August 28, 2017

SUBJECT:

UPDATED INSPECTION PLAN FOR BEAVER VALLEY POWER STATION, UNITS 1 AND 2 (REPORT 05000334/2017005 AND 05000412/2017005)

Dear Mr. Bologna:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Beaver Valley Power Station. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

In addition to normal baseline inspections, the NRC will be performing Inspection Procedure 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants.

Please contact me at 610-337-5046 with any questions you have regarding this letter.

Sincerely,

/RA/

Silas R. Kennedy, Chief

Reactor Projects Branch 6

Division of Reactor Projects

Docket Nos.

50-334 and 50-412 License Nos.

DPR-66 and NPF-73

Enclosure:

Beaver Valley Inspection Plan

cc: Distribution via ListServ

ML17240A009

SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

OFFICE RI/DRP RI/DRP

NAME CSafouri/CS SKennedy/SK

DATE 8/22/17 8/28/17

Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Beaver Valley Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 1 of 3 08/09/2017 12:55:24 11/6EXAM

- BEAVER VALLEY 2 INITIAL OL EXAM

2 FY18-BV2 INITIAL OPERATOR LICENSING EXAM U01938 10/09/2017 10/13/2017

FY18-BV2 INITIAL OPERATOR LICENSING EXAM U01938 11/06/2017 11/17/2017 7111111B

- BV2 REQUAL INSP WITH P/F RESULTS

2 IP Licensed Operator Requalification Program - Annual Review 7111111A 07/24/2017 07/24/2017

IP Licensed Operator Requalification Program 7111111B 07/24/2017 07/28/2017 71124

- HP INSPECTION

1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 08/07/2017 08/11/2017 1, 2 IP Occupational Dose Assessment 71124.04 08/07/2017 08/11/2017 1, 2 IP Radiation Monitoring Instrumentation 71124.05 08/07/2017 08/11/2017 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 08/07/2017 08/11/2017 71152

- RADIATION MONITORING SYSTEM

1, 2 IP Problem Identification and Resolution 71152 08/07/2017 08/11/2017 ISFSI

- ISFSI LOADING CAMPAIGN INSPECTION

1, 2 IP Operation Of An ISFSI 60855 09/25/2017 09/29/2017 1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 09/25/2017 09/29/2017 71124

- HP INSPECTION

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/16/2017 10/20/2017 1, 2 IP Occupational ALARA Planning and Controls 71124.02 10/16/2017 10/20/2017 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/16/2017 10/20/2017

IP Occupational Exposure Control Effectiveness 71151-OR01 10/16/2017 10/20/2017

IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 10/16/2017 10/20/2017 7111121M

- DESIGN BASES ASSURANCE INSPECTION

1, 2 IP Design Bases Assurance Inspection (Teams)

7111121M 10/30/2017 11/03/2017 1, 2 IP Design Bases Assurance Inspection (Teams)

7111121M 11/13/2017 11/17/2017 71152

- SAMPLE - EMERGENT RIVER WATER ISSUES

1, 2 IP Problem Identification and Resolution 71152 11/13/2017 11/17/2017 71124

- RAD SAFETY INSP

1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 01/22/2018 01/26/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 01/22/2018 01/26/2018 7111111B

- BV1 REQUAL INSP W/ P/S RESULTS

1 IP Licensed Operator Requalification Program - Annual Review 7111111A 04/09/2018 04/13/2018

IP Licensed Operator Requalification Program 7111111B 04/09/2018 04/13/2018 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Beaver Valley Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 2 of 3 08/09/2017 12:55:24 8/13EXAM

- BEAVER VALLEY 1 INITIAL OL EXAM

1 FY18-BEAVER VALLEY 1 INITIAL OPERATOR LICENSING EXAM U01961 08/20/2018 08/24/2018

FY18-BEAVER VALLEY 1 INITIAL OPERATOR LICENSING EXAM U01961 09/17/2018 09/28/2018 71124

- RAD SAFETY INSP

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/23/2018 04/27/2018 1, 2 IP Occupational ALARA Planning and Controls 71124.02 04/23/2018 04/27/2018 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/23/2018 04/27/2018 1, 2 IP Occupational Dose Assessment 71124.04 04/23/2018 04/27/2018 EP

- EP EXERCISE INSPECTION

1, 2 IP Exercise Evaluation 7111401 05/12/2018 07/12/2018 1, 2 IP Performance Indicator Verification 71151 06/11/2018 06/15/2018 U1 ISI

- UNIT 1 INSERVICE INSPECTION

1 IP Inservice Inspection Activities - PWR 7111108P 04/23/2018 05/04/2018 71124.06

- REMP

1, 2 IP Radiological Environmental Monitoring Program 71124.07 07/09/2018 07/13/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 07/09/2018 07/13/2018 7111105X

- TRIENNIAL FIRE PROTECTION

1, 2 IP Fire Protection - NFPA 805 (Triennial)

7111105X 07/23/2018 07/27/2018 1, 2 IP Fire Protection - NFPA 805 (Triennial)

7111105X 08/06/2018 08/10/2018 U2 ISI

- UNIT 2 INSERVICE INSPECTION

2 IP Inservice Inspection Activities - PWR 7111108P 10/08/2018 10/19/2018 71124

- RAD INSTRUMENTATION

1, 2 IP Radiation Monitoring Instrumentation 71124.05 10/29/2018 11/02/2018 71124.08

- RADWASTE

1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 11/05/2018 11/09/2018 71124

- RAD SAFETY INSPECTION

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 12/10/2018 12/14/2018 1, 2 IP Occupational ALARA Planning and Controls 71124.02 12/10/2018 12/14/2018 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 12/10/2018 12/14/2018 1, 2 IP Occupational Dose Assessment 71124.04 12/10/2018 12/14/2018 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 12/10/2018 12/14/2018 71152B

- PI&R BIENNIAL

1, 2 IP Problem Identification and Resolution 71152B 03/04/2019 03/08/2019 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Beaver Valley Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 3 of 3 08/09/2017 12:55:24 71152B

- PI&R BIENNIAL

1, 2 IP Problem Identification and Resolution 71152B 03/18/2019 03/22/2019 71124

- RAD SAFETY 01,02,03,04

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/18/2019 03/22/2019 1, 2 IP Occupational ALARA Planning and Controls 71124.02 03/18/2019 03/22/2019 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/18/2019 03/22/2019 1, 2 IP Occupational Dose Assessment 71124.04 03/18/2019 03/22/2019 EP

- EP PROGRAM INSPECTION

1, 2 IP Alert and Notification System Testing 7111402 06/10/2019 06/14/2019 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 06/10/2019 06/14/2019 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 06/10/2019 06/14/2019 1, 2 IP Performance Indicator Verification 71151 06/10/2019 06/14/2019 7111121N

- EQ PROGRAM

1, 2 IP Design Bases Assurance Inspection (Programs)

7111121N 06/10/2019 06/14/2019 1, 2 IP Design Bases Assurance Inspection (Programs)

7111121N 06/24/2019 06/28/2019 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.