MONTHYEARML21246A2942021-09-29029 September 2021 Enclosufinal Ea/Fonsi for Tva'S Initial and Updated Triennial Decommissioning Funding Plans for Browns Ferry Nuclear Plant ISFSIs CNL-17-079, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Corrected Pages for the Final Environmental Assessment and Finding of No Significant Impact2017-06-12012 June 2017 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Corrected Pages for the Final Environmental Assessment and Finding of No Significant Impact ML17062A3902017-05-22022 May 2017 Cover Letter; Final Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate NRC-2016-0244, Final Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate (CAC Nos. MF6741, MF6742, and MF6743)2017-05-22022 May 2017 Final Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate (CAC Nos. MF6741, MF6742, and MF6743) ML17062A4032017-05-22022 May 2017 Final Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate ML16287A5702016-11-21021 November 2016 EPU Draft Environmental Assessment ML0936501992010-01-26026 January 2010 Environmental Assessment and Finding of No Significant Impact ML0936502022010-01-26026 January 2010 Environmental Assessment and Finding of No Significant Impact ML0704301342007-02-20020 February 2007 Environmental Assessment and Finding of No Significant Impact Related to the Issuance of Exemption to 10 CFR Part 50, Appendix R ML0701902462007-02-0606 February 2007 Environmental Assessment, Final Environmental Assessment and Finding of No Significant Impact Related to Proposed Extended Power Uprate (TAC Nos. MC3812, MC3743 and MC3744) (TS-418 and TS-431) ML0631005632006-11-27027 November 2006 Notice of Availability of Draft Environmental Assessment of Extended Power Uprate ML0622600932006-10-30030 October 2006 Issuance of Environmental Assessment and Finding of No Significant Impact Related to Extended Power Uprate ML0612902782006-05-30030 May 2006 Environmental Assessment and Finding of No Significant Impact Related to the Issuance to 10 CFR Part 50, Appendix J ML0614405552006-05-19019 May 2006 Enclosures 1 - 4, Browns Ferry, Units 1, 2 & 3 - Radiological Impact Assessment 2004 ML0428001662003-08-0707 August 2003 Draft Supplemental Environmental Assessment, Browns Ferry Nuclear Plant Units 2 and 3 Extended Power Uprate Project, Limestone County, Alabama ML0412102532003-08-0707 August 2003 Extended Power Uprate Project - Environmental Assessment and Finding of No Significant Impact (Fonsi) ML0403402052003-08-0707 August 2003 Extended Power Uprate Project - Environmental Assessment and Finding of Significant Impact (Fonsi) ML0207006062002-03-11011 March 2002 Environmental Assessment and Finding of No Significant Impact for an Exemption from Requirements of 10 CFR Part 50 Appendix G TAC Nos. MB2751 and MB2752 ML0607202982001-03-13013 March 2001 Environmental Assessment Bear Creek Reservoirs Land Management Plan ML18283B7081977-07-31031 July 1977 an Environmental Assessment of Operation Oo Browns Perry Nuclear Plant with a Thermal Limit of 90oF Maximum Temperature in Wheeler Reservoir ML18283B6951976-06-30030 June 1976 Environmental Radioactivity Levels, Brown Ferry Nuclear Plant, July-December 1975 ML18283B6961975-12-31031 December 1975 Environmental Radioactivity Levels, Brown Ferry Nuclear Plant, January-June 1975 ML18283B6971975-06-30030 June 1975 Environmental Radioactivity Levels, Brown Ferry Nuclear Plant, July-December 1974 2021-09-29
[Table view] Category:Letter type:CNL
MONTHYEARCNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472024-01-11011 January 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan2023-11-29029 November 2023 Submittal of Fifth 10-Year Interval Inservice Testing Program Plan CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-025, American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472023-07-0303 July 2023 American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . CNL-23-046, Revision to Notice of Intent to Pursue Subsequent License Renewal - Schedule Submittal2023-06-0606 June 2023 Revision to Notice of Intent to Pursue Subsequent License Renewal - Schedule Submittal CNL-23-037, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Request2023-06-0101 June 2023 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Requests CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-034, 10 CFR 50.46 Annual Report2023-04-26026 April 2023 10 CFR 50.46 Annual Report CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-018, Request for Amendment Regarding Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves (BFN TS-540)2023-03-30030 March 2023 Request for Amendment Regarding Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves (BFN TS-540) CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-027, Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b (BFN TS-524)2023-03-29029 March 2023 Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b (BFN TS-524) CNL-23-022, Decommissioning Funding Status Report2023-03-29029 March 2023 Decommissioning Funding Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report CNL-23-019, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative BFN-0-ISI-322023-03-11011 March 2023 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative BFN-0-ISI-32 CNL-22-045, Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 42023-03-10010 March 2023 Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 4 CNL-23-021, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-03-0808 March 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-037, Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533)2023-01-31031 January 2023 Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533) CNL-23-003, Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A2023-01-30030 January 2023 Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A CNL-23-008, Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-12-22022 December 2022 Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-089, License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546)2022-12-20020 December 2022 License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546) CNL-22-090, Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Requests for the Fifth Inservice Testing Interval2022-12-12012 December 2022 Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Requests for the Fifth Inservice Testing Interval CNL-22-100, to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3,in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535)2022-12-0909 December 2022 to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3,in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535) CNL-22-097, Response to Request for Additional Information and Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide .2022-12-0101 December 2022 Response to Request for Additional Information and Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide . CNL-22-106, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operat2022-11-28028 November 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operatio CNL-22-105, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 222022-11-0808 November 2022 Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 22 CNL-22-099, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2022-10-31031 October 2022 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-22-098, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 552022-10-17017 October 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 55 CNL-22-055, Application to Delete Acreage Value Discussion from Technical Specifications (BFN TS-543)2022-09-29029 September 2022 Application to Delete Acreage Value Discussion from Technical Specifications (BFN TS-543) CNL-22-096, to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3, in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535)2022-09-29029 September 2022 to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3, in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535) CNL-22-083, to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3, in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535).2022-09-13013 September 2022 to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for Browns Ferry Nuclear Plant Units 1, 2, and 3, in Support of Atrium 11 Fuel Use at Browns Ferry (TS-535). CNL-22-075, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Unit 2, Request for Alternative, BFN-21-ISI-02, Alternative to American Society of Mechanical Engineers, Boiler and Pressure Vessel Code, Section Xi,.2022-09-12012 September 2022 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Unit 2, Request for Alternative, BFN-21-ISI-02, Alternative to American Society of Mechanical Engineers, Boiler and Pressure Vessel Code, Section Xi,. CNL-22-025, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative BFN-0-ISI-322022-08-22022 August 2022 American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative BFN-0-ISI-32 CNL-22-077, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-08-11011 August 2022 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-065, Response to Request for Confirmation of Information and Additional Information and Second Supplement Regarding Application Requesting NRC Prior Approval of a Proposed Chilled-Water Cross-tie.2022-08-0101 August 2022 Response to Request for Confirmation of Information and Additional Information and Second Supplement Regarding Application Requesting NRC Prior Approval of a Proposed Chilled-Water Cross-tie. CNL-22-076, to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 in Support of Atrium 11 Fuel2022-07-28028 July 2022 to Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 in Support of Atrium 11 Fuel CNL-22-066, Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for in Support of Atrium 11 Fuel Use Supplement 3, Response to Request for Additional Information2022-07-18018 July 2022 Request for License Amendment Regarding Application of Advanced Framatome Methodologies, and Adoption of TSTF-564 Revision 2 for in Support of Atrium 11 Fuel Use Supplement 3, Response to Request for Additional Information CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) CNL-22-064, Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change2022-06-0909 June 2022 Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change CNL-22-068, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-06-0808 June 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 2024-01-17
[Table view] |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-17-079 June 12, 2017 10 CFR 50.90 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
Subject:
Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Corrected Pages for the Final Environmental Assessment and Finding of No Significant Impact
References:
- 1. Letter from TVA to NRC, CNL-15-169, "Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU)," dated September 21, 2015 (ML15282A152)
- 2. Letter from TVA to NRC, CNL-17-017, "Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 37, Transmission System Update - Environmental Aspects," dated February 3, 2017 (ML17034A562)
- 3. Letter from NRC to TVA, "Browns Ferry Nuclear Plant, Units 1, 2, and 3 -
Final Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate (CAC NOS. MF6741, MF6742, AND MF6743)," dated May 22, 2017 (ML17062A383)
By the Reference 1 letter, Tennessee Valley Authority (TVA) submitted a license amendment request (LAR) for the Extended Power Uprate (EPU) of Browns Ferry Nuclear Plant (BFN) Units 1, 2 and 3. The proposed LAR modifies the renewed operating licenses to increase the maximum authorized core thermal power level from the current licensed
U.S. Nuclear Regulatory Commission CNL-17-079 Page 2 June 12, 2017 thermal power of 3458 megawatts to 3952 megawatts. In Reference 2, TVA provided a supplement that incorporated the environmental aspects associated with some proposed EPU-related Transmission System updates. Enclosure 3 of Reference 2 provided markups of the draft Environmental Assessment and Finding of No Significant Impact to reflect the changes associated with the Reference 2 supplement. The Reference 3 letter provided the NRCs final Environmental Assessment and Finding of No Significant Impact related to the proposed BFN EPU.
During a review of the Reference 3 document, TVA noted that some of the markups from of Reference 2 were not fully captured in the Reference 3 final letter. TVA determined that the strike-through mark-ups from Enclosure 3 of Reference 2 were deleted during the PDF creation prior to transmittal and, therefore, on one page, some suggested deletions were left in the Reference 3 document. Additionally, on two pages, markup inserts were not incorporated. A TVA condition report has been created to document this error.
The enclosure to this letter provides the corrected markups to the Final Environmental Assessment and Finding of No Significant Impact to reflect the changes associated with the proposed EPU-related Transmission System update included in Reference 2.
TVA has reviewed the information supporting the environmental consideration provided to the NRC in the Reference 1 letter. The supplemental information in this submittal does not affect the bases for concluding that an environmental impact statement does not need to be prepared in connection with the proposed license amendment. Additionally, in accordance with 10 CFR 50.91(b)(1), TVA is sending a copy of this letter to the Alabama State Department of Public Health.
There are no new regulatory commitments associated with this submittal. If there are any questions or if additional information is needed, please contact Mr. Edward D. Schrull at (423) 751-3850.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 12th day of June 2017.
Respectfully, Signing F or:
J. W. Shea Vice President, Nuclear Licensing Enclosure cc: See Page 3
U.S. Nuclear Regulatory Commission CNL-17-079 Page 3 June 12, 2017
Enclosure:
Corrected Markup Pages to the Final Environmental Assessment and Finding of No Significant Impact cc (Enclosure):
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant State Health Officer, Alabama Department of Public Health
ENCLOSURE Corrected Markup Pages to the Final Environmental Assessment and Finding of No Significant Impact
Plant Modifications and Upgrades An EPU usually requires significant modifications to major balance-of-plant equipment.
The proposed EPU for BFN would require the modifications described in Attachment 47 to the licensee's application entitled "List and Status of Plant Modifications, Revision 1" (TVA 2017d),
which include replacement of the steam dryers, replacement of the high pressure turbine rotors, replacement of reactor feedwater pumps, installation of higher capacity condensate booster pumps and motors, modifications to the condensate demineralizer system, modifications to the modifications to the main generator excitation system, feedwater heaters, and upgrade of miscellaneous instrumentation, setpoint changes, and software modifications.
All onsite modifications associated with the proposed action would be within the existing structures, buildings, and fenced equipment yards. All deliveries of materials to support EPU-related modifications and upgrades would be by truck, and equipment and materials would be temporarily stored in existing storage buildings and laydown areas. TVA anticipates no changes in existing onsite land uses or disturbance of previously undisturbed onsite land (TVA 2017a).
According to TVA's current schedule, modifications and upgrades related to the proposed EPU would be completed at Unit 1 during the fall 2018 refueling outage, at Unit 2 during the spring 2019 outage, and at Unit 3 during the spring 2018 outage. If the NRC approves the proposed EPU, TVA would begin operating each unit at the uprated power level following these outages.
Cooling Tower Operation and Thermal Discharge Operating BFN at the EPU power level of 3,952 MWt per unit would increase the steam flow to the plant's steam turbines, which would in turn increase the amount of waste heat that must be dissipated. TVA would increase its use of the cooling towers (i.e., operate in helper mode) to dissipate some of this additional heat; the remaining heat would be discharged to Wheeler Reservoir. If helper mode operation were to be insufficient to keep the reservoir 11
Springs Substation expansion. For the Corinth Substation expansion, TVA would purchase 3.5 ac {1.4 ha) of land and disturb 3 ac {1.2 ha) of land. TVA would complete the SVC and capacitor bank installations by spring 2020, although TVA's transmission system operator does not preclude BFN from operating at EPU levels during the capacitor bank installations (TVA 2017a, 2017c, 2017d, 2017e).
BFN Main Generator Excitation System Modifications TVA would modify the BFN main generator Alterrex excitation system for all three units with a bus-fed static excitation system consisting of a 3-phase power potential transformer, an automatic voltage regulator, and a power section. Physical work to complete these modifications would be performed within existing BFN structures and would not involve any previously undisturbed land. TVA is in the preliminary phase of the design change notice development for these modifications; therefore, TVA has not yet developed a specific timeline for implementation of the main generator excitation system modifications. However, TVA projects that these upgrades would be completed by 2020 {Unit 1), 2021 {Unit 2), and 2020 (Unit 3) (TVA 2017c, 2017d).
The Need for the Proposed Action As stated by the licensee in its application, the proposed action would allow TVA to meet the increasing power demand forecasted in TVA service area. TVA estimates that energy consumption in this area will increase at a compound annual growth rate of 1.2 percent until 2020 with additional moderate growth continuing after 2020.
Environmental Impacts of the Proposed Action This section addresses the radiological and non-radiological impacts of the proposed EPU. Separate from this EA, the NRC staff is evaluating the potential radiological 14
and sound attenuators, are incorporated as required to meet the guidelines. In the event that TVA (2016a) finds that the resulting noise levels exceed the FICON guidelines, TVA would develop and implement additional acoustical mitigation, such as modifications to fans and motors or the installation of barriers. TVA will also continue to comply with Occupational Safety and Health Administration (OSHA) regulations to protect worker health onsite.
The NRC staff concludes that the implementation of EPU modifications and upgrades, SVC and the capacitor bank installations, and additional operation of the cooling towers following implementation of the EPU would not result in significant noise impacts. Additionally, TVA would continue to comply with FICON guidelines and OSHA regulations regarding noise impacts, which would further ensure that future cooling tower operation would not result in significant impacts on the acoustic environment and human health.
Water Resources Impacts As previously described, EPU-related modifications at BFN to include replacement and upgrades of plant equipment would occur within existing structures, buildings, and fenced equipment yards. TVA does not expect any impact on previously undisturbed land at the BFN site. Any ground-disturbing activity would be subject to BFN's BMP Plan, which TVA must maintain as a condition of the BFN NPDES permit (ADEM 2012). TVA must implement and maintain the BMP Plan to prevent or minimize the potential for the release of pollutants in site runoff, spills, and leaks to waters of the State from site activities and operational areas.
Consequently, the NRC staff concludes that onsite EPU activities at BFN would have no significant effect on surface water runoff and no impact on surface water or groundwater quality.
Implementation of the EPU would also require upgrades to TVA's transmission system, including installation of a minimum of 764 MVAR reactive compensation, consisting of an SVC installation and four capacitor bank installations at five sites throughout TVA service area (see "MVAR Reactive Compensation" under "Description of the Proposed Action"). At two of the 28