 S80 INDIRECT COSTS 91 Construction facilities, equip't, and Services ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ ~ ~ 39,069 92 Engineering and const. mg't. services... 13 023 93'4 0 'ther cos'ts ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ 16 450 Interest during construction............
r 95 433 S Ub to'ta 1 ~ ~ ~ ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ $ 163 975 Start of construction cost.............. $ 636 669 Rscalat.ioo <luri>>g construction ( / yr.) varies galls-149)
Total plant capital iovestmcnt {4 'IQP) $ 662.~41 ei
FLORIDA POWER 88 LIGHT COMPANY October 31, 1974 SOURCES OF FUNDS FOR SYSTEM-HIDE CONSTRUCTION EXPENDITURES DURING, PERIOD OF CONSTRUCTION OF ST. LUCIE g2 NUCLEAR POWER PLANT 000) 1973 1974 1975 1976 1977 1978 1979 Security Issues and Other Funds Common Stock Preferred Stock f 44,812 40,013 0 f125, 60,000 $ 70,000 $ 30,000 f 35,000 f 50,000 50, 000 000 25, 000 30,000'70, 35,000 35, 000 Long Term Debt 148,023 375, 000 175,000 150, 000 000 200,000 250, 000 Notes Pavable 44 0 0 0 0 0 0 Other 0 0 4o,ooo 0 0 0 0 Total External Funds $ 232,892 4~255000 $ ~005000 $ 2455000 $ 230,000 $ 270,000 $ 335,000 J
Internal Funds Total From Retained Earnings, gorki.ng Capital and Other Internal Sources (1) $ 126,493 $ 168 829 $ 169.766 $ 201.748 $ 306 481 $ 326.716 $ 352.500 Total Construction Budget 8359,385 8593,889 $ 569, 766 $ 446. 748 $ 536, 481. $ 596. 716 $ 687 5OO Construction E enditures Nuclear Power Plants $ 94,017 $ 104,770 $ 128,687 4 .74,337 $ 146, 962 $ 222,347 $ 275,091 Other 865,385 489,059 44m o79 372.411 389,519 374,369 412,409 Total 8359,385 8593.889 $ 569,766 $ 446,748 $ 536,481 8596 n6 $ 687,5oo St. Lucie g2 6;584 8 59.657 8 45.837 8 69,277 8>86.747 )V5,om (1) Breakdown of Internal Sources not available Exhibit 3
~ ~ ~