MONTHYEARML22335A2802022-11-0404 November 2022 11-4-2022 Email Transmitting Draft Questions Pertaining to Pilgrim ISFSI Exemption Request ML22270A0422022-09-26026 September 2022 Acknowledgement Email for Holtecs Request for Reporting Exemption with Regards to the Pilgrim ISFSI Annual Radioactive Effluent Release Report (Docket No. 05000293) ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22007A2602021-12-0606 December 2021 E-mail from P. Obrien, Holtec, to A. Snyder, NRC, on Pilgrim Effluent Discharge ML21287A6192021-10-14014 October 2021 E-mail from S. Phillips, MEMA, to A. Snyder, NRC, Pilgrim Nuclear Power Station, Commonwealth of Massachusetts Consultation Response to Amendment Review for Emergency Preparedness ML21266A2512021-09-23023 September 2021 Consultation with Commonwealth of Massachusetts Regarding Proposed Amendment Application for Emergency Plan and Emergency Action Levels ML21267A0012021-09-23023 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance Review ML21266A2772021-09-23023 September 2021 HDI Clarification of Exemption Requested from 10 CFR 20, Appendix G, Section Iii.E ML21257A3832021-09-15015 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Follow-on Request Re Request for Additional Information 2 Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Pl ML21211A5162021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Physical Security Plan ML21211A5912021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21200A2352021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21200A1522021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim Isfi Only Physical Security Plan ML21176A1842021-06-25025 June 2021 Email from HDI Regarding Pilgrim Nuclear Power Station Training ML21180A0582021-06-17017 June 2021 Email from Region I Regarding Pilgrim Nuclear Power Station Inspection - EA-13-132 ML21097A0402021-04-0606 April 2021 E-Mail Consult with Commonwealth of Mass Re - Amendment Application - Physical Security Plan for the Pilgrim Nuclear Power Station L-20-092, Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B,2020-12-10010 December 2020 Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, ML20328A2982020-11-16016 November 2020 Response from Commonwealth of Massachusetts on No Significant Hazard for Pilgrim ISFSI Amendment to Address ISFSI II Dated November 16, 2020 ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20163A6802020-06-11011 June 2020 Confirmation of the Scope of the Requested Regulatory Relief for Pilgrim Security Qualifications ML20280A1912020-04-17017 April 2020 Request for Additional Information- Clarifying Information for Pilgrim ISFSI Physical Security Amendment Application ML20269A3542020-03-0505 March 2020 CFR 26.717 Reports 2019 Transmittal Email ML19336A0302019-11-27027 November 2019 OEDO-15-00479 - Re 2.206 Petition Regarding Pilgrim Nuclear Power Stations Current Licensing Basis for Flooding ML19336A0332019-11-26026 November 2019 OEDO-15-00479 - E-mail to Petitioner - 2.206 Petition Regarding Pilgrim Nuclear Power Stations Current Licensing Basis for Flooding (CAC No. MF6460; EPID L-2015-CRS-0002)- Issuance of Final Directors Decision ML19331A1952019-11-21021 November 2019 NRR E-mail Capture - (External_Sender) Pilgrim Nuclear Power Station - Commonwealth Consultation Response - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1732019-11-12012 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Cyber Security Plan ML19331A1642019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1792019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Emergency Planning Exemption CY-19-007, LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station2019-11-0404 November 2019 LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station ML19275H1962019-09-24024 September 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Consult with Commonwealth - Amendment Regarding Permanently Defueled Technical Specifications (PDTS) ML19239A0372019-08-26026 August 2019 E-mail from Entergy Dated August 26, 2019, Notification of Pilgrim License Transfer ML19239A0262019-08-23023 August 2019 LTR-19-0330 Janet Azarovitz, E-mail a Plea for More Time and Reasonable Discussion Including the Citizens of the Commonwealth in the Sale of the Pilgrim Nuclear Power Station ML19234A2072019-08-20020 August 2019 LTR-19-0328 Lawrence Delafield, President, Six Ponds Improv Assoc., Plymouth, Ma, Ltr Requests NRC to Postpone Consideration of Transferring the Licenses for the Pilgrim Nuclear Power Until the NRC Has Answered Concerns by Pilgrim Watch, Se ML19232A4032019-08-20020 August 2019 LTR-19-0322 Diane Turco, Director, Cape Downwinders, Massachusetts, Letter/E-mail Requests Suspension of the Pilgrim License Transfer from Entergy to Holtec Until the Adjudicatory Hearing Is Held and Raised Contentions Are Resolved ML19308A9942019-08-19019 August 2019 Entergy Nuclear Operations, Inc. Confirmatory Order Rescission Supplemental Information ML19226A3912019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Decommissioning Trust Fund Exemption (Holtec) ML19226A3962019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Conforming Amendment in Support of Pilgrim License Transfer Application ML19226A1212019-08-13013 August 2019 OEDO-15-00479-2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Status (CAC No. MF6460; EPID L-2015-CRS-0002) ML19227A1032019-08-0707 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Draft Wording for Potential Condition of License Transfer Order ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc ML19176A3452019-06-25025 June 2019 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Information (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) ML19154A0652019-06-0303 June 2019 NRR E-mail Capture - Pilgrim - Permanent Cessation of Power Operations ML19154A5242019-06-0303 June 2019 NRR E-mail Capture - RAI - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR) ML19161A2122019-05-20020 May 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of License Amendment Request to Remove Cyber Security Plan Requirements ML19123A0332019-05-0101 May 2019 NRR E-mail Capture - Logbook Entry: 05/01/2019 Endangered Species Report Regarding a Confirmed Sighting of North Atlantic Right Whale(S) (Balaena Glacialis) ML19122A4912019-04-29029 April 2019 NRR E-mail Capture - Logbook Entry: 04/29/2019 Regarding the Confirmed Sighting of Ten North Atlantic Right Whales (Balaena Glacialis) ML19108A2362019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance ML19108A2372019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 50.54(w)(1) - On-Site Property Damage Insurance ML19108A0122019-04-17017 April 2019 Notification of Change in Review Schedule - Oyster Creek License Transfer Application (L-2018-LLM-0002) 2022-09-26
[Table view] |
Text
NRR-DMPSPEm Resource From: Lamb, John Sent: Thursday, January 04, 2018 12:14 PM To: Mary Lampert
Subject:
RE: RE: Pilgrim- Request close/power down pending blizzard Ms. Lampert, I understand that you do not want your request to shutdown or downpower Pilgrim Nuclear Power Station due to Winter Storm Grayson to be processed under the 10 CFR 2.206 Petition Process.
The NRC will handle your request under the principal correspondence process. Region 1 will be responding to your request.
Sincerely, John G. Lamb From: Mary Lampert [1]
Sent: Thursday, January 04, 2018 10:25 AM To: Lamb, John Cc: Lew, David ; Burritt, Arthur ; Kurt Schwartz (MEMA) ; Kevin Nord ; Ted Flynn ; weavenel@gmail.com; 'Becky Chin' ;
'James lampert' ; 'Nancy Nowak' ; 'Pat Gagnon' ; 'Sheila Lynch'
Subject:
[External_Sender] RE: Pilgrim- Request close/power down pending blizzard Mr. Lamb:
We presume your suggestion that we might want to file a 2.206 was made tongue-in-cheek.
Clearly, our request to close or power down the reactor was made in response to todays pending storm- a storm predicted to make a timely evacuation not possible.
As we all know, a 2.206 process takes time, often months. The storm would be a distant memory by the time the 2.206 process was underway.
We hope that our request now will be taken seriously by NRC. We have reasons for concern during severe storms. For example, lessons from past experience warn that the switchyard may flash over as it gets coated with snow and ice. The waves will send salt spray into the yard as well.
Sincerely, Mary Lampert From: Lamb, John [2]
Sent: Thursday, January 4, 2018 8:39 AM To: Mary Lampert <mary.lampert@comcast.net>
1
Subject:
Pilgrim- Request close/power down pending blizzard Importance: High Ms. Lampert, I understand that the Town of Duxbury Nuclear Advisory Committee and Pilgrim Watch requests that Pilgrim Nuclear Power Station close or reduce power due to Winter Storm Grayson.
Title 10 of the Code of Federal Regulations, Section 2.206 (10 CFR 2.206) permits any person to file a petition to request that the U.S. Nuclear Regulatory Commission (NRC) take enforcement-related action.
10 CFR 2.206 petition process is a public process in which the petition and all information in it will be made public.
If you do not wish to proceed in the 10 CFR 2.206 petition process, please let me know. Unless I hear otherwise, the NRC will follow Management Directive 8.11, Review Process for 2.206 Petitions.
Sincerely, John G. Lamb From: Mary Lampert <mary.lampert@comcast.net>
Sent: Wednesday, January 3, 2018 4:26 PM To: Lew, David Cc: Burritt, Arthur; Kurt Schwartz (MEMA); Kevin Nord; Ted Flynn
Subject:
[External_Sender] Pilgrim- Request close/power down pending blizzard Hello:
The Town of Duxbury Nuclear Advisory Committee and Pilgrim Watch request that Pilgrim Station close, or at the least power way down, due to the predicted blizzard conditions from the National Weather Service. See below. We understand that the wind speed predicted is below the level protocol calls for a mandatory shut down. However, the National Weather Service says that, Travel will be very dangerous.. Therefore a timely evacuation would not be possible. Sheltering inside is a limited option. EPA shows that dose reduction is limited and in a short period the dose inside and outside become equivalent, Table 2.1. says that generally, sheltering-in-place can provide significant protection for about 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in small residential structures. Larger masonry structures can provide protection for up to 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />. The host community and surrounding towns are largely residential with wooden houses.
We urge NRC to take a precautionary approach to better protect our citizens.
Thank you for your consideration.
Mary Lampert Town of Duxbury Nuclear Advisory Committee 2
Pilgrim Watch, Director Duxbury MA 781.934.0389 Rebecca Chin Town of Duxbury Nuclear Advisory Committee Duxbury, MA 781.837.0009 https://www.google.org/publicalerts/alert?aid=447f4254f89e928a&hl=en&gl=US&source=wweather 3
Hearing Identifier: NRR_DMPS Email Number: 78 Mail Envelope Properties (John.Lamb@nrc.gov20180104121400)
Subject:
RE: RE: Pilgrim- Request close/power down pending blizzard Sent Date: 1/4/2018 12:14:04 PM Received Date: 1/4/2018 12:14:00 PM From: Lamb, John Created By: John.Lamb@nrc.gov Recipients:
"Mary Lampert" <mary.lampert@comcast.net>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 4148 1/4/2018 12:14:00 PM image001.png 96287 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: