ML18033B623

From kanterella
Jump to navigation Jump to search
LER 90-005-00:on 901231,reactor Bldg Vent Exhaust Monitor Removed from Svc Causing Compensatory Sample to Be Isolated. Caused by Inadequate Design Review.Procedures Revised to Utilize New Sample Taps on Refuel floor.W/910128 Ltr
ML18033B623
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 01/28/1991
From: Bynum J, Jay Wallace
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-90-005-04, LER-90-5-4, NUDOCS 9102070197
Download: ML18033B623 (16)


Text

'

I

~ FORD 1 REGULATORY'NFORMATION DISTRIBUTION SYSTEM (RIDS)

.l ACCESS10N'BR:9102070197 'DOC.DATE: 91/01/28 NOTARIZED: NO DOCKET ¹

>>'~ FACIL:50-296 Browns 'Ferry Nuclear Power Station, Unit 3, Tennessee 05000296 AUTH. NAME AUTHOR AFFILIATION WALLACE,J.E. Tennessee 'Valley Authority BYNUM,J.R. Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

LER 90-005-00:on 901231,reactor bldg vent exhaust, monitor

.removed from svc causing compensatory sample to be isolated.

Caused by. inadequate design review. Procedures revised to utilize new sample taps on refuel floor.W/910128 ltr..

'DISTRIBUTION CODE: IE22T COPIES RECEIVED'.LTR' ENCL / SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.

NOTES: 1 Copy each to: S. Black,, B. WILSON 05000296 RECIPIENT COPIES RECIPIENT COPIES'TTR lD CODE/NAME LTTR'NCL ID CODE/NAME ENCL KREBS,M. 1 1 HEBDONPF 1 1 ROSSiT. 1 1 INTERNAL: ACNW 2 2 ACRS 2 2 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 AEOD/ROAB/DSP .2 2 NRR'/DET/ECMB 9H 1 1 NRR/DET/EMEB'E 1 1 NRR/DLPQ/LHFB11 1 1

'NRR/DLPQ/LPEB10 1 1 NRR/DOEA/OEAB 1 1 NRR/DREP/PRPB11 2 2' NRR/DST/SELB 8D 1 1 NRR/DST/SICH 7E 1 SPLB8D1 1 1 NRR/DST/SRXB '8E 1 1 EG 02 1 1 RES/DSIR/EIB 1 1 RGN2 FILE 01 1 1 EXTERNAL EG&G BRYCE P J H L ST LOBBY WARD 1 1 NRC PDR NSIC MAYS,G 1 1

'NSIC MURPHY,G.A NUDOCS FULL TXT 1 1

.NOTES: 5 FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR ,38 ENCL 38

0 II Tennessee Valley Authonty, 1 tot Market Street. Chattanooga, Tennessee 37402 Joseph R. Bynum Vice President. Nuclear Operations JSN 28 l99t U.S. Nuclear Regulatory Commission ATTN: Document Control Desk tttashington, D.C. 20555

Dear Sir:

TVA BROWNS FERRY NUCLEAR PLANT (BFN) UNIT 3 DOCKET NO. 50-296 FACILITY OPERATING LICENSE DPR-68 REPORTABLE OCCURRENCE REPORT BFRO-50-296/90005 The enclosed report provides details concerning the reactor building vent exhaust monitor removed from services. This caused a compensatory sample to be isolated,, thereby causing technical specification monitoring requirements to be exceeded. This report is submitted in accordance with 10 CFR 50.73(a)(2)(i)(B).

'Very truly yours, TENNESS E VALLEY AUTHORITY Jo o 'num Vice Presiden Nuclear Operations Enclosure cc: see page 2 9i02070197 pi0l28 0500029'6 PDR ADQCK S

0 U.S. Nuclear Regulatory Commission

'JAN 28 les~

cc (Enclosure):

INPO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339 NRC Resident Inspector, BFN Regional Administration U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 2900 Atlanta, Georgia 30323 Thierry M. Ross U.S. Nuclear Regulatory Commission One 'White Flint, North 11555 Rockville,Pike Rockville, Maryland 20852

0 ll NRC Form 366 U. CLEAR REGULATORY COHHISSION Approved OHB No. 3150-0104 (6-89) Expires 4/30/92 LICENSEE EVENT REPORT (LER)

FACILITY NAHE (1) IDOCKET NUMBER,(2) I nl 1 TITLE (4) When the reactor building vent exhaust monitor was removed from service, a compensatory sample w 1 m i V NT 0 NV VD

) / I I ISEQUENTIAL ( /REVISIONI I I I FACILITY NAHES )DOCKET NUHBER(S)

Y Y H R D I I I I I I I I 012991 I I I

'5:

I OPERATING I ITHIS REPORT IS SUBHITTED PURSUANT TO THE REQUIREHENTS OF 10 CFR HODE I I I i20.405(c) I50.73(a)(2)(iv) l73 71(b)

POWER I )20.405(a)( l)(i) i50.36(c)(l) )50.73(a)(2)(v) ]73.71(c)

LEVEL i I l20.405(a)( 1)(ii) )50.36(c)(2) (50.73(a)(2)(vii) )OTHER .(Specify in Abstract below and in 1 IK IS0.73(a)(2)(i) (50.73(a)(2)(viii)(A) )

)20.405(a)( 1)(iv) I l50 73(a)(2)(ii) (50'.73(a)(2)(viii)(B) ) Text, NRC Form 366A) 1 NAHE

] AREA CODE ]

I n i n n r HP N I E A H HP N E D O'HI I I IREPORTABLEI I I I I IREPORTABLEI YTH HPN T N T N D H P T N T 0 I I I -I P N PRT P TO 14 I EXPECTED ( NT D .

Y AR I I SUBMISSION I I I i' 1 T BHI I N AT 'N ABSTRACT (Limit to 1400 spaces, i.e., approximately fifteen single-space typewritten, lines) (16)

On December 31, 1990 at 0530 hours0.00613 days <br />0.147 hours <br />8.763227e-4 weeks <br />2.01665e-4 months <br />, TVA discoverhd that during the reactor building vent exhaust monitor source calibration and functional test, monitor 3-RM-90-250

[MON] was val'ved out several'imes for periods of less than three hours. The aggregate time that the monitor was out of service was estimated to be 12 hours.

The closure of these valves isolated the temporary continuous moni.'toring system that had'een installed to satisfy,p1:ant technical specification requirements.

The cause of the event was an inadequate design review. With the design as it was, the calibration Surveillance Instruction (SI) and a chemistry sample procedure could not be performed simultaneously as required. A contributing cause was a misinterpretation of the technical specification requirements.

The immediate corrective action was to isolate the affected vents, thereby invalidating the need for a compensatory sample and the SI was completed.

Additional corrective actions taken to prevent recurrence were: (1) upstream chemistry sampling points were installed and (2) responsible organization will revise cal'ibration and functional test SIs for the 10 effluent CAMs to clarify sampling requirements when monitor is inoperable, prior to Unit 2 restart.

NRC Form 366(6-89)

II NR Form 3 A U.S. LEAR REGULATORY C HHIS ION Approve HB No.

(6-'89) Expires 4/30/92 LICENSEE EVENT 'REPORT (LER)

TEXT CONTINUATION FACILITY NAHE (1) [DOCKET NUHBER (2)

I I I'SEQUENTIAL I IREVISIONI I I I I I I I 1 I rwn r TEXT (If more space is required, use additional NRC Form 366A's) (17)

On December 31, 1990 at 0530 hours0.00613 days <br />0.147 hours <br />8.763227e-4 weeks <br />2.01665e-4 months <br />, TVA discovered that during the reactor building vent exhaust monitor source calibration and functional test, monitor 3-RM-90-250 [MON] was valved out several times for periods of less .than three hours., The aggregate time that the monitor was out of servi.ce was estimated to be 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

At 1410 hours0.0163 days <br />0.392 hours <br />0.00233 weeks <br />5.36505e-4 months <br /> on December 30, 1990, SI 3-SI-4.2'.K.2.a, reactor building vent exhaust monitor 3 RM-90-250 source calibration and functional test for the calibration of 3-RM-90-250, was started. Gaseous effluent'adiation monitor 3-RM-90-250 had been previously removed from service to install a newer monitor. The exhaust. monitor measures the amount of noble gas, radioiodine, and particulates being released from three sample points (i.e., Reactor Building Ventilation System [VS], Turbine Building Ventilation System [VK],, and Refuel Floor Ventilation System [VG].

At 1800 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.849e-4 months <br />, inlet isolation valves to 3-RM-90-250 were closed in accordance with the survei;llance instruction. At 1920 hours0.0222 days <br />0.533 hours <br />0.00317 weeks <br />7.3056e-4 months <br />, a radiochemical'aboratory analyst (RLA) (Non-li.censed Utility) noted the 3-RM-90-250 temporary sampler was running, but the Reactor, Refuel, and Turbine Building Zones were isolated.

Instrumentation and controls (I&C) personnel (Non-licensed Utility) opened the valves to allow the RLA to obtain a grab sample and said the valves had only been closed a few minutes. At this time, the I&C section presumed that the grab sample satisfied all actions of Table 3.2.K. The incident was reported to the chemistry control shift supervi.sor.

,At 0600, on December 31, 1990, 3-SI-4.2.K.2.a was stopped by the shift operation supervisor (Licensed utility). Also, the inlet isolation valves were opened.

During, this event, all three units were defueled and no fuel handling or operations over the spent 'fuel were performed. This event is reportable in accordance with 10 CFR'0.73(a)(2)(i)(B), an operation prohibited by the technical specifications.

NRC Form 366(6-89)

0 NRC Form 366A U.S. EAR REGULATORY COHHISSION Approved OHB No. 3150-0104 (6-89) Expires 4/30/92 LICENSEE EVENT REPORT (LER)

TEXT CONTINUATION FACILITY NAHE (1) iDOCKET NUHBER (2)

I J SEQUENTIAL I. )REVISION(

I A 0 I I I I TEXT (If more space is required, use additional NRC Form 366A's) (17)

The Continuous Air Monitors take an isokinetic sample of various exhaust ventilation effluents and the release rate for each activity is recorded on the control room strip chart recorder. A high radioactivity or monitor malfunctions alarms in the main control, room. Since this monitor does not initiate an isolation signal, the system is not essential during a transient or accident; consequently, no redundancy is required.

During the modification for the monitor replacement, the inlet piping was cut out and new piping was installed. This installation eliminated an upstream chemistry sample point. The required chemistry sample was being obtained on the monitor's front panel in accordance with chemistry procedure O-SI-4.8.B.l.a.2, A'irborne Effluent Release Rate By 'Manual Sampling.

The compensatory sampling was in place to satisfy the requirements of technical specification Table 3.2;K Actions A, B, and D which state the following:

Action A: "With the number of channels OPERABLE less than required by the Minimum Channels Operable requirement, effluent releases via the affected pathway may continue provided a temporary monitoring system is installed or grab samples are taken and analyzed at least once every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />."

Action B: "With a number of channels OPERABLE less than required by the Minimum Channels Operable requirement, effluent releases via this pathway may continue provided samples are continuously collected with auxiliary sampling equipment for periods on the order of seven (7) days and analyzed in accordance with the sampling and analysis program specified in the REM within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> after the end of the sampling period."

Action D: 'With the number of channels OPERABLE less .than required by the Minimum Channels Operable requirement, effluent releases via this pathway may continue provided the flow rate is estimated at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />."

The absence of continuous monitoring could have resulted in an unmonitored release to the environment when continuous sampling was disrupted for approximately 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. An evaluation of the available data indicates that there was a low probability that any radiological release via this pathway had occurred because of the current plant condition. Finally, the isolation signals for these systems are generated from a Geiger-Muller type detector, externally attached to the effluent ducts-NRC Form 366(6-89)

Cl ~I NRC Form 366A U.S. LEAR REGULATORY COHHISSION Approved OHB No. 3150-0104 (6&9) Expires LICENSEE EVENT REPORT (LER)

TEXT CONTINUATION 4/30/92'ACILITY NAHE (1) IDOCKET NUHBER (2)

I /SEQUENTIAL ) /REVISION(

I I I I I TEXT (If more space is required, use additional NRC Form 366A's) (17)

The root cause of the m'issed compensatory sampling was an oversi.ght in the design review for the installation of the new exhaust monitors to ensure

.compensatory sampling could be performed. It was later determined that additional test connections would be required to replace the sampling points removed during the modification to ensure the simultaneous performance of IGCs calibration SI and chemistry's compensatory sampling requirement. A contributing factor for the missed compensatory sampling was in inadequate precaution in the procedure which resulted in a misinterpretation of the technical specification requirements.

The immediate corrective actions were: (1) terminated the surveillance instruction, (2) isolated the affected ventilation duct; thereby, compensatory monitoring would'ot be required, and (3) completed the SI. To prevent recurrence of this event, new chemistry grab sample points were installed upstream of the inlet isolation valves for 10 effluent CAMs.

O-SI-4.8.B.l.a.2 has been revised to utilize new sample taps on the refuel floor CAMs. Responsible organization will revise calibration and functional test SIs for the 10 effluent CANs to clarify sampling requirements when moni.tor is inoperable.

LER 259/85010 The control room operator received an erroneous alarm from the reactor building ventilation system. Compensatory samples were being taken until 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> when a maintenance personnel told the radiological laboratory analyst (RLA) that the "as-found" condition showed that two of the three channels were working properly. This interface lead to the RLA prematurely suspending needed sampling. The root cause was due to personnel error, failure to follow procedure. This root cause was not related to design problems.

LER 259/85046 The sampling hose for the turbine building ventilation CAM was left disconnected during a source check test. The disconnected hose was discovered and reconnected. This disconnected hose event required sample hoses to be disconnected. The root cause of this event was personnel error. Although the sample lines in the December 30, 1990 event were isolated, they were not inadvertently left in that configuration. Therefore, the corrective actions for LER 259/85046 were adequate for the event and would not be expected to contribute to the December 30, 1990 event.

NRC Form 366(6-89)

ll II 4

orm pprove 0 ~

(6-89) Expires 4/30/92 LICENSEE EVENT REPORT (LER)

TEXT CONTINUATION FACILITY NAME (1) 'IOOCKET NUHBER (2)

I I SEqUENTIAL I IREVISIONI I Vumi&l I I I

.8 rr ni 2 TEXT (If more space is required, use additional NRC Form 366A's) (17)

LER 259/88010 The chemistry section was notified that the reactor building closed cooling water heat exchanger was removed from service. At that time, the RLA presumed that the raw cooling water to the heat exchanger was also isolated. Therefore, the RL'A prema'turely suspended sampling. This heat exchanger event is different since no secondary systems'ere involved in the December 30, 1990 event.

LER 259/88041 An RLA failed to perform a compensatory sample for the raw cooling water system. The root cause was due to an inadequate shift turnover.

The system was still out-of-service and this, piece of information was not discussed at the- shift turnover. This previous LER did not address any design errors; therefore, its corrective action appear adequate and did not contribute to the December 30, 1990 event.

LER 259/90005 An RLA took two of three chemistry samples in a secondary location on the raw cooling water system. This was due to the RLA not realizing that a third raw cooling water heat exchanger was in service. 'This previous.

event's root cause was due to failure to follow procedure in that the analyst did not contact the control room to verify if the third heat exchanger was in service. In the December 30, 1990 event, the chemistry was cognizant of the out-of-service component; therefore, the corrective actions did not contribute to the December 30, 1990 event.

Responsible organization will revise calibration and functional test Sls for the 10 effluent CANs to clarify sampling, requirements when monitor is inoperable prior to Unit 2 restart.

NRC Form 366(6-89)

~I Y I

I 1