ML15281A230

From kanterella
Jump to navigation Jump to search
Shine Tribal Feis Letter_07OCT15
ML15281A230
Person / Time
Site: SHINE Medical Technologies
Issue date: 10/16/2015
From: David Wrona
NRC/NRR/DLR/RERGUB
To: Barrett J, Besaw G, Cleveland W, Frank H, Froman J, Jensvold K, Rachel Johnson, Lapointe D, Larsen R, Meshigaud K, Onnen L, Pearson M, Reider A, Renville B, Rhoads K, Taylor L, Trudell R, Walkup B, Wiggins M
Bad River Band of Lake Superior Chippewa Indians, Citizen Potawatomi Nation, Shawnee, OK, Flandreau Santee Sioux Tribe of South Dakota, Forest County Potawatomi Tribal Community, Hannahville Indian Community, Ho-Chunk Nation of Wisconsin, Iowa Tribe of Oklahoma, Lower Sioux Indian Community of Minnesota, Menominee Indian Tribe of Wisconsin, Peoria Tribe of Indians of Oklahoma, Prairie Band Potawatomi Nation, Prairie Island Indian Community, Sac & Fox Nation of Oklahoma, Santee Sioux Nation, Sisseton-Wahpeton Oyate Tribes, Spirit Lake Tribe, St. Croix Chippewa Indians of Wisconsin, Upper Sioux Community of Minnesota, Winnebago Tribe of Nebraska
Hoffman R
Shared Package
ML15281A235 List:
References
DLR-15-0466
Download: ML15281A230 (22)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. John Barrett, Chairman Citizen Potawatomi Nation 1601 S. Gordon Cooper Dr.

Shawnee, OK 74801

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Chairman Barrett:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Mike Wiggins, Jr, Chairman Bad River Band of Lake Superior Chippewa Indians 72682 Maple Street P.O. Box 39 Odanah, WI 54861

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Chairman Wiggins:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

//RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Lewis Taylor, Chairman St. Croix Chippewa Indians of Wisconsin St. Croix Tribal Center 24663 Angeline Ave.

Webster, WI 54893

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Chairman Taylor:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS cc w/encls: Wanda McFaggen, THPO

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Gary Besaw, Chairman Menominee Indian Tribe of Wisconsin W2908 Tribal Office Loop Road P.O. Box 910 Keshena, WI 54135

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Chairman Besaw:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS cc w/encls: David Grignon, THPO

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Anthony Reider, President Flandreau Santee Sioux Tribe of South Dakota 603 West Broad Avenue P.O. Box 283 Flandreau, SD 57208

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear President Reider:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Bobby Walkup, Chairman Iowa Tribe of Oklahoma 335588 E. 750 Rd.

Perkins, OK 74059

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Chairman Walkup:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

//RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Harold Frank, Chairman Forest County Potawatomi Community 5416 Everybody's Rd.

Crandon, WI 54520

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Chairman Frank:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS cc w/encls: Melissa Cook, THPO

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Kenneth Meshigaud, Chairperson Hannahville Indian Community N14911 Hannahville B-1 Rd.

Wilson, MI 49896

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Chairperson Meshigaud:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Wilfrid Cleveland, President Ho-Chunk Nation of Wisconsin P.O. Box 667 W9814 Airport Road Black River Falls, WI 54615

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear President Cleveland:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS cc w/encls: William Quackenbush, THPO

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Ms. Kay Rhoads, Principal Chief Sac and Fox Nation Administration Building 920883 S. Hwy 99, Bldg A Stroud, OK 74079

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Principal Chief Rhoads:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Robert Larsen, President Lower Sioux Indian Community 39527 Res. Highway 1 P.O. Box 308 Morton, MN 56270

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear President Larsen:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS cc w/encls: Grace Goldtooth-Campos, THPO

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Ms. Liana Onnen, Chairperson Prairie Band of Potawatomi Nation 16281 Q Road Mayetta, KS 66509

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Chairperson Onnen:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Ronald Johnson, President Prairie Island Indian Community 5636 Sturgeon Lake Road Welch, MN 55089

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear President Johnson:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Roger Trudell, Tribal Chairman Santee Sioux Nation 108 Spirit Lake Ave. W.

Niobrara, NE 68760

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Tribal Chairman Trudell:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Bruce Renville, Tribal Chairman Sisseton-Wahpeton Oyate of the Lake Traverse Reservation 100 Veterans Memorial Drive PO Box 509 Agency Village, SD 57262

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Tribal Chairman Renville:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS cc w/encls: Tribal Historic Preservation Office

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Ms. Myra Pearson, Tribal Chairperson Spirit Lake Tribe 816 3rd Avenue North P.O. Box 359 Fort Totten, ND 58335

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Tribal Chairperson Pearson:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Kevin Jensvold, Chairman Upper Sioux Community 5722 Travers Lane P.O. Box 147 Granite Falls, MN 56241

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Chairman Jensvold:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. John P. Froman, Chief Peoria Tribe of Indians of Oklahoma 118 S. Eight Tribes Trail P.O. Box 1527 Miami, OK 74355

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Chief Froman:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Ms. Darla LaPointe, Tribal Chair Winnebago Tribe of Nebraska 100 Bluff Street - P.O. Box 687 Winnebago, NE 68071

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Tribal Chair LaPointe:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS

ML15281A235 (Pkg), ML15281A230 (Ltr), ML15280A139 (FRN),

ML15288A046 (Final EIS)

  • concurred via email RERB Technical BC:RERB:DLR OFFICE LA:DLR PM:RERB:DLR Staff Member NAME IBetts MMoser RHoffman DWrona DATE 10-13-15 10-13-15 10-15-15 10-16-15 Identical letters have been sent to:

Chairman John Barrett, Citizen Potawatomi Nation Chairman Mike Wiggins, Jr., Bad River Band of Lake Superior Chippewa Indians Chairman Lewis Taylor, St. Croix Chippewa Indians of Wisconsin Chairman Gary Besaw, Menominee Indian Tribe of Wisconsin President Anthony Reider, Flandreau Santee Sioux Tribe of South Dakota Chairman Bobby Walkup, Iowa Tribe of Oklahoma Chairman Harold Frank, Forest County Potawatomi Community Chairperson Kenneth Meshigaud, Hannahville Indian Community President Wilfrid Cleveland, Ho-Chunk Nation of Wisconsin Principal Chief Kay Rhoads, Sac and Fox Nation President Robert Larsen, Lower Sioux Indian Community Chairperson Liana Onnen, Prairie Band of Potawatomi Nation President Ronald Johnson, Prairie Island Indian Community Tribal Chairman Roger Trudell, Santee Sioux Nation Tribal Chairman Bruce Renville, Sisseton-Wahpeton Oyate of the Lake Traverse Reservation Tribal Chairperson Myra Pearson, Spirit Lake Tribe Chairman Kevin Jensvold, Upper Sioux Community Chief John P. Froman, Peoria Tribe of Indians of Oklahoma Tribal Chair Darla LaPointe, Winnebago Tribe of Nebraska

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY DISTRIBUTION:

E-MAIL:

PUBLIC Public DHowe SLynch JLynch SHarwell RTR r/f MAdams CWeber CFrazier MConley RidsNrrDpr MMoser DBarss LLondon JWeil RidsNrrDprPrta AAdams ASapountzis MYoung VHuckabay RidsNrrDprPrtb LTran DSeymour TZaki DWrona RidsOgcRp Resource RHoffman RidsAcrsAcnw_MailCTR Resource HARD COPY:

Laura Bub Environmental Analysis and Review Specialist State of Wisconsin Department of Natural Resources 3911 Fish Hatchery Road Fitchburg, WI 53711 Jim Costedio Licensing Manager SHINE Medical Technologies, Inc.

2555 Industrial Drive Monona, WI 53713 Randy Howell National Nuclear Security Administration, NA-212 U.S. Department of Energy 1000 Independence Ave SW Washington, DC 20585

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. John Barrett, Chairman Citizen Potawatomi Nation 1601 S. Gordon Cooper Dr.

Shawnee, OK 74801

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Chairman Barrett:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Mike Wiggins, Jr, Chairman Bad River Band of Lake Superior Chippewa Indians 72682 Maple Street P.O. Box 39 Odanah, WI 54861

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Chairman Wiggins:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

//RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Lewis Taylor, Chairman St. Croix Chippewa Indians of Wisconsin St. Croix Tribal Center 24663 Angeline Ave.

Webster, WI 54893

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Chairman Taylor:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS cc w/encls: Wanda McFaggen, THPO

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Gary Besaw, Chairman Menominee Indian Tribe of Wisconsin W2908 Tribal Office Loop Road P.O. Box 910 Keshena, WI 54135

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Chairman Besaw:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS cc w/encls: David Grignon, THPO

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Anthony Reider, President Flandreau Santee Sioux Tribe of South Dakota 603 West Broad Avenue P.O. Box 283 Flandreau, SD 57208

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear President Reider:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Bobby Walkup, Chairman Iowa Tribe of Oklahoma 335588 E. 750 Rd.

Perkins, OK 74059

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Chairman Walkup:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

//RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Harold Frank, Chairman Forest County Potawatomi Community 5416 Everybody's Rd.

Crandon, WI 54520

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Chairman Frank:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS cc w/encls: Melissa Cook, THPO

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Kenneth Meshigaud, Chairperson Hannahville Indian Community N14911 Hannahville B-1 Rd.

Wilson, MI 49896

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Chairperson Meshigaud:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Wilfrid Cleveland, President Ho-Chunk Nation of Wisconsin P.O. Box 667 W9814 Airport Road Black River Falls, WI 54615

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear President Cleveland:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS cc w/encls: William Quackenbush, THPO

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Ms. Kay Rhoads, Principal Chief Sac and Fox Nation Administration Building 920883 S. Hwy 99, Bldg A Stroud, OK 74079

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Principal Chief Rhoads:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Robert Larsen, President Lower Sioux Indian Community 39527 Res. Highway 1 P.O. Box 308 Morton, MN 56270

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear President Larsen:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS cc w/encls: Grace Goldtooth-Campos, THPO

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Ms. Liana Onnen, Chairperson Prairie Band of Potawatomi Nation 16281 Q Road Mayetta, KS 66509

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Chairperson Onnen:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Ronald Johnson, President Prairie Island Indian Community 5636 Sturgeon Lake Road Welch, MN 55089

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear President Johnson:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Roger Trudell, Tribal Chairman Santee Sioux Nation 108 Spirit Lake Ave. W.

Niobrara, NE 68760

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Tribal Chairman Trudell:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Bruce Renville, Tribal Chairman Sisseton-Wahpeton Oyate of the Lake Traverse Reservation 100 Veterans Memorial Drive PO Box 509 Agency Village, SD 57262

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Tribal Chairman Renville:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS cc w/encls: Tribal Historic Preservation Office

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Ms. Myra Pearson, Tribal Chairperson Spirit Lake Tribe 816 3rd Avenue North P.O. Box 359 Fort Totten, ND 58335

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Tribal Chairperson Pearson:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Kevin Jensvold, Chairman Upper Sioux Community 5722 Travers Lane P.O. Box 147 Granite Falls, MN 56241

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Chairman Jensvold:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. John P. Froman, Chief Peoria Tribe of Indians of Oklahoma 118 S. Eight Tribes Trail P.O. Box 1527 Miami, OK 74355

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Chief Froman:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Ms. Darla LaPointe, Tribal Chair Winnebago Tribe of Nebraska 100 Bluff Street - P.O. Box 687 Winnebago, NE 68071

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Tribal Chair LaPointe:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA Jim Danna for /

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

Final EIS

ML15281A235 (Pkg), ML15281A230 (Ltr), ML15280A139 (FRN),

ML15288A046 (Final EIS)

  • concurred via email RERB Technical BC:RERB:DLR OFFICE LA:DLR PM:RERB:DLR Staff Member NAME IBetts MMoser RHoffman DWrona DATE 10-13-15 10-13-15 10-15-15 10-16-15 Identical letters have been sent to:

Chairman John Barrett, Citizen Potawatomi Nation Chairman Mike Wiggins, Jr., Bad River Band of Lake Superior Chippewa Indians Chairman Lewis Taylor, St. Croix Chippewa Indians of Wisconsin Chairman Gary Besaw, Menominee Indian Tribe of Wisconsin President Anthony Reider, Flandreau Santee Sioux Tribe of South Dakota Chairman Bobby Walkup, Iowa Tribe of Oklahoma Chairman Harold Frank, Forest County Potawatomi Community Chairperson Kenneth Meshigaud, Hannahville Indian Community President Wilfrid Cleveland, Ho-Chunk Nation of Wisconsin Principal Chief Kay Rhoads, Sac and Fox Nation President Robert Larsen, Lower Sioux Indian Community Chairperson Liana Onnen, Prairie Band of Potawatomi Nation President Ronald Johnson, Prairie Island Indian Community Tribal Chairman Roger Trudell, Santee Sioux Nation Tribal Chairman Bruce Renville, Sisseton-Wahpeton Oyate of the Lake Traverse Reservation Tribal Chairperson Myra Pearson, Spirit Lake Tribe Chairman Kevin Jensvold, Upper Sioux Community Chief John P. Froman, Peoria Tribe of Indians of Oklahoma Tribal Chair Darla LaPointe, Winnebago Tribe of Nebraska

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY DISTRIBUTION:

E-MAIL:

PUBLIC Public DHowe SLynch JLynch SHarwell RTR r/f MAdams CWeber CFrazier MConley RidsNrrDpr MMoser DBarss LLondon JWeil RidsNrrDprPrta AAdams ASapountzis MYoung VHuckabay RidsNrrDprPrtb LTran DSeymour TZaki DWrona RidsOgcRp Resource RHoffman RidsAcrsAcnw_MailCTR Resource HARD COPY:

Laura Bub Environmental Analysis and Review Specialist State of Wisconsin Department of Natural Resources 3911 Fish Hatchery Road Fitchburg, WI 53711 Jim Costedio Licensing Manager SHINE Medical Technologies, Inc.

2555 Industrial Drive Monona, WI 53713 Randy Howell National Nuclear Security Administration, NA-212 U.S. Department of Energy 1000 Independence Ave SW Washington, DC 20585