Letter Sequence Other |
---|
|
|
MONTHYEARML17101A2822017-04-0505 April 2017 Mary Lampert, Pilgrim Watch Email Regarding Issuance of Relief Request Nos. PNPS-ISI-004 and PNPS-ISI-005 for Pilgrim Nuclear Power Station Project stage: Request ML17096A3962017-04-11011 April 2017 E-mail Response to Mary Lampert, Pilgrim Watch 4/5/2017 Email Re Pilgrim Nuclear Power Station'S Relief Request Nos. PNPS-ISI-004 and PNPS-ISI-005 Granted 4/3/2017 Project stage: Other ML17181A3492017-09-12012 September 2017, 26 September 2017 LTR-17-0257 David Lochbaum, Director, Nuclear Safety Project, Union of Concerned Scientists, Letter Two Decisions Issued by the NRC Staff in January Regarding the Licensing Basis for Loss of Coolant Accident and a Concurrent Loss of Offsite Project stage: Request ML17214A7032017-09-26026 September 2017 LTR-17-0257- NRR Response Letter to David Lochbaum, Letter Two Decisions Issued by the NRC Staff in January Regarding the Licensing Basis for Loss of Coolant Accident and a Concurrent Loss of Offsite Power Project stage: Acceptance Review 2017-04-05
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML22335A2802022-11-0404 November 2022 11-4-2022 Email Transmitting Draft Questions Pertaining to Pilgrim ISFSI Exemption Request ML22270A0422022-09-26026 September 2022 Acknowledgement Email for Holtecs Request for Reporting Exemption with Regards to the Pilgrim ISFSI Annual Radioactive Effluent Release Report (Docket No. 05000293) ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22007A2602021-12-0606 December 2021 E-mail from P. Obrien, Holtec, to A. Snyder, NRC, on Pilgrim Effluent Discharge ML21287A6192021-10-14014 October 2021 E-mail from S. Phillips, MEMA, to A. Snyder, NRC, Pilgrim Nuclear Power Station, Commonwealth of Massachusetts Consultation Response to Amendment Review for Emergency Preparedness ML21266A2512021-09-23023 September 2021 Consultation with Commonwealth of Massachusetts Regarding Proposed Amendment Application for Emergency Plan and Emergency Action Levels ML21267A0012021-09-23023 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance Review ML21266A2772021-09-23023 September 2021 HDI Clarification of Exemption Requested from 10 CFR 20, Appendix G, Section Iii.E ML21257A3832021-09-15015 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Follow-on Request Re Request for Additional Information 2 Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Pl ML21211A5162021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Physical Security Plan ML21211A5912021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21200A2352021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21200A1522021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim Isfi Only Physical Security Plan ML21176A1842021-06-25025 June 2021 Email from HDI Regarding Pilgrim Nuclear Power Station Training ML21180A0582021-06-17017 June 2021 Email from Region I Regarding Pilgrim Nuclear Power Station Inspection - EA-13-132 ML21097A0402021-04-0606 April 2021 E-Mail Consult with Commonwealth of Mass Re - Amendment Application - Physical Security Plan for the Pilgrim Nuclear Power Station L-20-092, Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B,2020-12-10010 December 2020 Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, ML20328A2982020-11-16016 November 2020 Response from Commonwealth of Massachusetts on No Significant Hazard for Pilgrim ISFSI Amendment to Address ISFSI II Dated November 16, 2020 ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20163A6802020-06-11011 June 2020 Confirmation of the Scope of the Requested Regulatory Relief for Pilgrim Security Qualifications ML20280A1912020-04-17017 April 2020 Request for Additional Information- Clarifying Information for Pilgrim ISFSI Physical Security Amendment Application ML20269A3542020-03-0505 March 2020 CFR 26.717 Reports 2019 Transmittal Email ML19336A0302019-11-27027 November 2019 OEDO-15-00479 - Re 2.206 Petition Regarding Pilgrim Nuclear Power Stations Current Licensing Basis for Flooding ML19336A0332019-11-26026 November 2019 OEDO-15-00479 - E-mail to Petitioner - 2.206 Petition Regarding Pilgrim Nuclear Power Stations Current Licensing Basis for Flooding (CAC No. MF6460; EPID L-2015-CRS-0002)- Issuance of Final Directors Decision ML19331A1952019-11-21021 November 2019 NRR E-mail Capture - (External_Sender) Pilgrim Nuclear Power Station - Commonwealth Consultation Response - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1732019-11-12012 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Cyber Security Plan ML19331A1642019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1792019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Emergency Planning Exemption CY-19-007, LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station2019-11-0404 November 2019 LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station ML19275H1962019-09-24024 September 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Consult with Commonwealth - Amendment Regarding Permanently Defueled Technical Specifications (PDTS) ML19239A0372019-08-26026 August 2019 E-mail from Entergy Dated August 26, 2019, Notification of Pilgrim License Transfer ML19239A0262019-08-23023 August 2019 LTR-19-0330 Janet Azarovitz, E-mail a Plea for More Time and Reasonable Discussion Including the Citizens of the Commonwealth in the Sale of the Pilgrim Nuclear Power Station ML19234A2072019-08-20020 August 2019 LTR-19-0328 Lawrence Delafield, President, Six Ponds Improv Assoc., Plymouth, Ma, Ltr Requests NRC to Postpone Consideration of Transferring the Licenses for the Pilgrim Nuclear Power Until the NRC Has Answered Concerns by Pilgrim Watch, Se ML19232A4032019-08-20020 August 2019 LTR-19-0322 Diane Turco, Director, Cape Downwinders, Massachusetts, Letter/E-mail Requests Suspension of the Pilgrim License Transfer from Entergy to Holtec Until the Adjudicatory Hearing Is Held and Raised Contentions Are Resolved ML19308A9942019-08-19019 August 2019 Entergy Nuclear Operations, Inc. Confirmatory Order Rescission Supplemental Information ML19226A3912019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Decommissioning Trust Fund Exemption (Holtec) ML19226A3962019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Conforming Amendment in Support of Pilgrim License Transfer Application ML19226A1212019-08-13013 August 2019 OEDO-15-00479-2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Status (CAC No. MF6460; EPID L-2015-CRS-0002) ML19227A1032019-08-0707 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Draft Wording for Potential Condition of License Transfer Order ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc ML19176A3452019-06-25025 June 2019 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Information (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) ML19154A0652019-06-0303 June 2019 NRR E-mail Capture - Pilgrim - Permanent Cessation of Power Operations ML19154A5242019-06-0303 June 2019 NRR E-mail Capture - RAI - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR) ML19161A2122019-05-20020 May 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of License Amendment Request to Remove Cyber Security Plan Requirements ML19123A0332019-05-0101 May 2019 NRR E-mail Capture - Logbook Entry: 05/01/2019 Endangered Species Report Regarding a Confirmed Sighting of North Atlantic Right Whale(S) (Balaena Glacialis) ML19122A4912019-04-29029 April 2019 NRR E-mail Capture - Logbook Entry: 04/29/2019 Regarding the Confirmed Sighting of Ten North Atlantic Right Whales (Balaena Glacialis) ML19108A2362019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance ML19108A2372019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 50.54(w)(1) - On-Site Property Damage Insurance ML19108A0122019-04-17017 April 2019 Notification of Change in Review Schedule - Oyster Creek License Transfer Application (L-2018-LLM-0002) 2022-09-26
[Table view] |
Text
Lamb, John From: Lamb, John Sent: Tuesday, April 11, 2017 10:43 AM To: 'mary.lampert@comcast.net' Cc: Dean, Bill; Evans, Michele; Dorman, Dan; Ross-Lee, MaryJane; Benner, Eric; Brock, Kathryn; Broaddus, Doug; Brown, Eva; Lubinski, John; Coyne, Kevin; Alley, David; Cumblidge, Stephen; Burritt, Arthur; Cline, Leonard; Carfang, Erin; Vazquez, Justin; Pinson, Brandon; Lew, David; Wall, Scott; Scott, Michael; Screnci, Diane; Sheehan, Neil; Tifft, Doug; Weil, Jenny; Dacus, Eugene; Burkhardt, Janet; Jackson, Donald; Watson, Bruce; Parrott, Jack; Carter, Ted; Kulp, Jeffrey
Subject:
NRC Response to Pilgrim Watch's Email Dated April 5, 2017, Regarding Pilgrim Relief Request Nos. PNPS-ISI-004 and PNPS-ISI-005
Dear Ms. Lampert:
I am responding to your e-mail dated April 5, 2017 (Agencywide Documents and Access Management System (ADAMS) Accession No. ML17101A282), to the U.S. Nuclear Regulatory Commission (NRC), regarding the Pilgrim Nuclear Power Station (Pilgrim). Specifically, your e-mail communicated questions regarding Pilgrims Relief Request Nos. PNPS-ISI-004 and PNPS-ISI-005 for relief from the American Society of Mechanical Engineers (ASME) Code,Section XI, volumetric inspections (ADAMS Accession No. ML17081A563). Your email had the following questions:
(1) Were the welds tested in the past?
(2) When in the past?
(3) How were they tested?
(4) If they have been tested in the past, what has changed to make testing difficult?
BACKGROUND In the document cited, Entergy requested relief from the essentially 100 percent volumetric coverage requirements for certain welds on the basis that the Code requirement is impractical due to the geometric configuration of the components.
The NRC regulations require that inservice examination of components and system pressure tests conducted during the first 10-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code, which was incorporated by reference in Title 10 of the Code of Federal Regulations, Part 50, Section 55a(b), 12 months prior to the start of the 10-year interval, subject to the limitations and modifications listed therein.
RESPONSES TO PILGRIM WATCH QUESTIONS Question 1 Were the welds tested in the past?
Response 1 Yes, the welds have been previously tested.
Question 2 When in the past?
Response 2 1
These welds are inspected once during each 10-year inservice inspection interval, i.e., between 1975-1985; 1985-1995; 1995-2005; and 2005-2015. Specifically, during the most recent interval, the inspections were conducted during May 2009, and April 2011.
Question 3 How were they tested?
Response 3 These welds were examined using ultrasonic testing (UT).
Question 4 If they have been tested in the past, what has changed to make testing difficult?
Response 4 Nothing has physically changed to make the test (inspection) more difficult. What has changed is that the last exams were conducted (qualified) in accordance with a more rigorous process that is now required by the ASME Code. The current ASME Code requires higher quality data than that previously required. Given the new data requirements, some portions of welds that previously could be considered inspected now must be classified as missed coverage. However, Entergy performed additional best effort inspection, which brought the volumetric coverage of the welds to close to 100-percent. Although the additional best effort inspections did not meet current qualification requirements, they were performed in a manner consistent with the ASME qualification process for the first three examinations. Therefore, the relief request which is the basis for your question is not the result of a decrease in the inspection of these welds, but rather an increase in the data quality acceptance criterion associated with the inspection.
As always, the health and safety of the public is of paramount importance to the NRC, and we appreciate your interest in our mission.