MONTHYEARML17171A3172018-04-20020 April 2018 Transmittal Letter for Draft Safety Evaluation for BWRVIP-41, Revision 4, BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines ML17240A2312017-08-24024 August 2017 Project No. 704, BWRVIP-308NP: BWR Vessel and Internals Project, Testing and Evaluation of the Hatch Unit 1 300 Degrees Surveillance Capsule ML17114A3712017-04-20020 April 2017 Errata for BWRVIP-271NP: BWR Vessel and Internals Project, Testing and Evaluation of the Browns Ferry, Unit 2, 120 Degree Capsule ML17111A8702017-04-19019 April 2017 Surveillance Capsule Test Results Report ML17025A0352016-10-31031 October 2016 PSEG Letter LR-N16-0168, 10 CFR 50 Appendix H Status Update for Hope Creek Generating Station, October 31, 2016 ML16132A0802016-05-0505 May 2016 Surveillance Capsule Test Results Report ML14140A7012014-07-30030 July 2014 Extension of Schedule for Reporting Surveillance Capsule Test Results Under the Integrated Surveillance Program (TAC No. MF3926)(EPRI Letters 2013-185, and 2013-211) ML13227A3532013-04-17017 April 2013 Transmittal of Technical Report 3002000078, BWRVIP-271NP: BWR Vessel & Internals Project Testing and Evaluation of the Browns Ferry Unit 2 120 Degrees Capsule ML12297A0692012-10-15015 October 2012 Project No. 704 - BWR Vessel and Internals Inspection Summaries for Fall 2011 Outages ML12135A2142012-05-10010 May 2012 TVA Browns Ferry, Unit 2, Surveillance Capsule Test Results Report ML12090A4742012-03-28028 March 2012 Surveillance Capsule Test Results Report ML1108712502011-03-24024 March 2011 BWR Vessel and Internals Inspection Summaries for Spring 2010 Outages ML1004801842010-02-0808 February 2010 BWRVIP-117-A: BWR Vessel and Internals Project, RAMA Fluence Methodology Plant Application-Susquehanna Unit 2 Surveillance Capsule Fluence Evaluation for Cycles 1-5 ML0905506352009-02-19019 February 2009 BWRVIP-199: BWR Vessel and Internals Project, Testing and Evaluation of the Monticello 300 Degree Capsule - Cover Letter ML0820701932008-07-24024 July 2008 Ltr. to: Mr. Rick Libra; from: J. E. Dyer, Chief Financial Officer; Dated: July 24, 2008; BWRVIP-182 Fee Waiver ML0728501222007-10-10010 October 2007 BWRVIP-145NP, BWR Vessel and Internals Project, Evaluation of Susquehanna Unit 2 Top Guide and Core Shroud Material Samples Using RAMA Fluence Methodology ML0723403152007-08-22022 August 2007 Staff Evaluation of BWRVIP Response to Nuclear Regulatory Commission Safety Evaluation of BWR Vessel and Internals Project, Evaluation of Crack Growth in BWR Stainless Steel RPV Internals (BWRVIP-14-A) ML0722505422007-08-13013 August 2007 Acknowledgment of Withdrawal of BWRVIP-41 and BWRVIP-138 Reports (MD0048) ML0706104572007-02-28028 February 2007 BWRVIP Actions in Response to Flaw Indications in Recirculation Inlet Piping Nozzle to Safe End Welds at Duane Arnold ML0622004572006-08-0707 August 2006 Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline BSEP 06-0073, Notification of Deviation from Boiling Water Reactor Vessel and Internals Project Guidelines2006-07-18018 July 2006 Notification of Deviation from Boiling Water Reactor Vessel and Internals Project Guidelines ML0525502872005-09-0606 September 2005 Revised Request for Additional Information - BWRVIP-108: BWR Vessel and Internals Project Technical Basis for the Reduction of Inspection Requirements for the Boiling Water Reactor Nozzle-to-Vessel Shell Welds and Nozzle Blend Radii ML0513302732005-03-30030 March 2005 Project No. 704 - BWRVIP-18-A: BWR Vessel and Internals Project, BWR Core Spray Internals Inspection and Flaw Evaluation Guidelines - Enclosure 1 to 05/10/2005 Ltr NL-05-0851 ML0507504332005-03-11011 March 2005 PROJ0704 - BWRVIP-1 17NP: BWR Vessel and Internals Project, RAMA Fluence Methodology Plant Application - Susquehanna Unit 2 Surveillance Capsule Fluence Evaluation for Cycles 1-5 ML0406309252004-03-0101 March 2004 Integrated Surveillance Program (ISP) Capsules a, B, and C Test Results Report ML0330401822003-10-29029 October 2003 Transmittal of Report BWRVIP-121: BWR Vessel and Internals Project, RAMA Fluence Methodology Procedures Manual, EPRI Technical Report 1008062, October 2003. ML0322303132003-08-0505 August 2003 BWRVIP-117: BWR Vessel & Internals Project, RAMA Fluence Methodology Plant Application - Susquehanna Unit 2 Surveillance Capsule Fluence Evaluation for Cycles 1-5 ML0316309072003-06-10010 June 2003 Transmittal of Report BWRVIP-113: BWR Vessel and Internals Project, River Bend 183 Degree Surveillance Capsule Report, EPRI Technical Report 1003345, June 2003 ML0306905892003-03-0707 March 2003 BWR Vessel & Internal'S Project, Updated BWR Integrated Surveillance Program Implementation Plan, Dated November 12, 2002 ML0305603702003-02-20020 February 2003 Surveillance Capsule Test Results Report ML0301001612003-01-0808 January 2003 Project No.704 - Transmittal of BWRVIP - 111 ML0233302032002-11-25025 November 2002 Project No. 704 - BWRVIP-108: BWR Vessel & Internals Project, Technical Basis for Reduction of Inspection Requirements for Boiling Water Reactor Nozzle-to-Vessel Shell Welds & Nozzle Blend Radii ML0231904872002-11-12012 November 2002 Project No. 704-BWRVIP-86-A: BWR Vessel & Internals Project, Updated BWR Integrated Surveillance Program (ISP) Implementation Plan 2018-04-20
[Table view] |
Text
~1=:11211
-=*- ELECTRIC POWER RESEARCH INSTITUTE 2016-114 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ BWR Vessel & Internals Project (BWRVIP)
October 31, 2016 Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 Attention: Carleen Parker Hope Creek Docket No. 50-534 BWRVIP Project No. 704
Subject:
BWRVIP-298NP: BWR Vessel and Internals Project, Testing and Evaluation of the Hope Creek 120° Capsule
References:
- 1. PSEG letter LR-N16-0168, "10 CFR 50 Appendix H Status Update for Hope Creek Generating Station," October 31, 2016.
- 2. T. Wengert to A. McGehee and T. Hanley, "Hope Creek Generating Station
- Extension of Schedule for Reporting Surveillance Capsule Test Results Under the Integrated Surveillance Program (TAC NO. MF6759), (EPRI Letter 2015-050)," April 12, 2016.
Enclosed are five (5) paper copies of the report "BWRVIP-298NP: BWR Vessel and Internals Project, Testing and Evaluation of the Hope Creek 120° Capsule," EPRI Technical Report 3002007844, October 2016. This report is being transmitted to the NRC for information only.
This report describes testing and evaluation of the Hope Creek 120° capsule. These results will be used to monitor embrittlement as part of the BWRVIP Integrated Surveillance Program (ISP).
The materials in the Hope Creek 120° capsule are identified in BWRVIP-86, Revision 1-A, as representative for target materials for the Hope Creek reactor vessel and no other plants in the BWRVIP ISP. Therefore, there is no potential for the Hope Creek 120° capsule evaluation results to effect any plant's approved Pressure-Temperature (P-T) curves other than those of Hope Creek. Note that consistent with the reporting requirements of 10 CFR 50 Appendix H, Paragraph IV.C, PSEG's plans to address the effect of the 120° capsule results on the Hope, Creek P-T curves are being submitted to the NRC concurrent with this capsule report submittal.
See Reference 1.
It should be noted that the BWRVIP previously requested an extension to the 10 CFR 50 Appendix H surveillance capsule testing reporting requirements and committed to providing the Together ... Shaping the Future of Electricity PALO ALTO OFFICE 3420 Hillview Avenue, Palo Alto, CA 94304-1395 USA
- Customer Service 800.313.377 4
BWRVIP 2016-114 results of the Hope Creek 120° capsule by October 31, 2016. That request was approved in Reference 2.
Please also note that the enclosed report is non-proprietary and is available to the public by request to EPRI.
If you have any questions on this subject please call Steve Richter (Energy Northwest, BWRVIP Assessment Focus Group Chairman) at 509-377-4703.
Sincerely, Andrew McGehee, EPRI, BWRVIP Program Manager Tim Hanley, Exelon, BWRVIP Chairman c: D. Rudland, NRC-NRR M. Kirk, NRC-RES D. Odell, Exelon Corp.
R. Carter, EPRI A. McGehee, EPRI C. Wirtz, EPRI