RC-17-0062, Special Report (Spr) 2017-001 Regarding a Fire Barrier Assembly Not Being Restored to Operability within Seven Days After Declaration of Inoperability

From kanterella
(Redirected from ML17128A364)
Jump to navigation Jump to search
Special Report (Spr) 2017-001 Regarding a Fire Barrier Assembly Not Being Restored to Operability within Seven Days After Declaration of Inoperability
ML17128A364
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 05/05/2017
From: Lippard G
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RC-17-0062, SPR-17-001
Download: ML17128A364 (1)


Text

George Lippard Vice President. Nuclear Operations 803.345.4810 A SCANA COMPANY May 5, 2017 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir I Madam:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION (VCSNS), UNIT NO. 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 SPECIAL REPORT (SPR) 2017-001 South Carolina Electric & Gas Company (SCE&G) is submitting this Special Report pursuant to the requirements of Technical Specifications 6.9.2 and as required by Station Administrative Procedure (SAP) -131A, Fire Protection Program Surveillances and Compensatory Measures, .1, step 6.1.11, Action 4. This report addresses a fire barrier assembly not being restored to operability within seven days after declaration of inoperability.

On April 3, 2017, at 09:20 hours, the 2-hour Albi-Duraspray fire barrier at the ceiling joint of 1 OX Turbine Building switchgear room, 463 foot elevation (TB-63-02), was declared inoperable after not meeting its surveillance acceptance criteria. The surveillance results revealed the fire barrier material degraded and pulling away from the vertical sheetmetal portion of the wall with pieces of the material missing. The condition was entered into the station's corrective action program. Upon declaring the fire barrier material inoperable, VCSNS implemented an hourly roving fire watch patrol.

Action to repair the fire barrier material will consist of replacing the degraded and obsolete Albi material with Pyrocrete 241. Repair is scheduled for week of June 19, 2017. After repair and satisfactory testing, the fire barrier material will be returned to operable status.

Should you have any questions, please call Bruce Thompson at (803) 931-5042 at your convenience.

~ly ~

' Georga ;ard WCM/GL/wk c: K. B. Marsh S. A. Williams S. A. Byrne NRC Resident Inspector J. B. Archie K. M. Sutton N. S. Carns NSRC J. H. Hamilton RTS (CR-17-01492)

S. M. Shealy File (818.08)

W*. M. Cherry PRSF (RC-17 -0062)