MONTHYEARML22335A2802022-11-0404 November 2022 11-4-2022 Email Transmitting Draft Questions Pertaining to Pilgrim ISFSI Exemption Request ML22270A0422022-09-26026 September 2022 Acknowledgement Email for Holtec'S Request for Reporting Exemption with Regards to the Pilgrim ISFSI Annual Radioactive Effluent Release Report (Docket No. 05000293) ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22007A2602021-12-0606 December 2021 E-mail from P. O'Brien, Holtec, to A. Snyder, NRC, on Pilgrim Effluent Discharge ML21287A6192021-10-14014 October 2021 E-mail from S. Phillips, MEMA, to A. Snyder, NRC, Pilgrim Nuclear Power Station, Commonwealth of Massachusetts Consultation Response to Amendment Review for Emergency Preparedness ML21266A2512021-09-23023 September 2021 Consultation with Commonwealth of Massachusetts Regarding Proposed Amendment Application for Emergency Plan and Emergency Action Levels ML21266A2772021-09-23023 September 2021 HDI Clarification of Exemption Requested from 10 CFR 20, Appendix G, Section Iii.E ML21267A0012021-09-23023 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance Review ML21257A3832021-09-15015 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Follow-on Request Re Request for Additional Information 2 Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Pl ML21211A5912021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21211A5162021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Physical Security Plan ML21200A2352021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21200A1522021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim Isfi Only Physical Security Plan ML21176A1842021-06-25025 June 2021 Email from HDI Regarding Pilgrim Nuclear Power Station Training ML21180A0582021-06-17017 June 2021 Email from Region I Regarding Pilgrim Nuclear Power Station Inspection - EA-13-132 ML21097A0402021-04-0606 April 2021 E-Mail Consult with Commonwealth of Mass Re - Amendment Application - Physical Security Plan for the Pilgrim Nuclear Power Station L-20-092, Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B,2020-12-10010 December 2020 Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, L-20-096, Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 20102020-12-10010 December 2020 Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 2010 ML20328A2982020-11-16016 November 2020 Response from Commonwealth of Massachusetts on No Significant Hazard for Pilgrim ISFSI Amendment to Address ISFSI II Dated November 16, 2020 ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20163A6802020-06-11011 June 2020 Confirmation of the Scope of the Requested Regulatory Relief for Pilgrim Security Qualifications ML20280A1912020-04-17017 April 2020 Request for Additional Information- Clarifying Information for Pilgrim ISFSI Physical Security Amendment Application ML20269A3542020-03-0505 March 2020 CFR 26.717 Reports 2019 Transmittal Email ML19336A0302019-11-27027 November 2019 OEDO-15-00479 - Re 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding ML19336A0332019-11-26026 November 2019 OEDO-15-00479 - E-mail to Petitioner - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding (CAC No. MF6460; EPID L-2015-CRS-0002)- Issuance of Final Director'S Decision ML19331A1952019-11-21021 November 2019 NRR E-mail Capture - (External_Sender) Pilgrim Nuclear Power Station - Commonwealth Consultation Response - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1732019-11-12012 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Cyber Security Plan ML19331A1642019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1792019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Emergency Planning Exemption CY-19-007, LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station2019-11-0404 November 2019 LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station ML19275H1962019-09-24024 September 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Consult with Commonwealth - Amendment Regarding Permanently Defueled Technical Specifications (PDTS) ML19239A0372019-08-26026 August 2019 E-mail from Entergy Dated August 26, 2019, Notification of Pilgrim License Transfer ML19239A0262019-08-23023 August 2019 LTR-19-0330 Janet Azarovitz, E-mail a Plea for More Time and Reasonable Discussion Including the Citizens of the Commonwealth in the Sale of the Pilgrim Nuclear Power Station ML19234A2072019-08-20020 August 2019 LTR-19-0328 Lawrence Delafield, President, Six Ponds Improv Assoc., Plymouth, Ma, Ltr Requests NRC to Postpone Consideration of Transferring the Licenses for the Pilgrim Nuclear Power Until the NRC Has Answered Concerns by Pilgrim Watch, Se ML19232A4032019-08-20020 August 2019 LTR-19-0322 Diane Turco, Director, Cape Downwinders, Massachusetts, Letter/E-mail Requests Suspension of the Pilgrim License Transfer from Entergy to Holtec Until the Adjudicatory Hearing Is Held and Raised Contentions Are Resolved ML19308A9942019-08-19019 August 2019 Entergy Nuclear Operations, Inc. Confirmatory Order Rescission Supplemental Information ML19226A3912019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Decommissioning Trust Fund Exemption (Holtec) ML19226A3962019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Conforming Amendment in Support of Pilgrim License Transfer Application ML19226A1212019-08-13013 August 2019 OEDO-15-00479-2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Status (CAC No. MF6460; EPID L-2015-CRS-0002) ML19227A1032019-08-0707 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Draft Wording for Potential Condition of License Transfer Order ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc ML19176A3452019-06-25025 June 2019 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Information (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) ML19154A0652019-06-0303 June 2019 NRR E-mail Capture - Pilgrim - Permanent Cessation of Power Operations ML19154A5242019-06-0303 June 2019 NRR E-mail Capture - RAI - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR) ML19161A2122019-05-20020 May 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of License Amendment Request to Remove Cyber Security Plan Requirements ML19123A0332019-05-0101 May 2019 NRR E-mail Capture - Logbook Entry: 05/01/2019 Endangered Species Report Regarding a Confirmed Sighting of North Atlantic Right Whale(S) (Balaena Glacialis) ML19122A4912019-04-29029 April 2019 NRR E-mail Capture - Logbook Entry: 04/29/2019 Regarding the Confirmed Sighting of Ten North Atlantic Right Whales (Balaena Glacialis) ML19108A2372019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 50.54(w)(1) - On-Site Property Damage Insurance ML19108A2362019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance 2022-09-26
[Table view] |
Text
March 7, 2017 ADAMS Accession No: ML17061A515 From: Cline, Leonard Sent: Friday, February 24, 2017 3:34 PM To: Pinkham, Laurie
Subject:
2017 SST - 875: Pilgrim Watch 1/11/17 Request NRC to Order Pilgrim Shutdown Attachments: MLampert_11117.pdf
Dear Mary,
I am responding to your January 11, 2017, email to then-Chairman Stephen Burns and NRC Commissioners Kristine Svinicki and Jeff Baran regarding degraded safety performance at Pilgrim (attached). In the email you requested that the NRC order Pilgrim to be closed based on recent plant events and NRC inspection results, including the Inspection procedure 95003 inspection observations communicated in the December 6, 2016, released email.
I want to assure you that the NRC has concerns regarding degraded performance at Pilgrim, but we continue to conclude the plant remains safe to operate and that the Reactor Oversight Process (ROP) provides the means for ensuring the continued safety of the public under this circumstance.
As you are aware, on September 1, 2015, the NRC issued a White finding and Notice of Violation because Entergy had not adequately addressed a significant equipment problem that caused a failure of one of the plants safety/relief valves in February 2013 and then caused a similar failure in January 2015. This issue combined with a failure to adequately address the causes of multiple reactor shutdowns at Pilgrim in 2013 were indications of degrading performance that moved them into Column 4 (the Repetitive Degraded Cornerstone Column) of the NRC ROP Action Matrix in Inspection Manual Chapter 0305.
When Pilgrim moved to Column 4, the NRCs oversight program directed the staff to complete a supplemental inspection, referred to as a 95003 inspection. The first objective of this inspection is to provide timely additional information to be used by the NRC in deciding whether the continued operation of the facility is acceptable and whether additional regulatory actions are necessary to arrest declining plant performance. The determination of unacceptable performance would result in moving the plant to Column 5 and ordering the plant to shut down.
In accordance with the procedure, to support timely assessment of the safety of continued operation and the need for additional regulatory action, Region I elected to complete the inspection in three phases, with Phase A completed in mid-January of last year and Phase B in April 2016. Both of these inspections reviewed aspects of Pilgrims corrective action program to determine whether continued operation was acceptable or additional regulatory action was needed. Following completion of those inspections, the NRC concluded that Pilgrim continued to operate safely and that, at that time, additional regulatory action was not required.
As you know, Phase C of the inspection is currently underway. The team completed three weeks of onsite inspection on January 13, 2017, and is currently finalizing the inspection results. We expect to issue the report sometime in the early spring of 2017. There will also be two public meetings to discuss the inspection - one was held on January 31, 2017, and the other will take place in late March.
1
Column 5 of the Action Matrix is the Unacceptable Performance Column. Entry into this column occurs when it is determined that licensee performance is unacceptable. At that point, adequate protection is no longer assured and continued plant operation is not acceptable. If this occurs, the NRC would issue a shutdown order.
According to Inspection Manual Chapter 0305, unacceptable performance represents situations in which the NRC lacks reasonable assurance that the licensee can or will conduct its activities to ensure protection of public health and safety. Section 10.02e discusses criteria for Column 5 entry and lists three examples of what unacceptable performance may include:
- 1) Multiple escalated violations of the facilitys license, technical specifications, regulations, or orders.
- 2) Loss of confidence in the licensees ability to maintain and operate the facility in accordance with the design basis (e.g., multiple safety-significant examples where the facility was determined to be outside of its design basis, either because of inappropriate modifications, the unavailability of design basis information, inadequate configuration management, or the demonstrated lack of an effective Corrective Action Program).
- 3) A pattern of failure of licensee management controls to effectively address previous significant concerns to prevent recurrence.
These examples have been applied to the results of the IP 95003 inspection results to date to evaluate the need for the NRC to take action to order the shutdown of the Pilgrim plant before the 2019 scheduled permanent shutdown date. The NRC has concluded based on the results of inspections to date that Pilgrim has not entered Column 5. More specifically this conclusion is based on the following:
- 1) Since Pilgrims entry into Column 4, there have been no additional escalated enforcement violations, and the IP 95003 inspection team has identified only one potential greater than green finding, to date.
- 2) Since entry into Column 4, there have not been multiple safety significant examples where the licensee was determined to be outside of its design basis. The inspection record has not identified multiple significant performance issues in design and configuration control and has, therefore, concluded there has been adequate performance in design and configuration control at Pilgrim.
- 3) There has not been a pattern of failure of licensee management controls to effectively address previous significant safety concerns to prevent recurrence.
The results of Phase C of the IP 95003 inspection are currently being finalized, and during this process the NRC will continue to evaluate the need for additional action if the results indicate a degradation in site performance beyond Column 4. At a minimum, the Regional Office will issue a Confirmatory Action Letter to document the licensees commitments, including those in its performance improvement plan, needed to ensure adequate protection of the public health and safety is maintained. The NRC will then conduct follow-up inspections to ensure actions taken to complete the commitments from the Confirmatory Action Letter are met. Pilgrim will not transition from Column 4 until all commitments are confirmed complete.
In the interim, the three NRC Resident Inspectors assigned to Pilgrim will continue to carry out our rigorous inspection program. NRC senior management will continue to conduct quarterly reviews of Pilgrim performance, with a particular focus on monitoring for additional performance decline. The NRC senior management has also engaged Entergy with more frequent site visits. And, in June 2016, the Commission met with Entergy officials to discuss its performance improvement plan at a public meeting at NRC headquarters. As our assessment of the plants performance in Column 4 continues, the NRC may take additional regulatory actions as warranted, including additional supplemental inspections, or issuance of an order, up to and including a plant shutdown. We will also keep the public apprised of our assessment of Entergys performance at Pilgrim and any additional regulatory actions through our public meetings, inspection reports, and letters.
Leonard Cline Sr. Project Engineer Pilgrim & James A. FitzPatrick USNRC, RI 610-337-5373 2