ML14029A432

From kanterella
Jump to navigation Jump to search
NRR E-mail Capture - Acceptance Review e-mail for MF3284 and MF3285 Inservice Inspection (Lsi) Request for Alternative NDE-SFW-13
ML14029A432
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/29/2014
From: Brian Benney
Plant Licensing Branch IV
To: Soenen P
Pacific Gas & Electric Co
References
MF3284, MF3285
Download: ML14029A432 (2)


Text

NRR-PMDAPEm Resource From: Benney, Brian Sent: Wednesday, January 29, 2014 8:57 AM To: Soenen, Philippe R (PNS3@pge.com)

Cc: Burkhardt, Janet; Kim, James; Zeleznock, Karen; Benney, Brian

Subject:

Acceptance review e-mail for MF3284 and MF3285 Inservice Inspection (lSI) Request for Alternative NDE-SFW-13

Dear Mr. Soenen:

By letter dated December 18, 2013, (Agencywide Documents Access and Management System Accession Nos. ML13353A475), pursuant to 10 CFR 50.55a(a)(3)(i), Pacific Gas and Electric Company (PG&E) requested Nuclear Regulatory Commission (NRC) review and approval of the Inservice Inspection (lSI)

Request for Alternative NDE-SFW-13 for the Diablo Canyon Power Plant Unit 1 and Unit 2 third lSI intervals.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Please note that acceptance is not approval of the amendment.

If you have any questions, please contact me at (301) 415-2767.

Sincerely, Brian Benney, Project Manager Plant Licensing Branch IV-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 1

Hearing Identifier: NRR_PMDA Email Number: 1048 Mail Envelope Properties (Brian.Benney@nrc.gov20140129085700)

Subject:

Acceptance review e-mail for MF3284 and MF3285 Inservice Inspection (lSI)

Request for Alternative NDE-SFW-13 Sent Date: 1/29/2014 8:57:00 AM Received Date: 1/29/2014 8:57:00 AM From: Benney, Brian Created By: Brian.Benney@nrc.gov Recipients:

"Burkhardt, Janet" <Janet.Burkhardt@nrc.gov>

Tracking Status: None "Kim, James" <James.Kim@nrc.gov>

Tracking Status: None "Zeleznock, Karen" <Karen.Zeleznock@nrc.gov>

Tracking Status: None "Benney, Brian" <Brian.Benney@nrc.gov>

Tracking Status: None "Soenen, Philippe R (PNS3@pge.com)" <PNS3@pge.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2021 1/29/2014 8:57:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: