Summary of 810402-03 Meeting W/B&W Owners Group & Vendors in Bethesda,Md Re Proposed Responses to NRC 810109 Info Request Re Asymmetric LOCA Loadings
ML16138A497
Person / Time
Site: Davis Besse, Oconee, Arkansas Nuclear, Crystal River, Rancho Seco, Crane  
Issue date: 04/09/1981
From: Vissing G
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
TAC-08602, TAC-08843, TAC-8602, TAC-8843, NUDOCS 8104200321
Download: ML16138A497 (12)


Text

05 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Dockets Nos. 50-269/27Ar/289/3O2/3l2/3l3 and 346 FACILITIES: Oconee 1, 2 and 3, Three Mile Island 1, Rancho Seco, Arkansas Nuclear One Unit 1, Davis-Besse 1, and Crystal River Unit 3 LICENSEES:

Babcock and Wilcox Reactor Owner Group -

Duke Power Company, Metropolitan Edison Company, Sacramento Municipal Utility District, Arkansas Power and Light Company, Toledo Edison Company-and Florida Power Corporation

SUBJECT:

SUMMARY

OF MEETING WITH THE B&W OWNERS GROUP CONCERNING PROPOSED RESPONSES TO NRC INFORMATION REQUEST OF JANUARY 9, 1981, REGARDING ASYMMETRIC LOCA LOADINGS Introduction By letter dated January 9, 1981, we requested from each B&W NSS owner addi tional information as a result of our review of the B&W 177-FA Owners Group submittal on "Effects of Asymmetric LOCA Loadings -

Phase II Analysis" - B&W 1597 dated February 1980 and B&W 1621 dated July 1980. Since there were a lot of questions and the responses would be quite complicated, we suggested that we convene a meeting with the Owners Group to discuss the responses before formal responses were submitted.

Such a meeting was held on April 2 and 3, 1981, at the NRC offices in Bethesda, Maryland.

The attendees are identi fied in Enclosure 1.

Discussion and Conclusions Each item of the request of January 9, 1981, was discussed on how it would be addressed in the formal response-by reference to documentation in the docket files, by detailed data and drawings and/or by background infor mation and explanation. provides a summary of the proposed method of responses.

The proposed responses were discussed for their acceptability; a clear under standing on what would be acceptable by the staff was provided; and there appeared to be a general acceptance as to what would be expected in the formal responses.

However, to assure that the formal responses would be complete and the issues be resolved to the fullest degree possible, the Owners Group requested another meeting with the staff after the staff would have an opportunity to review a draft of the responses.

APR 14 1981

The.0wners Group.committed to provide -theastaff a.draft of thezresponses by June 26, 1981.

A meeting of the.-staff and Owners Group to discuss-thesdraft responses was scheduled for 10:00 am July:16t9 1981, at the.NRC Offices-in.

Bethesda.

Guy Vissing, Proj ac nagere Operating Reactors B 7nch-!#4.

Division of Licensing Encl osures:

1. Listrof Attendees
2. Summary-of: Proposed.Methods of Responses cc-.w/enclosures:

Seelast page

ATTENDANCE LIST MEETING WITH B&W OWNERS GROUP CONCERNING ASYMMETRIC LOCA LOADINGS APRIL 2 & 3, 1981 Attendance 1NRC April 2 April 3 Guy S. Vissing X

X G. A. Schwenk X(Part time)

A. J. Cappucci X"

Jack Page X"

J. Rajan X

X E. Chelliah X

X Garry G. Young x

James Shea X(Part time)

EG&G Idaho Randy Lippert X

X

0. Mark Hanner, Jr.

X X

Richard Rah1 X

X EDS Nuclear Gerry Slagis X

X John Edinger X

X B&W Barry J. Short X

X W. C. Nester X

X Wm. D. Maxhem X

X D. L. Howell X

X GPU Nuclear Lou Lanese X

X

-2 Attendance April 2 April 3 FPC Joe Vattamattam X

X AP&L Larry D. Young X

TECo John K. Wood x

SMUD R. A. Dieterich x

DPC R. S..Bhatnagan X

NUS Corporation

.Mike Schoppman x

/

A-2~ L 6 2.1%J owv9.u cj(RooP s~uu SN a

k k's ru kfJ Av

__I SII I _II.

____R__

os____

a stoM st

.uLA FGie "7

Vc_

________D

____ Lxip___L____

L R*/M 1

A-0.PA

__A__/_D_

1 O

R-M A \\t 1

2-3

-_\\

$2 2-7?2 21_

VLe V_\\

_Ep

A-2~

/

4~J~

A-tA. ~A-NJ ~JL%

YX~A/9~A4 I

SA'T.

t.D A WV S V___

o'A

_________<___ 1 3-I S17 VI 3S V

3_

T___

_w__

W A__oA___

3" sl

A 16/

W I

~

A 9-V-S

~~

__-7_

j~~P~

___~~3 2-1_

_I_

)

j u V14 c~4~i

_____~~~A--

LA_____ P______ Vr tE-cA ALA

-1 ta t~$EL f

M~flE

______________Al

.- co

_S

___47_

vt cte ~ S P" 'a4 6

~43ls 4

Vavu2-,A

//

AQP A-PE A'F L-A li nIr

__R__

otA s4e spoM A

se.

F e4

____ 3' 2..-

__AIL____)________

/D

______o__/___P_____

_______7

______\\____

cA o7 T__T_

ATA s

aL 7

A-2!-

LI xr /D-J

~

/

-7 4

,/

4 C>_

P-4_

_ ~

E V1,

~-

~

'JAL

__~ ~ ~ ~~~1 A_

L c C

-~

I 6

MEETING

SUMMARY

DISTRIBUTION Licensee: Duke Power Company, Metropolitan Edison Company, Sacramento Municipal Utility District, Arkansas Power & Light Company, Toledo Edison Company

& Florida Power Corporation

  • Copies also sent'to those people on service (cc) list for subject plant(s)..

Docket File-8 NRC PDR L PDR ORB#4 Rdg TNovak JStolz Project Manager -6 Licensing Assistant-2 OELD Heltemes, AEOD IE-3 SShowe (PWR) or CThayer (BWR), IE Meeting Summary File-ORB#4, RFraley, ACRS-10 Program Support Branch J01shinski BGrimes, DEP SSchwartz, DEP SRamos, EPDB FPagano, EPLB GSchwenk ACappucci JPage JRajan ECHelliah GYoung JShea