MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000293/20240022024-08-21021 August 2024 NRC Inspection Report No. 05000293/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24129A1042024-05-26026 May 2024 Preapplication Readiness Assessment Plan for the Holtec Decommissioning International License Termination Plan ML24135A3212024-05-14014 May 2024 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2023 ML24136A2382024-05-14014 May 2024 Annual Radiological Environmental Operating Report for 2023 IR 05000293/20240012024-05-0707 May 2024 NRC Inspection Report No. 05000293/2024001 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 L-24-010, Request for Preapplication Readiness Assessment of the Draft License Termination Plan2024-04-22022 April 2024 Request for Preapplication Readiness Assessment of the Draft License Termination Plan L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) IR 05000293/20230032024-02-29029 February 2024 NRC Inspection Report Nos. 05000293/2023003 and 05000293/2023004 L-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary – November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 And Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23300A0022023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 ML23143A0872023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 And Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 2024-09-18
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 26, 2017 Ms. Mary Lampert Director, Pilgrim Watch 148 Washington Street Duxbury, MA 02332
Dear Ms. Lampert:
By e-mail dated October 27, 2016, 1 to the U.S. Nuclear Regulatory Commission (NRC), you requested answers to questions regarding the Pilgrim Nuclear Power Station's (Pilgrim's) onsite independent spent fuel storage cask liability and guarantees. You also raised questions regarding the liability agreements between Entergy Nuclear Generation Company (the licensee) and Holtec International (the vendor). By letter dated January 17, 2017, 2 the NRC responded to your October 27, 2016, e-mail. By e-mail dated January 22, 2017 3 , you requested the NRC to provide greater specificity related to your earlier October 27, 2016, e-mail. I am responding to your e-mail dated January 22, 2017, to the NRC regarding Pilgrim.
Compliance with NRC Regulations The NRC's requirements for independent spent fuel storage installations are primarily found in Title 10 of the Code of Federal Regulations (10 CFR) Part 72, "Licensing Requirements for the Independent Storage of Spent Nuclear Fuel, High-Level Radioactive Waste, and Reactor-Related Greater than Class C Waste," and are designed to ensure protection of public health and safety and the environment. Entergy Nuclear Generation Company holds a 10 CFR Part 50 reactor license and a general license for the onsite independent spent fuel storage installation in accordance with 10 CFR Part 72, Subpart K, "General License for Storage of Spent Fuel at Power Reactor Sites."
Reactor Station Site Property Insurance Under 10 CFR Part 50, power reactor licensees are required to have onsite property insurance.
Specifically, 10 CFR 50.54(w) requires NRC licensees to have and maintain onsite property insurance in the amount of $1.06 billion during operations. This insurance is to be used to stabilize the reactor and decontaminate the reactor and the reactor station site in the event of a nuclear incident.
Reactor Station Site Liability Insurance In addition to the requirement for each power reactor licensee to maintain insurance for onsite decontamination activities, offsite liability insurance is mandated by the Price-Anderson Act ("the Act"). The Act is implemented by the NRC's offsite liability insurance requirements and can be found in 10 CFR Part 140, "Financial Protection Requirements and Indemnity Agreements."
1 Agencywide Documents Access and Management System (ADAMS) Accession No. ML17011A136 2 ADAMS Accession No. ML17011A277 3 ADAMS Accession No. ML17030A020
M. Lampert Under the Act and the NRC's implementing regulations, offsite liability is currently limited to approximately $13 billion for any potential incident. In the event of a nuclear incident involving damages in excess of this amount, Congress reserves the right to take whatever action is deemed necessary to protect the public.
In this regard, the Act covers liability claims associated with offsite contamination. The scope of the Act's coverage includes nuclear incidents in the course of the operation of power reactors and transportation of nuclear fuel to and from a covered facility.
The Act ensures that those who may be injured by a potential nuclear incident are assured of the availability of funds to pay their claims. The Act channels the obligation to pay compensation for any potential damages to the licensee. Thus, a claimant need not sue all of the parties or firms that contribute in some manner to the construction (including design),
operation, and/or maintenance of covered licensees, but can bring his or her claim to the reactor licensee. Additionally, this means that the same protection available to Pilgrim extends through indemnification to any person who may be legally liable, regardless of the identity of the person liable or his or her relationship to the licensed activity.
Agreements Between the Licensee and the Vendor In this context, the NRC does not have regulations that obligate the licensee or the vendor to disclose any potential private agreements they may have with each other, and therefore, the NRC does not have access to any such agreements, nor is access to such private agreements necessary to provide financial protection, or otherwise protect public health and safety. Instead, the NRC relies on compliance with all applicable regulations to ensure public health and safety, including compliance with its onsite and offsite insurance regulations found in 10 CFR Part 50 and Part 140, respectively, to provide financial protection.
Spent Fuel Cask Certificate of Compliance (CoC) Guarantees The NRC regulations that govern approval of a Coe do not require the applicant for a CoC to provide proof of insurance because approval of a CoC does not authorize possession of radioactive material. As to the process regarding approval of initial and renewal CoCs, after receiving an application under 10 CFR Part 72, by demonstrating compliance with the necessary regulations, a CoC may be issued by the NRC for a period not to exceed 40 years
( 10 CFR 72.238). Pursuant to 10 CFR 72.240, if the renewal application for a Coe is submitted not less than 30 days before the expiration date of the Coe, the existing Coe will not expire until the application for renewal has been determined by the NRC. If the spent fuel cask vendor does not apply for a Coe renewal, according to 10 CFR 72.240(a), any licensee using a spent fuel storage cask, a representative of such licensee, or another certificate holder, may apply for the renewal of the Coe for a period not to exceed 40 years.
M. Lampert I appreciate your correspondence on this matter. Please direct any future correspondence to the Pilgrim Project Manager, John G. Lamb. Mr. Lamb's telephone number is 301-415-3100, and his e-mail address is john.lamb@nrc.gov.
Sincerely,
Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation cc: Distribution via Listserv
M. Lampert
SUBJECT:
PILGRIM WATCH'S RESPONSE TO STEPHEN KOENICK'S JANUARY 7, 2017, REPLY TO ITS OCTOBER 27, 2016, E-MAIL REGARDING LIABILITY AND HOLTEC GUARANTEES AT PILGRIM NUCLEAR POWER STATION DATED APRIL 26, 2017 DISTRIBUTION: Y020170006 PUBLIC LPL 1 R/F RidsNrrDirslfib Resource RidsRgn1 MailCenter Resource RidsNMSSDSFM Resource RidsNrrDorlLpl1 Resource RidsOcaMailCenter Resource JBowen, OEDO LCline, R-1 JNicholson, R-1 EOlvera, NRR RidsNrrPMPilgrim Resource MDusaniwskyj, NRR RidsNrrMailCenter Resource RidsEdoMailCenter Resource RidsSecyMailCenter Resource RidsOgcMailCenter Resource RidsACRS_MailCTR Resource RidsNrrDorl Resource ABurritt, R-1 BVenkataraman, NRR ADAMS A ccess1on No.: ML17065A109 *b1y e-ma1*1 OFFICE DORL/LPL 1/PM DORL/LPL 1/LA DI RS/I FIB* NMSS/DSFM/IOB/BC*
NAME BVenkataraman LRonewicz A Bowers PSilva DATE 04/ /2017 04/25/2017 04/06/2017 03/31/2017 OFFICE Rl/DRP/PB5/BC* OGC-NLO DORL/LPL 1/BC DORL/D(A)
(w/edits)*
NAME ABurritt A Coggins JDanna MJRoss-Lee DATE 03/15/2017 0410712017 and 04/25/2017 04/26/2017 04/25/2017 OFFICIAL RECORD COPY