Advises That Addl Info Requested in NRC Will Not Be Provided on 871231,per .Util Has Changed Contractors for leak-before-break Analysis in Order to Obtain Clarifications.Submittal Will Be Made by 880130
ML20236R788
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 11/20/1987
From: Cockfield D
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
TAC-06596, TAC-6596, NUDOCS 8711240029
Download: ML20236R788 (1)


Text

l J I

1

- means num P0ftlatici Getieral Bectric Coiiipen iy David W. Cockfield Vice President. Nuclear November 20,'1987 Trojan Nuclear Plant' j Docket 50-344 -4 License NPF-1

]

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555 i

Dear Sir:

Leak-Before-Break Analysis (TAC No. 06596)

By letter dated August 4, 1987, the Nuclear Regulatory Commission (NRC) staff requested that Portland General Electric (PGE) provide' additional l information regarding the elimination of dynamic effects of postulated primary loop pipe ruptures front the design basis for the Trojan Nuclear Plant. PGE responded in an Aupst 25, 1987 letter that the information requested by the staff would be provided by December 31,-1987.

In the interim since the submittal of the August 25, 19g7 letter,.PGE has discussed the NRC questions with the NRC staff in order to obtain clari-fications. As a result, PGE has changed contractors for the leak-before-break analysis. This change was determined to be necessary to develop and ensure an adequate response to the staff'r voquest for information.

As a result of the time taken to evaluate and uelect a new contractor, PGE will not be able to meet the December 31, 1987 submittal date. A complete submittal will be made on or before January 29, 1988 in response ,

to your request for additional information. .

Sincerely, c: Mr. John B. Martin Regional Administrator, Region V U.S. Nuclear Regulatory Commission l Mr. Dave Yaden. Director '