Text

NRR-PMDAPEm Resource From: Singal, Balwant Sent: Tuesday, September 09, 2014 4:27 PM To: pns3@pge.com Cc: Burkhardt, Janet

Subject:

Acceptance Review - Request for Alternative RPV-U1-Extension to Allow Use of Alternate Reactor Inspection Interval Requirements (TAC No. MF4678)

By letter dated August 18, 2014 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML14230A618), Pacific Gas and Electric Company (the licensee) submitted request for alternative RPV-U1-Extension to allow use of alternate reactor inspection interval requirements for Diablo Canyon Power Plant, Unit 1. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

Balwant K. Singal Senior Project Manager (Comanche Peak, STP, Diablo Canyon, and Palo Verde)

Nuclear Regulatory Commission Division of Operating Reactor Licensing Balwant.Singal@nrc.gov Tel: (301) 415-3016 Fax: (301) 415-1222 1

Hearing Identifier: NRR_PMDA Email Number: 1558 Mail Envelope Properties (Balwant.Singal@nrc.gov20140909162700)

Subject:

Acceptance Review - Request for Alternative RPV-U1-Extension to Allow Use of Alternate Reactor Inspection Interval Requirements (TAC No. MF4678)

Sent Date: 9/9/2014 4:27:12 PM Received Date: 9/9/2014 4:27:00 PM From: Singal, Balwant Created By: Balwant.Singal@nrc.gov Recipients:

"Burkhardt, Janet" <Janet.Burkhardt@nrc.gov>

Tracking Status: None "pns3@pge.com" <pns3@pge.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1971 9/9/2014 4:27:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: ZZZ