August 28, 2017
SUBJECT:
UPDATED INSPECTION PLAN FOR SEABROOK STATION, UNIT NO. 1 (REPORT 05000443/2017005)
Dear Mr. Nazar:
The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Seabrook Station, Unit 1 (Seabrook). The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised.
The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.
In addition to baseline inspections, the NRC plans to conduct Inspection Procedure (IP) 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants.
As previously noted in the annual assessment letter dated March 1, 2017 (Report 05000443/2016006; ADAMS Accession No.: ML17059C0161) regarding the Alkali-Silica Reaction (ASR) concrete issues, the NRC will continue to provide focused oversight of NextEras assessment of ASR progression in Seabrooks concrete structures using Problem Identification and Resolution (PI&R) annual samples. While tentative dates for these ongoing inspections are included in the attached inspection schedule, we understand that your schedule is subject to change. We will coordinate closely with your ASR project management staff to select the most appropriate opportunities to inspect your activities.
1 The designation in parentheses refers to an Agencywide Documents Access and Management System (ADAMS) Accession Number. Documents referenced in this letter are publicly available using the Accession Number in ADAMS. Please contact me at (610) 337-5200 with any questions you have regarding this letter.
Sincerely,
/RA/
Fred L. Bower, III, Chief Project Branch 3 Division of Reactor Projects
Docket No. 50-443 License No. NPF-86
Enclosure: Seabrook Inspection Plan
cc: Distribution via ListServ
SUNSI Review
Non-Sensitive Sensitive
Publicly Available Non-Publicly Available
OFFICE RI/DRP RI/DRP RI/DRP
NAME PCataldo/per email MD MDraxton FBower
DATE 8/17/17 8/17/17 8/21/17
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Seabrook Inspection / Activity Plan 08/29/2017 - 06/30/2019 Page 1 of 2 08/29/2017 09:41:18 71124
1 IP Radiological Environmental Monitoring Program 71124.07 09/04/2017 09/07/2017 2/19EXM
- SEABROOK INITIAL OL EXAM
1 FY18-SEABROOK INITIAL OPERATOR LICENSING EXAM U01948 01/22/2018 01/26/2018
FY18-SEABROOK INITIAL OPERATOR LICENSING EXAM U01948 02/19/2018 02/23/2018 71152A
- PI&R ANNUAL SAMPLE - ASR MONITORING
1 IP In-depth Reviews 71152-Reviews 10/01/2017 12/31/2017 7111111B
- SEABROOK REQUAL INSP WITH P/F RESULTS
1 IP Licensed Operator Requalification Program - Annual Review 7111111A 12/04/2017 12/08/2017
IP Licensed Operator Requalification Program 7111111B 12/04/2017 12/08/2017 71124
- 71151 PI VERIFY71124.02ALARA06RETS07REMP
1 IP Occupational ALARA Planning and Controls 71124.02 12/04/2017 12/07/2017
IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 12/04/2017 12/07/2017
IP Radiological Environmental Monitoring Program 71124.07 12/04/2017 12/07/2017
IP Occupational Exposure Control Effectiveness 71151-OR01 12/04/2017 12/07/2017
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 12/04/2017 12/07/2017 ASR
- PI&R SAMPLE - ASR MONITORING
1 IP Problem Identification and Resolution 71152 01/01/2018 03/31/2018 EP
- EP EXERCISE INSPECTION
1 IP Exercise Evaluation 7111401 04/02/2018 04/06/2018 7111121N
- EQ PROGRAM
1 IP Design Bases Assurance Inspection (Programs)
7111121N 03/19/2018 03/23/2018
IP Design Bases Assurance Inspection (Programs)
7111121N 04/02/2018 04/06/2018 71124
- HP
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/26/2018 03/30/2018
IP Occupational ALARA Planning and Controls 71124.02 03/26/2018 03/30/2018
IP Occupational Dose Assessment 71124.04 03/26/2018 03/30/2018 HEAT
- TRIENNIAL HEAT SINK
1 IP Heat Sink Performance 7111107T 06/04/2018 06/08/2018 71124
- HP
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 06/11/2018 06/15/2018
IP Occupational ALARA Planning and Controls 71124.02 06/11/2018 06/15/2018
IP Radiation Monitoring Instrumentation 71124.05 06/11/2018 06/15/2018 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Seabrook Inspection / Activity Plan 08/29/2017 - 06/30/2019 Page 2 of 2 08/29/2017 09:41:18 7111117T
- 50.59 PROCESS
1 IP Evaluations of Changes, Tests, and Experiments 7111117T 06/18/2018 06/22/2018 71152B
- PI&R BIENNIAL
1 IP Problem Identification and Resolution 71152B 07/23/2018 07/27/2018
IP Problem Identification and Resolution 71152B 08/06/2018 08/10/2018 71124.08
- RADWASTE
1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 08/20/2018 08/24/2018 U1 ISI
- UNIT 1 INSERVICE INSPECTION
1 IP Inservice Inspection Activities - PWR 7111108P 10/08/2018 10/19/2018 71124
- HP
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/15/2018 10/19/2018
IP Occupational ALARA Planning and Controls 71124.02 10/15/2018 10/19/2018
IP Occupational Exposure Control Effectiveness 71151-OR01 10/15/2018 10/19/2018
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 10/15/2018 10/19/2018 EP
- EP PROGRAM INSPECTION
1 IP Alert and Notification System Testing 7111402 04/08/2019 04/12/2019
IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 04/08/2019 04/12/2019
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 04/08/2019 04/12/2019
IP Performance Indicator Verification 71151 04/08/2019 04/12/2019 71124.06
- RAD SAFETY RETS
1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 04/08/2019 04/12/2019 DBAI-T
- DESIGN BASES ASSURANCE INSP - TEAMS
1 IP Design Bases Assurance Inspection (Teams)
7111121M 04/15/2019 04/19/2019
IP Design Bases Assurance Inspection (Teams)
7111121M 04/29/2019 05/03/2019 71124
- RAD SAFETY 01,02,03,04
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/20/2019 05/24/2019
IP Occupational ALARA Planning and Controls 71124.02 05/20/2019 05/24/2019
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/20/2019 05/24/2019
IP Occupational Dose Assessment 71124.04 05/20/2019 05/24/2019 71124.07
- RAD SAFETY REMP
1 IP Radiological Environmental Monitoring Program 71124.07 06/17/2019 06/21/2019 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.