ML14300A033

From kanterella
Jump to navigation Jump to search
Assessment Follow-Up Letter for Davis-Besse Nuclear Power Station
ML14300A033
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/24/2014
From: Boland A
Division Reactor Projects III
To: Lieb R
FirstEnergy Nuclear Operating Co
References
Download: ML14300A033 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 October 24, 2014 Mr. Raymond Lieb Site Vice President FirstEnergy Nuclear Operating Co.

Davis-Besse Nuclear Power Station 5501 N. State Rte. 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760

SUBJECT:

ASSESSMENT FOLLOW-UP LETTER FOR DAVIS-BESSE NUCLEAR POWER STATION

Dear Mr. Lieb,

As a result of its continuous review of plant performance, the U.S. Nuclear Regulatory Commission (NRC) updated its assessment of Davis-Besse Nuclear Power Station. The NRCs evaluation consisted of a review of performance indicators and inspection results. This letter informs you of the NRCs assessment of Davis-Besse Nuclear Power Station, and its plans for a future inspection at your facility. This letter supplements but does not supersede, the mid-cycle letter issued on September 2, 2014.

On October 22, 2014, the NRC forwarded a letter that stated the final significance determination of one or more greater-than-green inspection findings in the Security Cornerstone.

The NRC determined the performance at Davis-Besse Nuclear Power Station, to be in the Regulatory Response Column of the Reactor Oversight Process Action Matrix beginning third quarter of 2014. Therefore, the NRC plans to conduct a supplemental inspection. The NRC requests that your staff provide notification of your readiness for the NRC to conduct this supplemental inspection.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

R. Lieb Please contact Jamnes Cameron at 630-829-9833 with any questions you have regarding this letter.

Sincerely,

/RA/

Anne T. Boland, Director Division of Reactor Projects Docket No. 50-346 License No. NPF-3 cc: Distribution via LISTSERV

R. Lieb Please contact Jamnes Cameron at 630-829-9833 with any questions you have regarding this letter.

Sincerely,

/RA/

Anne T. Boland, Director Division of Reactor Projects Docket No. 50-346 License No. NPF-3 cc: Distribution via LISTSERV DISTRIBUTION:

John Jandovitz RidsNrrDorlLpl3-2 Resource RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Carmen Olteanu ROPassessment.Resource@nrc.gov DOCUMENT NAME: Davis-Besse Assessment Letter Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME JBoettcher:mt JRutkowski JCameron DATE 10/23/14 10/23/14 10/23/14 OFFICIAL RECORD COPY