|
---|
Category:Letter
MONTHYEARML24344A0692024-12-0909 December 2024 Proof of Financial Protection 10 CFR 140.15 IR 05000293/20240032024-11-20020 November 2024 Decommissioning International, Llc., Pilgrim Nuclear Power Station - NRC Inspection Report 05000293/2024003 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000293/20240022024-08-21021 August 2024 NRC Inspection Report No. 05000293/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24129A1042024-05-26026 May 2024 Preapplication Readiness Assessment Plan for the Holtec Decommissioning International License Termination Plan ML24135A3212024-05-14014 May 2024 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2023 ML24136A2382024-05-14014 May 2024 Annual Radiological Environmental Operating Report for 2023 IR 05000293/20240012024-05-0707 May 2024 NRC Inspection Report No. 05000293/2024001 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 L-24-010, Request for Preapplication Readiness Assessment of the Draft License Termination Plan2024-04-22022 April 2024 Request for Preapplication Readiness Assessment of the Draft License Termination Plan L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) L-24-008, Reply to a Notice of Violation EA-2024-0232024-03-29029 March 2024 Reply to a Notice of Violation EA-2024-023 IR 05000293/20230032024-02-29029 February 2024 NRC Inspection Report Nos. 05000293/2023003 and 05000293/2023004 L-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary – November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 And Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23300A0022023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 ML23143A0872023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 L-22-036, Decommissioning Trust Fund Agreement2022-11-0808 November 2022 Decommissioning Trust Fund Agreement ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 And Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay 2024-09-18
[Table view] Category:Licensee Response to Notice of Violation
MONTHYEARL-24-008, Reply to a Notice of Violation EA-2024-0232024-03-29029 March 2024 Reply to a Notice of Violation EA-2024-023 ML18117A1632018-03-29029 March 2018 Response to Notice of Violation; EA-17-143 ML17053B2732017-02-16016 February 2017 Correction of Response to Apparent Violation in Office of Investigations Report No. 1-2015-005 ML15306A4972015-10-30030 October 2015 Reply to a Notice of Violation, Per Problem Identification and Resolution Inspection Report 05000293/2015010 ML13190A3112013-06-20020 June 2013 Reply to NRC Investigation Report No. 1-2012-013 and NRC Inspection Report No. 05000293-11-005 ML1006406682010-03-0404 March 2010 Reply to Notice of Violation ML0524305492005-08-0909 August 2005 Reply to a Notice of Violation, EA-05-089 2024-03-29
[Table view] |
Text
SEn tergy Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 October 30, 2015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Reply to a Notice of Violation Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35
REFERENCE:
NRC Letter to Entergy, "Pilgrim Nuclear Power Station - Problem Identification and Resolution Inspection Repor*t 05000293/201 5010 and Notices of Violation," dated October 1, 2015 LETTER NUMBER: 2.15.077
Dear Sir or Madam,
This letter provides the information requested in the Notice of Violation received at Pilgrim Nuclear Power Station in the above referenced letter. The requested information is provided in the Attachment to this letter.
This letter contains no commitments.
Should you have any questions concerning the content of this letter or require additional information, please contact me at (508) 830-8227.
Sincerely, Manager, Emergency Preparedness DC/mew
Attachment:
Reply to a Notice of Violation (2 Pages)
PNPS Letter 2.15.077 Page 2 of 2 Cc:
Mr. Daniel H. Dorman Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Boulevard, Suite 100 King of Prussia, PA 19406-1 415 NRC Senior Resident Inspector Pilgrim Nuclear Power Station
Attachment To PNPS Letter 2.15.077 Reply to a Notice of Violation (2 Pages)
Attachment to PNPS Letter 2.15.077 Page 1 of 2 Reply to Notice of Violation During an NRC inspection conducted from August 3 through 20, 2015, a violation of NRC requirements was identified. The violation is associated with the following requirement:
Violation No. Description 201 5010-02 10 CFR 50.54(q)(2) requires, in part, that a holder of a nuclear power reactor operating license shall follow and maintain the effectiveness of an emergency plan that meets the requirements in Appendix E to this part, and the planning standards of 10 CFR 50.47(b).
10 CFR 50.47(b) (8) requires, in part, that adequate equipment to support the emergency response are provided and maintained.
Contrary to the above, since December 2011, Entergy did not follow and maintain the effectiveness of the Pilgrim Emergency Plan to meet the requirement that adequate equipment to support the emergency response was provided and maintained. Specifically, in December 2011, Entergy cancelled preventive maintenance of the 160' back-up meteorological tower, and that tower became non-functional. As a result, on eight occasions between March 18, 2012, and August 15, 2015, when the 220' primary meteorological tower was also non-functional for various reasons, Pilgrim did not have instrumentation available on either tower for continuous reading of the wind speed, wind direction, air temperature, and delta air temperature.
Attachment to PNPS Letter 2.15.077 Page 2 of 2 VIOLATION 201 5010-02 - Failure to Maintain Station Meteorological Towers Reason for the Violation During the 2015 NRC Problem Identification and Resolution (PI&R) Inspection a Green Notice of Violation (NOV) was issued for failure to follow and maintain the effectiveness of the Pilgrim Emergency Plan to meet the requirement that adequate equipment to support the emergency response was provided and maintained. The failure to properly maintain the 220' tower and restore or replace the 160' tower was previously identified in Non-Cited Violation (NCV) 2013008-02 issued for violation of 10 CFR 50.54(q)(2). The 2015 PI&R inspection determined Entergy did not address the adverse condition within a reasonable period of time after the NRC documented the initial Green NOV.
An organizational performance gap existed in that the meteorological towers performance monitoring and issue resolution did not have a single point of ownership, such that the priority to resolve issues was not properly evaluated to ensure timely resolution. As a consequence, previously identified corrective actions were untimely with inadequate organizational engagement to monitor performance or resolve issues.
Corrective steps' that have been taken and the results achieved The Emergency Preparedness Department (EPD) has taken ownership of the meteorological towers. The EPD obtained the necessary project funding, engineering design support, and installation support to install the replacement 160' tower. The tower structure is in place. The meteorological instruments have been installed. Post installation testing of the instruments and data communication system is in progress.
The Regulatory Assurance Weekly Report was modified to include a "deadline" date for completion of corrective actions associated with regulatory findings. Additionally, a Regulatory Assurance review has been incorporated as a required element for corrective actions associated with NRC Findings.
Corrective steps that will be taken Post installation testing of the new 160' tower will be completed and the tower placed in service.
Date when full compliance will be achieved The current schedule for resolution is on or before December 16, 2015, at which time full compliance to the NRC requirements will be achieved.