Supplemental Information Related to Calvert Cliffs Nuclear Power Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, Revision 12
ML16321A478
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 11/15/2016
From: Thomas Young
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML16321A478 (2)


Text

SAFEGUARDS INFORMATION Security-Related Information Withhold Under 10 CFR 2.390 Tuane L. Young Manager-Security Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657 410 495 5223 Office www.exeloncorp.com Tuane.Young@exeloncorp.com 10 CFR 50.54(p)(2) 10 CFR 50.4{b)(4)

November 15, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 & 2 Facility Operating License Nos. DPR-53 and DPR-69 NRG Docket Nos. 50-317 and 50-318 Independent Spent Fuel Storage Installation Material License No. SN.M-2505 NRG Docket No. 72-8

Subject:

Supplemental Information Related to Calvert Cliffs Nuclear Power Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, Revision 12

Reference:

1. Letter from T. L. Young (Exelon) to Document Control Desk (NRG), dated October 20, 2016, Calvert Cliffs Nuclear Power Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, Revision 12 In accordance with 10 CFR 50.54, "Conditions of licenses," paragraph (p)(2), Exelon Generation Company, LLC (EGG) is submitting supplemental information related to Revision 12 of the Calvert Cliffs Nuclear Power Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program as requested by the Nuclear Regulatory Commission at a meeting with EGG during the week of October 10, 2016. No changes are being made to Revision 12 of the Calvert Cliffs Site Security Plan.

Exelon has concluded that the attached supplemental information (Attachment 1) does not decrease the safeguards effectiveness of the Calvert Cliffs Nuclear Power Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program.

This cover letter is not subject to protective requirements. The Attachment is subject to Safeguards Information protection according to 10 CFR 73.21. Upon separation -from the attachment, this cover letter is to be considered Decontrolled.

SAFEGUARDS INFORMATION Security"'.Related Information Withhold Under 10 CFR 2.390 SoDI rJtvf5S l~

. NJ~~6

SAFEGUARDS INFORMATION Security-Related Information Withhold Under 10 CFR 2.390 Document Control Desk November 15, 2016 Page 2 The Attachment contain~ Safeguards Information. . Therefore, EGC requests that this information be withheld from public disclosure in accordance with 10 CFR 2.390, "Public inspections, exemptions, requests for withholding," paragraph (d){1 ), and 10 CFR 73.22, "Protection of Safeguards Information: Specific Requirements," paragraph (a)(1 )(i).

There are no regulatory commitments contained in this letter.

Should you have questions regarding this matter, please contact Mr. Larry D. Smith at 410-495-5219~--

TLY/PSF/bjm

Attachment:

(1) Calvert Cliffs Nuclear Power Plant Supplemental Information Supporting the Site Security Plan, Revision 12 (Safeguards Information) cc: NRC Regional Administrator, Region I NMSS Director (Without Attachments)