Appendix C Job Performance Measure Form ES-C-i Worksheet SIM JPM A 2013 Systems Control Room JPM A (Rev_112013)

- NUREG 1021, Revision 9

Appendix C Page 2 of 1 1 Form ES-C-i Job Performance Measure Worksheet Facility: McGuire Task No.:

Task

Title:

Manually Align Phase B HVAC JPM No.: 2013 Systems Control Eguirment Room JPM A KJA

Reference:

028 A4.01 (4.0/4.0)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • You are the Unit 2 BOP.
  • Unit 1 has experienced a Large Break LOCA.
  • The crew is implementing EP/1/A15000/E-0 (Reactor Trip or Safety Injection).

Initiating Cue: The CRS has directed you to check Phase B HVAC equipment in accordance with Enclosure 2, (Phase B HVAC Equipment), of EP/1/A15000/E-0, (Reactor Trip or Safety Injection).

Task Standard: The operator will determine that the VEIVX Systems did not automatically start as expected and manually start both Trains of both systems.

Required Materials: None General

References:

EP/1/A15000/E-0 (Reactor Trip or Safety Injection), Rev 33 2013 Systems Control Room JPM A

- NUREG 1021, Revision 9

Appendix C Page 3 of 1 1 Form ES-C-i Job Performance Measure Worksheet Handouts: Handout 1: Enclosure 2 (Phase B HVAC Equipment) of EP/1IA/50001E-O (Reactor Trip or Safety Injection).

Time Critical Task: NO Validation Time: 5 minutes 2013 Systems Control Room JPM A NUREG 1021, Revision 9

Appendix C Page 4 of 11 Form ES-C1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Reset to IC # 39, 100% Power, MOL. Go to RUN.
2. Insert:
a. MALF-N0008A Large Break LOCA on Trigger 1.
b. MALF-ISEOO4A (Both) Failure of Train A of Phase B Containment Isolation MALF-ISEOO4B (Both) Failure of Train B of Phase B Containment Isolation
3. Actuate Trigger 1
4. Perform steps 1 through 15 RNO.g of EP/1/A15000/E-0 (Including manual actions to overcome failure of Containment Phase B Isolation).
5. Freeze Simulator.

OR

1. Reset Simulator to Temporary Snap IC-250 (November, 2013).
2. Momentarily go to RUN to acknowledge Alarms then place Simulator in FREEZE.
3. Leave Simulator in FREEZE until operator is ready to begin.

NOTE: FWST level is depleting rapidly and could interfere with the performance of this JPM.

If the FWST level drops low enough to require CLR switchover the Simulator Instructor should silence the alarm.

The operator will NOT be expected to respond to this alarm.

2013 Systems Control Room JPM A

- NUREG 1021, Revision 9

Appendix C Page 5 of 1 1 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT Simulator Instructor NOTE: Leave Simulator in FREEZE until operator is ready to begin.

(Step 1) Check VE System The operator observes the in operation as follows: iA VE Fan Green status light LIT, and Red status light OFF and determines (Step 1 .a) VE Fans ON. that the fan is OFF.

The operator observes the 1 B VE Fan Green status light LIT, and Red status light OFF and determines that the fan is OFF.

  • 2 (Steps l.a RNO a.1-2) Start The operator places the iA fans as follows: VE Fan control switch to ON, and observes the Red Select ON. status light LIT, Green status light OFF.

Return switch to AUTO.

The operator returns the 1A VE Fan control switch to AUTO.

The operator places the 1 B VE Fan control switch to ON, and observes the Red status light LIT, Green status light OFF.

The operator returns the 1 B VE Fan control switch to AUTO.

2013 Systems Control Room JPM A

- NUREG 1021, Revision 9

Appendix C Page 6 of 1 1 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED

. FOR UNSAT 3 (Step 1 .b) Ensure all damper mode select switches in AUTO:

The operator observes that 1AVS-D-7 Mode Select the 1AVS-D-7 Mode Select Switch is in AUTO.

The operator observes that 1AVS-D-8 Mode Select the 1AVS-D-8 Mode Select Switch is in AUTO.

1AVS-D-2 Mode Select The operator observes that the 1AVS-D-2 Mode Select Switch is in AUTO.

1 AVS-D-3 Mode Select. The operator observes that the 1AVS-D-3 Mode Select Switch is in AUTO.

4 (Step 1 .c) Annulus pressure The operator observes being maintained - 1 VEP-51 00 and 1 VEP-51 10 NEGATIVE, are indicating -3 water column and determines that the Annulus pressure is negative.

5 (Step 2) Check VX System in operation as follows Cue (Step 2 a) Time since Phase B Isolation on Unit Phase B actuation - 1 actuated 12 minutes GREATERTHAN1O ago MINUTES.

After the cue, the operator recognizes that the time since Phase B actuation is greater than 10 minutes and proceeds to Step 2.b.

2013 Systems Control Room JPM A

- NUREG 1021, Revision 9

Appendix C Page 7 of 1 1 Form ES-C-i PERFORMANCE IN FORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 6 (Step 2.b) Check the following OPEN:

The operator observes that 1 RAF-D-4 (1 B Cont Air Ret the 1 RAF-D-4 Green status Fan To Lwr Cont Test A) light is LIT, Red status light is OFF.

The operator observes that 1VX-2B (lB H2 Skimmer Fan Isol Test A) the 1VX-2B Green status light is LIT, Red status light is OFF.

1 RAF-D-2 (1 A Cont Air Ret The operator observes that Fan To Lwr Cont Test A) the 1 RAF-D-2 Green status light is LIT, Red status light is OFF.

The operator observes that 1VX-1A (1A H2 Skimmer the 1VX-1A Green status Fan Isol Test A). light is LIT, Red status light is OFF.

  • 7 The operator presses the (Step 2.b RNO) OPEN 1 RAF-D-4 OPEN dampers.

pushbutton and observes the Red status light is LIT, Green status light is OFF.

The operator presses and holds the 1VX-2B OPEN pushbutton and observes the Red status light is LIT, Green status light is OFF.

The operator presses the 1 RAF-D-2 OPEN pushbutton and observes the Red status light is LIT, Green status light is OFF.

The operator presses and holds the 1VX-1A OPEN pushbutton and observes the Red status light is LIT, Green status light is OFF.

2013 Systems Control Room JPM A

- NUREG 1021, Revision 9

Appendix C Page 8 of ii Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 8 (Step 2.c) Check The operator observes the Containment Air Return iA CAR Fan Green status fans ON.

light LIT, and Red status light OFF.

The operator observes the 1 B CAR Fan Green status light LIT, and Red status light OFF.

  • 9 The operator depresses the (Step 2.c RNO) start fans.

START pushbutton for the iA CAR Fan, and observes the Red status light LIT, Green status light OFF.

The operator depresses the START pushbutton for the i B CAR Fan, and observes the Red status light LIT, Green status light OFF.

10 (Step 2.d) Check H 2 The operator observes the Skimmer fans ON.

- 1A H2 Skimmer Fan Green status light LIT, and Red status light OFF.

The operator observes the lB H2 Skimmer Fan Green status light LIT, and Red status light OFF.

2013 Systems Control Room JPM A

- NUREG 1021, Revision 9

Appendix C Page 9 of 1 1 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 1 1 (Step 2.d RNO) start fans. The operator depresses the START pushbutton for the 1A H2 Skimmer Fan, and observes the Red status light LIT, Green status light OFF.

The operator depresses the START pushbutton for the 1B H2 Skimmer Fan, and observes the Red status light LIT, Green status light OFF.

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2013 Systems Control Room JPM A NUREG 1021, Revision 9

Appendix C Page 10 of 1 1 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.: 2013 Systems Control Room JPM A Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2013 Systems Control Room JPM A

- NUREG 1021, Revision 9

Appendix C Form ES-C-i JPMCUESHEET INITIAL CONDITIONS:

  • You are the Unit 2 BOP.
  • Unit 1 has experienced a Large Break LOCA.
  • The crew is implementing EPI1IAJ5000IE-O (Reactor Trip or Safety Injection).

INITIATING CUE: The CRS has directed you to check Phase B HVAC equipment in accordance with Enclosure 2, (Phase B HVAC Equipment), of EP/i/A15000/E-O, (Reactor Trip or Safety Injection).

NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-i Worksheet SIM JPM B 2013 Systems Control Room JPM B (Rev_111113)

- NUREG 1021, Revision 9

Appendix C Page 2 of 12 Form ES-C-i Job Performance Measure Worksheet Facility: McGuire Task No.:

Task

Title:

Isolate the NV S/I Flowpath While JPM No.: 2013 Systems Control Terminating Safety Iniection Room JPM B (Alternate Path)

K/A

Reference:

E02 EA1 .1(4.0/3.9)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM).

Initial Conditions:

  • Safety Injection Termination criteria has been met and the crew is implementing EP/i/A15000/ES-i .1 (Safety Injection Termination).

Initiating Cue: The CRS has directed you to isolate the NV S/I flowpath in accordance with Step 6 of EP/1/A/5000/ES-1 .1 (Safety Injection Termination).

Task Standard: The operator will attempt to isolate NV S/I flow per EP/i/AJ500/ES-1 .1, recognize that this cannot be accomplished and complete Generic Enclosure 18 to isolate NV S/I flow.

Required Materials: Control Room copy (CRS Desk) of EP/i/A15000/ES-i .1 marked up through Step 5 (See Attached Markup).

General

References:

EP/1/N5000/ES-i .1 (Safety Injection Termination), Rev 26 EP/1/A/5000/G-i (Generic Enclosures) Rev 34 2013 Systems Control Room JPM B

- NUREG 1021, Revision 9

Appendix C Page 3 of 12 Form ES-C-i Job Performance Measure Worksheet Handouts: Handout 1: Blank Copy of EPI1/AI5000IG-i (Generic Enclosures),

Generic Enclosure 18.

Time Critical Task: NO Validation Time: 12 minutes 2013 Systems Control Room JPM B NUREG 1021, Revision 9

Appendix C Page 4 of 12 Form ES-C-i Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Reset the Simulator to 10-39 (100%)
2. Insert MAL-ISEOO6A = BLK_BOTH (Failure of MSI Signal Train A)

Insert MAL-ISEOO6B = BLK_BOTH (Failure of MSI Signal Train B)

Insert MAL-SMOO9 (Main Steam Header Break)

(Event requiring SI initially, but as transient progresses will lead to implementation of SI Termination).

3. Manually close MSIVs when NC pressure decreases to less than 2000 psig.
4. Ensure that 1 NV-i 508 and 1 NV-i 51 A are CLOSED (Simulating closure of valves on E-0 Foldout Page requirement to close. NOT re-opened per Foldout Page as of yet)
5. Insert REM-N VOl 51A = 0 (1NV-151A (Ui NV Pump Recirc Isol) is stuck CLOSED).
6. Perform all EP actions up to through step 5 of EPI1IAJ5000/ES-1 .1.
7. Ensure that NC System pressure is 2000 psig and rising.
8. Stabilize plant conditions and Freeze the Simulator OR
1. Reset Simulator to Temporary Snap IC-251 (May, 2013)
2. Momentarily place Simulator in Run to acknowledge alarms.
3. Leave Simulator in FREEZE until operator is ready to begin.

NOTE: During the performance of this JPM, the Simulator Instructor will need to monitor unrelated alarms and silence as needed.

2013 Systems Control Room JPM B

- NUREG 1021, Revision 9

Appendix C Page 5 of 12 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM).

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT Simulator Instructor NOTE: Leave Simulator in FREEZE until operator is ready to begin.

(Step 6) Isolate NV S/I The operator observes the flowpath as follows: 1 NV-221 A Red status light is LIT, and Green status (Step 6.a) Check the light is OFF.

following valves OPEN:

1 NV-221A (Ui NV Pump The operator observes the Suct From FWST Isol) 1NV-222B Red status light is LIT, and Green status 1 NV-222B (Ui NV Pump light is OFF.

Suct From FWST Isol).

2 (Step 6.b) Check the The operator observes the following valves OPEN:

1NV-i5OB Green status iNV-150B(U1 NV Pump light is LIT, and Red status Recirc Isol) light is OFF.

1NV-151A (Ui NV Pump The operator observes the Recirc Isol).

iNV-151A Green status light is LIT, and Red status light is OFF.

2013 Systems Control Room JPM B

- NUREG 1021, Revision 9

Appendix C Page 6 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 3 (Step 6.b RNO b) Perform The operator presses the the following:

1NV-150B OPEN (Step 6.b RNO b.i) OPEN pushbutton and observes valves. the Red status light is LIT, and Green status light is OFF.

The operator presses the 1NV-i5iA OPEN pushbutton and observes the Green status light remains LIT, and Red status light remains OFF.

(Alternate Path)

(Step 6.b RNO b.2) IF both The operator recognizes valves open, THEN that both valves are NOT open and continues.

5 (Step 6.b RNO b.3) The operator contacts an Dispatch operator to OPEN AC and directs that they affected valve(s).

open 1NV-151A locally.

1 NV-i 50B (aux bldg, 71 6+8, HH-55, room 627, Cue:

NV pump room 1A, west of pump motor) The AO acknowledges.

1NV-151A (aux bldg, 71 6+9, HH-55, room 627, NV pump room 1A, west of pump motor).

2013 Systems Control Room JPM B

- NUREG 1021, Revision 9

Appendix C Page 7 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 6 (Step 6.b RNO b.4) Realign The operator proceeds to charging PER Generic Enclosure 18.

EPI1/A15000/G-1 (Generic Enclosures), Enclosure 18 Examiner Note (Aligning Normal Charging With NV Recirc Path When the operator Isolated). locates the G-1 Notebook, provide the operator with Handout 1.

7 (Enclosure 18, Step 1) The operator observes Check VI header pressure OVIP-5090 and determines GREATER THAN 60 PSIG. that VI header pressure is 115 psig.

8 (Step 2) Check NC pump The operator observes seal injection flow - 1 NVP-5300, 5310, 5320 GREATER THAN OR and 5330 and determines EQUAL TO 6 GPM TO that Seal Injection flow to EACH NC PUMP. each NCP is greater than 6 gpm.

9 (Step 3) GO TO Step 8. The operator proceeds to Step 8.

  • 10 (Step 8) CLOSE 1 NV-241 The operator adjusts the (Ui Seal Water Inj Flow 1 NV-24i Manual Loader Control). counter-clockwise until the Manual Loader output equals 0%.

2013 Systems Control Room JPM B

- NUREG 1021, Revision 9

Appendix C Page 8 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT (Step 9) Check one of the The operator observes the following valves OPEN:

INV-13B Red status light is 1NV-13B (Ui NV Supply To 1 and the Green status LIT 1A NC Loop Isol) hg is OR 1 NV-i 6A (Ui NV Supply To Examiner NOTE 1 D NC Loop Isol) 1NV-16A is CLOSED 12 (Step 10) Check 1 NV-21 A The operator observes the (Ui NV Supply to Ui Aux 1NV-21A Green status light PZR Spray Isol) CLOSED.

- is LIT, and the Red status light is OFF.

  • 13 (Step 11) OPEN the The operator presses the following valves:

1 NV-244A OPEN 1 NV-244A Ui Ch pushbutton and observes Hdr Cont Outside Isol) e e s a us ig is Green status light OFF.

1 NV-245B (Ui Charging The operator presses the Hdr Cont Outside Isol). 1 NV245B OPEN pushbutton and observes the Red status light is LIT, Green status light OFF.

  • 14 (Step 12) Establish The operator presses the charging pump minimum Blue M pushbutton on the flow as follows: 1 NV-238 SLIMS.

(Step 12.a) Place 1NV-238 (Ui Charging Hdr Control) controller in manual.

15 (Step 1 2.b) Check NC The operator observes NC pressure LESS THAN

- System pressure is greater 1800 PSIG. than 1800 psig.

2013 Systems Control Room JPM B

- NUREG 1021, Revision 9

Appendix C Page 9 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 16 (Step 12.b RNO b) Perform The operator presses the the following: 1 NV-238 SLIMS OUTPUT (Step 12.b RNO b.1) Fully Raise pushbutton until OPEN 1 NV-238 (Ui SLIMS output is at 100%.

Charging Hdr Control).

17 (Step 12.b RNO b.2) IF The operator recognizes 1 NV-238 cannot be that this step is NOT operated from the Control applicable and continues.

Room 18 (Step 12.b RNO b.3) IF NC The operator observes NC pressure less than 2000 System pressure is greater 2000 psig.

  • 19 (Step 12.b RNO b.4) The operator adjusts the THROTTLE 1NV-24i (Ui 1NV-241 Manual Loader Seal Water Inj Flow Control) clockwise until the Manual to 50% OPEN. Loader output equals 50%.

20 (Step 12.b RNO b.5) IF The operator recognizes 1 NV-241 cannot be that this step is NOT operated from the Control applicable and continues.

Room 21 (Step 12.b RNO b.6) GO The operator proceeds to TO Step 13. Step 13.

  • 22 (Step 13) CLOSE the The operator presses the following valves:

1 NI-9A CLOSE pushbutton 1 Nl-9A (NC Cold Leg Inj and observes the Green From NV) status light is LIT, Red status light is OFF.

1 NI-i OB (NC Cold Leg lnj The operator presses the From NV). 1NI1OB CLOSE pushbutton and observes the Green status light is LIT, Red status light is OFF.

2013 Systems Control Room JPM B

- NUREG 1021, Revision 9

Appendix C Page 10 of 12 Form ES-C-i PERFORMANCE INFORMAflON STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 23 (Caution prior to Step 14) The operator reads the Failure to maintain charging Caution and proceeds.

flow above 80 GPM will result in inadequate NV pump minif low protection.

This limit applies to all subsequent EPs.

  • 24 (Step 14) THROTTLE . The operator observes charging and seal injection to maintain the following: Charging flow to be between 80-200 gpm.

Charging flow between 80 GPM and 200 GPM The operator observes Seal injection flow 6-10 1 NVP-5300, 5310, 5320 GPM per NC pump. and 5330 and determines that Seal Injection flow to each NCP is between 6-10 gpm.

Examiner Note:

The operator may make the necessary adjustments.

25 (Step 15) RETURN TO The operator reports that procedure and step in NV S/I Flow has been effect. isolated per Generic Enclosure 18.

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2013 Systems Control Room JPM B NUREG 1021, Revision 9

Appendix C Page ii of 12 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.: 2013 Systems Control Room JPM B Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2013 Systems Control Room JPM B

- NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

Safety Injection Termination criteria has been met and the crew is implementing EPI1IAI5000/ES-i .1 (Safety Injection Termination).

INITIATING CUE: The CRS has directed you to isolate the NV S/I flowpath in accordance with Step 6 of EP/iIA/5000/ES-i.i (Safety Injection Termination).

NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-i Worksheet SIM JPM C 2013 Systems Control Room JPM C (Revlllll3)

- NUREG 1021, Revision 9

Appendix C Page 2 of 12 Form ES-C-i Job Performance Measure Worksheet Facility: McGuire Task No.:

Task

Title:

Rewond to Failed ESF Actuation JPM No.: 2013 Systems Control Room JPM C (Alternate Path)

K/A

Reference:

013 A4.01 (4.5/4.8)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • Unit 1 experienced an ATWS and a Safety Injection actuation.
  • The crew is presently performing EP/i/AJ5000/FR-S.1 (Response to Nuclear Power Generation/ATWS).

Initiating Cue: The CRS has directed you to perform Enclosure 3 (Subsequent S/I Actions) of EP/1/N5000/FR-S.1 (Response to Nuclear Power Generation/ATWS), while the crew continues with the actions of EPI1 /N5000IFR-S. 1.

Task Standard: The operator will complete the required actions of Enclosure 3 including manually actuating the Train B of SI and Phase A CIS, reset the Train B SIS and Sequencer and dispatch an operator to stop the B Diesel Generator using the Emergency Stop Pushbutton.

Required Materials: None General

References:

EP/i/A/5000/E-0 (Reactor Trip or Safety Injection), Rev 32 2013 Systems Control Room JPM C

- NUREG 1021, Revision 9

Appendix C Page 3 of 12 Form ES-C-i Job Performance Measure Worksheet EPI1 IA/5000IFR-S. 1 (Response to Nuclear Power Generation/ATWS),

Rev 13 OMP 11-3 (Operations Response to Electrical Component Failures),

Rev 1 Handouts: Enclosure 3 (Subsequent S/I Actions) of EP/1/A15000/FR-S.i (Response to Nuclear Power Generation/ATWS)

Time Critical Task: NO Validation Time: 8 minutes 2013 Systems Control Room JPM C

- NUREG 1021, Revision 9

Appendix C Page 4 of 12 Form ES-C-i Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Reset the Simulator to IC-39 (100% Power MOL)
2. Insert the following malfunctions to cause an ATWS:

IPEOO1A (FAILURE OF AUTO REACTOR TRIPS TRAIN A)

IPEOO1 B (FAILURE OF AUTO REACTOR TRIPS TRAIN B)

IPE0O2A (FAILURE OF MANUAL REACTOR TRIPS TRAIN A)

IPE0O2B (FAILURE OF MANUAL REACTOR TRIPS TRAIN B)

3. Insert Malfunction ISEOO2B (Failure of Train B SI Auto ONLY)
4. Insert Malfunction ISEOO3B (Failure of Train B Phase A CIS Auto ONLY)
5. Insert Malfunction ISEOO1A (Inadvertent Train A SI Actuation)
6. Insert Malfunction RNOO7B (RN PUMP B TRIPS DUE TO OVERCURRENT)
7. Allow Accident to continue, complete actions of EP/i/A15000/E-0 and EP/1/A15000/FR-S.1 up to Step 7.

Note: At an appropriate time, Manually trip the reactor using LOA- IPEOO3/004 (RTB = RO)

8. Ensure that only Train A Phase A CIS has actuated.
9. Acknowledge all alarms and Freeze the Simulator OR
1. Reset to lC-264 (November, 2013)
2. Momentarily go to RUN to acknowledge Alarms then place Simulator in FREEZE.
3. Leave Simulator in FREEZE until operator is ready to begin.

NOTE: During the performance of this JPM, the Simulator Instructor will need to monitor un-related alarms and silence as needed.

2013 Systems Control Room JPM C

- NUREG 1021, Revision 9

Appendix C Page 5 of 12 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT Simulator Instructor NOTE: Leave Simulator in FREEZE until operator is ready to begin.

1 (Enclosure 3, Step 1) Check The operator observes Bus 1 ETA and 1 ETB - voltage (or equivalent), and ENERGIZED. determines that 1 ETA and 1 ETB are energized.

2 (Step 2) Check both LOCA The operator observes the Sequencer Actuated status Train A LOCA Sequencer lights (1 SI-i 4) LIT.

Actuated status light is LIT.

The operator observes the Train B LOCA Sequencer Actuated status light is LIT.

3 (Step 2RNO) Perform the The operator recognizes following: that S/I had not been previously initiated and (Step 2RNO.a) IF S/I had reset, and proceeds.

previously been initiated and reset

  • 4 The operator presses the B (Step 2RNO.b) Initiate S/I.

Train SI pushbutton.

(Step 3) Check all The operator observes that Feedwater Isolation status all FWIS status lights are lights (iSl-4) LIT.

LIT.

2013 Systems Control Room JPM C NUREG 1021, Revision 9

Appendix C Page 6 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 6 (Step 4) Check Phase A The operator observes that RESET lights DARK.

A Train Phase A RESET light is DARK.

The operator observes that B Train Phase A RESET light is LIT.

  • 7 The operator presses the B (Step 4 RNO) Initiate Phase A Isolation. Train B Phase A Containment Isolation pushbutton.

8 (Step 5) Check ESF Monitor The operator observes that Light Panel on energized Groups 1, 2 and 5 ESF train(s): Monitor Light Panel status lights are DARK.

(Step 5.a) Groups 1 ,2,5 -

DARK.

9 (Step 5) Check ESF Monitor The operator observes that Light Panel on energized Group 3 ESF Monitor Light train(s): Panel status lights are LIT.

(Step 5.b) Group 3 LIT.

10 (Step 5) Check ESF Monitor The operator observes that Light Panel on energized Group 4 ESF Monitor Light train(s): Panel status lights are LIT.

(Step 5.c) Group 4 LIT AS REQUIRED.

2013 Systems Control Room JPM C

- NUREG 1021, Revision 9

Appendix C Page 7 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 11 (Step 5) Check ESF Monitor The operator observes that Light Panel on energized Group 6 ESF Monitor Light train(s): Panel status lights are LIT.

(Step 5.d) Group 6 LIT.

- Examiner NOTE:

It is expected that all Group 6 lights will be LIT If they are, proceed to JPM Step 16 If not, continue with JPM Step 12.

12 (Step s.d RNO) GO TO The operator proceeds to Step 5.f Step 5.f.

13 (Step 5.f) Check the The operator observes that following: the OAC is in service.

  • OAC IN SERVICE The operator observes the

. LOCA Sequencer Train A and B LOCA Actuated status light Sequencer Actuated status (iSI-14) on energized light is LIT.

train(s) LIT.

14 (Step 5.g) Perform the The operator observes following on energized MONL.

train(s):

The operator will observe (Step 5.g.i) Check OAC that all SI valves are closed.

Monitor Light Program (MONL) for Group 6 The operator will observe windows that are dark.

that 1VQ-2B is not in the required position.

15 (Step 5.g.2) Align valves as The operator will press the required. CLOSE pushbutton for 1VQ-2B and observe Green status light is LIT, and Red status light is OFF.

2013 Systems Control Room JPM C NUREG 1021, Revision 9

Appendix C Page 8 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 16 (Step 5) Check ESF Monitor The operator proceeds to Light Panel on energized Step 6.

train(s):

Examiner NOTE:

(Step 5.e) GO TO Step 6.

If all Group 6 lights are LIT in JPM Step 12.

continue HERE 17 (Step 6) Check proper CA The operator observes the pump status: Red status light LIT, and normal running amps for the 1A MD CA Pump.

(Step 6.a) MD CA pumps -

ON. The operator observes the Red status light LIT, and normal running amps for the lB MD CA Pump.

18 (Step 6.b) N/R level in at The operator observes NR least 3 S/Gs GREATER level in all Steam THAN 17%. Generators to be less than 17%, and proceeds to the Step 6.b RNO.

19 (Step 6.b RNO) Ensure TD The operator observes the CA pump on. Unit 1 CA Turbine Speed to be 38OO RPM, and determines that the TD CA Pump is running.

2013 Systems Control Room JPM C

- NUREG 1021, Revision 9

Appendix C Page 9 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 20 (Step 7) Check all KG The operator observes the pumps ON.

Red status light LIT, and normal running amps for the 1A1 KG Pump.

The operator observes the Red status light LIT, and normal running amps for the 1A2 KG Pump.

The operator observes the Red status light LIT, and normal running amps for the 1B1 KG Pump.

The operator observes the Red status light LIT, and normal running amps for the iB2 KG Pump.

21 (Step 8) Check both RN The operator observes the pumps ON.

Green Status light LIT (or equivalent), and determines that the 1 B RN Pump has tripped (Alternate Path),

and proceeds to Step 8 RNO.

22 (Step 8 RNO a) Perform the The operator recognizes the following: pump has tripped and proceeds.

Start pumps(s)

OR The operator attempts to reclose the 1 B RN Pump Breaker by depressing the 1 B RN START Pushbutton and observes that the Green status light is LIT, and Red status light is OFF.

The operator recognizes that the pump will not start and proceeds.

2013 Systems Control Room JPM C

- NUREG 1021, Revision 9

Appendix C Page 10 of 12 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 23 (Step 8 RNO b.1) IF any RN The operator observes that pump off, THEN perform 1ETB is energized and that the following: the 1 B DG is running unloaded, and proceeds.

IF affected train is deenergized, AND its D/G is off

  • 24 (Step 8 RNO b.2) Reset the The operator depresses the following on affected train: Train B SI Reset Pushbutton and observes

. S/I the Yellow status light LIT.

. Sequencer The operator depresses the Train B Sequencer Reset Pushbutton and observes the Yellow status light LIT.

  • 25 (Step 8 RNO b.3) Dispatch The operator contacts the operator to stop affected AO and directs that the 1 B D/G using emergency stop DG be stopped using the pushbutton. emergency stop pushbutton.

Cue:

As the AO, acknowledge Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2013 Systems Control Room JPM C

- NUREG 1021, Revision 9

Appendix C Page 11 of 12 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.: 2013 Systems Control Room JPM C Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2013 Systems Control Room JPM C

- NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

  • Unit 1 experienced an ATWS and a Safety Injection actuation.
  • The crew is presently performing EP/1/A/5000/FR-S.1 (Response to Nuclear Power Generation/ATWS).

INITIATING CUE: The CRS has directed you to perform Enclosure 3 (Subsequent S/I Actions) of EP/1IA/5000IFR-S.1 (Response to Nuclear Power Generation/ATWS), while the crew continues with the actions of EPI1/AI5000IFR-S.1.

NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C1 Worksheet SIM JPM D 2013 Systems Control Room JPM D (Rev_111913)

NUREG 1021, Revision 9

Appendix C Page 2 of 13 Form ES-C-i Job Performance Measure Worksheet Facility: McGuire Task No.:

Task

Title:

Swan Hotwell/CM Booster Pumps JPM No.: 2013 Systems Control Room JPM D (Alternate Path)

K/A

Reference:

056 A2.04 (2.6/2.8)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testinci:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAM INEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • Unit 1 is operating at 90% power in preparation for a Condensate System Pump Swap.
  • The A and the B Hotwell Pumps are running, with the C Hotwell Pump in Standby.
  • The A and the B Condensate Booster Pumps are running, with the C Condensate Booster Pump in Standby.
  • To support maintenance activities, it is desired to swap Condensate System Pumps.
  • U-i TB Rounds AC (Bob) is standing by via radio, and has reported that the 1 C Hotwell Pump and the 1 C CM Booster Pump have been checked out and both are ready to start, and all operating parameters are normal.

Initiating Cue:

  • The CRS has directed you to start the C Hotwell Pump, and place the A Hotwell Pump in standby, and then start the C Condensate Booster Pump and place the A Condensate Booster Pump in standby using Enclosure 4.5 of OP/i/A/6250/001 (Condensate and Feedwater System).

2013 Systems Control Room JPM D

- NUREG 1021, Revision 9

Appendix C Page 3 of 13 Form ES-C-i Job Performance Measure Worksheet

  • All outstanding R&Rs that may have impacted the performance of this procedure have been evaluated.

Task Standard: The operator will start the C Hotwell Pump, and place the A Hotwell Pump in standby. Then, the operator will start the C Condensate Booster Pump, and place the A Condensate Booster Pump in standby.

The operator will then respond to an ARP, requiring that the A Hotwell Pump be restarted and the C Hotwell Pump removed from service.

Required Materials: None General

References:

OP/11A16250/O0i (Condensate and Feedwater System), Rev 190 OP/1/N6100/010 I (Annunciator Response for Panel 1AD-8), Rev 50 SOMP 01-02 (Reactivity Management), Rev 8 OMP 8-1 (Star and Peer Checking), Rev ii Handouts: Handout 1: Enclosure 4.5 (Swapping Hotwell/CM Booster Pumps) of OPI1IAI6250/001 (Condensate and Feedwater System) marked up for place-keeping through step 3.1.

Time Critical Task: NO Validation Time: 15 minutes 2013 Systems Control Room JPM D

- NUREG 1021, Revision 9

Appendix C Page 4 of 13 Form ES-C-i Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Reset simulator to IC-225, 90% power increasing from BOO.
2. Place in RUN
3. Ensure both A and B Hotwell Pumps are running, and C Hotwell Pump is in Standby.
4. Ensure both A and B Condensate Booster Pumps are running, and C Condensate Booster Pump is in Standby.
5. Place XMT-CM_1 CMPT5O2O =4 Ramp = 10, on Trigger #1.
6. Freeze the Simulator OR
1. Reset to IC-253 (November, 2013)
2. Place Simulator in Run and acknowledge alarms/Reset SLIMS.

NOTE: During the performance of this JPM, the simulator operator will need to operate Trigger #1 at the end of Step 14 of this JPM, after switch has been placed in AUTO, and then clear this malfunction at Step 16.

2013 Systems Control Room JPM D

- NUREG 1021, Revision 9

Appendix C Page 5 of 13 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

STARTTIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT Simulator Instructor NOTE: Leave Simulator in FREEZE until operator is ready to begin.

Examiner Note:

Throughout JPM, If the operator provides information to the OATC, as OATC, acknowledge.

(Step 3.2) Perform the The operator proceeds to following Sections as Section 3.3.

applicable.

Section 3.3, Swapping Hotwell Pumps Section 3.4, Swapping CM Booster Pumps 2 (Step 3.3) Swapping The operator has the CRS Hotwell Pumps. sign for the evaluation of operational concerns (Step 3.3.1) Evaluate related to swapping Hotwell potential operational Pumps on line.

concerns related to swapping Hotwell Pumps on line. (R.M.) Cue.

When requested, Sign as CRS.

2013 Systems Control Room JPM D

- NUREG 1021, Revision 9

Appendix C Page 6 of 13 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT (Note prior to Step 3.3.1) The operator reads the Starting a Hotwell Pump will Note and proceeds.

cause an increase in condensate flow to the Steam Generators and result in an NC System temperature decrease (R.M.)

4 (Step 3.3.2) Start desired The operator may make an Hotwell Pump (R.M.)

announcement regarding

  • 1A Hotwell Pump the Pump start.
  • 1 B Hotwell Pump
  • 1C Hotwell Pump The operator rotates the 10 Hotwell Pump control switch to the START position and observes the Red status light LIT, and Green status light OFF.

The operator observes motor amps rise, peak, and then stabilize at 45 amps.

Booth Cue:

If the operator contacts the AO to check pump status, as AO, report The 1C Hotwell Pump is operating properly all operating parameters normal.

(Note prior to Step 3.3.3) The operator reads the Securing an operating Note and proceeds.

Hotwell pump will cause a decrease in condensate flow to the Steam Generators and result in an NC System temperature increase (R.M) 2013 Systems Control Room JPM D

- NUREG 1021, Revision 9

Appendix C Page 7 of 13 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 6 (Step 3.3.3) IF required, The operator rotates the 1A ace desired Hotwell Pump Hotwell Pump control switch to the STOP position and

. 1A Hotwell Pump observes the Green status

. 1 B Hotwell Pump light LIT, and Red status

. 1 C Hotwell Pump light OFF.

The operator observes motor amps lower to 0 amps.

  • 7 (Step 3.3.4) WHEN CF The operator rotates the 1A Pump suction pressure normal, place non-operating Hotwell Pump control switch 0 th e AUTO posi ion.

Hotwell Pump in AUTO

. 1A Hotwell Pump The operator returns to step

. 1 B Hotwell Pump 32

. iCHotwellPump 8 (Step 3.2) Perform the The operator proceeds to following Sections as Section 3.4.

applicable.

Section 3.3, Swapping Hotwell Pumps Section 3.4, Swapping CM Booster Pumps (Step 3.4) Swapping CM The operator has the CRS Booster Pumps. sign for the evaluation of operational concerns (Step 3.4.1) Evaluate related to swapping CM potential operational Booster Pumps on line.

concerns related to swapping CM Booster Pumps on line (R M) Cue When requested, Sign as CRS.

2013 Systems Control Room JPM D NUREG 1021, Revision 9

Appendix C Page 8 of 13 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 10 (Step 3.4.2) Ensure The operator contacts the Auxiliary Oil Pump AO to check the Auxiliary operating on CM Booster Oil Pump running.

Pump to be started:

Booth Cue:

. 1A CM Booster Auxiliary Oil Pump As the AO, report that the

. 1B CM Booster Auxiliary Oil Pump 1C CM Booster Auxiliary

. 1C CM Booster Auxiliary Oil Pump is running.

Oil Pump 11 (Note prior to Step 3.4.3) The operator reads the Starting a CM Booster Note and proceeds.

Pump will cause a increase in condensate flow to the Steam Generators and result in an NC System temperature decrease.

(R.M.)

2013 Systems Control Room JPM D

- NUREG 1021, Revision 9

Appendix C Page 9 of 13 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 12 (Step 3.4.3) Start desired The operator may make an CM Booster Pump (R.M.)

announcement regarding the Pump start.

. 1 A CM Booster Pump The operator rotates the 1 C

. 1 B CM Booster Pump CM Booster Pump control

. 1 C CM Booster Pump switch to the START position and observes the Red status light LIT, and Green status light OFF.

The operator observes motor amps rise, peak, and then stabilize at 9O amps.

Cue:

If the operator contacts the AO to check pump status as AO, report The 1C CM Booster Pump is operating properly all operating parameters normal 13 (Note ?rior to Step a4.4) The operator reads the Securing an operating CM Note and proceeds.

Booster Pump will cause a decrease in condensate flow to the Steam Generators and result in an NC System temperature increase. (R.M.)

2013 Systems Control Room JPM D

- NUREG 1021, Revision 9

Appendix C Page 10 of 13 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 14 (Step 3.4.4) IF required, The operator rotates the 1A place the desired CM CM Booster Pump control Booster Pump in STOP (R.M.) switch to the STOP position and observes the Green

. 1A CM Booster Pump status light LIT, and Red

. 1 B CM Booster Pump status light OFF.

. lCCMBoosterPump The operator observes motor amps lower to 0 amps.

Simulator Instructor Note: Just after the operator places the 1A CM Booster Pump Control Switch to STOP, operate Trigger #1.

This will cause MCB Annunciator 1AD-8, A3, HTWL PUMP C STRNR HI DIP.

  • 15 (Step 3.4.5) Place non- The operator rotates the 1A operating CM Booster Pumps in AUTO. CM Booster Pump control switch to the AUTO

. 1A CM Booster Pump position.

. iBCMBoosterPump

. 1 C CM Booster Pump The operator addresses Annunciator Response Procedure for Panel 1 AD-8, A3, HWIL PUMP C STRNR HI D/P (Alternate Path).

2013 Systems Control Room JPM D

- NUREG 1021, Revision 9

Appendix C Page 1 1 of 13 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 16 (OP/11A16100/O1O I, 1AD8 The operator depresses the A3, Step 1 (IA)) Start 1A Hotwell Pump START standby Hotwell Pump.

Pushbutton and observes the Red status light LIT, and Green status light OFF.

The operator observes motor amps rise, peak, and then stabilize at 45 amps.

Cue:

If the operator reports the Immediate Actions to the CRS, as the CRS, direct the operator to take any immediate actions.

Simulator Instructor Note: Clear XMT-CMO1 1 when operator takes the next action.

  • 17 (Step 2 (IA)) Remove C The operator depresses the Hotwell Pump from Service 1C Hotwell Pump STOP Pushbutton and observes the Green status light LIT, and Red status light OFF.

The operator observes motor amps lower to 0 amps.

Terminating Cue: Evaluation on this JPM is complete.

STOPTIME:

2013 Systems Control Room JPM D

- NUREG 1021, Revision 9

Appendix C Page 12 of 13 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.: 2013 Systems Control Room JPM D Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2013 Systems Control Room JPM D

- NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

  • Unit i is operating at 90% power in preparation for a Condensate System Pump Swap.
  • The A and the B Hotwell Pumps are running, with the C Hotwell Pump in Standby.
  • The A and the B Condensate Booster Pumps are running, with the C Condensate Booster Pump in Standby.
  • To support maintenance activities, it is desired to swap Condensate System Pumps.
  • U-i TB Rounds AO (Bob) is standing by via radio, and has reported that the i C Hotwell Pump and the i C CM Booster Pump have been checked out and both are ready to start, and all operating parameters are normal.

INITIATING CUE:

  • The CRS has directed you to start the C Hotwell Pump, and place the A Hotwell Pump in standby, and then start the C Condensate Booster Pump and place the A Condensate Booster Pump in standby using Enclosure 4.5 of OP/i /N6250/00l (Condensate and Feedwater System).
  • All outstanding R&Rs that may have impacted the performance of this procedure have been evaluated.

NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-i Worksheet SIM JPM E 2013 Systems Control Room JPM E (Rev_112013)

- NUREG 1021, Revision 9

Appendix C Page 2 of 11 Form ES-C-i Job Performance Measure Worksheet Facility: McGuire Task No.:

Task

Title:

Resijond to ND System Malfunction JPM No.: 2013 Systems Control While at Mid Looi Room JPM E K/A

Reference:

025 AA1.12 (3.6/3.5)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testinQ:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM).

Initial Conditions:

  • Unit 2 is at 100% power.
  • Unit 1 is in Mode 5 with the NC System drained to approximately 10 inches.
  • 1A ND Pump is in service to all four Cold Legs.
  • ND flow has suddenly increased.

Initiating Cue: The CRS has directed you to implement AP/1/A/5500/19 (Loss of ND or ND System Leakage) AND control ND flow so that NC Temperature is maintained at its present temperature.

Task Standard: The A ND Train flow is throffled to less than 3000 gpm using 1 NI-i 73 and 1 NI-i 78; and positions the Manual Loaders for the 1 A and 1 B ND Heat Exchanger Outlets valves to full Open.

Required Materials: None General

References:

OP/1/A/6i00/SD-20 (Draining the NC System), Rev 49 2013 Systems Control Room JPM E

- NUREG 1021, Revision 9

Appendix C Page 3 of 1 1 Form ES-C-i Job Performance Measure Worksheet API1/A15500119 (Loss of ND or ND System Leakage), Rev 26 Handouts: None NOTE: The operator will need to use the Control Room copy of API1/A/5500119 (Loss of ND or ND System Leakage).

Time Critical Task: NO Validation Time: 8 minutes 2013 Systems Control Room JPM E

- NUREG 1021, Revision 9

Appendix C Page 4 of 11 Form ES-C-i Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Reset to 10-01, Post Refueling, Core Reloaded, 23 Above CL, Train A ND in service (BOC)
2. Insert OVERRIDEiTRANSMITTERS:

A. XMT-NC_1NCLT5991, [NCOO8] Ui NC System Narrow Range Level M1A0608 = 10 B. XMT-NC_1NCLT846O, 10 NC Loop Hot Leg Level Mi Al 509 = 10 C. XMT-NC_1NCLT847O, 1A NC Loop Hot Leg Level M1A1 503 = 10 D. XMT-NCjNCLT5990, [NCOO7J Ui NC System Wide Range Level M1A1 053 = 10

3. Insert REM-ND0029, [1 N00029j A ND HX Outlet = 1.0 Insert REM-ND0034, [1 NC0034] A & B ND HX Bypass = 1.0
4. Place OAC point Mi P0828 (Ui AVG of FIVE HOTEST I/C THERMOCOUPLES) on 10 Minute trend.
5. Stabilize Incore Thermocouple temperature.
6. Freeze Simulator
7. Remove Red Tag stickers from the following Valves:
1. Reset to 10-254 (November, 2013)
2. REMOVE Red Tag Stickers from the following Valves:
3. Momentarily place Simulator in Run to acknowledge alarms/Reset SLIMS.
4. Leave Simulator in FREEZE until operator is ready to begin.

2013 Systems Control Room JPM E

- NUREG 1021, Revision 9

Appendix C Page 5 of 1 1 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM)

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT Simulator Instructor NOTE: Leave Simulator in FREEZE until operator is ready to begin.

(Caution prior to Step 1) The operator reads the Changes in NC pressure Caution and proceeds.

could result in inaccuracies in NC Level indications.

2 (Step 1) Check ND pumps The operator observes the ANY RUNNING. 1A ND Pump Red status light LIT, Green status light OFF, and motor amps to be 7O amps; and determines that the 1A ND Pump is running.

3 (Step 2) Check if ND pumps The operator observes one should remain running as or more of the following follows: instruments:

. 1 NCP-5991 NC SYS N/R LVL (Step 2.a) NC level -

  • 1 NCP-8470 NC LOOP GREATER THAN 4 A ULTRASONIC LEVEL INCHES.
  • 1 NCP-5990 NC SYS W/R LVL And determines that NC Level is 1O inches.

4 (Step 2.b) Check NC The operator observes the subcooling based on core NC Subcooling Monitors exit T/Cs GREATER (Train A or Train B) and THAN 0°F. determines that NC Subcooling is i 15°F.

2013 Systems Control Room JPM E

- NUREG 1021, Revision 9

Appendix C Page 6 of 1 1 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 5 (Step 2.c) Check the The operator observes 1 ND following valves OPEN

-i B and 1 ND-2AC on the

. 1ND-iB (1C NC Loop OAC (ND Graphic), seeing To ND Pumps Isol) that they are Red, determines that both valves are open.

  • 1ND-2AC (iC NC Loop to ND Pumps Cont Note Inside Isol)

Both breaker status lights are OFF since the valves are de-energized in this mode.

6 (Step 2.d) IF AT ANY TIME The operator reads the NC level goes below 4 step, which is a continuous inches OR NC subcooling action step, and proceeds.

based on core exit T/Cs goes below 0°F, THEN Note It is not expected that the conditions for this continuous action step will be met during the performance of this JPM.

7 (Step 3) Check NC level - The operator observes one LESS THAN 15 INCHES or more of the following (TOP OF HOT LEG). instruments:

  • 1 NCP-599i NC SYS N/R LVL

. 1 NCP-8470 NC LOOP A ULTRASONIC LEVEL

. 1 NCP-8460 NC LOOP C ULTRASONIC LEVEL

. 1 NCP-5990 NC SYS W/R LVL And determines that NC Level is i0 inches.

2013 Systems Control Room JPM E NUREG 1021, Revision 9

Appendix C Page 7 of 1 1 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 8 (Note prior to Step 4) ND The operator reads the flow control valves fail open Note, and proceeds.

on a loss of air.

Note A common air line failure has caused both 1ND29 (ND Heat Exchanger Outlet Or Bypass Valve) and 1ND34 (ND Heat Exchanger Outlet Or Bypass Valve) to fail open.

(Step 4) Check ND Flow The operator observes total control: ND system flow by observing 1NDP-51 91 (C &

(Step 4.a) Check total ND D Cold Leg) to be 2i75 system flow GREATER gpm and 1 NDP-51 81 (A &

THAN 3000 GPM. B Cold Leg) to be 2325 gpm; and determines that ND system flow is 45O0 gpm.

10 (Step 4.b) Throttle the The operator attempts to following valves as adjust the position of both necessary to reduce ND i ND-29 and 1 ND-34 by System to less than 3000 adjusting the controller.

. 1 ND-i 4 (1 B ND Hx The operator observes that Outlet Isol) controller adjustments do NOT impact total ND

. 1 ND-29 (1A ND Hx System flow still indicates Outlet iso 4500 gpm, and proceeds to Step 4.b RNO (Alternate Path).

. 1 ND-34 (1 A & 1 B ND Hx Byp Isol) 2013 Systems Control Room JPM E NUREG 1021, Revision 9

Appendix C Page 8 of 1 1 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 11 (Step 4.b RNO) Perform the following:

(Note prior to Step 4.b RNO The operator reads the b.i) When throttling closed Note and proceeds.

1 NI-i 73A or 1 NI-i 78B, the seal in circuit may cause The operator may observe the valve to fully close MCB flow indications, or before a drop in flow is flow on OAC (ND Screen).

seen. If the valve inadvertently closes, it may be pulsed open to the The operator depresses the desired flow. 1NI-173AJ1NI-178B Close pushbutton and observes a (Step 4.b RNO b.1) Throttle reduction in flow rate to the the following valves as Cold Legs (operator should necessary to reduce ND be monitoring this System to less than 3000 parameter while throttling GPM: and both valves already have red and green lights

  • iNl-i73A(1ANDtoA& LIT due to being in a B Cold Legs Cont throttled position).

Outside Isol)

D Cold Legs Cont Outside Isol) The critical task is to reduce total flow to less than 3000 GPM. Operator may throttle one or both of the valves.

The operator observes total flow (1 NDP-51 81 and 1 NDP-5i 91) to be less than 3000 gpm.

12 (Step 4.b RNO b.2) IF ND The operator checks for an Pump(s) cavitating, oscillation in flow, motor THEN amps and pressure, then determines ND pump is not cavitatinQ, and proceeds to RNO step 4.b.3.

2013 Systems Control Room JPM E

- NUREG 1021, Revision 9

Appendix C Page 9 of 1 1 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 13 (Step 4.b RNO b.3) Place the following manual loaders in the full open position:
  • 1 ND-29 (1 A ND Hx The operator rotates the Outlet Isol) 1ND-29 manual loader counter-clockwise until the needle is at 100%.

The operator rotates the

. 1ND-14 (lB ND Hx 1ND-14 manual loader Outlet lsol) counter-clockwise until the needle is at 100%.

Note:

The critical task is to OPEN at least one of the two Manual Loaders Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2013 Systems Control Room JPM E NUREG 1021, Revision 9

Appendix C Page 10 of 11 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.: 2013 Systems Control Room JPM E Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2013 Systems Control Room JPM E

- NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

  • Unit 2 is at 100% power.
  • Unit 1 is in Mode 5 with the NC System drained to approximately 10 inches.
  • iA ND Pump is in service to all four Cold Legs.
  • ND flow has suddenly increased.

INITIATING CUE: The CRS has directed you to implement API1/A15500/19 (Loss of ND or ND System Leakage) AND control ND flow so that NC Temperature is maintained at its present temperature.

NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-i Worksheet SIM JPM F 2013 Systems Control Room JPM F (Rev_111113)

- NUREG 1021, Revision 9

Appendix C Page 2 of 1 1 Form ES-C-i Job Performance Measure Worksheet Facility: McGuire Task No.:

Task

Title:

Restore from a Fire in the Unit 1 JPM No.: 2013 Systems Control Cable Sreadinci Room Room JPM F (Alternate Path)

K/A

Reference:

067 AA2.04 (3.1/4.3)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAM INEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM).

Initial Conditions: Unit 1 and 2 are at 100% power.

A fire has been reported in the Unit 1 Cable Spreading Room.

The crew has implemented AP/0/AJ5500/45 (Plant Fire) and is presently in Enclosure 17 (AB 750 Unit 1 Cable Spreading Room Fire Unit 1 and 2 Actions).

The following actions have been taken in response:

  • The breaker for 1CA-7AC has been OPENED.
  • The Pzr PORV Isolation Valves have been CLOSED.
  • The Main Steamline PORV Manual Loaders have been closed.

The Fire Brigade has reported that the fire is no longer active.

The SSF has NOT been activated.

Station Management has indicated that the crew may return Control Room controls to normal as identified within Enclosure 17.

AO (John) is standing by to assist.

2013 Systems Control Room JPM F

- NUREG 1021, Revision 9

Appendix C Page 3 of 1 1 Form ES-C-i Job Performance Measure Worksheet Initiating Cue: The CRS has directed you to restore the Control Room controls to normal by performing Step 21 a through e of Enclosure 17 (AB 750 Unit I Cable Spreading Room Fire Unit 1 and 2 Actions) of APIOIA/5500145 (Plant Fire).

Task Standard: The operator will determine that one Pzr PORV has inadvertently opened, and ensure that its isolation valve remains closed, by directing that its motor breaker be opened. The operator will then open the remaining Pzr PORV isolation valves, direct that the motor breaker for 1 CA-7A be closed; and open the manual loaders for the Main Steam Line PORVs while the valves remain closed. When the operator opens the 1 C SM PORV manual loader, the valve will open, and the operator will need to re-close the manual loader.

Required Materials: Control Room copy of AP/0/A15500/45 marked up through Step 20 (See Attached Markup).

General

References:

AP/0/A15500/45 (Plant Fire), Rev. 15 PT/1/A14600/003D (Monthly Surveillance Items), Rev. 85 Handouts: None Time Critical Task: NO Validation Time: 12 minutes 2013 Systems Control Room JPM F

- NUREG 1021, Revision 9

Appendix C Page 4 of 1 1 Form ES-C-i Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Reset to IC # 39, 100% Power, MDL. Go to RUN.
2. Take all actions required by AP/0/A15500/45 (Plant Fire), Enclosure 17 (AB 750 Unit 1 Cable Spreading Room Fire Unit 1 Actions), Steps 1-17 as follows:

LOA-CAO1 5 = Racked Out (Step 5)

Close 1 NC-3i B, 33A and 35B (Step 6)

Close the 1SV-19AB, 13AB, 7ABC, and lAB Manual Loaders (Step 17)

3. Insert REM-N00032B = 0.05 (Fail 1 NC-32B to intermediate).
4. Place LOA-NC033 = Racked Out on Trigger #1.
5. Place LOA-CAO1 5 = Racked IN on Trigger #3.
6. Place MAL-SMOO1C = 40 on Trigger #5.
7. Place Clear PORV Malfunction_Ol (Triggered X02_095_i lt.0i)
8. Allow plant time to stabilize and then Freeze Simulator.

OR

1. Reset Simulator to Temporary Snap lC-255 (May, 2013).
2. Momentarily place Simulator in Run to acknowledge alarms/Reset SLIMS.
3. Leave Simulator in FREEZE until operator is ready to begin.
4. Execute Lesson Plan 2013 NRC Exam JPM F.

NOTE: The Simulator Operator will need to operate the following Triggers:

Trigger #1 at Step 5 of this JPM Open Breaker for 1 NC-31 B Trigger #3 at Step 8 of this JPM Close Breaker for 1 NC-7A Trigger #5 at Step 10 of this JPM Insert MAL-SMOO1C = 10 (Triggered to clear when Manual Loader is lowered to 0)

Simulator Driver: Affix Camera on the Controller for 1SV-7ABC throughout the JPM (Used at Step 10) 2013 Systems Control Room JPM F NUREG 1021, Revision 9

Appendix C Page 5 of 1 1 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM).

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT (Caution prior to Step 21) The operator reads the Energizing equipment with Caution and proceeds.

fire damaged cables may cause a re-flash in the fire area.

2013 Systems Control Room JPM F

- NUREG 1021, Revision 9

Appendix C Page 6 of 1 1 Form ES-C1 PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 2 (Step 21) WHEN the fire is reduced to a non active status, THEN have station management evaluate returning controls to normal as follows:

(Caution prior to Step 21 .a) The operator recognizes that If the SSF has been the SSF has NOT been activated activated and proceeds.

(Step 21 .a) Check the following Pzr PORVs Closed:

  • 1 NC-34A (PZR PORV) The operator observes the 1 NC-34A Green status light LIT, Red status light OFF.
  • 1 NC-32B (PZR PORV) The operator observes the 1 NC-32B Green and Red status lights LIT.

(ALTERNATE PATH)

NOTE:

The Operator will likely address the RNO before checking the status of 1 NC-36B.

The operator observes the

  • 1 NC-36B (PZR PORV) 1 NC-36B Green status light LIT, Red status light OFF.

The operator determines that one PORV is OPEN (1 NC-32B), and implements the Step 21 .a RNO.

2013 Systems - Control Room JPM F NUREG 1021, Revision 9

Appendix C Page 7 of 11 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 3 (Step 21 .a RNO) Perform The operator rotates the the following: 1 NC-32B Control Switch counter-clockwise to the (Step 21 .a RNO 1) Close CLOSE position, and Pzr PORV(s) observes the 1 NC-32B Green and Red status lights LIT.

4 (Step 2i.a RNO 2) IFa Pzr PORV will not close, THEN perform the following:

(Step 1 5.a RNO 2.a) The operator observes the CLOSE the associated Pzr 1 NC-31 B Green status light PORV isolation valve. LIT, Red status light OFF.

  • 5 (Step 21 .a RNO 2.b) The operator contacts AO Dispatch operator to open and directs that the breaker breaker for the closed Pzr for 1 NC-31 B be opened.

PORV isolation valve.

NOTE: Simulator Driver Operate Trigger #1.

Within 30 seconds report back as the AO that the breaker for 1 NC-31 B has been opened.

Examiner NOTE: (Alternate Path) It is expected that the operator will NOT re-open 1 NC-31 B in the subsequent Step. If the operator attempts to open the valve before the AO reports that the breaker is open, the JPM is failed. IF the operator attempts to open 1 NC-31 B after the breaker has been opened, 1 NC-31 B will NOT open, and the operator will NOT necessarily fail the JPM.

  • 6 (Step 21 .b) Open Pzr The operator rotates the (See PORV isolation valves for 1 NC-33A Control Switch to Above PORVs that are verified OPEN, and observes the Note) closed. Red status light LIT, Green status light OFF.

The operator rotates the 1 NC-35B Control Switch to OPEN, and observes the Red status light LIT, Green status light OFF.

2013 Systems Control Room JPM F NUREG 1021, Revision 9

Appendix C Page 8 of 1 1 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 7 (Caution prior to Step 21 .c) The operator reads the A fire induced hot short may Caution, and proceeds.

cause valve in next step to operate when power is restored.

  • 8 (Step 21 .c) Dispatch The operator contacts AC operator to close breaker and directs that the breaker 1 EMXA4-2A (Unit 1 TD CA for 1 CA-7A be closed.

Pump Suction Isol Motor (1 CA-7A) (north wall 1 ETA room).

NOTE: Simulator Driver Operate Trigger #3.

Within 30 seconds report back as the AO that the breaker for 1 CA-7A has been closed.

9 (Step 21 .d) Ensure 1 CA- After the report of the 1 CA 7AC (Ui TD CA Pump 7AC Breaker being closed, Suction Isol) is in proper the operator observes the position. 1CA-7AC Red status light is LIT, Green status light is OFF.

NOTE: When operator attempts to OPEN 1SV-7ABC in the next step, Simulator Driver Operate Trigger #5.

(1SV-7ABC will OPEN with Manual Loader. The Malfunction is triggered to delete when Manual Loader goes closed.)

2013 Systems Control Room JPM F

- NUREG 1021, Revision 9

Appendix C Page 9 of 11 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 10 (Step 21 .e) Slowly open the following manual loaders while ensuring that the The operator rotates the valves remain closed: 1 SV-1 9AB adjust knob clockwise until the Manual Slowly OPEN 1SV-19AB Loader indicates 100%, the (1A Main Steam Line Green status light is LIT, and PORV) the Red status light is OFF.

The operator rotates the Slowly OPEN 1SV-13AB 1 SV-1 3AB adjust knob (lB Main Steam Line clockwise until the Manual PORV) Loader indicates 100%, the Green status light is LIT, and the Red status light is OFF.

Slowly OPEN 1 SV-7ABC The operator rotates the (10 Main Steam Line 1 SV-7ABC adjust knob PORV) clockwise until the Manual Loader indicates >0%.

The operator will observe that as the Manual Loader is opened, the SM PORV Red and Green status lights are LIT (Alternate Path).

The operator rotates the 1 SV-7ABC adjust knob counter-clockwise until the Manual Loader indicates 0%, Green status light is LIT, Red status light is OFF.

The operator rotates the Slowly OPEN iSV-lAB (1D iSV-lAB adjust knob Main Steam Line PORV) clockwise until the Manual Loader indicates 100%, the Green status light is LIT, and the Red status liqht is OFF.

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2013 Systems Control Room JPM F

- NUREG 1021, Revision 9

Appendix C Page 10 of 1 1 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.: 2013 Systems Control Room JPM F Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2013 Systems Control Room JPM F

- NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS: Unit i and 2 are at 100% power.

A fire has been reported in the Unit 1 Cable Spreading Room.

The crew has implemented AP/01A15500/45 (Plant Fire) and is presently in Enclosure 17 (AB 750 Unit i Cable Spreading Room Fire Unit 1 and 2 Actions).

The following actions have been taken in response:

  • The breaker for i CA-7AC has been OPENED.
  • The Pzr PORV Isolation Valves have been CLOSED.
  • The Main Steamline PORV Manual Loaders have been closed.

The Fire Brigade has reported that the fire is no longer active.

The SSF has NOT been activated.

Station Management has indicated that the crew may return Control Room controls to normal as identified within Enclosure 17.

AO (John) is standing by to assist.

INITIATING CUE: The CRS has directed you to restore the Control Room controls to normal by performing Step 21 .a through e of Enclosure 17 (AB 750 Unit 1 Cable Spreading Room Fire Unit 1 and 2 Actions) of AP/0/A/5500/45 (Plant Fire).

NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-i Worksheet SIM JPM G 2013 Systems Control Room JPM G (Rev_112013)

- NUREG 1021, Revision 9

Appendix C Page 2 of 9 Form ES-C-i Job Performance Measure Worksheet Facility: McGuire Task No.:

Task

Title:

Respond to an Alternate Action on a JPM No.: 2013 Systems Control VCT Level Channel Room JPM G K/A

Reference:

016A4.0i (2.9/2.8)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial ConditionsICue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • Unit 1 is at 100% power.
  • VOT Level (1 NVP-5763) indicates that the level has lowered but stable.
  • VOT Level SLIMs is in MANUAL.

Initiating Cue: The CRS has directed you to respond to an Alternate Action on a VOT Level Channel in accordance with Enclosure 4.1 (Remove/Returning a VCT Level Channel From/To Service) of OP/1/N6102/003 (Distributed Control System Operation).

Task Standard: The operator will use Section 3.2 of Enclosure 4.1, and select 1 NVP 5761 for operation.

Required Materials: None 2013 Systems Control Room JPM G NUREG 1021, Revision 9

Appendix C Page 3 of 9 Form ES-C-i Job Performance Measure Worksheet General

References:

OP/1/N6i021003 (Distributed Control System Operation), Rev 9 OP/1/A16100/O1OC (Annunciator Response For Panel 1AD-2), Rev 62 OAC Annunciator Response Procedure Mi Dii 68, VCT LEVEL ALTERNATE ACTION Handouts: Handout 1: OP/1/A/6i02/003 (Distributed Control System Operation)

Time Critical Task: NO Validation Time: 10 minutes 2013 Systems Control Room JPM G

- NUREG 1021, Revision 9

Appendix C Page 4 of 9 Form ES-C-i Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Reset Simulator to IC-39 (100% power)
2. Insert XMT-NV_i NVLT576O {NVOO1] Ui VCT Level M1A0734 = 100
3. Respond in accordance with MCB Annunciator 1AD-2, F8 DCS ALTERNATE ACTION
4. Respond in accordance with OAC Annunciator Mi Dii 68, VCT LEVEL ALTERNATE ACTION
5. Freeze Simulator.
6. Goto RUN.

OR

1. Reset Simulator to Temporary Snap IC-256 (November, 2013).

2013 Systems Control Room JPM G

- NUREG 1021, Revision 9

Appendix C Page 5 of 9 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT (Step 2.1) One of the The operator places a check following conditions exists: in the Alternate Action Block, and proceeds.

A VCT Level Alternate Action has occurred OR IAE to calibrate a VCT Level transmitter 2 (Step 3.1) Perform the The operator will proceed to following section(s), as Section 3.2.

applicable:

Section 3.2, Respond To An Alternate Action.

Section 3.3, Remove A VCT Level Channel For IAE Calibration.

Section 3.4, Return A VCT Level Channel To Service.

  • 3 (Step 3.2) Respond To An On the DCS Control Station Alternate Action the operator will call up the DCS Boric Acid Blender (Step 3.2.1) On DCS Boric graphic.

Acid Blender graphic, perform the following: The operator selects 2XS for VCT Level 1.

(Step 3.2.1.1) Select 2XS forVCT Level 1.

4 (Step 3.2.1.2) Determine The operator will observe which level transmitter is both transmitters and NOT faulted. recognizes that NVAA 5761 (Transmitter B) is NOT NVAA 5760 (Transmitter A) faulted.

NVAA 5761 (Transmitter B) 2013 Systems Control Room JPM G

- NUREG 1021, Revision 9

Appendix C Page 6 of 9 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 5 (Step 3.2.1 .3) Select the The operator selects non-faulted level transmitter Transmitter B.

for VCT level input (Transmitter A or Transmitter B).

  • 6 (Step 3.2.1.4) Select DEV The operator selects DEV MRE INHIBIT to block the MRE INHIBIT.

deviation input.

7 (Step 3.2.1 .5) Check MRE The operator observes that BLOCKED lit (blinking red). MRE BLOCKED is blinking Red.

  • 8 (Step 3.2.2) On DOS Boric On the DCS Control Station Acid Blender Graphic, the operator wilt call up the perform the following: DOS Boric Acid Blender graphic.

(Step 3.2.2.1) Select 2XS for VCT Level 2. The operator selects 2XS for VOT Level 2.

9 (Step 3.2.2.2) Determine The operator will observe which level transmitter is both transmitters and NOT faulted. recognizes that NVAA 5761 (Transmitter A) is NOT NVAA 5761 (Transmitter A) faulted.

NVAA 5760 (Transmitter B)

  • 10 (Step 3.2.2.3) Select the The operator selects non-faulted level transmitter Transmitter A.

for VOT level input (Transmitter A or Transmitter B).

  • 1 1 (Step 3.2.2.4) Select DEV The operator selects DEV MRE INHIBIT to block the MRE INHIBIT.

deviation input.

2013 Systems Control Room JPM G

- NUREG 1021, Revision 9

Appendix C Page 7 of 9 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 12 (Step 3.2.2.5) Check MRE The operator observes that BLOCKED lit (blinking red). MRE BLOCKED is blinking Red.

  • j3 (Step 3.2.3) On DCS Boric On the DCS Control Station Acid Blender graphic, the operator will call up the perform the following: DCS Boric Acid Blender graphic.

(Step 3.2.3.1) Select NV 137A (VCT Level). The operator selects NV i37A.

14 (Step 3.2.3.2) Ensure NV- The operator observes that i37A is in auto. NV-i37A is in auto.

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2013 Systems Control Room JPM G

- NUREG 1021, Revision 9

Appendix C Page 8 of 9 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.: 2013 Systems Control Room JPM G Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2013 Systems Control Room JPM G

- NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

  • Unit 1 is at 100% power.
  • VCT Level (1 NVP-5760) indicates 100%.
  • VCT Level (1 NVP-5763) indicates that the level has lowered but stable.
  • VCT Level SLIMs is in MANUAL.

INITIATING CUE: The ORS has directed you to respond to an Alternate Action on a VCT Level Channel in accordance with Enclosure 4.1 (Remove/Returning a VOT Level Channel From/To Service) of OP/1/A16102/003 (Distributed Control System Operation).

NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-i Worksheet SIM JPM H 2013 Systems Control Room JPM H (Rev_112013)

- NUREG 1021, Revision 9

Appendix C Page 2 of 9 Form ES-C-i Job Performance Measure Worksheet Facility: McGuire Task No.:

Task

Title:

Emerciency Borate for Stuck Rods JPM No.: 2013 Systems Control Room JPM H K/A

Reference:

007 EA1 .06 (4.4/4.5)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testinci:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM).

Initial Conditions:

  • In response, the crew enters EP/1/A/5000/E-0 (Reactor Trip or Safety Injection), and then transitions to EP/1/N5000/ES-0.1 (Reactor Trip Response).
  • EP/1/AJ5000/ES-0.1 has been completed through Step 11.

Initiating Cue: The CRS has directed you to check for adequate Shutdown Margin in accordance with Step 12 of EP/1/N5000/ES-0.1 (Reactor Trip Response).

Task Standard: The operator will identify that there are three stuck rods, and then initiate Emergency Boration in accordance with AP/1/A/5500/38 (Emergency Boration and Response to Inadvertent Dilution), and identify that Emergency Boration must continue for 76-87 minutes.

Required Materials: None General

References:

EP/i/A/5000/E-0 (Reactor Trip or Safety Injection), Rev 33 2013 Systems Control Room JPM H NUREG 1021, Revision 9

Appendix C Page 3 of 9 Form ES-C-i Job Performance Measure Worksheet EPI1IAI5000IES-O.1 (Reactor Trip Response), Rev 36 AP/1/N5500/38 (Emergency Boration and Response to inadvertent Dilution), Rev ii Handouts: Handout 1: AP/11A15500138 (Emergency Boration and Response to Inadvertent Dilution)

NOTE: The operator will initially use the Control Room copy of EP/11A15000/ES-O.1 (Reactor Trip Response) marked up for the current plant conditions. When the operator seeks to find AP/11A15500/38, Handout 1 will be provided (See JPM Step 2).

Time Critical Task: NO Validation Time: 5 minutes 2013 Systems Control Room JPM H

- NUREG 1021, Revision 9

Appendix C Page 4 of 9 Form ES-C-i Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Reset simulator to IC-39, 100% Power
2. Place in RUN and allow time to stabilize
3. Insert Malfunctions:

MAL-IREO1 0C5, Rod C5 Stuck = TRUE MAL-IREO1OD14, Rod Di4 Stuck = TRUE MAL-IREO1 OHiO, Rod HiO Stuck = TRUE

4. Manually trip the reactor.
5. Perform the actions of EP/1/A15000/E-0 up through step 5 and transition to ES-0.1.
6. Perform the actions of EP/i/A15000/ES-0.i up through step ii.
7. Ensure three Control Rods have stuck out of the core.
8. Freeze the Simulator OR
1. Reset to IC-257 (November, 2013)

NOTE: The Simulator Instructor will need to remain available to silence nuisance alarms during the performance of the JPM.

2013 Systems Control Room JPM H

- NUREG 1021, Revision 9

Appendix C Page 5 of 9 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM).

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT Simulator Instructor NOTE: Leave Simulator in FREEZE until operator i.s ready to begin.

(Step 12) Check if shutdown margin adequate:

(Step i2.a) All control rods The operator observes FULLY INSERTED DRPI and determines that

. three Control Rods are stuck out of the Reactor; moves to Step i2.a RNO 2.

2 (Step 12.a RNO) Perform the following:

(Step i2.a RNO 1) IF all rod The operator observes that position indication is lost, DRPI is available, and that OR greater than 5 rods not there are NOT> 5 rods fully inserted, THEN stuck out of the Reactor.

(Step i2.a RNO2)lF2to5 rods not fully inserted, The operator determines THEN emergency borate that 6900 gallons of Boric 2300 gallons of 7000 PPM Acid solution umust be boron solution for each rod added, and transitions to not fully inserted PER AP-38.

AP/1 /A15500/38 (Emergency Boration and Cue:

Response to Inadvertent Dilution) When the operator obtains the Control Room AP-38 Book, provide Handout 1 2013 Systems Control Room JPM H

- NUREG 1021, Revision 9

Appendix C Page 6 of 9 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 3 (AP/i/A15500/38, Step 1) The operator recognizes Check if boron dilution - that entry into the AP is due SUSPECTED. to Stuck Rods not dilution; and proceeds to the RNO.

(Step 1 RNO) GO TO Step 9.

4 (Step 1 RNO) Perform the The operator recognizes following: that the reactor trip breakers are open and that (Step 1RNO.a) IF unit in the plant is in Mode 3, and Mode 1 or 2, THEN proceeds.

5 (Step 1 RNO.b) GO TO Step The operator proceeds to

12. Step 12.

6 (Step 12) Initiate The operator observes Red emergency boration as status light LIT for 1 B NV follows: Pump, and Green status light LIT for 1A NV Pump, (Step 12.a) Check 1A or 1 B and determines that 1 B NV NV pump AVAILABLE.

Pump is available.

7 (Step 12.b) Check any NV The operator observes Red pump ON.

status light LIT for 1 B NV Pump, and Green status light LIT for 1 A NV Pump, and determines that 1 B NV Pump is ON.

8 (Step 1 2.c) Check the The operator observes following boric acid system 1 NV-5740 and 1 NV-6070, components AVAILABLE.

and determines that BAST is available.

Boric Acid Storage Tank.

. . The operator observes Red Boric Acid Transfer pump. status light LIT for 1 B BA Transfer Pump and Green status light is LIT for 1 A BA Transfer Pump, and determines that both pumps are available.

2013 Systems Control Room JPM H NUREG 1021, Revision 9

Appendix C Page 7 of 9 Form ES-C-i PERFORMANCE INFORMATION ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT (Step 1 2.d) Open 1 NV- The operator presses 265B (Boric Acid To NV OPEN pushbutton for 1 NV Pumps). 265B and observes Red Status light LIT, Green status light OFF.

(Step 1 2.e) Ensure a boric The operator observes the acid transfer pump is Red Status light is LIT for running. 1 B BA Transfer Pump and determines that it is running.

  • 11 (Step 1 2.f) Check boration Operator observes 1 NVP flow using one of the 5440 and Determines that following methods: 80-90 ppm of boration flow is occurring.

IF 1NV-265B is open, THEN check EMERGENCY BORATION FLOW ESTABLISHED.

Cue:

Examiner Ask: How long must Emergency Boration Continue?

Answer:____________

23Oja,s X 3Stcko X Mfl=76-87mn, Stuck Rod 80-90 gal Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2013 Systems Control Room JPM H

- NUREG 1021, Revision 9

Appendix C Page 8 of 9 Form ES-C-i VERFlCATION OF COMPLETION Job Performance Measure No.: 2013 Systems Control Room JPM H Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2013 Systems Control Room JPM H

- NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

  • In response, the crew enters EPI1IA/50001E-0 (Reactor Trip or Safety Injection), and then transitions to EP/i/A/5000IES-O.i (Reactor Trip Response).
  • EPI1IA/5000IES-O.1 has been completed through Step 11.

INITIATING CUE: The CRS has directed you to check for adequate Shutdown Margin in accordance with Step 12 of EP/i/A15000/ES-0.i (Reactor Trip Response).

NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-i Works heet In-Plant JPM I 2013 Systems In-Plant JPM I (Rev_111113) NUREG 1021, Revision 9

Appendix C Page 2 of 8 Form ES-C-i Job Performance Measure Worksheet Facility: McGuire Task No.:

Task

Title:

Reset Unit 2 Turbine Driven CA JPM No.: 2013 Systems In Pumr Stoic Valve Plant JPM I K/A

Reference:

054 AA1 .02 (4.4/4.4)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testinci:

Simulated Performance: X Actual Performance:

Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • Unit 2 has tripped from 100% power due to a loss of Main Feedwater.
  • The crew has entered EP/2/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink).
  • While performing Step 7.d, the RO notices the TD CA PUMP STOP VLV NOT OPEN alarm (2AD-5, F-3) is lit.

Initiating Cue: The CRS dispatches you to reset the U-2 TD CA stop valve PER EP/2/N5000/G-1 (Generic Enclosures), Enclosure 24 (Resetting TD CA Stop Valve).

Task Standard: The operator will reset and open 2SA-3 (Unit 2 TD CA Pump Turb Stop Valve).

Required Materials: PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)

General

References:

EP/2/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink), Rev 20 2013 Systems In-Plant JPM I NUREG 1021, Revision 9

Appendix C Page 3 of 8 Form ES-C-i Job Performance Measure Worksheet EP/2IAJ5000IG-i (Generic Enclosures), Rev 38 Handouts: Handout i: Enclosure 24 (Resetting TD CA Stop Valve) of EP/2/AI5000IG- 1 (Generic Enclosures)

Time Critical Task: NO Validation Time: 10 minutes NOTE: A picture of the Valve Trip Mechanism and Overspeed Trip Mechanism is located on Page 7 of 8 of this JPM.

2013 Systems In-Plant JPM I NUREG 1021, Revision 9

Appendix C Page 4 of 8 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 1 (Step 1) Turn handwheel The operator turns clockwise to allow handwheel clockwise.

mechanical linkage to reconnect Cue Handwheel rotated clockwise, stem is in

  • 2 (Step 2) Reconnect The operator looks at the mechanical linkage by mechanical Linkage.

pulling mechanical linkage toward Valve Trip Cue:

Mechanism and slowly release while ensuring The Linkage is NOT the following connections: connected.

The operator pulls the mechanical linkage toward the Valve Trip Mechanism and slowly releases.

Cue The mechanical linkage pulled toward Valve Trip Mechanism and is slowly released.

The operator observes the (Step 2.a) At Valve Trip Valve Trip Mechanism figure.

Mechanism: (See Figure below) Cue:

Trip Hook is fully engaged Trip Hook is fully engaged with Latch-up Lever, with Latch-up Lever.

2013 Systems In-Plant JPM I NUREG 1021, Revision 9

Appendix C Page 5 of 8 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 3 (Step 2.b) At Overspeed The operator observes the Trip Mechanism: (See Overspeed Trip Mechanism Figure below) figure.

Tappet nut lays flat against Cue Overspeed Trip Mechanism housing. Tappet nut is laying flat against Overspeed Trip Head Lever is vertical. Mechanism housing, AND the Head lever is vertical.

  • 4 (Step 3) Slowly turn The operator rotates the handwheel handwheel in the counter-counterclockwise to open clockwise direction.

stop valve while it is reset.

Cue:

The handwheel rotates, and then stops.

  • 5 jStep 4) WHEN handwheel The operator rotates the reaches full open, position handwheel in the clockwise valve 1/4 turn from open direction 11/4 turn.

backseat to prevent thermal binding. Cue:

The handwheel rotates until stopped.

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2013 Systems In-Plant JPM I NUREG 1021, Revision 9

Appendix C Page 6 of 8 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.: 2013 Systems In-Plant JPM I Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2013 SystemsIn-Plant JPM I NUREG 1021, Revision 9

Appendix C Page 7 of 8 Form ES-C-i VERIFICATION OF COMPLETION Valve Trip Mechanism Overspeed Trip Mechanism 2013 Systems In-Plant JPM I NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

  • Unit 2 has tripped from 100% power due to a loss of Main Feedwater.
  • The crew has entered EP/2/A15000/FR-H.i (Response to Loss of Secondary Heat Sink).
  • While performing Step 7.d, the RO notices the TD CA PUMP STOP VLV NOT OPEN alarm (2AD-5, F-3) is lit.

INITIATING CUE: The CRS dispatches you to reset the U-2 TD CA stop valve PER EPI2/AJ5000IG-i (Generic Enclosures), Enclosure 24 (Resetting TD CA Stop Valve).

NOTE: No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.

NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-i Worksheet In-Plant JPM J 2013 Systems In-Plant JPM J (Rev_i 11113) NUREG 1021, Revision 9

Appendix C Page 2 of 1 1 Form ES-C-i Job Performance Measure Worksheet Facility: McGuire Task No.:

Task

Title:

Start the Hydrocien Analyzers JPM No.: 2013 Systems In-Plant JPM J K/A

Reference:

069 AA1 .03 (2.8/3.0)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testinci:

Simulated Performance: X Actual Performance:

Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), Key 172 and Handout 1.

Initial Conditions:

  • Unit 1 has tripped from 100% power due to an accident.
  • The crew is currently in EP/i/A/5000/FR-Z.1 (Response to High Containment Pressure).
  • The crew is currently checking Containment Hydrogen Concentration.

Initiating Cue: The CRS has directed you to place the Hydrogen Analyzers in service in accordance with Enclosure 5 (Placing H 2 Analyzers In Service) of EP/1 1N5000/G-1 (Generic Enclosures).

Task Standard: The operator will place the 1A Hydrogen Analyzer in service.

Required Materials: PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)

KEY #172 (Key 178 will be Simulated)

General

References:

EP/i/N5000/FR-Z.i (Response to High Containment Pressure), Rev 19 EP/i/A15000/G-i (Generic Enclosures), Rev 34 2013 Systems In-Plant JPM J NUREG 1021, Revision 9

Appendix C Page 3 of 1 1 Form ES-C-i Job Performance Measure Worksheet Handouts: Handout 1: Enclosure 5 (Placing H 2 Analyzers In Service) of EP/i/A/5000/G-i (Generic Enclosures).

Time Critical Task: NO Validation Time: 20 minutes NOTE: The Examiner will need to sign out Key 172 from the WCC ahead of time.

2013 Systems In-Plant JPM J NUREG 1021, Revision 9

Appendix C Page 4 of 1 1 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), Key 172 and Handout 1.

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT (Step 1) Obtain one key 172 The operator recognizes and two keys 178 from Unit that the required Keys have BOP desk. been obtained and proceeds.

Cue The Use of the 178 Keys will be simulated during this JPM.

  • 2 (Step 2) Start 1A H 2 The operator proceeds to Analyzer as follows: cabinet.

(Step 2.a) Proceed to 1MICA 6851 1AVX HYDROGEN ANALYZER REMOTE CABINET (750 elevation in cable spreading room).

  • 3 (Step 2.b) Use key 172 to The operator uses Key 172 access remote panel. to Open Cabinet.

2013 Systems In-Plant JPM J NUREG 1021, Revision 9

Appendix C Page 5 of 1 1 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 4 (Step 2.c) Inside remote The operator places Key panel, use key 178 to place 178 in the ISOLATION ISOLATION VALVES VALVES OPEN switch, OPEN switch to ON. and rotates the switch clockwise (Simulates).

Cue:

The Switch is in the ON position.

5 (Step 2.d) Check POWER The operator observes the ON light above POWER ON light.

ISOLATION VALVES OPEN switch LIT.

Cue:

The POWER ON light is LIT.

  • 6 (Step 2.e) Place The operator rotates the HYDROGEN ANALYZER HYDROGEN ANALYZER SAMPLE ENABLE SAMPLE ENABLE SWITCH to SAMPLE. SWITCH clockwise.

Cue:

The Switch is in SAMPLE.

2013 Systems In-Plant JPM J NUREG 1021, Revision 9

Appendix C Page 6 of 11 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 7 (Step 2.f) Select sample The operator rotates the location as follows: HYDROGEN ANALYZER SAMPLE SELECT switch (Step 2.f.1) Place counter-clockwise.

HYDROGEN ANALYZER SAMPLE SELECT switch Cue:

to UPPER CONT The Switch is in UPPER (Step 2.f.2) Check POWER CONT.

ON light for selected location OFF The operator observes the POWER ON light.

Cue:

The POWER ON light is OFF.

(Step 2.g) Depress OFF The operator presses the pushbutton on SAMPLE OFF PB for SAMPLE ROUTED TO PAMS ROUTED TO PAMS PANEL switch. PANEL switch.

(Step 2.h) Place OFF- The operator rotates the STAND BY/ANALYZE OFF-STANDBY switch to ANALYZE /ANALYZE switch clockwise.

Cue:

The Switch is in Analyze 2013 Systems In-Plant JPM J NUREG 1021, Revision 9

Appendix C Page 7 of 1 1 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 10 (Step 2.i) Depress The operator presses the LOCALJREMOTE LOCAL/REMOTE SELECTOR pushbutton. SELECTOR pushbutton.

11 (Step 2.j) Ensure H2 DUAL The operator observes the RANGE SW is in 0-30% position of the H2 DUAL range. RANGE SW.

Cue:

The Switch is in the 0-30%

range.

  • 12 (Step 2.k) Place The operator rotates the EU NCTION SELECTOR EU NCTION SELECTOR to SAMPLE. counterclockwise.

Cue:

The Function Selector is in the SAMPLE position.

13 (Step 2.1) Do not continue The operator waits for five until 5 minutes have minutes.

elapsed.

Cue:

Using Time Compression, five minutes have elapsed.

2013 Systems In-Plant JPM J NUREG 1021, Revision 9

Appendix C Page 8 of 1 1 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 14 (Step 2.m) IF COMMON The operator observes the ALARM lit, THEN perform COMMON ALARM.

the following:

Cue:

(Note prior to Step 2.m.i) A low gas flow condition may The COMMON ALARM be causing the COMMON light is LIT.

ALARM and may clear itself once condensation is removed from the sample line. The operator reads the NOTE, and proceeds.

(Step 2.m.i) Depress ALARM RESET.

The operator presses the ALARM RESET pushbutton and observes the COMMON ALARM.

Cue:

The COMMON ALARM light is CLEAR.

15 (Step 2.n) Notify control The operator calls the room that 1A H2 Analyzer is control room and reports.

in service.

Cue:

As the BOP, acknowledge report.

2013 Systems In-Plant JPM J NUREG 1021, Revision 9

Appendix C Page 9 of 1 1 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 16 (Step 3) Start 1 B H2 The operator starts to place Analyzer as follows the 1 B Hydrogen Analyzer in service.

Cue:

Another Operator wHI start 1 B H2 Analyzer and complete the Enclosure.

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2013 Systems In-Plant JPM J NUREG 1021, Revision 9

Appendix C Page 10 of ii Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.: 2013 Systems In-Plant JPM J Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2013 Systems In-Plant JPM J NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

  • Unit 1 has tripped from 100% power due to an accident.
  • The crew is currently in EP/i/A15000/FR-Z.i (Response to High Containment Pressure).
  • The crew is currently checking Containment Hydrogen Concentration.

INITIATING CUE: The CRS has directed you to place the Hydrogen Analyzers in service in accordance with Enclosure 5 (Placing H 2 Analyzers In Service) of EP/i/N5000/G-i (Generic Enclosures).

NOTE: No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.

NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-i Worksheet In-Plant JPM K 2013 SystemsIn-Plant JPM K(Rev_111113) NUREG 1021, Revision 9

Appendix C Page 2 of 14 Form ES-C-i Job Performance Measure Worksheet Facility: McGuire Task No.:

Task

Title:

Establish NC Pump Seal Injection JPM No.: 2013 Systems In-From the SSF Plant JPM K K/A

Reference:

EPE 055 EK3.02 4.3/4.6 Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: X Actual Performance:

Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and WHEN the operator locates the Brown Folder at the SSF, provide Handout 1.

Initial Conditions:

  • A Loss of All AC has occurred on Unit 1.
  • EP/1/A/5000/ECA-0.0 (Loss of All AC Power) has been implemented.
  • The SRO has dispatched one (1) operator to 1 ETA to swap 1EMXA4.

Initiating Cue: The CRS has directed you to obtain the Brown Folder at SSF and complete Enclosure 1 (Unit 1 SSF-ECA-0.0 Actions).

Task Standard: The operator will place the SSF Diesel in operation and supply power to 1 SLXG, start the Standby Makeup Pump and ensure that it is supplying NCP seal injection within 7 minutes, ensure that 1 SLXG is supplying power to SMXG and SMXG-1, and that Battery Chargers SDSP-1 and SDSP-2 supply breakers are closed.

Required Materials: PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)

2013 Systems In-Plant JPM K NUREG 1021, Revision 9

Appendix C Page 3 of 14 Form ES-C-i Job Performance Measure Worksheet General

References:

EP/1/A/5000IECA-0.0 (Loss of All AC Power), Rev 33 PT/0/A1460011 13 (Operator Time Critical Task Verification), Rev 19 Handouts: Handout 1: Enclosure 1 (Unit 1 SSF ECA-0.0 Actions) of EP/1/A/5000/ECA-O.O (Loss of All AC Power)

Time Critical Task: YES According to PT/0/A14600/1 13 (Operator Time Critical Task Verification), Enclosure 13.11 (Initiate SSF NCP Seal Injection and Swap to the SSF):

Expectation: Seal injection from standby makeup pump can be initiated within 10 minutes of a loss of all AC power event or an App R fire event.

This requires completion of actions at SSF within 7 minutes of dispatch, and completion of actions in ETA room to swap EMXA-4 within 4 minutes of dispatch. To support the local actions, the following dispatches must be initiated:

Operator dispatched to SSF within 3 minutes of loss of all NCP seal cooling. (Total time = 7 mm + 3 mm = 10 mm to initiate NCP seal injection from SBMUP).

This JPM should be timed starting from the OPS Kitchen. Once flow from the standby makeup pump is verified, the critical time stops.

Validation Time: 15 minutes 2013 Systems In-Plant JPM K NUREG 1021, Revision 9

Appendix C Page 4 of 14 Form ES-C-i PERFORMANCE INFORMATION (Denote Critical Steps with an asterisk*)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and WHEN the operator locates the Brown Folder at the SSF, provide Handout 1.

START TIME:

STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT (Note prior to Step 1) The The operator reads the following steps are NOTE and proceeds.

performed at SSF Control Panel until stated otherwise.

2 (Step 1) Check LINE The operator observes the VOLTAGE line voltare meter APPROXIMATELY 600V.

Cue Meter reads 0 Volts 3 (Step 1 RNO) GO TO Step Operator goes to Step 3.

3.

  • 4 (Step 3) Place SSF The operator rotates SSF DIESEL DIESEL TEST/EMERG TEST/EMERGENCY switch clockwise to EM ER switch to EMER (Simulated)

Cue Switch rotated clockwise to EMER positIon.

2013 Systems In-Plant JPM K NUREG 1021, Revision 9

Appendix C Page 5 of 14 Form ES-C-i PERFORMANCE INFORMATION 2013 Systems In-Plant JPM K NUREG 1021, Revision 9

Appendix C Page 6 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 8 (Step 7) Depress TRIP , For the two breakers on the the following breakers with top row right and all the yellow Time Critical labels: breakers on the bottom row the operator presses TRIP for NORMAL INCOMING BREAKER CONTROL.

Two breakers on top row (Simulated)

(right)

All breakers on bottom row. Cue:

Pushbutton depressed, green light is Lit

  • 9 (Step 8) Depress CLOSE The operator presses on GENERATOR CLOSE for GENERATOR BREAKER CONTROL. BREAKER CONTROL.

(Simulated)

Cue:

Pushbutton depressed, red light is LIT

  • 10 (Step 9) Depress CLOSE The operator presses on 1SLXG-5C CTRL SW. CLOSE for 1SLXG-5C CTRL SW. (Simulated)

Cue:

Pushbutton depressed, red light is LIT.

(Step 10) Wait 10 seconds. The operator waits 10 seconds.

2013 Systems In-Plant JPM K NUREG 1021, Revision 9

Appendix C Page 7 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 12 (Step 1 1) Depress CLOSE The operator presses on 1 SLXG-4C CTRL SW. CLOSE for 1 SLXG-4C CTRL SW. (Simulated)

Cue:

Pushbutton depressed, red light is Lit

  • 13 (Step 12) Open the The operator opens valves following valves: by depressing OPEN pushbutton, observes Red 1NV-842AC (Ui Standby status light LIT. (Simulated)

Makeup Pump Suction Isol)

Cue:

1NV-849AC (Ui Standby Makeup Pump Cont As each valve is Outside lsol) repositioned, Pushbutton depressed, red light is LIT.

14 (Step 13) Check 1 NV- The operator observes Red 1013C (Standby M/U Pump status light LIT.

to NC Pmp Seals Isol)

OPEN Cue:

Red light is LIT.

  • 15 (Step 14) CLOSE 1NV The operator presses the 94AC (Ui NC Pumps Seal CLOSE pushbutton, and Water Return Cont Inside observes Green status light Isol) LIT. (Simulated) 2013 Systems in-Plant JPM K NUREG 1021, Revision 9

Appendix C Page 8 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS FOR UNSAT

  • 16 (Step 15) Start Unit 1 The operator presses the Standby Makeup Pump. START pushbutton, observes Red status light LIT. (Simulated) 17 (Step 16) Check Unit 1 The operator observes Standby Makeup Pump flow meter (1NVP6420) GREATER THAN OR EQUAL TO 26 Cue GPM Meter indicates 28 gpm.

Stop Time for Time Critical Task:

NOTE This time must be 7 minutes 18 (Note prior to Step 17) The operator reads the Remaining steps ifl this NOTE and proceeds.

enclosure are not time critical, but must be completed in a timely manner.

19 (Step 17) Check 1 NV- The operator observes iOl2C (Standby M/U Pump Green status light LIT.

Disch to Cont Sump) -

CLOSED Cue:

Green light is LIT 2013 Systems In-Plant JPM K NUREG 1021, Revision 9

Appendix C Page 9 of 14 Form ES-C-i PERFORMANCE INFORMATION 2013 Systems In-Plant JPM K NUREG 1021, Revision 9

Appendix C Page 10 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 24 (Step 21) At SMXG-1: The operator observes breaker SMXG1-FAE.

(Step 21 .a) Check breaker SMXG1-FAE (SDSP1 BATTERY CHARGER) IN Cue INTERMEDIATE POSITION. Breaker s in the Trippedllntermediate positiOn.

25 (Step 21 .a RNO) Periorm The operator proceeds to the following: Step 21 .b.

IF breaker is open, THEN GO TO Step 21.b.

  • 26 (Step 21 .b) Reset shunt trip The operator resets the and close breaker SMXG1 - shunt trip by sliding the FAE as follows: breaker down to the fully Open position.

Slide breaker fully to open position. Cue:

Close breaker Breaker is down in full Open position The operator closes the breaker by pushing the breaker up into the Closed position.

Cue:

Breaker is up in the Closed position 27 (Step 21 .c) Wait 10 The operator waits 10 seconds. seconds.

2013 Systems In-Plant JPM K NUREG 1021, Revision 9

Appendix C Page ii of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT

  • 28 (Step 21 .d) Reset shunt trip The operator resets the and close breaker SMXG1- shunt trip by sliding the RAD (SDSP2 BATTERY breaker down to the fully CHARGER) as follows: Open position.

Slide breaker fully to open position.

Close breaker.

The operator closes the breaker by pushing the breaker up into the Closed position.

Cue:

Breaker is up in the Closed position.

(Step 22) At SMXG: The operator observes breaker position.

(Step 22.a) Ensure SMXG F5A (Unit 1 Pzr Heaters Cue:

28/55/56 Feeder) is closed.

Breaker is closed.

(Step 23) At SSF Control The operator presses the Panel: CLOSE pushbuffon and observes the Red status (Step 23.a) Depress light.

CLOSE on 1 SLXG-5D CTRL SW (SDSS BATTERY CHARGER FDR BKR CONTROL).

2013 Systems In-Plant JPM K NUREG 1021, Revision 9

Appendix C Page 12 of 14 Form ES-C-i PERFORMANCE INFORMATION STEPS ELEMENTS STANDARD S/U COMMENTS REQUIRED FOR UNSAT 31 (Step 23.b) Check SSF D/G The operator observes SSF FREQUENCY AT 60 HZ DIG Frequency Meter.

Cue:

Meter indicates 60 Hz.

32 (Step 23.c) Check SSF D/G The operator observes SSF VOLTAGE AT 600V.

D/G Voltage Meter.

Cue:

Meter indicates 600 volts.

(Step 23.c) Check SSF The operator observes SSF Generator Load LESS Generator Load Meter.

THAN OR EQUAL TO 700 KW.

Cue:

Meter indicates 500 KW.

34 (Step 24) Ensure SSF D/G The operator observes SSF room intake louvers are D/G room intake louvers open (located above rollup position.

doors in D/G room).

Cue:

Intake louvers are open.

Terminating Cue: Another operator will complete this procedure.

STOP TIME: CRITICAL TIME:

2013 Systems In-Plant JPM K NUREG 1021, Revision 9

Appendix C Page 13 of 14 Form ES-C-i VERIFICATION OF COMPLETION Job Performance Measure No.: 2013 Systems In-Plant JPM K Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2013 Systems In-Plant JPM K NUREG 1021, Revision 9

Appendix C Form ES-C-i JPM CUE SHEET INITIAL CONDITIONS:

  • A Loss of All AC has occurred on Unit 1.
  • EPI1IAI5000IECA-O.O (Loss of All AC Power) has been implemented.
  • The SRO has dispatched one (1) operator to 1 ETA to swap 1 EMXA4.

INITIATING CUE: The CRS has directed you to obtain the Brown Folder at SSF and complete Enclosure 1 (Unit 1 SSF-ECA-O.O Actions).

NOTE: No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.

Note: A portion of the JPM is TIME CRITICAL.

NUREG 1021, Revision 9