MONTHYEARML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23086B9862023-03-27027 March 2023 NRR E-mail Capture - Davis-Besse, Unit No. 1 - Acceptance Review Results for Davis-Besse, Unit No. 1 - Proposed Alternative Request RP-5 ML23033A0322023-02-0101 February 2023 NRR E-mail Capture - Request for Additional Information for Davis-Besse's 2022 Steam Generator Inspection Report (L-2022-LRO-0115) ML22266A1102022-09-23023 September 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding July 21, 2022, Request for Withholding Information from Public Disclosure ML22164A8572022-06-13013 June 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan ML22118A6862022-04-28028 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML22112A1092022-04-22022 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building ML22090A1692022-03-30030 March 2022 Re_ Action Tracking Item 2022 SST - 335 - Tom Gurdziel, E-mail Re_ Event Number 55734 at Davis Besse, a Matter of Interpretation ML22080A2512022-03-18018 March 2022 NRR E-mail Capture - (External_Sender) ASME OM Code Case OMN-27, Alternative Requirements for Testing Category a Valves (Non- Piv/Civ) ML22055B0382022-02-24024 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Upcoming Steam Generator Tube Inservice Inspection ML22055A0872022-02-23023 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Relief Request RP-3 ML22045A4962022-02-14014 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Emergency Plan ML22040A1832022-02-0707 February 2022 LTR-22-0033 Tom Gurdziel, E-mail Event Number 55734 at Davis Besse, a Matter of Interpretation ML22034A9472022-02-0303 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Revised Review Estimates for Proposed Alternative to Extend the Steam Generator Weld Inspection Interval ML22033A0632022-02-0101 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Design Basis for the Shield Building Containment Structure ML21321A3782021-11-16016 November 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Adoption of TSTF-554 EPID-L-2021-LLA-0193 ML21321A3792021-11-16016 November 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML21287A0382021-10-14014 October 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Requests for Relief from Certain Inservice Testing Requirements ML21271A1332021-09-28028 September 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Proposed Alternative RR-A2 for Certain Steam Generator Weld Inspections ML21119A2152021-04-28028 April 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSE Unit 1 - Acceptance of Relief Request Proposed Alternative to Use ASME OM Code Case OMN-27 ML21041A5452021-02-10010 February 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Steam Generator Tube Inspection Reports ML21007A3732021-01-0707 January 2021 NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, ML21004A1442020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff ML20329A3832020-11-24024 November 2020 NRR E-mail Capture - Davis Besse Nuclear Power Station, Unit No. 1 - Request for an Exemption from the 2020 Force-on-Force Exercises ML20304A2842020-10-29029 October 2020 50.59 Inspection 2nd Request for Information ML20289A0992020-10-0505 October 2020 NRR E-mail Capture - Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20281A3692020-10-0505 October 2020 Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20239A7942020-08-25025 August 2020 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Incorporation of Applicable Standard in TS 5.2.2.e ML20203M3712020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 ML20203M3722020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 and Part 2 L-20-183, Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force2020-06-23023 June 2020 Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force ML20154K7642020-06-0202 June 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425 ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20058D3152020-02-27027 February 2020 Completion of License Transfer for the Beaver Valley, Davis-Besse and Perry Nuclear Units ML20024E0092020-01-23023 January 2020 NRR E-mail Capture - FENOC License Transfer - January 23, 2020 Call Summary ML20021A3162020-01-21021 January 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request to Revise Containment Leakage Rate Testing ML19346B3972019-12-11011 December 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Adopt TSTF-425 ML19273A1132019-09-27027 September 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Acceptance of License Amendment Request to Extend Containment Leakage Rate Test Interval ML19179A1382019-06-28028 June 2019 NRR E-mail Capture - Davis-Besse - Request for Additional Information Regarding the Decommissioning Quality Assurance Program ML19164A1532019-06-13013 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Post-Shutdown Emergency Plan ML19162A3922019-06-11011 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML19161A2132019-06-0606 June 2019 NRR E-mail Capture - Results of Acceptance Review - FENOC Fleet - Request for Approval of Request for Approval of Lrradiated Fuel Management Plans, EPID L-2019-LRO-0016 ML19149A6202019-05-29029 May 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Approval of the Decommissioning Quality Assurance Program ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19106A2512019-04-16016 April 2019 NRR E-mail Capture - Davis-Besse - Proposed License Condition and Draft Safety Evaluation for the License Amendment Request to Adopt NFPA 805 ML19073A1112019-03-14014 March 2019 NRR E-mail Capture - Davis-Besse - Acceptance of License Amendment Request for Permanently Defueled License and Technical Specifications ML19043A6962019-02-0808 February 2019 NRR E-mail Capture - Davis-Besse License Amendment Request for the Post-Shutdown Emergency Plan ML18320A1272018-11-16016 November 2018 NRR E-mail Capture - Davis-Besse LAR to Change TS Definitions and Administrative Controls for Permanently Defueled Conditions ML18282A1482018-10-0909 October 2018 NRR E-mail Capture - Results of Acceptance Review - FENOC Fleet - Request for Exemption Related to the Suspension of Security Measures in an Emergency or During Severe Weather, EPID L-2018-LLL-0016 ML18282A2422018-10-0808 October 2018 OEDO-18-00160, FENOC Fleet, 2.206 Petition, Submission of Supplement Dated October 8, 2018, from the Petitioners - PRB and Petitioners (Elpc), Includes Email, Cover Letter from Elpc, and the Attachments to the Email 2023-05-08
[Table view] |
Text
NRR-PMDAPEm Resource From: Grange, Briana Sent: Friday, May 02, 2014 9:07 AM To: Finfera, Jennifer
Subject:
RE: Davis Besse operating license renewal
- Jenny, Thanks for getting in touch with me. Two weeks is perfectI do not need a letter any sooner.
I read through your recommendations concerning the various species. As you indicated at the bottom of your email, the site is already disturbed since the Davis-Besse plant is already operating, and the proposed license renewal wouldnt involve any additional disturbances to natural habitats. I will, however, include your recommendations as mitigation measures that could avoid impacts in the projects final EIS in the circumstance that safety or other unforeseen reasons require tree or vegetation removal in the future. Thank you for including such detailed comments! Its helpful to be able to include this type of information so that our licensee understands what types of activities and times of the year could affect each species.
Briana
______________
Briana A. Grange Biologist U.S. Nuclear Regulatory Commission NRR/DLR/RERB (301) 415-1042 briana.grange@nrc.gov From: Finfera, Jennifer [1]
Sent: Friday, May 02, 2014 8:56 AM To: Grange, Briana
Subject:
Davis Besse operating license renewal
- Briana, I am coordinating with the Ottawa National Wildlife Refuge to see if they have any comments on this. I should be able to provide you a letter in the next 2 weeks. Please let me know if you need something sooner.
You have made determinations for the Indiana bat, piping plover, eastern prairie fringed orchid, and Lakeside daisy. The proposed project also lies within the range of the northern long-eared bat (Myotis septentrionalis), a species that is currently proposed for listing as federally endangered under the Endangered Species Act (ESA) (87 Stat. 884, as amended; 16 U.S.C. 1531 et seq.). The final listing decision for the northern long-eared bat is expected in October 2014. No critical habitat has been proposed at this time. Recently white-nose syndrome (WNS), a novel fungal pathogen, has caused serious declines in the northern long-eared bat population in the northeastern U.S. WNS has also been documented in Ohio, but the full extent of the impacts from WNS in Ohio is not yet known.
During winter, northern long-eared bats hibernate in caves and abandoned mines. Summer habitat requirements for the species are not well defined but the following are considered important:
1
(1) Roosting habitat in dead or live trees and snags with cavities, peeling or exfoliating bark, split tree trunk and/or branches, which may be used as maternity roost areas; (2) Foraging habitat in upland and lowland woodlots and tree lined corridors; (3) Occasionally they may roost in structures like barns and sheds.
Pursuant to section 7(a)(4) of the ESA, federal action agencies are required to confer with the Service if their proposed action is likely to jeopardize the continued existence of the northern long-eared bat (50 CFR 402.10(a)). Federal action agencies may also voluntarily confer with the Service if the proposed action may affect a proposed species. Nevertheless, species proposed for listing are not afforded protection under the ESA; however as soon as a listing becomes effective, the prohibition against jeopardizing its continued existence and take applies regardless of an actions stage of completion. If the federal agency retains any discretionary involvement or control over on-the-ground actions that may affect the species after listing, section 7 applies.
Since it appears that some forested habitat may be present at the proposed project site, we recommend that trees exhibiting any of the characteristics listed above, as well as any wooded areas or tree lined corridors be saved wherever possible. If the trees must be cut, we recommend that they be cut between October 1 and March 31 to avoid impacts to northern long-eared bats. Incorporating these conservation measures into your project at this time may avoid significant future project delays should the listing become official.
If implementation of the seasonal tree cutting timeframe is not possible, we recommend that summer surveys be conducted to document the presence or probable absence of the northern long-eared bat within the project area during the summer. Due to the potential for the surveyor to capture federally listed endangered Indiana bats, the survey must be conducted by an approved surveyor and be designed and conducted in coordination with the Endangered Species Coordinator for this office.
The proposed project lies within the range of the Kirtlands warbler (Setophaga kirtlandii), a federally listed endangered species. The Kirtland's warbler is a small blue-gray songbird with a bright yellow breast. This species migrates through Ohio in the spring and fall, traveling between its breeding grounds in Michigan, Wisconsin, and Ontario and its wintering grounds in the Bahamas. While migration occurs in a broad front across the entire state, approximately half of all observations in Ohio have occurred within 3 miles of the shore of Lake Erie. During migration, individual birds usually forage in shrub/scrub or forested habitat and may stay in one area for a few days. If clearing of suitable habitat cannot be avoided, to preclude adverse effects to Kirtlands warblers, clearing within 3 miles of the shoreline of Lake Erie should not occur from April 22nd - June 1st, or from August 15th -
October 15th.
The proposed project lies within the range of the rufa red knot (Calidris canutus rufa), a species that is currently proposed to be listed as federally threatened. The red knot is a shorebird that known to migrate through Ohio during the spring and fall. Red knot migratory stopover habitat includes sand, gravel, or cobble beaches, and mudflats along the shore of Lake Erie. If the proposed project is 2
expected to impact habitat of this type we recommend that further consultation with this office will be necessary.
The project also lies within the range of the eastern massasauga (Sistrurus catenatus), a small, docile rattlesnake that is currently a Federal candidate species and the Lake Erie Watersnake (Nerodia sipedon insularum), a state endangered species, and a Federal species of concern that was recently removed from the Federal list of Endangered and Threatened Wildlife and Plants due to recovery. Due to the project location and onsite habitat no impacts are expected for these species.
MIGRATORY BIRD COMMENTS: The project lies within the range of the bald eagle (Haliaeetus leucocephalus). Bald eagles are protected under the Migratory Bird Treaty Act (16 U.S.C. 703-712; MBTA), and are afforded additional legal protection under the Bald and Golden Eagle Protection Act (16 U.S.C. 668-668d, BGEPA). BGEPA prohibits, among other things, the killing and disturbance of eagles.
Our records indicate that multiple bald eagle nests are located within 1/2 mile of the project area. To evaluate your projects potential to affect bald eagles, please visit:
http://www.fws.gov/midwest/MidwestBird/EaglePermits/baeatake/index.html.
In order to avoid take of bald eagles, we recommend that no tree clearing occur within 660 feet of a bald eagle nest or within any woodlot supporting a nest tree. Further, we request that new activity within 660 feet of a nest or within the direct line-of-site of a nest be restricted from January 15 through July 31. This will prevent disturbance of the eagles from the egg-laying period until the young fledge, which encompasses their most vulnerable times.
If these recommendations cannot be implemented and take of bald eagles is likely, a bald eagle take permit for this project may be necessary. Further information on eagle take permits can be found at:
http://www.fws.gov/midwest/MidwestBird/EaglePermits/index.html.
We realize that most of the area around the reactor has already been previously disturbed, however we recommend that if any vegetation clearing were necessary that it be completed as recommended above to avoid impacts to bats and birds. Please let us know if this is possible.
Thank you,
--
Jenny Finfera Wildlife Biologist 3
Ecological Services 4625 Morse Road, Suite 104 Columbus, Ohio 43230 Phone: 614-416-8993 ext.13 Fax: 614-416-8994 4
Hearing Identifier: NRR_PMDA Email Number: 1366 Mail Envelope Properties (Briana.Grange@nrc.gov20140502090600)
Subject:
RE: Davis Besse operating license renewal Sent Date: 5/2/2014 9:06:44 AM Received Date: 5/2/2014 9:06:00 AM From: Grange, Briana Created By: Briana.Grange@nrc.gov Recipients:
"Finfera, Jennifer" <jennifer_finfera@fws.gov>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 8474 5/2/2014 9:06:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: