MONTHYEARONS-2018-025, 2017 Annual Radiological Environmental Operating Report (AREOR)2018-05-15015 May 2018 2017 Annual Radiological Environmental Operating Report (AREOR) ONS-2018-024, 2017 Annual Radioactive Effluent Release Report (ARERR)2018-04-30030 April 2018 2017 Annual Radioactive Effluent Release Report (ARERR) ONS-2018-032, Ufsar/Selected Licensee Commitment Changes2018-04-17017 April 2018 Ufsar/Selected Licensee Commitment Changes ONS-2018-029, Technical Specifications Task Force (TSTF) - 448, Revision 3, Control Room Habitability, License Amendment Request No. 2015-03, Supplement 32018-04-0404 April 2018 Technical Specifications Task Force (TSTF) - 448, Revision 3, Control Room Habitability, License Amendment Request No. 2015-03, Supplement 3 ONS-2018-027, Oconee, Units 1, 2, and 3, Submittal of Emergency Plan Revision 2018-0022018-03-28028 March 2018 Oconee, Units 1, 2, and 3, Submittal of Emergency Plan Revision 2018-002 ONS-2018-023, Response to Nrc'S Request for Additional Information Regarding Relief Request 17-ON-001; Alternative to Extend the Code Case N-770, Inspection Item B, Examination Frequency2018-03-20020 March 2018 Response to Nrc'S Request for Additional Information Regarding Relief Request 17-ON-001; Alternative to Extend the Code Case N-770, Inspection Item B, Examination Frequency ONS-2018-017, Oconee, Units 1, 2, and 3, Submittal of Revised Evaluation to Emergency Plan2018-03-15015 March 2018 Oconee, Units 1, 2, and 3, Submittal of Revised Evaluation to Emergency Plan ONS-2018-021, ISFSI - Submittal of 2017 Annual Effluent Release Report2018-03-0101 March 2018 ISFSI - Submittal of 2017 Annual Effluent Release Report ONS-2018-020, Refuel 28 (O2R28) In-service Inspection (ISI) and Steam Generator In-service Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval2018-02-26026 February 2018 Refuel 28 (O2R28) In-service Inspection (ISI) and Steam Generator In-service Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval ONS-2018-013, Technical Specification Bases Changes2018-02-22022 February 2018 Technical Specification Bases Changes ONS-2018-015, Duke Energy Response to Request for Additional Information; Request for Alternative to Codes and Standards Requirements Pursuant to 10 CFR 50.55a(z) to Satisfy 10 CFR 50.55a(h)(2) Associated with Bronze Tape Wrapped Emergency Power Cabl2018-02-19019 February 2018 Duke Energy Response to Request for Additional Information; Request for Alternative to Codes and Standards Requirements Pursuant to 10 CFR 50.55a(z) to Satisfy 10 CFR 50.55a(h)(2) Associated with Bronze Tape Wrapped Emergency Power Cables i ONS-2018-014, License Amendment Request (LAR) for Changes to the Duke Energy Physical Security Plan - License Amendment Request No. 2018-012018-02-12012 February 2018 License Amendment Request (LAR) for Changes to the Duke Energy Physical Security Plan - License Amendment Request No. 2018-01 ONS-2018-019, Submittal of Emergency Plan, Section B2018-02-0505 February 2018 Submittal of Emergency Plan, Section B ONS-2018-011, Ufsar/Selected Licensee Commitment Changes2018-01-25025 January 2018 Ufsar/Selected Licensee Commitment Changes ONS-2017-087, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from ...2017-12-0404 December 2017 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from ... ONS-2017-083, Core Operating Limits Report (COLR) for Cycle 29 ONEl-0400-491, Revision 02017-11-21021 November 2017 Core Operating Limits Report (COLR) for Cycle 29 ONEl-0400-491, Revision 0 ONS-2017-041, Revision to Tornado/Helb Mitigation Strategies and Regulatory Commitments2017-11-15015 November 2017 Revision to Tornado/Helb Mitigation Strategies and Regulatory Commitments ONS-2017-085, Duke Energy Comments on the October 24, 2017, Public Meeting with NRC Committee to Review Generic Requirements (CRGR)2017-11-15015 November 2017 Duke Energy Comments on the October 24, 2017, Public Meeting with NRC Committee to Review Generic Requirements (CRGR) ONS-2017-079, Supplemental Information to Support NRC Review of Relief Request No. 17-0N-001; Alternative to Extend the Code Case N-770, Inspection Item B Examination Frequency2017-11-13013 November 2017 Supplemental Information to Support NRC Review of Relief Request No. 17-0N-001; Alternative to Extend the Code Case N-770, Inspection Item B Examination Frequency ONS-2017-078, Emergency Plan Revision 2017-0042017-11-0909 November 2017 Emergency Plan Revision 2017-004 ONS-2017-074, Proposed Amendment to the Renewed Facility Operating Licenses Regarding Revisions to the Updated Final Safety Analysis Report Section Associated with Tile Standby Shutdown Facility License Amendment Request No. 2017-032017-10-20020 October 2017 Proposed Amendment to the Renewed Facility Operating Licenses Regarding Revisions to the Updated Final Safety Analysis Report Section Associated with Tile Standby Shutdown Facility License Amendment Request No. 2017-03 ONS-2017-067, Response to Request for Additional Information Regarding License Amendment Request for TSTF-448, Revision 3, Control Room Habitability, License Amendment Request No. 2015-03, Supplement 22017-10-16016 October 2017 Response to Request for Additional Information Regarding License Amendment Request for TSTF-448, Revision 3, Control Room Habitability, License Amendment Request No. 2015-03, Supplement 2 ONS-2017-069, (ONS) - Additional Information Regarding License Amendment Request for Temporary Completion Time for One Keowee Hydro Unit Inoperable for Generator Stator Replacement2017-10-13013 October 2017 (ONS) - Additional Information Regarding License Amendment Request for Temporary Completion Time for One Keowee Hydro Unit Inoperable for Generator Stator Replacement ONS-2017-070, Transmittal of Oconee, Units 1, 2, and 3, Emergency Plan Implementing Procedures Manual Volume 2, Revision 2017-0022017-10-0505 October 2017 Transmittal of Oconee, Units 1, 2, and 3, Emergency Plan Implementing Procedures Manual Volume 2, Revision 2017-002 ONS-2017-072, Fifth Ten Year Lnservice Inspection Interval, Relief Request No. 17-0N-001; Alternative to Extend the Code Case N-770, Inspection Item B Examination Frequency2017-10-0303 October 2017 Fifth Ten Year Lnservice Inspection Interval, Relief Request No. 17-0N-001; Alternative to Extend the Code Case N-770, Inspection Item B Examination Frequency ONS-2017-066, Registration for Use of General License Spent Fuel Cask Numbers 147 and 1482017-09-20020 September 2017 Registration for Use of General License Spent Fuel Cask Numbers 147 and 148 ONS-2017-061, Revised Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator License Examinations2017-08-10010 August 2017 Revised Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator License Examinations ONS-2017-060, Registration for Use of General License Spent Fuel Cask Numbers 145 and 1462017-08-0303 August 2017 Registration for Use of General License Spent Fuel Cask Numbers 145 and 146 ONS-2017-059, Transmittal of Response to March 12, 2012 Request for Information, Recommendation 2.1 Flooding, Required Response 3, Flooding Focused Evaluation Summary2017-07-31031 July 2017 Transmittal of Response to March 12, 2012 Request for Information, Recommendation 2.1 Flooding, Required Response 3, Flooding Focused Evaluation Summary ONS-2017-050, Technical Specification Bases Change 2017-042017-07-21021 July 2017 Technical Specification Bases Change 2017-04 ONS-2017-052, Technical Specification Bases Change 2017-032017-07-20020 July 2017 Technical Specification Bases Change 2017-03 ONS-2017-043, Technical Specification Bases Change 2017-012017-07-20020 July 2017 Technical Specification Bases Change 2017-01 ONS-2017-047, Registration for Use of General License Spent Fuel Cask Numbers 142, 143, and 1442017-06-27027 June 2017 Registration for Use of General License Spent Fuel Cask Numbers 142, 143, and 144 ONS-2017-042, Additional Information Regarding License Amendment Request for Temporary Completion Time for One Keowee Hydro Unit Inoperable for Generator Stator Replacement, License Amendment Request No. 2015-08, Supplement 22017-06-0101 June 2017 Additional Information Regarding License Amendment Request for Temporary Completion Time for One Keowee Hydro Unit Inoperable for Generator Stator Replacement, License Amendment Request No. 2015-08, Supplement 2 ONS-2017-040, Transmittal of Emergency Plan Implementing Procedures Manual Volume 1, Revision 2017-0032017-05-22022 May 2017 Transmittal of Emergency Plan Implementing Procedures Manual Volume 1, Revision 2017-003 ONS-2017-037, 2016 Annual Radiological Environmental Operating Report2017-05-15015 May 2017 2016 Annual Radiological Environmental Operating Report ONS-2017-026, Submittal of Ufsar/Selected Licensee Commitment Change2017-04-11011 April 2017 Submittal of Ufsar/Selected Licensee Commitment Change ONS-2017-024, Revision 028 to ERTG-001, Emergency Response Organization and Emergency Services Training Program2017-03-16016 March 2017 Revision 028 to ERTG-001, Emergency Response Organization and Emergency Services Training Program ONS-2017-001, Submittal of Emergency Plan Program Procedure HP/O/B/1009/001 Rev 0452017-03-0202 March 2017 Submittal of Emergency Plan Program Procedure HP/O/B/1009/001 Rev 045 ONS-2017-017, Emergency Plan Implementing Procedures Manual Volume 1, Revision 2017-0012017-03-0202 March 2017 Emergency Plan Implementing Procedures Manual Volume 1, Revision 2017-001 ONS-2017-018, Emergency Plan Implementing Procedures Manual Volume 2, Revision 2017-0012017-03-0202 March 2017 Emergency Plan Implementing Procedures Manual Volume 2, Revision 2017-001 ONS-2017-015, End of Cycle 29 (1 EOC29) Refueling Outage Lnservice Inspection (ISI) and Steam Generator Lnservice Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval2017-02-24024 February 2017 End of Cycle 29 (1 EOC29) Refueling Outage Lnservice Inspection (ISI) and Steam Generator Lnservice Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval ONS-2017-019, Technical Specification Bases Change 2015-092017-02-23023 February 2017 Technical Specification Bases Change 2015-09 ONS-2017-011, Emergency Plan Revised Evaluation2017-02-0202 February 2017 Emergency Plan Revised Evaluation ONS-2017-009, Units 1, 2 & 3 - Notification of Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events.2017-02-0101 February 2017 Units 1, 2 & 3 - Notification of Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events. ONS-2017-004, Submittal of Core Operating Limits Report2017-01-12012 January 2017 Submittal of Core Operating Limits Report ONS-2017-006, Emergency Plan Revision 2016-0032017-01-12012 January 2017 Emergency Plan Revision 2016-003 ONS-2016-097, Emergency Plan/Emergency Plan Implementing Procedures Manual, Revised 10CFR 50.54(q) Evaluation(S)2016-11-17017 November 2016 Emergency Plan/Emergency Plan Implementing Procedures Manual, Revised 10CFR 50.54(q) Evaluation(S) ONS-2016-098, Special Report Per Technical Specification 5.6.6, Inoperability of Post Accident Monitoring Containment High Range Radiation Monitors2016-11-14014 November 2016 Special Report Per Technical Specification 5.6.6, Inoperability of Post Accident Monitoring Containment High Range Radiation Monitors ONS-2016-096, Revised Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations2016-11-10010 November 2016 Revised Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations 2018-05-15
[Table view] |
Text
DUKER ENERGYe Scot L.Batson Vice President Oconee Nuclear Station Duke Energy ONOIVP 17800 Rochester Hwy Seneca, SC 29672 o: 864.873.3274 f, 864.873. 4208 Scott.Betson@duke-energy.com 10 CFR 50.54 (f)
ONS-2014-003 February 3, 2014 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Duke Energy Carolinas, LLC (Duke Energy)
Oconee Nuclear Station (ONS), Unit Nos. 1, 2, and 3 Docket Nos. 50-269, 50-270, and 50-287 Renewed License Nos. DPR-38, DPR-47, and DPR-55 Response to Request for Additional Information Regarding Response to Bulletin 2012-01, "Design Vulnerability in Electric Power System"
Reference:
- 1. NRC Letter, Request for Additional Information Regarding Response to Bulletin 2012-01, "Design Vulnerability in Electric Power System, "dated 12/20/2013 (ADAMS ML13351A314).
On July 27, 2012, the Nuclear Regulatory Commission (NRC) issued NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System," to all power reactor licensees and holders of combined licenses for nuclear power reactors. Duke Energy provided its response to Bulletin 2012-01 in a letter dated October 23, 2012 (ADAMS ML12300A426). On December 20, 2013, the NRC issued a request for additional information (RAI) requesting licensees to (1) verify the completion of interim corrective actions and compensatory measures and (2) to report the status of each licensee's long-term corrective actions. The enclosure to this letter contains Duke Energy's response for the Oconee Nuclear Station (ONS).
There are no new regulatory commitments contained in this letter.
Please address any comments or questions regarding this matter to Bob Meixell, Oconee Regulatory Affairs, at (864) 873-3279.
§2f7/
U. S. Nuclear Regulatory Commission February 3, 2014 Page 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on February 3, 2014.
Sincerely, Scott L. Batson Vice President Oconee Nuclear Station Enclosure
,U. S. Nuclear Regulatory Commission February 3, 2014 Page 3 xc (w/enclosure):
Mr. Victor McCree, Regional Administrator U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 Mr. Richard Guzman, Project Manager (ONS)
(by electronic mail only)
U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop O-8C2 Rockville, MD 20852 Mr. Eddy Crowe NRC Senior Resident Inspector Oconee Nuclear Station
Enclosure Oconee Nuclear Station Units 1, 2, and 3 Response to the NRC Request for Additional Information Bulletin 2012-01
Enclosure - Response to NRC Request for Additional Information February 3, 2014 Page 1 RAI NRC letter (ADAMS ML13351A314) dated December 20, 2013 requests the following:
"In order for the NRC staff to complete its review of responses to the bulletin, the following additional information is requested:
- 1. Provide a summary of all interim corrective actions that have been taken since the January 30, 2012, event at Byron Station, Unit 2, to ensure that plant operators can promptly diagnose and respond to open phase conditions on the offsite power circuits for Class-i E vital buses until permanent corrective actions are completed.
- 2. Provide a status and schedule for completion of plant design changes and modifications to resolve issues with an open phase of electric power."
Response I - Summary of All Interim Corrective Actions Lessons learned from the events at Byron Nuclear Station were reviewed and various interim corrective actions evaluated for safety and efficiency at the Oconee Nuclear Station (ONS).
Based on ONS's offsite power configuration, electrical design details, and lessons learned, the following actions were taken to ensure plant operators can promptly diagnose and respond to open phase conditions (OPC):
Interim Corrective Actions:
- 1. Revised the ONS Units 1, 2, and 3 alarm response guides, to include appropriate responses during a possible OPC.
- 2. ONS Operations personnel perform daily rounds of the switchyards. This is a general observation performed on the equipment to note any out of normal conditions and take appropriate actions. The daily switchyard rounds procedure was revised to incorporate specific points to look for areas of degraded off site power vulnerabilities.
- 3. Completed a review of switchyard equipment Preventive Maintenance (PM) procedures to adequately address inspection for potential degraded connections, insulators, etc.
Procedures have been revised as needed.
- 4. Preliminary training (Read & Sign Package) has been developed and completed for applicable operations personnel.
- 5. Developed classroom training for this event: causes, consequences, and response. The training is scheduled to be completed in 2014.
- 6. ONS Maintenance personnel perform multiple walk downs of the switchyards per month monitoring the system. During the walk downs, maintenance personnel look for any anomalies and initiate a corrective action report and/or Work Request to address the issue.
- 7. Thermal imaging is performed on a semi-annual frequency in the switchyard to detect any potential connection or equipment problems.
Enclosure - Response to NRC Request for Additional Information
'February 3, 2014 Page 2 Response 2 - Status and schedule for completion of plant design changes and modifications The Duke Energy nuclear fleet is investigating options being researched by several vendors, e.g., PSC2000TM, Electric Power Research Institute (EPRI), Schweitzer, etc., to detect open phase fault conditions. There is currently no proven industry technology available to detect all the required open phase fault conditions for all plant and transformer designs. With the goal of ensuring accurate detection without compromising nuclear safety or increasing plant risk, it is paramount that this new technology being evaluated be tested and fully analyzed before implementation.
Design studies of the single open phase fault conditions have been started for the Duke Energy nuclear fleet. The Duke Energy nuclear fleet is fully engaged in the development of the Nuclear Energy Institute (NEI) Open Phase Condition industry guidance document, as well as development of enhancements to the Electrical Transient Analyzer Program (ETAP) software tool being used to analyze open phase fault conditions.
Duke Energy intends to follow the NEI Industry Initiative document and the generic schedule provided within that document. A provision in the NEI Industry Initiative has already been identified for any deviations required for items such as the accommodation of outage schedules or technology availability and will be documented through the NEI Industry Initiative exemption process.
The NEI Initiative recommends installing new equipment to disable (i.e., trip) the offsite power source for an Open Phase Condition of the transformer(s) that connect the plant onsite power system to the offsite power source. At ONS, the transformers credited with providing offsite power to the onsite power systems are nuclear safety-related and controlled by the station's Technical Specifications (TSs) as part of both the offsite power source and as part of one of two onsite emergency power sources, namely the Keowee Hydroelectric Station's emergency power overhead path. Installing new equipment to change the operation of this transformer will likely require changes to the ONS TSs as compared to other nuclear stations. As outlined in the NEI Industry Initiative, impacts to ONS TSs are likely to result in changes to the schedule provided in the Initiative, at a minimum, to allow for increased NRC review times.