MONTHYEARIR 05000440/20230042024-01-30030 January 2024 Integrated Inspection Report 05000440/2023004 L-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative IR 05000440/20234022024-01-10010 January 2024 Cyber Security Inspection Report 05000440/2023402 ML24003A8032024-01-0303 January 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML23321A0472023-12-20020 December 2023 Letter to Rod L. Penfield - Perry Nuclear Power Plant, Unit 1 - License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000440/20230112023-11-28028 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000440/2023011 IR 05000440/20234032023-11-27027 November 2023 Security Baseline Inspection Report 05000440/2023403 ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 ML23292A2482023-10-19019 October 2023 Fws to NRC, Federal Agency Coordination Under ESA Section 7 for Perry Nuclear Plant, Unit 1, License Renewal, and Concurrence with Not Likely to Adversely Affect Determination for Northern Long-eared Bat ML23292A2472023-10-19019 October 2023 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000440/20230032023-10-11011 October 2023 Integrated Inspection Report 05000440/2023003 ML23249A1032023-10-0303 October 2023 Letter to Rod L. Penfield, Site Vice President-Perry Nuclear Power Plant, Unit 1-Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23261C3642023-09-25025 September 2023 License Renewal Application Online Reference Portal ML23261B0192023-09-25025 September 2023 Aging Management Audit Plan Regarding the License Renewal Application Review ML23256A3592023-09-22022 September 2023 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Energy Harbor Nuclear Corp. Application for License Renewal L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000440/20234012023-08-28028 August 2023 Public - Perry Nuclear Power Plant Security Baseline Inspection Report 05000440/2023401 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000440/20230052023-08-24024 August 2023 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2023005) ML23172A2852023-08-23023 August 2023 Safety Evaluation Irradiated Fuel Management Plan and Preliminary Decommissioning Cost Estimate ML23227A2202023-08-15015 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Perry Nuclear Power Plant L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications IR 05000440/20230022023-08-0202 August 2023 Integrated Inspection Report 05000440/2023002 L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative ML23198A2842023-07-17017 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant IR 05000440/20230102023-06-29029 June 2023 Comprehensive Engineering Team Inspection Report 05000440/2023010 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener ML23144A3562023-05-25025 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End of Cycle Plant Performance Assessment of Perry Nuclear Power Plant, Unit 1 L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) IR 05000440/20230012023-05-0404 May 2023 Integrated Inspection Report (05000440/2023001) L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report 2024-01-30
[Table view] |
Text
.FENOCŽ RrstEnergy Nuclear Operating Company Ernest J. Harkness Vice President November 18, 2014 L-14-369 Attention:
Document Control Desk U.S. Nuclear Regulatory Commission Washington, Dy 20555-0.001_
SUBJECT:
Perry Nuclear Power Plant, Unit No. 1. Docket No. 50.:440, License No: NPF-58 Notice Regarding Acquisition of Leased Interests by FirstEnergy Nuclear Generation.
LLC . . Perry Nuclear Power Plant : P.O. Box 97 10 Center Road Perry, Ohio 44081 . 440-280-5382 Fax: 440-280-8029 FirstEnergy Nuclear Operating Company (FENOC), acting as the agent for and oh behalf of FirstEnergy Nuclear Generation, LLC (FENGeri) and Ohio Edison Company* (OE), hereby notifies the Nuclear Regulatory Commission (NRC) of a planned acquisition by FENGen of certain owner participant interests in Perry Nuclear Power Plant Unit, No. 1 (PNPP) that are held pursuant to various sale and leaseback*
arrangements authorized by the PNPP Operating License. Under the NRC-authorized arrangements, these interests are currently owned by certain investors as owner . pa.rticipants and leased to OE, which is the NRC licensee for these interests in PNPP.
will increase its stake in the owner participant interests.
FENGen will continue
- to be *an owner participant under the existing lease arrangements, and OE will continue to the plant and will remain as the licensee for the affected leased interests in PNPP. Pursuant to License Condition 2.B.(7)(a) of the PNPP license, OE was authorized in 1987 to transfer ownership interests in PNPP to investors pursuant to sale and . leaseback transactions and subject to the requirements of NRC's creditor regulations at 10 CFR 50.81. OE currently retains a 12.58% licensed interest in PNPP, pursuant to sale and leaseback arrangements whereby this 12.58% interest in PNPP isqwned by *various investor owner participants and leased to OE. FENGen is the owner of the remaining 87.42% interest in PNPP. License Condition 2.8.(?)(b) of the PNPP license requires that the licensees "notify the NRC in writing prior to any change ... the term or conditions of any lease agreements."
Perry Nuclear Power Plant, Unit No. 1 L-14.,369 Page 2 FENGen plans to acquire owner participant interests in PNPP from Perry One Beta Limited Partnership and Perry One Gamma Limited Partnership.
The acquisitions are anticipated to be completed by the end of November 2014. Additionally, FENGen has recently entered into a binding agreement to acquire the owner participant interest in PNPP from Perry One Delta Limited Partnership in May 2016. FENGen will assume ' -these ownership interests subject to the terms and conditions of the lease agreements with the current third party owner participants.
The FENGen owner participant interests will continue to be held in trust, along with the other third party owner participant
- interests and leased to OE. *
- OE will continue to exercise control and retain responsibility for its 12.58% leased interes't in PNPP. It is anticipated that the lease agreements will terminate at the end of the lease term in May 2016. It is also anticipated that FENGen, as the owner participant, will assume control over these leased interests at lease termination.
As. required for any owner participant to assume control of the leased interests, FENGen will seek and obtain the prior written consent of the NRG in accordance with .. 10 GFR 50.80, before exercising any control over the leased interests that it holds initially as an owner participant under the sale and leaseback arrangements.
Thus, at the end of the leases, these interests would transfer to FENGen, and FEN Gen , ultimately will replace OE as the owner for the 12.58% interests in PNPP, eventually becoming the 100% owner of PNPP. One or more license amendments will also need
- to be processed in order to reflect FEN Gen's acquisition of the licensed interests in PNPP. . . There are no regulatory commitments contained in this letter. If there are any questions.
or if additional information is required, please contact Mr. Thomas A. Lentz, Manager, Fleet Licensing, at 330-315-6810.
Sincerely, ' // fe=/YJ -Ernest J. Harkness cc: NRG Director, Office of N_uclear Reactor Regulation NRG Region Ill Administrator NRR Project Manager _ NRG Resident Inspector