TVA Browns Ferry, Unit 2, Surveillance Capsule Test Results Report
ML12135A214
Person / Time
Site: Browns Ferry, PROJ0704  Tennessee Valley Authority icon.png
Issue date: 05/10/2012
From: Czufin D
Electric Power Research Institute
To: Andrew Hon
Document Control Desk, Office of Nuclear Reactor Regulation
References
2012-097
Download: ML12135A214 (1)


Text

I I ELECTRIC POWER RESEARCH INSTITUTE 2012-097 BWR Vessel & Internals Project (BWRVIP)

May 10, 2012 Document Control Desk U. S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 Attention:

Andrew Hon

Subject:

Project No. 704 - TVA Browns Ferry Unit 2 Surveillance Capsule Test Results Report

References:

BWRVIP Letter 2012-076, "Project No. 704 - TVA Browns Ferry Unit 2 Surveillance Capsule Test Results Report," March 28, 2012.

The purpose of this letter is 'to provide an updated schedule for the BWRVIP to transmit the Browns Ferry Unit 2 120 degree surveillance capsule test report to the NRC.

The BWRVIP notified the NRC by letter on March 28, 2012 (referenced above) that the transmittal of the final report on the Brown Ferry Unit 2 120 degree surveillance capsule would be delayed and committed to provide a schedule to the staff as soon as possible.

A data status will be provided to the NRC in December 2012. The final report will be completed and transmitted to the NRC no later than May 1, 2013.

If you have any questions on this subject, please contact Chuck Wirtz (FirstEnergy, BWRVIP Integration Committee Technical Chairman) by email at ciwirtz(&firstenergycorp.com or by telephone at 440.280.7665.

Sincerely, David Czufin, Exelon Chairman, BWR Vessel and Internals Project c:

V. Schiavone, TVA G. Haliburton, TVA S. Rosenberg, NRC C. Wirtz, FirstEnergy R. Stark, EPRI Together...