ML14010A306
| ML14010A306 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 12/30/2013 |
| From: | Energy Northwest |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML14010A476 | List:
|
| References | |
| GO2-13-174 | |
| Download: ML14010A306 (179) | |
Text
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 Chapter 11 RADIOACTIVE WASTE MANAGEMENT TABLE OF CONTENTS Section Page LDCN-02-005 11-i 11.1 SOURCE TERMS........................................................................ 11.1-1 11.1.1 FISSION PRODUCTS................................................................. 11.1-1 11.1.1.1 Noble Radionuclide Fission Products............................................ 11.1-1 11.1.1.2 Radiohalogen Fission Products.................................................... 11.1-4 11.1.1.3 Other Fission Products.............................................................. 11.1-6 11.1.1.4 Nomenclature......................................................................... 11.1-6 11.1.2 ACTIVATION PRODUCTS........................................................... 11.1-7 11.1.2.1 Coolant Activation Products....................................................... 11.1-7 11.1.2.2 Noncoolant Activation Products................................................... 11.1-7 11.1.2.3 Steam and Power Conversion System N-16 Inventory......................... 11.1-8 11.1.3 TRITIUM................................................................................. 11.1-8 11.1.4 FUEL FISSION PRODUCT INVENTORY AND FUEL EXPERIENCE....... 11.1-11 11.1.4.1 Fuel Fission Product Inventory.................................................... 11.1-11 11.1.4.2 Fuel Experience...................................................................... 11.1-11 11.1.5 RADIOACTIVITY LEAKAGE AND EFFLUENT SOURCES.................... 11.1-11 11.
1.6 REFERENCES
.......................................................................... 11.1-12 11.2 LIQUID WASTE MANAGEMENT SYSTEM..................................... 11.2-1 11.2.1 DESIGN BASIS........................................................................ 11.2-1 11.2.2 SYSTEM DESCRIPTION............................................................ 11.2-3 11.2.2.1 Process Description.................................................................. 11.2-3 11.2.2.2 Subsystems Description............................................................. 11.2-4 11.2.2.2.1 Equipment Drain Subsystem.................................................... 11.2-4 11.2.2.2.2 Floor Drain Subsystem........................................................... 11.2-5 11.2.2.2.3 Chemical Waste Subsystem...................................................... 11.2-6 11.2.2.2.4 Shared Equipment................................................................. 11.2-7 11.2.2.2.5 Surge Capacities................................................................... 11.2-7 11.2.2.2.6 Design Features.................................................................... 11.2-8 11.2.3 RADIOACTIVE RELEASES........................................................ 11.2-9 11.2.3.1 Release Point and Dilution......................................................... 11.2-9 11.2.3.2 Calculation of Releases of Radioactive Materials.............................. 11.2-9 11.2.3.3 Exposure of Persons at or Beyond the Site Boundary......................... 11.2-10 11.2.3.4 Cost-Benefit Analysis............................................................... 11.2-10 11.3 GASEOUS WASTE MANAGEMENT SYSTEMS................................ 11.3-1 11.3.1 DESIGN BASES....................................................................... 11.3-1
COLUMBIA GENERATING STATION Amendment 58 FINAL SAFETY ANALYSIS REPORT December 2005 Chapter 11 RADIOACTIVE WASTE MANAGEMENT TABLE OF CONTENTS (Continued)
Section Page LDCN-03-069 11-ii 11.3.2 SYSTEM DESCRIPTION............................................................ 11.3-2 11.3.2.1 Main Condenser Steam Jet Air Ejector RECHAR System................... 11.3-2 11.3.2.2 Other Radioactive Gas Sources.................................................... 11.3-6 11.3.2.3 Cost-Benefit Analysis............................................................... 11.3-8 11.3.2.4 Design Features of the Offgas System........................................... 11.3-8 11.3.2.4.1 Maintainability..................................................................... 11.3-8 11.3.2.4.2 Pressure Boundaries.............................................................. 11.3-8 11.3.2.4.3 Building Seismic Design......................................................... 11.3-9 11.3.2.4.4 Construction of Process Systems............................................... 11.3-9 11.3.2.4.5 Instrumentation and Control..................................................... 11.3-9 11.3.2.4.6 Detonation Resistance............................................................ 11.3-10 11.3.2.4.7 Operator Exposure Criteria and Controls..................................... 11.3-10 11.3.2.4.8 Equipment Malfunction.......................................................... 11.3-10 11.3.2.5 Offgas System Operating Procedure.............................................. 11.3-11 11.3.2.5.1 Prestartup Preparations........................................................... 11.3-11 11.3.2.5.2 Startup............................................................................... 11.3-11 11.3.2.5.3 Normal Operation................................................................. 11.3-11 11.3.2.6 Offgas System Performance Tests................................................ 11.3-11 11.3.2.6.1 Recombiner......................................................................... 11.3-11 11.3.2.6.2 Prefilter............................................................................. 11.3-12 11.3.2.6.3 Desiccant Gas Dryer.............................................................. 11.3-12 11.3.2.6.4 Charcoal Performance............................................................ 11.3-12 11.3.2.6.5 Post Filter........................................................................... 11.3-12 11.3.3 RADIOACTIVE RELEASES........................................................ 11.3-12 11.3.3.1 Release Points........................................................................ 11.3-12 11.3.3.2 Dilution Factors...................................................................... 11.3-13 11.3.3.3 Estimated Releases................................................................... 11.3-13 11.
3.4 REFERENCES
......................................................................... 11.3-14 11.4 SOLID WASTE MANAGEMENT SYSTEM....................................... 11.4-1 11.4.1 DESIGN BASIS........................................................................ 11.4-1 11.4.2 SYSTEM DESCRIPTION............................................................ 11.4-2 11.4.2.1 General................................................................................ 11.4-3 11.4.2.2 Radwaste Disposal System For Reactor Water Cleanup Resin.............. 11.4-3 11.4.2.3 Radwaste Disposal System For Condensate Demineralizer Resin........... 11.4-4
COLUMBIA GENERATING STATION Amendment 58 FINAL SAFETY ANALYSIS REPORT December 2005 Chapter 11 RADIOACTIVE WASTE MANAGEMENT TABLE OF CONTENTS (Continued)
Section Page LDCN-04-052 11-iii 11.4.2.4 Radwaste Disposal System For Fuel Pool, Floor Drain, and Waste Collector Filter Resin............................................................... 11.4-4 11.4.2.5 Radwaste Disposal System For Spent Resin.................................... 11.4-4 11.4.2.6 Resin Container Handling and Storage........................................... 11.4-4 11.4.2.7 Miscellaneous Dry Solid Waste System......................................... 11.4-5 11.4.2.8 Expected Volumes................................................................... 11.4-5 11.4.2.9 Packaging............................................................................. 11.4-6 11.4.2.10 Storage Facilities................................................................... 11.4-6 11.4.2.11 Shipment............................................................................. 11.4-6 11.4.2.12 Process Monitoring................................................................ 11.4-7 11.4.3 PROCESS CONTROL PROGRAM................................................ 11.4-7 11.4.3.1 Objective.............................................................................. 11.4-7 11.4.3.2 Process Control Program........................................................... 11.4-8 11.4.3.3 Process Control Systems............................................................ 11.4-9 11.4.3.4 Waste Characterization............................................................. 11.4-9 11.4.3.5 Processing Methods (Wet Wastes)................................................ 11.4-10 11.4.3.6 Control Instrumentation and Sampling Program............................... 11.4-11 11.4.3.7 Maintenance and Calibration....................................................... 11.4-11 11.4.3.8 Waste Processing System Capacity............................................... 11.4-12 11.4.3.9 Waste Storage Capacity............................................................. 11.4-12 11.4.3.10 Compliance With ALARA Principles........................................... 11.4-12 11.4.3.11 Unanticipated Wastes.............................................................. 11.4-14 11.4.3.12 Waste Classification............................................................... 11.4-14 11.4.3.13 Waste Packaging and Shipping................................................... 11.4-14 11.5 PROCESS AND EFFLUENT RADIOLOGICAL MONITORING AND SAMPLING SYSTEMS.......................................................... 11.5-1 11.5.1 DESIGN BASIS........................................................................ 11.5-1 11.5.1.1 Design Objectives.................................................................... 11.5-1 11.5.1.1.1 Systems Required for Safety.................................................... 11.5-1 11.5.1.1.2 Systems Required for Plant Operation......................................... 11.5-1 11.5.1.2 Design Criteria....................................................................... 11.5-3 11.5.1.2.1 Systems Required for Safety.................................................... 11.5-3 11.5.1.2.2 Systems Required for Plant Operation......................................... 11.5-4
COLUMBIA GENERATING STATION Amendment 61 FINAL SAFETY ANALYSIS REPORT December 2011 Chapter 11 RADIOACTIVE WASTE MANAGEMENT TABLE OF CONTENTS (Continued)
Section Page LDCN-08-014 11-iv 11.5.2 SYSTEM DESCRIPTION............................................................ 11.5-4 11.5.2.1 Systems Required for Safety....................................................... 11.5-4 11.5.2.1.1 Main Steam Line Radiation Monitoring System............................. 11.5-4 11.5.2.1.2 Reactor Building Exhaust Plenum Radiation Monitoring System......... 11.5-5 11.5.2.1.3 Control Room Fresh Air Intake Radiation Monitoring System........... 11.5-6 11.5.2.1.4 Standby Service Water Radiation Monitoring System...................... 11.5-7 11.5.2.2 Systems Required for Plant Operation........................................... 11.5-7 11.5.2.2.1 Gaseous Process and Effluent Radiation Monitoring System.............. 11.5-8 11.5.2.2.1.1 Offgas Pretreatment Radiation Monitoring System....................... 11.5-8 11.5.2.2.1.2 Offgas Posttreatment Radiation Monitoring System...................... 11.5-8 11.5.2.2.1.3 Offgas Charcoal Bed Vault Radiation Monitoring System.............. 11.5-9 11.5.2.2.1.4 Mechanical Vacuum Pump Exhaust Radiation Monitoring System.... 11.5-10 11.5.2.2.1.5 Reactor Building Elevated Release Duct Radiation Monitoring System............................................................................ 11.5-10 11.5.2.2.1.6 Turbine-Generator Building Ventilation Release Duct Radiation Monitoring System............................................................. 11.5-13 11.5.2.2.1.7 Radwaste Building Ventilation Release Ducts Radiation Monitoring System............................................................. 11.5-14 11.5.2.2.1.8 NRC Safety Evaluation Report, NUREG-0892 Acceptance............ 11.5-14 11.5.2.2.2 Liquid Process and Effluent Radiation Monitoring System................ 11.5-15 11.5.2.2.2.1 Standby Service Water Radiation Monitoring System.................... 11.5-16 11.5.2.2.2.2 Reactor Building Closed Cooling Water Radiation Monitoring System............................................................................ 11.5-16 11.5.2.2.2.3 Radwaste Effluent Radiation Monitoring System......................... 11.5-16 11.5.2.2.2.4 Circulating Water and Plant Service Water Radiation Monitoring Systems........................................................................... 11.5-17 11.5.2.2.3 Primary Containment Radiation Monitoring System........................ 11.5-17 11.5.2.2.3.1 Leak Detection Monitors...................................................... 11.5-17 11.5.2.2.3.2 Loss-of-Coolant Accident Tracking Radiation Monitoring Systems (Containment Drywell)........................................................ 11.5-18 11.5.2.3 Sampling............................................................................... 11.5-19 11.5.2.3.1 Process Sampling.................................................................. 11.5-19 11.5.2.3.2 Effluent Sampling................................................................. 11.5-19 11.5.2.3.3 Analytical Procedures............................................................ 11.5-20 11.5.2.3.4 Inservice Inspection, Calibration, and Maintenance........................ 11.5-20 11.5.3 EFFLUENT MONITORING AND SAMPLING................................ 11.5-21
COLUMBIA GENERATING STATION Amendment 58 FINAL SAFETY ANALYSIS REPORT December 2005 Chapter 11 RADIOACTIVE WASTE MANAGEMENT TABLE OF CONTENTS (Continued)
Section Page 11-v 11.5.4 PROCESS MONITORING AND SAMPLING................................... 11.5-21 11.6 POSTACCIDENT SAMPLING SYSTEM........................................... 11.6-1 11.6.1 DESIGN BASIS........................................................................ 11.6-1 11.6.2 SYSTEM DESCRIPTION............................................................ 11.6-1
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 Chapter 11 RADIOACTIVE WASTE MANAGEMENT LIST OF TABLES Number Page LDCN-02-005 11-vi 11.1-1 Noble Radiogas Source Terms.................................................... 11.1-13 11.1-2 Halogen Radioisotopes in Reactor Water....................................... 11.1-15 11.1-3 Other Fission Product Radioisotopes in Reactor Water...................... 11.1-16 11.1-4 Coolant Activation Products in Reactor Water and Steam................... 11.1-18 11.1-5 Noncoolant Activation Products in Reactor Water............................. 11.1-19 11.2-1 Liquid Waste Management System Radioisotope Inventory Equipment Drain Subsystem..................................................................... 11.2-11 11.2-2 Liquid Waste Management System Radioisotope Inventory Chemical Waste Subsystem.................................................................... 11.2-13 11.2-3 Liquid Waste Management System Radioisotope Inventory RWCU and Condensate Filter Demineralizers................................................ 11.2-15 11.2-4 Liquid Waste Management System Radioisotope Inventory Spent Resin and Condensate Backwash Receiving Tanks.................................... 11.2-17 11.2-5 Liquid Waste Management System Radioisotope Inventory Phase Separators............................................................................. 11.2-19 11.2-6 Annual Average Concentration of Radionuclides in Liquid Effluent....... 11.2-21 11.2-7 Tank Design Features............................................................... 11.2-23 11.2-8 Equipment Drain Subsystem Sources............................................ 11.2-24 11.2-9 Floor Drain Subsystem Sources................................................... 11.2-25 11.2-10 Chemical Waste Subsystem Sources............................................. 11.2-26 11.2-11 Radwaste System Process Flow Diagram Data................................ 11.2-27
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 Chapter 11 RADIOACTIVE WASTE MANAGEMENT LIST OF TABLES (Continued)
Number Title Page LDCN-02-000,02-005 11-vii 11.2-12 Radwaste Process Equipment Design Basis..................................... 11.2-37 11.2-13 Liquid Radwaste Equipment....................................................... 11.2-38 11.2-14 Annual Releases of Radioactive Material as Liquid........................... 11.2-41 11.3-1 Design Air Ejector Offgas Release Rates....................................... 11.3-15 11.3-2 Offgas System Major Equipment Items.......................................... 11.3-16 11.3-3 Process Data for the Offgas (RECHAR) System.............................. 11.3-18 11.3-4 Offgas System Alarmed Process Parameters................................... 11.3-19 11.3-5 Equipment Malfunction Analysis................................................. 11.3-20 11.3-6 Release Point Data.................................................................. 11.3-24 11.3-7 Gaseous Waste System Release................................................... 11.3-25 11.3-8 Building Volume and Ventilation Rates......................................... 11.3-27 11.3-9 Maximum Sector Annual Average Concentrations of Gaseous Radioactive Materials at the Original Restricted Area Boundary........... 11.3-28 11.3-10 Frequency and Quantity of Steam Discharged to Suppression Pool........ 11.3-29 11.4-1 Waste Processing Systems Capacities............................................ 11.4-15 11.4-2 Solid Waste Management System Major Equipment Items.................. 11.4-16 11.4-3 Significant Isotope Activity in Dewatered Waste.............................. 11.4-18 11.4-4 Expected Annual Production of Solids........................................... 11.4-21
COLUMBIA GENERATING STATION Amendment 55 FINAL SAFETY ANALYSIS REPORT May 2001 Chapter 11 RADIOACTIVE WASTE MANAGEMENT LIST OF TABLES (Continued)
Number Title Page 11-viii 11.5-1 Process and Effluent Radiation Monitoring System (Gaseous and Airborne Monitors)................................................................. 11.5-23 11.5-2 Process and Effluent Radiation Monitoring System (Liquid Monitors).... 11.5-27 11.5-3 Radiological Analysis Summary of Gaseous Effluent Samples.............. 11.5-28 11.5-4 Radiological Analysis Summary of Liquid Process Samples................ 11.5-29 11.5-5 Radiological Analysis Summary of Gaseous Process Samples.............. 11.5-30 11.5-6 Radiological Analysis Summary of Liquid Effluent Samples................ 11.5-31
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 Chapter 11 RADIOACTIVE WASTE MANAGEMENT LIST OF FIGURES Number Title LDCN-02-000,02-005 11-ix 11.1-1 Noble Radiogas Decay Constant Exponent Frequency Histogram 11.1-2 Radiohalogen Decay Constant Exponent Frequency Histogram 11.1-3 Noble Radiogas Leakage Versus Iodine-131 Leakage 11.2-1 Radwaste System Process Diagram 11.2-2 Flow Diagram Radioactive Waste System Equipment Drain Processing 11.2-3 Flow Diagram Radioactive Waste System Floor Drain Processing 11.2-4 Flow Diagram Chemical Waste Processing (Sheets 1 through 3) 11.3-1 Offgas System - Low Temperature 11.3-2 Offgas System P&ID (Sheets 1 and 2) 11.4-1 Flow Diagram Radioactive Waste Disposal Solids Handling System 11.5-1 Main Steam Line Monitors 11.5-2 Reactor Building Exhaust Plenum Monitors and Charcoal Bed Vault Monitor 11.5-3 Control Room Fresh Air Intake Monitors 11.5-4 Process and Effluent Liquid Radiation Monitors 11.5-5 Offgas Pretreatment and Posttreatment Radiation Monitors 11.5-6 Mechanical Vacuum Pumps Exhaust Monitor and Reactor Building Elevated Release Stack Monitor 11.5-7 Turbine and Radwaste Building Ventilation Release Duct Monitors 11.5-8 DELETED
COLUMBIA GENERATING STATION Amendment 55 FINAL SAFETY ANALYSIS REPORT May 2001 Chapter 11 RADIOACTIVE WASTE MANAGEMENT LIST OF FIGURES (Continued)
Number Title 11-x 11.5-9 Primary Containment Leak Detection Monitor 11.5-10 Primary Containment and Elevated Release Stack LOCA Tracking 11.5-11 Elevated Release Stack LOCA Monitoring
COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 11.1-1 Chapter 11 RADIOACTIVE WASTE MANAGEMENT 11.1 SOURCE TERMS The italicized information is historical and was provided to support the application for an operating license.
Radioactive material sources (activation products and fission product release from fuel) have been evaluated in operating boiling water reactors (BWRs) over the past decade. These source terms are reviewed and periodically revised to incorporate up-to-date information. Release of radioactive material from operating BWRs has resulted in doses to offsite persons which have been only a small fraction of 10 CFR 20 permissible or natural background doses.
The information provided in this section defines the design-basis radioactive material levels in the reactor water, steam, and offgas. The various radioisotopes listed have been grouped as coolant activation products, noncoolant activation products, and fission products. The fission product levels are based on measurements of BWR reactor water and offgas at several stations through mid-1971. Emphasis was placed on observations made at Kernkraftwerk RWE-Bayernwerk GmbH (KRB) and Dresden-2. The design-basis radioactive material levels do not necessarily include all the radioisotopes observed or predicted theoretically to be present. The radioisotopes included are considered significant to one or more of the following criteria:
- a.
Plant equipment design,
- b.
Shielding design,
- c.
Understanding system operation and performance,
- d.
Measurement practicability, and
- e.
Evaluating radioactive material releases to the environment.
The inventory of radionuclides used to determine shielding requirements of system components are discussed in Chapter 12.
11.1.1 FISSION PRODUCTS 11.1.1.1 Noble Radiogas Fission Products The noble gas radionuclide fission product source terms observed in operating BWRs are generally complex mixtures whose sources vary from miniscule defects in cladding to tramp uranium on external cladding surfaces. The relative concentrations or amounts of noble radiogas can be described as follows.
COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 11.1-2 Equilibrium: Rg,i = K1Y1 (11.1-1)
Recoil:
Rg,i = K2Y1i (11.1-2)
The nomenclature in Section 11.1.1.4 defines the terms in these and succeeding equations. The constants K1 and K2 describe the fractions of the total fissions that are involved in each of the releases. The equilibrium and recoil mixtures are the two extremes of the mixture spectrum that are physically possible. When a sufficient time delay occurs between the fission event and the time of release of the radiogases from the fuel to the coolant, the radiogases approach equilibrium levels in the fuel and the equilibrium mixture results. Where there is no delay between the fission event and the release of the radiogases, the recoil mixture is observed.
Prior to Vallecitos Boiling Water Reactor (VBWR) and Dresden-1 experience, it was assumed that noble radiogas leakage from the fuel would be the equilibrium mixture of the noble radiogases present in the fuel.
The VBWR and early Dresden-1 experience (Reference 11.1-1) indicated that the actual mixture most often observed approached a distribution which was intermediate in character to the two extremes. This intermediate decay mixture was termed the diffusion mixture. It must be emphasized that this diffusion mixture is merely one possible point on the mixture spectrum ranging from the equilibrium to the recoil mixture and does not have the absolute mathematical and mechanistic basis for the calculational methods possible for equilibrium and recoil mixtures. However, the diffusion distribution pattern which has been described is as follows:
Diffusion:
Rg,i = K3Yii0.5 (11.1-3)
The constant K3 describes the fraction of total fissions that are involved in the release. The value of the exponent of the decay constant, i, is midway between the values for the equilibrium case, 0, and recoil case 1. The diffusion pattern value of 0.5 was originally derived from diffusion theory.
Although the previously described diffusion mixture was used by GE as a basis for design since 1963, the design-basis release magnitude used has varied from 0.5 Ci/sec to 0.1 Ci/sec as measured after 30-minute decay (t=30 minutes).* Since about 1967, the design-basis release magnitude used (including the 1971 source terms) was established at an annual average of 0.1 Ci/sec (t = 30 minutes). This design basis is considered as an annual average with some time above and some time below this value. This design value was selected on the basis of operating experience rather than predictive assumptions. Several judgment factors,
- The noble radiogas source term rate after 30-minute decay has been used as a conventional measure of the design-basis fuel leakage rate since it is conveniently measurable and was consistent with the nominal design-basis 30-minute offgas holdup system used on a number of previous plants.
COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 11.1-3 including the significance of environmental release, reactor water radioisotope concentrations, liquid waste handling and effluent disposal criteria, building air contamination, shielding design, and turbine and other component contamination affecting maintenance, have been considered in establishing this level.
Noble radiogas source terms from fuel above 0.1 Ci/sec (t = 30 minutes) can be tolerated for reasonable periods of time. Continual assessment of these values is made on the basis of actual operating experience in BWRs (References 11.1-2 and 11.1-3).
While the noble radiogas source-term magnitude was established at 0.1 Ci/sec (t = 30 minutes), it was recognized that there may be a more statistically applicable distribution for the noble radiogas mixture. Sufficient data were available from KRB operations from 1967 to mid-1971 along with Dresden-2 data from operation in 1970 and several months in 1971 to more accurately characterize the noble radiogas mixture pattern for an operating BWR.
The basic equation for each radioisotope used to analyze the collected data is:
(
)(
)
R K Y e
i e
i g,i g
i im T
t
=
1 (11.1-4)
With the exception of Kr-85 with a half-life of 10.74 years, the noble radiogas fission products in the fuel are essentially at an equilibrium condition after an irradiation period of several months (rate of formation is equal to the rate of decay). So for practical purposes the term (1 - e -iT) approaches 1 and can be neglected when the reactor has been operating steady state for long periods of time. The term (1 - e -iT) is used to adjust the releases from the fuel (t = 0) to the decay time for which values are needed. Historically, t = 30 minutes has been used. When discussing long steady-state operation and leakage from the fuel (t = 0), the following simplified form of Equation 11.1-4 can be used to describe the leakage of each noble radiogas:
R K Y g,i g
i im
=
(11.1-5)
The constant, Kg, describes the magnitude of leakage from the fuel. The relative rates of leakage of the different noble radiogas isotopes is accounted for by the variable, m, the exponent of the decay constant, i.
Dividing both sides of Equation 11.1-5 by yi, the fission yield, and taking the logarithm of both sides results in the following equation:
(
)
(
)
(
)
log
/
log R
Y m log K
g,i i
i g
=
+
(11.1-6)
COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 11.1-4 Equation 11.1-6 represents a straight line when log (Rg,i/yi) is plotted vs. log (i); m is the slope of the line. This straight line is obtained by plotting (Rg,i/yi) vs. (i) on logarithmic graph paper. By fitting actual data from KRB and Dresden-2 (using least squares techniques) to the equation, the slope, m, can be obtained. This can be estimated on the plotted graph.
With radiogas leakage at KRB over the nearly 5-year period varying from 0.001 to 0.056 Ci/sec (t = 30 minutes) and with radiogas leakage at Dresden-2 varying from 0.001 to 0.169 Ci/sec (t = 30 minutes), the average value of m was determined. The value for m is 0.4 with a standard deviation of +/-0.07. This is illustrated in Figure 11.1-1 as a frequency histogram. As can be seen from this figure, variations in m were observed in the range of m = 0.1 to m = 0.6. After establishing the value of m = 0.4, the value of Kg can be calculated by selecting a value for Rg, or as has been done historically, the design basis is set by the total design-basis source-term magnitude at t = 30 minutes. With SRg at 30 minutes = 100,000 mCi/sec, Kg can be calculated as being 2.6 x 107 and Equation 11.1-4 becomes:
(
)(
)
R x
Y e
i e
i g,i i
i t
t
=
2 6 10 1
7 0.4
(11.1-7)
This updated noble radiogas source-term mixture has been termed the 1971 mixture to differentiate it from the diffusion mixture. The noble gas source term for each radioisotope can be calculated from Equation 11.1-7. The resultant source terms are presented in Table 11.1-1 as leakage from fuel (t = 0) and after 30-minute decay. While Kr-85 can be calculated using Equation 11.1-7, the number of confirming experimental observations was limited by the difficulty of measuring very low release rates of this isotope. Therefore, the table provides an estimated range for 85Kr based on a few actual measurements.
11.1.1.2 Radiohalogen Fission Products Historically, the radiohalogen design-basis source term was established by the same equation as that used for noble radiogases. In a fashion similar to that used with gases, a simplified equation can be shown to describe the release of each radiohalogen:
R K Y h
h i
in
,i =
(11.1-8)
The constant, Kh, describes the magnitude of leakage from fuel. The relative rates of radiohalogen leakage is expressed in terms of n, the exponent of the decay constant, i. As was done with the noble radiogases, the average value was determined for n. The value for n is 0.5 with a standard deviation of +/-0.19. This is illustrated in Figure 11.1-2 as a frequency histogram. As can be seen from this figure, variations in n were observed in the range of n = 0.1 to n = 0.9.
COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 11.1-5 It appeared that the use of the previous method of calculating radiohalogen leakage from fuel was overly conservative. Figure 11.1-3 relates KRB and Dresden-2 noble radiogas versus I-131 leakage. While it can be seen from Dresden-2 data, during the period August 1970 to January 1971, that there is a relationship between noble radiogas and I-131 leakage under one fuel condition, there was no simple relationship for all fuel conditions experienced. Also, it can be seen that during this period, high radiogas leakages were not accompanied by high radioiodine leakage from the fuel. Except for one KRB datum point, all steady-state I-131 leakages observed at KRB or Dresden-2 were equal to or less than 505 µCi/sec. Even at Dresden-1 in March 1965, when severe defects were experienced in stainless steel clad fuel, I-131 leakages greater than 500 µCi/sec were not experienced. Figure 11.1-3 shows that these higher radioiodine leakages from the fuel were related to noble radiogas source terms of less than the design-basis value of 0.1 Ci/sec (t = 30 minutes). This may be partially explained by inherent limitations due to internal plant operational problems that caused plant derating.
In general, it would not be anticipated that operation at full power would continue for any significant time period with fuel cladding defects, which would be indicated by 131I leakage from the fuel in excess of 700 µCi/sec. When high radiohalogen leakages are observed, other fission products will be present in greater amounts.
Using these judgment factors and experience to date, the design-basis radiohalogen source terms from fuel were established based on 131I leakage of 700 µCi/sec. This value, as seen in Figure 11.1-3, accommodates the experience data and the design-basis noble radiogas source term of 0.1 Ci/sec (t = 30 minutes). With the I-131 design-basis source-term established, Kh can be calculated as being 2.4 x 107 and radiohalogen release can be expressed by the following equation:
(
)(
)
R x
Y e
i e
i h
i i
T t
,i
=
2 4 10 1
7 0 5
(11.1-9)
Concentrations of radiohalogens in reactor water can be calculated using the following equation:
(
)
C R
M h
h i
,i
,i
=
+
+
(11.1-10)
The observed carryover for radiohalogens has varied from 0.1% to about 2% on newer plants. The average of observed radiohalogen carryover measurements has been 1.2% by weight of reactor water in steam with a standard deviation of +/-0.9%. In the present source term definition, a radiohalogen carryover of 2% (0.02 fraction) was used.
The radiohalogen release rate from the fuel was calculated from equation 11.1-9.
COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 11.1-6 Concentrations in reactor water were calculated from equation 11.1-10.
The resultant concentrations are presented in Table 11.1-2. Radiohalogens with half-lives less than 3 minutes were omitted.
11.1.1.3 Other Fission Products The observations of other fission products (and transuranic nuclides, including 239Np) in operating BWRs are not adequately correlated by simple equations. For these radioisotopes, design-basis concentrations in reactor water have been estimated conservatively from experience data (Reference 11.1-8) and are presented in Table 11.1-3. Radioisotopes with half-lives less than 10 minutes were not considered. Carryover of these radioisotopes from the reactor water to the steam is estimated to be 0.1% ( 0.001 fraction) (Reference 11.1-8). In addition to carryover, however, decay of noble radiogases in the steam leaving the reactor will result in production of noble gas daughter radioisotopes in the steam and condensate systems.
Some daughter radioisotopes (e.g., yttrium and lanthanum) were not listed as being in reactor water. Their independent leakage to the coolant is negligible; however, these radioisotopes may be observed in some samples in equilibrium or approaching equilibrium with the parent radioisotope.
Except for 239Np, trace concentrations of transuranic isotopes have been observed in only a few samples where extensive and complex analyses were carried out. The predominant alpha emitter present in reactor water is 242Cm at an estimated concentration of 10-6 µCi/g or less, which is below the maximum permissible concentration in drinking water applicable to continuous use by the general public. The concentration of alpha-emitting plutonium radioisotopes is more than one order of magnitude lower than that of 242Cm.
Plutonium-241 (a beta emitter) may also be present in concentrations comparable to the 242Cm level.
11.1.1.4 Nomenclature The following list defines the terms used in equations for source term calculations:
Rg,i
= leakage rate of noble gas radioisotope i (µCi/sec)
Rh,i
= leakage rate of a halogen radioisotope i (µCi/sec)
Yi
= fission yield of a radioisotope i (atoms/fission)
I
= decay constant of a radioisotope i (sec-1)
COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 11.1-7 T
= fuel irradiation time (sec) t
= decay time following leakage from fuel (sec) m
= noble radiogas decay constant exponent (dimensionless) n
= radiohalogen decay constant exponent (dimensionless)
Kg
= a constant establishing the level of noble radiogas leakage from fuel Kh
= a constant establishing the level of radiohalogen leakage from fuel Ch,i = concentration of a radiohalogen i in reactor water (µCi/g)
M
= mass of water in the operating reactor (g)
= cleanup system removal constant (sec-1)
= cleanup system flow rate (g/sec)
M(g) g
= grams mass
= halogen steam carryover removal constant (sec-1)
= concentration of rad Ci g x
iohalogen isotope in steam ( Ci / g)
C steam flow (g / sec)
M (g) h,i
µ
µ
(
/
)
11.1.2 ACTIVATION PRODUCTS 11.1.2.1 Coolant Activation Products The coolant activation products are not adequately correlated by simple equations. Design basis concentrations in reactor water and steam have been estimated conservatively from experience data. The resultant concentrations are presented in Table 11.1-4.
11.1.2.2 Noncoolant Activation Products The activation products formed by activation of impurities in the coolant or by corrosion of irradiated system materials are not adequately correlated by simple equations. The design-basis source terms of noncoolant activation products have been estimated conservatively
COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 11.1-8 from experience data (Reference 11.1-8). The resultant concentrations are presented in Table 11.1-5. Carryover of these isotopes from the reactor water to the steam is estimated to be <0.1% (<0.001 fraction) (Reference 11.1-8).
11.1.2.3 Steam and Power Conversion System N-16 Inventory The main steam and reactor feedwater systems sources are discussed in Section 12.2.1.2.2.7.
This section discusses the N-16 source strength in the moisture separators and reheaters, main condenser and hotwell, feedwater heaters, and associated piping.
11.1.3 TRITIUM In a BWR, tritium is produced by three principal methods:
- a.
Activation of naturally occurring deuterium in the primary coolant,
- b.
Nuclear fission of UO2 fuel, and
- c.
Neutron reactions with boron used in reactivity control rods.
The tritium formed in control rods, which may be released from a BWR in liquid or gaseous effluents, is believed to be negligible. The prime source of tritium available for release from a BWR is that produced from activation of deuterium in the primary coolant. Some fission product tritium may also transfer from fuel to primary coolant. This discussion is limited to the uncertainties associated with estimating the amounts of tritium generated in a BWR which are available for release. All of the tritium produced by activation of deuterium in the primary coolant is available for release in liquid or gaseous effluents. The tritium formed in a BWR from deuterium activation is calculated using the equation R
V x
P act =
3 7 104 (11.1-11) where:
Ract
=
tritium formation rate by deuterium activation act (µCi/sec/MWt)
=
macroscopic thermal neutron cross section (cm-1)
=
thermal neutron flux (neutrons/cm2-sec)
V
=
coolant volume in core (cm3)
COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 11.1-9
=
tritium radioactive decay constant (1.78 x 10-9 sec-1)
P
=
reactor power level (MWt)
For recent BWR designs, Ract is calculated to be (1.3 +/- 0.4) x 10-4 µCi/sec/MWt. The uncertainty indicated is derived from the estimated errors in selecting values for the coolant volume in the core, coolant density in the core, abundance of deuterium in light water [some additional deuterium will be present because of the H(n,) D reaction], thermal neutron flux, and microscopic cross section for deuterium.
The fraction of tritium produced by fission which may transfer from the fuel to the coolant (which will then be available for release in liquid and gaseous effluents) is more difficult to estimate. However, since zircaloy-clad fuel rods are used in BWRs, essentially all fission product tritium will remain in the fuel rods unless defects are present in the cladding material (Reference 11.1-4).
The study made at Dresden-1 in 1968 by the U.S. Public Health Service (USPHS) suggests that essentially all of the tritium released from the plant could be accounted for by the deuterium activation source (Reference 11.1-3). For purposes of estimating the leakage of tritium from defective fuel, it is assumed that it leaks in a manner similar to the leakage of noble radiogases. Thus, use is made of the empirical relationship described as the diffusion mixture used for predicting the source term of individual noble radiogas isotopes as a function of the total noble gas source term. The equation which describes this relationship is:
R Ky dif =
0 5.
(11.1-12) where:
Rdif
=
leakage rate of tritium from fuel (µCi/sec) y
=
fission yield fraction (atoms/fission)
=
radioactive decay constant (sec-1)
K
=
a constant related to total tritium leakage rate.
When the total noble radiogas source term is 100,000 µCi/sec after 30-minutes decay, leakage from fuel is calculated to be about 0.24 µCi/sec of tritium. To place this value in perspective, in the USPHS study (Reference 11.1-3), the observed rate of 85Kr (which has a half-life similar to that of tritium) was 0.06 to 0.4 times that calculated using the diffusion mixture relationship. This would suggest that the actual tritium leakage rate might range from 0.015 to 0.10 µCi/sec. Since the annual average noble radiogas leakage from a BWR is expected to
COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 11.1-10 be less than 100,000 µCi/sec (t = 30-minutes), the annual average tritium release rate from the fission source is conservatively estimated at 0.12 +/- 0.12 µCi/sec, or 0.0 to 0.24 µCi/sec.
Based on this approach, the estimated total tritium appearance rate in reactor coolant and release rate in the effluent is about 19 Ci/yr.
Tritium formed in the reactor is present as tritiated oxide (HTO) and to a lesser degree as tritiated gas (HT). Tritium concentration on a weight basis in the steam formed in the reactor is the same as in the reactor water at any given time. This tritium concentration is also present in condensate and feedwater. Since radioactive effluents generally originate from the reactor and power cycle equipment, radioactive effluents also have this tritium concentration. The condensate storage tanks receive treated water from the liquid waste management systems and rejected water from the condensate system. Thus, all plant process water approaches a common tritium concentration.
Offgases released from the plant contain tritium, which is present as tritiated gas (HT) resulting from reactor water radiolysis as well as tritiated water vapor (HTO). In addition, water vapor from the turbine gland seal steam packing exhauster and some water vapor present in ventilation air due to process steam leaks and evaporation from sumps and tanks also contain tritium. The remainder of the tritium leaves the plant in liquid effluents or with solid wastes.
Recombination of radiolysis gases in the offgas system forms water, which is condensed and returned to the main condenser. This tends to reduce the amount of tritium leaving in gaseous effluents. Reducing the gaseous tritium release results in a slightly higher tritium concentration in the plant process water. Reducing the amount of liquid effluent discharged will also result in a higher process coolant tritium concentration.
Essentially all tritium in the primary coolant is eventually released to the environs, either as water vapor and gas to the atmosphere or as liquid effluent to the plant discharge or as solid waste. Reduction due to radioactive decay is negligible due to the 12.3-year half-life of tritium.
The USPHS study at Dresden-1 estimated that approximately 90% of the tritium release was observed in liquid effluent, with the remaining 10% leaving as gaseous effluent (Reference 11.1-5).
Efforts to reduce the volume of liquid effluent discharges may change this distribution so that a greater amount of tritium will leave as gaseous effluent. From a practical standpoint, the fraction of tritium leaving as liquid effluent may vary between 60% and 90% with the remainder leaving in gaseous effluent.
COLUMBIA GENERATING STATION Amendment 54 FINAL SAFETY ANALYSIS REPORT April 2000 LDCN-98-117 11.1-11 The amount of tritium released to the environment in liquid and gaseous effluents is based on the draft Regulatory Guide 1.CC, BWR-GALE code analyses. This is discussed in Sections 11.2 and 11.3 respectively.
11.1.4 FUEL FISSION PRODUCT INVENTORY AND FUEL EXPERIENCE 11.1.4.1 Fuel Fission Product Inventory Fuel fission product inventory information is used in establishing fission product source terms for accident analysis and is, therefore, discussed in Chapter 15.
11.1.4.2 Fuel Experience A discussion of BWR fuel experienced including fuel failure, burn-up and thermal conditions under which the experience was gained, is presented in References 11.1-2, 11.1-3, and 11.1-6.
11.1.5 RADIOACTIVITY LEAKAGE AND EFFLUENT SOURCES Process leakage results in potential release paths for noble gases and other volatile fission products via ventilation systems. Liquids from process leaks are collected and routed to radioactive equipment and floor drain systems. Radioisotope releases via ventilation paths are at extremely low levels and have been insignificant compared to process offgas from operating BWR plants. However, because the implementation of improved process offgas treatment systems makes the ventilation release comparatively significant, measurements have been conducted to identify and quantify these low-level release paths. In addition an awareness of measurements by the Electric Power Research Institute, other organizations, and routine measurements by other utilities with operating BWRs has been maintained. Design basis estimates of the various liquid, gaseous, and solids effluents are discussed in Sections 11.2, 11.3, and 11.4 which follow.
Concurrently, analytical and mathematical model studies are being performed to provide a description of the transport, residence, and release of various radionuclides in and from an operating BWR.
Process leakage measurement, detection, and control methods are further discussed in Sections 5.2.5, 11.2.2, 11.3.2, and 12.1.2.
The effect of process leakage sources on the in-plant airborne radionuclide concentrations and the adequacy of plant ventilation systems is discussed in Section 12.2.2. Liquid radioactive sources are discussed in Section 11.2 and gaseous radioactive sources are discussed in Section 11.3.
COLUMBIA GENERATING STATION Amendment 54 FINAL SAFETY ANALYSIS REPORT April 2000 11.1-12 11.
1.6 REFERENCES
11.1-1 Brutschy, F. J., A comparison of Fission Product Release Studies in Loops and VBWR, Paper presented at the Tripartite Conference on Transport of Materials in Water Systems, Chalk River, Canada (February 1961).
11.1-2 Williamson, H. E., Ditmore, D. C., Experience with BWR Fuel Through September 1971, NEDO-10505, May 1972. (Update) 11.1-3 Elkins, R. B., Experience with BWR Fuel Through September 1974, NEDO-20922, June 1975.
11.1-4 Ray, J. W., Tritium in Power Reactors, Reactor and Fuel Processing Technology, 12 (1), pp. 19-26, Winter 1968-1969.
11.1-5 Kahn, B., et al, Radiological Surveillance Studies at a Boiling Water Nuclear Power Reactor, BRH/DER 70-1, March 1970.
11.1-6 Williamson, H. E., Ditmore, D. C., Current State of Knowledge of High Performance BWR Zircaloy Clad UO Fuel, NEDO-10173, May 1970.
11.1-7 Marrero, T. R., Airborne Releases From BWRs for Environmental Impact Evaluation, NEDO-21159, March 1976.
11.1-8 Gilbert, R. S., Skarpelos, J. M., Technical Derivation of 1971 BWR Design Basis Radioactive Material Source Terms, NEDO-10871, March 1973.
COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 Table 11.1-1 Noble Radiogas Source Terms Isotope Half-Life Source Term t = 0
(µCi/sec)
Source Term t = 30 minutes
(µCi/sec) 11.1-13 83mKr 1.86 hr 3.4 x 103 2.9 x 103 85mKr 4.4 hr 6.1 x 103 5.6 x 103 85Kr 10.74 years 10 to 20a 10 to 20a 87Kr 76 minutes 2.0 x 104 1.5 x 104 88Kr 2.79 hr 2.0 x 104 1.8 x 104 89Kr 3.18 minutes 1.3 x 105 1.8 x 102 90Kr 32.3 sec 2.8 x 105 91Kr 8.6 sec 3.3 x 105 92Kr 1.84 sec 3.3 x 105 93Kr 1.29 sec 9.9 x 104 94Kr 1.0 sec 2.3 x 104 95Kr 0.5 sec 2.1 x 103 97Kr 1.0 sec 1.4 x 101 131mXe 11.96 days 1.5 x 101 1.5 x 101 133mXe 2.26 days 2.9 x 102 2.8 x 102 133Xe 5.27 days 8.2 x 103 8.2 x 103 135mXe 15.7 minutes 2.6 x 104 6.9 x 103 135Xe 9.16 hr 2.2 x 104 2.2 x 104 137Xe 3.82 minutes 1.5 x 105 6.7 x 102
COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 Table 11.1-1 Noble Radiogas Source Terms (Continued)
Isotope Half-Life Source Term t = 0
(µCi/sec)
Source Term t = 30 minutes
(µCi/sec) 11.1-14 138Xe 14.2 minutes 8.9 x 104 2.1 x 104 139Xe 40 sec 2.8 x 105 140Xe 13.6 sec 3.0 x 105 141Xe 1.72 sec 2.4 x 105 142Xe 1.22 sec 7.3 x 104 143Xe 0.96 sec 1.2 x 104 144Xe 9.0 sec 5.6 x 102 Totals 2.5 x 106 1.0 x 105 a Estimated from experimental observations.
COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 11.1-15 Table 11.1-2 Halogen Radioisotopes in Reactor Water Isotope Half-Life Concentration
(µCi/g) 83Br 2.40 hr 1.5 x 10-2 84Br 31.8 minutes 2.7 x 10-2 85Br 3.0 minutes 1.7 x 10-2 131I 8.07 days 1.3 x 10-2 132I 2.28 hr 1.2 x 10-1 133I 20.8 hr 8.8 x 10-2 134I 52.3 minutes 2.4 x 10-1 135I 6.7 hr 1.3 x 10-1
COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 Table 11.1-3 Other Fission Product Radioisotopes in Reactor Water Isotope Half-Life Concentration
(µCi/g) 11.1-16 89Sr 50.8 days 3.1 x 10-3 90Sr 28.9 years 2.3 x 10-4 91Sr 9.67 hr 6.9 x 10-2 92Sr 2.69 hr 1.1 x 10-1 95Zr 65.5 days 4.0 x 10-5 97Zr 16.8 hr 3.2 x10-5 95Nb 35.1 days 4.2 x 10-5 99Mo 66.6 hr 2.2 x10-2 99mTc 6.007 hr 2.8 x 10-1 101Tc 14.2 minutes 1.4 x 10-1 103Ru 39.8 days 1.9 x 10-5 106Ru 368 days 2.6 x 10-6 129mTe 34.1 days 4.0 x 10-5 132Te 78.0 hr 4.9 x 10-2 134Cs 2.06 years 1.6 x-10-4 136Cs 13.0 days 1.1 x 10-4 137Cs 30.2 years 2.4 x 10-4 138Cs 32.3 minutes 1.9 x 10-1 139Ba 83.2 minutes 1.6 x 10-1
COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 Table 11.1-3 Other Fission Product Radioisotopes in Reactor Water (Continued)
Isotope Half-Life Concentration
(µCi/g) 11.1-17 140Ba 12.8 days 9.0 x 10-3 141Ba 18.3 minutes 1.7 x 10-1 142Ba 10.7 minutes 1.7 x 10-1 141Ce 32.53 days 3.9 x 10-5 143Ce 33.0 hr 3.5 x 10-5 144Ce 384.4 days 3.5 x 10-5 143Pr 13.58 days 3.8 x 10-5 147Nd 11.06 days 1.4 x 10-5 239Np 2.35 days 2.4 x 10-1
COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 11.1-18 Table 11.1-4 Coolant Activation Products in Reactor Water and Steam Isotope Half-Life Steam Concentration
(µCi/g)
Reactor Water Concentration
(µCi/g) 13N 9.99 minutes 7 x10-3 4 x 10-2 16N 7.13 sec 5 x 101 4 x 101 17N 4.14 sec 2 x 10-2 6 x 10-3 19O 26.8 sec 8 x 10-1 7 x 10-1 18F 109.8 minutes 4 x 10-3 4 x 10-3
COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 11.1-19 Table 11.1-5 Noncoolant Activation Products in Reactor Water Isotope Half-Life Concentration
(µCi/g) 24Na 15 hr 2 x 10-3 32P 14.31 days 2 x 10-5 51Cr 27.8 days 5 x 10-4 54Mn 313 days 4 x 10-5 56Mn 2.58 hr 5 x 10-2 58Co 71.4 days 5 x 10-3 60Co 5.25 years 5 x 10-4 59Fe 45 days 8 x 10-5 65Ni 2.55 hr 3 x 10-4 65Zn 243.7 days 2 x 10-6 69mZn 13.7 hr 3 x 10-5 110mAg 253 days 6 x 10-5 187W 23.9 hr 3 x 10-3
Noble Radiogas Decay Constant Exponent Frequency Histogram 900547.45 11.1-1 Figure Amendment 53 November 1998 Form No. 960690 Draw. No.
Rev.
Equilibrium Frequency of Measurements Diffusion Recoil m = KRB and Dresden 2 Average 0
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 Noble Radiogas Decay Constant Exponent (m) 5 10 15 20 25
-1
+1 Columbia Generating Station Final Safety Analysis Report
Radiohalogen Decay Constant Exponent Frequency Histogram 900547.46 11.1-2 Figure Amendment 53 November 1998 Form No. 960690 Draw. No.
Rev.
Equilibrium Diffusion Recoil n = KRB and Dresden 2 Average 15 10 5
0 0
0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 Radiohalogen Decay Constant Exponent (n)
Frequency of Measurements
-1
+1 Columbia Generating Station Final Safety Analysis Report
Noble Radiogas Leakage Versus Iodine-131 Leakage 900547.47 11.1-3 Figure Amendment 53 November 1998 Form No. 960690 Draw. No.
Rev.
KRB Dresden 2 50,000 100,000 150,000 0
0 100 200 300 400 500 600 700 800 900 1000 1100 1200 Noble Radiogas Leakage at +30 min (µCi/sec)
Dresden 1 March 1965 Dresden 2 (August 1970 - January 1971)
Iodine-131 Leakage From Fuel (µCi/sec)
Iodine-131 Design Basis 1971 Source Terms Iodine-131 Design Basis Pre-1971 Source Terms 1690 Columbia Generating Station Final Safety Analysis Report
COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 11.2-1 11.2 LIQUID WASTE MANAGEMENT SYSTEM 11.2.1 DESIGN BASIS The liquid waste management system is designed to collect, segregate, store, and process potentially radioactive liquids generated during normal plant operation and anticipated operational occurrences. The design objective is to keep the radiation dose in unrestricted areas as low as is reasonably achievable (ALARA) within the guidelines of Appendix I to 10 CFR 50. The design incorporates the objectives of maximum recycle and minimum release of radioactive liquids without limiting plant operations or availability.
The criteria considered in the design of this system include volume, radioactivity, operational exposure, and required quality for recycle of the processed liquid. Radioisotopic inventories of the components used for the design are listed in Tables 11.2-1 through 11.2-5. These values are based on the reactor water source term associated with the design-basis fuel leakage rate.
Allowance is made for concentration, decay and daughter product buildup in filters, demineralizers, and tanks. Equipment locations and arrangements are shown in Section 1.2.
The system is designed to treat process liquids with radioisotope concentrations associated with the design-basis fuel leakage and produce a quality of water which allows its recycle for plant reuse. Water inventory will occasionally require the discharge of processed liquids to the environs, in which case concentrations of radioisotopes in the effluent (Table 11.2-6) will be significantly less than the values specified in 10 CFR 20 and within the release limits established in the Technical Specifications. Radiation exposure to persons in unrestricted areas resulting from liquid waste discharged during normal operation and anticipated operational occurrences is less than the guidelines specified in 10 CFR 50, Appendix I.
Tanks that hold radioactive liquid, including the condensate storage tanks, are monitored for level and alarm primarily in the radwaste control room. Table 11.2-7 lists the design features of the tanks in the radwaste building used to prevent uncontrolled releases due to spillage and shows overflow alarms and drainage paths. The radwaste systems are operated from the radwaste control room; hence, additional local alarms are not required for radwaste tank levels.
All liquid waste management system tank overflows and drains are routed to the radwaste building equipment and floor drain sumps (see Figure 9.3-11). Radioactive liquid samples are primarily routed to sampling sinks. Those samples, which are local, drain into floor drain trenches, equipment or floor drain funnels, and pump beds. The above sample receivers are routed to various radioactive sumps, all of which are processed by the liquid waste management system.
Indoor tanks that hold radioactive liquid are not enclosed by individual curbs or elevated thresholds. The portion of the radwaste building that houses radioactive liquid tanks is Seismic
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 LDCN-02-005 11.2-2 Category I, as discussed in Section 3.8.4.1.2. The radwaste building can retain the normal operating capacity of all liquid radwaste tanks, which are nonseismic. Analysis of a postulated radioactive release due to a liquid radwaste tank failure is presented in Section 15.7.3.
The radioactive and nonradioactive equipment and floor drains within the plant are segregated.
Equipment and floor drains within the reactor building and radwaste building are routed to the liquid waste management system. The turbine building equipment and floor drains are segregated for radioactivity by component source and area (see Section 9.3.3). Although three of the turbine building sumps are designated as collectors of nonradioactive waste water, there is a possibility of low level contamination of the effluent water. One contamination source is steam leaks inside the building which condense on interior surfaces and are routed to floor drains. Because of this possibility, the discharge of these three sumps is routed to the radwaste system for processing.
The design of the system was accomplished prior to the issuance of Regulatory Guide 8.8.
However, the system does incorporate substantially the guidance provided in this regulatory guide.
Like the nonradioactive sumps, the storm water drainage system (see Section 9.3.3.2.3.1) is not intended to collect radioactive materials. Nonetheless, radionuclides have been detected in the pond water and sediments. These concentrations are attributed to unanticipated and unavoidable occurrences. For example, special system draindowns during maintenance activities may have contributed minor amounts of tritium and corrosion products. Tritium that leaves the plant as a vapor can condense on building roofs and exterior walls and be carried to the pond in storm drainage. Also, water treatment filter backwashes that are routed to the pond can contribute radionuclides which were withdrawn from the river.
The degree of compliance with Regulatory Guide 1.143 is described in Section 1.8.
The liquid waste management system is designed to the requirements of General Design Criteria, Appendix A to 10 CFR 50, as follows:
General Design Criterion 60 The system capacity as required by General Design Criterion 60 is sufficient for the volume of liquid waste expected from normal operation and anticipated operational occurrences such as condenser leakage, maintenance activities, and process equipment down time. Flow rates are listed in Tables 11.2-8 through 11.2-10.
General Design Criterion 64 Radioactivity monitoring in the sample tanks and in the effluent discharge path ensures that excess liquid discharged to the environs does not exceed the limits of 10 CFR 20. Sampled
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-3 fluids exceeding these limits are returned to an appropriate collector tank for reprocessing.
The radwaste effluent radiation monitoring system is described in Section 11.5.2.2.2.3.
11.2.2 SYSTEM DESCRIPTION 11.2.2.1 Process Description Radioactive liquid wastes are collected and segregated into three categories: high purity waste, low purity waste, and chemical waste. Wastes thus classified are treated in subsystems designated as equipment drain, floor drain, and chemical waste, respectively.
High purity wastes, treated in the equipment drain subsystem, have low conductivity and relatively high radioactivity concentrations. Radioactive material is removed from these wastes by filtration and ion exchange. Following treatment and batch sampling, the processed waste is normally returned to condensate storage for reuse in plant.
Low purity wastes, treated in the floor drain subsystem, have moderate conductivity and generally low radioactivity. As with high purity wastes, radioactive material is removed by filtration and ion exchange. Following treatment and batch sampling, the processed waste is normally returned to condensate storage for reuse in the plant.
The high conductivity and organic content of chemical wastes preclude normal treatment in the system demineralizers by ion exchange. These wastes can be neutralized by adding appropriate neutralizing agent and thorough mixing. If necessary, following neutralization, these wastes are routed to a backwash tank or phase separator where unexpended ion-exchange capacity of the resins is used to remove contaminants from the chemical waste. After thorough mixing and a period of quiescence to allow the ion-exchange process to proceed, the excess liquid is decanted to the floor drain system for further processing. The spent resins in the separators are then processed as described below.
The installed chemical waste concentrators are currently not used. Their preoperational testing and use has been deferred until a need is identified. There are currently no plans to activate the concentrators.
The installed detergent drain tanks are not normally used. Any wastes requiring disposal are handled on a case-by-case basis and routed for processing and disposal in accordance with plant procedures and regulatory requirements and guidelines.
All liquid radwaste process streams terminate in one of the sample or distillate tanks. Since the liquid waste management system is operated on a batch basis, this arrangement allows each treated batch to be sampled to ensure that the treatment was effective. If the sample indicates that the processed liquid is still above acceptable radioactivity limits or substandard in purity, equipment is provided to either recycle the batch through the same treatment or through a
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-4 subsystem providing a higher degree of treatment. If the sample indicates that the level of activity is within limits required to discharge and the water is in excess of inventory capacity or is substandard in purity, the processed liquid may be discharged. The actual release of effluents from any processed and sampled batch tank requires the opening of a key-locked valve in accordance with written operating procedures. All required information regarding the batch release must be documented. These procedures are established to prevent inadvertent release of liquids that have not been suitably processed and analyzed.
Expended ion exchange resins are removed by backwashing to the spent resin tank and phase separators. Excess backwash water is removed from the phase separators by decantation and routed to either the floor drain or equipment drain collector tank for treatment. The powdered resin sludge is accumulated for radioactive decay. Following accumulation of successive layers in the phase separator, the sludge is then transferred to the radwaste processing system for dewatering or solidification. The deep bed resins in the spent resin tank, after a decay period, are also transferred to the solid radwaste processing system. Water separated from the wastes is returned via the waste sludge phase separator to the floor drain collector tank for treatment. The solid waste management system is described in Section 11.4.
Noncondensable gases from the liquid waste processing vessels are vented through the radwaste building exhaust system. This system is described in Section 9.4.3.2.
A process flow diagram, Figure 11.2-1, together with process flow diagram data, Table 11.2-11, show the volumes, flow rates, and radioactivity concentration used in the design of the liquid and solid waste management system.
The radionuclide distribution of liquid waste management system influents is based on the reactor coolant concentrations, as discussed in Section 11.1, taking into consideration mixing and dilution sources.
Decontamination factors which were used for evaluations of the system are those values specified in draft Regulatory Guide 1.CC. Table 11.2-12 shows the process equipment design basis decontamination factors which were used to generate the radioactivity values in Table 11.2-11.
11.2.2.2 Subsystems Description 11.2.2.2.1 Equipment Drain Subsystem The equipment drain subsystem consists of a waste collector tank, waste surge tank, pressure precoat filter, deep bed demineralizer, two waste sample tanks, and auxiliary equipment necessary to operate the subsystem. Sizes and capacities of the equipment are listed in Table 11.2-13. The waste surge tank principally serves as a receptacle for reactor hydrotest and thermal expansion water and residual heat removal (RHR) system flush water during
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-5 startup and testing of these systems. The waste surge tank also serves as backup during equipment downtime. The piping and instrumentation drawing for this subsystem is shown in Figure 11.2-2.
High purity (low solids content) liquid wastes are collected in the waste collector tank from the following sources:
- a.
Drywell equipment drain sump,
- b.
Reactor building equipment drain sump,
- c.
Radwaste building equipment drain sump,
- d.
Turbine building equipment drain sump,
- e.
Reactor water cleanup system,
- f.
RHR system,
- g.
Cleanup phase separators (decant water),
- h.
Condensate phase separators (decant water), and
- i.
Fuel pool seal rupture drains (to waste surge tank).
The quantities of these wastes are summarized in Table 11.2-8. Since these wastes can contain a high percentage of primary reactor water, the radioactive concentration could be relatively high (on the order of 2.4 µCi/ml).
In the event of a component malfunction within the equipment drain subsystem, sufficient cross ties are provided to the floor drain subsystem to permit continued processing of the wastes.
Sufficient capacity and treatment capability are provided to handle such conditions.
Normally, the equipment drain subsystem treated effluents are recycled to the condensate storage tanks for reuse within the plant. When condensate storage capacity is not available or the water is substandard in purity, the purified liquid from this subsystem may be sampled, analyzed and, if acceptable for release as described previously, routed to the blowdown line for discharge. Liquid waste that is unacceptable for discharge is reprocessed.
11.2.2.2.2 Floor Drain Subsystem The floor drain subsystem consists of a floor drain collector tank, pressure precoat filter, deep bed demineralizer, sample tank, and auxiliary equipment necessary to operate the subsystem.
Sizes and capacities of the equipment are listed in Table 11.2-13. The flow diagram for this subsystem is shown in Figure 11.2-3.
Intermediate purity liquid wastes are collected in the floor drain collector tank from the following sources:
- a.
Drywell floor drain sump,
- b.
Reactor building floor drain sumps,
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-6
- c.
Radwaste building floor drain sumps,
- d.
Turbine building floor drain sump, and
- e.
Waste sludge phase separator (decant water).
The quantities of these wastes are summarized in Table 11.2-9. These wastes are normally of intermediate purity (50 mho/cm and higher) and have radioactive concentrations on the order of 0.1 µCi/ml.
Similar to the equipment drain subsystem, the floor drain subsystem normally functions as an independent process stream. Equipment redundancy and intersystem cross ties have been provided to allow substitution for any failed component.
High purity effluent is routed to condensate storage for reuse in the plant. When condensate storage capacity is exceeded or the processed liquid is substandard in purity, it may be discharged via the blowdown line, if it meets acceptable limits.
11.2.2.2.3 Chemical Waste Subsystem The chemical waste subsystem consists of two of each of the following: detergent drain tanks, chemical waste tanks, decontamination solution concentrators, decontamination solution concentrated waste tanks, and distillate tanks. It contains also a polishing (deep bed) demineralizer and auxiliary equipment necessary to operate the subsystem. Sizes and capacities of the equipment are listed in Table 11.2-13. The flow diagram for this subsystem is shown in Figure 11.2-4. The decontamination solution concentrators, concentrated waste tanks, distillate tanks, and polishing demineralizer have been installed but will not be used until plant operating experience indicates a need and system testing is accomplished. Chemical wastes are currently processed by routing to a backwash tank or phase separator for use of unexpended ion-exchange capacity of the resins to clean the water prior to decanting to the floor drain subsystem for further processing.
Chemical wastes collected in the chemical waste tank are from the following sources:
- a.
Detergent drains,
- b.
Shop decontamination solutions,
- c.
Reactor and turbine building decontamination drains,
- d.
Low purity wastes from either the equipment or floor drain subsystems,
- e.
Filter demineralizer element chemical cleaning solutions,
- f.
Battery room drains,
- g.
Chemical system overflows and tank drains, and
- h.
Laboratory drains.
The quantities of these wastes are summarized in Table 11.2-10. These chemical wastes are of such high conductivity and organic content as to preclude normal treatment by ion exchange,
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-7 and the radioactivity concentrations are variable. These wastes are processed by routing to a backwash tank or phase separator and to the floor drain system for further processing.
If the concentrators were ever activated, the evaporator concentrates would be processed by the solid waste management system and the distillate would be routed to the distillate tank. After analysis, the distillate could be routed through a polishing demineralizer to further reduce impurities, recycled through the evaporator, or sent directly to condensate storage for plant reuse. As with the other subsystems, when high purity water storage capacity is exceeded or the processed liquid is of substandard purity, liquid within 10 CFR 20 release limits could be discharged via the blowdown line.
11.2.2.2.4 Shared Equipment Other than serving as mutual backup, main process equipment normally is not shared between subsystems. Auxiliary equipment not in the direct process stream is shared between subsystems. Shared equipment includes the following:
- a.
The waste precoat tank and waste precoat pump are shared between the waste collector filter and the floor drain filter,
- b.
The waste filter aid tank is shared between the waste collector filter and floor drain filter,
- c.
The resin addition tank is shared between the waste demineralizer, floor drain demineralizer, and polishing demineralizer, and
- d.
The chemical addition tanks, caustic and acid, and associated pumps are shared between the waste collector tank, floor drain collector tank, detergent tanks, and chemical waste tanks.
11.2.2.2.5 Surge Capacities The radwaste system process data is the basis for sizing of the equipment. Tables 11.2-8, 11.2-9, and 11.2-10 list startup flows, daily flows, and maximum flows for the equipment drain subsystem, floor drain subsystem and chemical waste subsystem, respectively.
Anticipated operational occurrences such as startup operations, equipment malfunction, and shutdown operations are accounted for in these tabulations. The bases for these types of values are presented in NEDO-10951, Releases from BWR Radwaste Management Systems, July 1973.
The surge storage and process capacities can be envisioned by comparing the normal and maximum daily volumes, listed in Table 11.2-11, with the design flow rates of pumps and tank volumes listed in Table 11.2-13. Alternate processing rather than bypass operations are used
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-8 during equipment downtime. The equipment and floor drain subsystems are sized such that with either subsystem inoperative, the remaining subsystem is capable of processing the maximum expected volume of both subsystems. Additionally, the waste surge tank provides reserve storage capacity. The chemical waste subsystem incorporates two parallel processing paths. Cross connections allow individual components from either process path to serve as a substitute in the other process path. The parallel path processing and adequate storage capacity ensures that inoperability of any component in this subsystem will not limit plant operation.
11.2.2.2.6 Design Features The design pressures and temperatures for individual components are listed in Table 11.2-13.
Collection and storage tanks are designed for atmospheric pressure. The mixed-bed demineralizer units, precoat filter units, and concentrators are pressure vessels. The quality classification for the system is Quality Group D+ as defined in Section 3.2.
Chapter 12 discusses the design features incorporated in the system to maintain occupational exposure ALARA. As shown in the general arrangement drawings in Section 1.2, the radwaste processing equipment is located in shielded rooms and cells. Process lines that penetrate shield walls are routed to prevent a direct radiation path from the tanks and equipment to normally occupied areas.
Control of the liquid waste management system is from a shielded radwaste control room and from shielded local operating galleries. Flanges are provided where required for maintenance in an otherwise all-welded system. The cells and concrete rooms provide secondary enclosures which facilitate collection of spills or leaks from the system for processing. Vessels that may have their contents mixed with air or that may have batches transferred into them by means of pneumatic transfer are closed and vented to the radwaste building ventilation system. Piping and tubing 2 in. and under is field routed but required to be in specified space envelopes for shielding and in-plant exposure consideration.
The liquid waste management system is designed to minimize the effects of equipment malfunction and operator error. After initiation by the operator, valve positioning, equipment startup, and system operation can be automatically performed by a process controller. Failure of any valve to properly align stops the sequence and prevents a pump start. Once on line, processing continues until the feed volume is processed or the capacity of a piece of process equipment is reached. In either case, automatic shutdown occurs with valves returning to the shutdown position. During initial system startup or in the event of controller failure, the processes are manually controlled. System variables, such as tank levels, flow rates, pressures, and conductivity are indicated and alarmed in the radwaste control room.
The discharge from the liquid waste subsystems to the blowdown line is normally isolated by a closed manual valve and a key-locked closed manual valve separated by a telltale drain. This path is further protected by air-operated isolation valves, flow control valves, flow indication
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-9 and radiation monitoring instrumentation. These design features are complimented by administrative procedures which prevent inadvertent radioactive liquid releases and releases of liquids that exceed the Technical Specifications release limit.
11.2.3 RADIOACTIVE RELEASES The decision to recycle or to release a particular batch of processed liquid is based on plant water inventory and the type and concentration of chemical impurities being processed. It is not expected that tritium buildup in the plant will determine the frequency of releases.
Concentration of radionuclides released to the environment will be significantly less than those values specified in 10 CFR 20. The quantities of radioactive materials released during normal operation will not result in dose rates to persons in unrestricted areas in excess of 10 CFR 50, Appendix I, values as implemented by the Technical Specifications release limits.
11.2.3.1 Release Point and Dilution Excess liquid effluent is discharged to the circulating water blowdown line at a variable rate up to about 190 gpm. Dilution is furnished by circulating water system blowdown when required or when normal blowdown is in progress. The circulating water blowdown line terminates in the Columbia River. Applicable concentration limits specified in 10 CFR 20 apply at the point of discharge to the river.
The storm water drainage pond described in Section 9.3.3.2.3.1 is a point of release of detectable radionuclides. For the reasons discussed in Section 11.2.1, most of the activity is believed to be either condensed gaseous effluent or material of external origin. The pond is within a plant restricted area (see Section 2.1.1.3), and public access is restricted by a fence which surrounds the pond and discharge channel.
11.2.3.2 Calculation of Releases of Radioactive Materials Quantities of radioactive materials released with liquids were calculated for initial plant licensing using the GALE code presented in draft Regulatory Guide 1.CC to show compliance with Appendix I to 10 CFR 50 for normal operation plus anticipated operational occurrences.
The plant operational parameters, including source terms, were those presented in Appendix B of the guide with waste stream flow rates adjusted to the Columbia Generating Station plant design. The calculated quantities of radioactive materials released with liquids used for initial plant licensing are presented in Table 11.2-14 in terms of curies per year. The radionuclide concentrations in the effluent are presented in Table 11.2-6 and are compared with the values of 10 CFR 20, Appendix B, Table II, Column 2.
Since becoming operational, releases of radioactive materials in liquid effluents have been determined using actual flow volumes and quantitative and qualitative laboratory analyses.
Doses due to radioactive materials released in liquid effluents are determined to be in
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-10 compliance with Technical Specifications at specified intervals. Compliance is reported in the Annual Radioactive Effluent Release Report using the NRC LADTAP II computer code along with parameters outlined in the Offsite Dose Calculation Manual.
11.2.3.3 Exposure of Persons at or Beyond the Site Boundary Estimated annual exposure of persons in unrestricted areas resulting from liquid effluents (Table 11.2-6) is discussed in Section 5.2 of the Environmental Report, Operating License stage. The estimated total body dose of 2.3 mrem per year and largest calculated single organ dose of 1.6 mrem per year to the bone are well within the guidelines of 10 CFR 50, Appendix I.
11.2.3.4 Cost-Benefit Analysis It has been determined that a cost-benefit analysis, as described in Appendix I to 10 CFR 50 Section II.D is not required for Columbia Generating Station.
The question of eligibility of Columbia Generating Station to dispense with the Appendix I cost-benefit analysis as to per site limitations was reviewed by the NRC in connection with their review of WPPSS Nuclear Project No. 1 (WNP-1) and WPPSS Nuclear Project No. 4 (WNP-4), Docket Nos. 50-460 and 50-513. The Staff concluded in its testimony at the Atomic Safety and Licensing Board (ASLB) hearing for WNP-1 and WNP-4 held on November 11, 1975, that The aggregate doses associated with WPPSS Nuclear Project No. 1, WPPSS Project No. 2, and WPPSS Nuclear Project No. 4 operation meet the RM-50-2 (i.e., Annex) design objectives [Tr. 724-727].
These conclusions were ratified by the ASLB on its decision pertaining to WNP-1 and WNP-4 of December 22, 1975, RAI-75/12 922, 934.
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-11 Table 11.2-1 Liquid Waste Management System Radioisotope Inventory Equipment Drain Subsystem Radioisotope Inventory (µCi)
Radioisotope Waste Collector Tanka Waste Filtera Waste Demineralizera Waste Sample Tanka 83Br 4.53E4 3.15E4 3.18E2 84Br 4.67E4 9.19E3 9.28E1 85Br 1.17E4 4.17E-4 4.21E-6 89Sr 4.35E4 1.88E6 4.35E2 90Sr 3.25E3 2.12E5 3.25E1 91Sr 7.12E5 1.10E6 9.13E3 92Sr 3.40E5 2.48E5 2.50E3 90Y 3.53E2 2.00E5 3.92E0 91Y 4.21E3 5.10E5 4.69E1 91MY 4.12E5 7.31E5 5.82E3 92Y 2.15E5 2.37E5 2.33E3 95Zr 5.63E2 2.81E2 1.31E4 5.62E0 97Zr 6.94E1 1.73E1 1.70E1 3.46E-1 95Nb 5.93E2 2.97E2 1.69E4 5.93E0 99Mo 2.79E5 1.38E5 6.13E5 2.75E3 99MTc 1.70E6 8.18E3 2.02E6 1.51E4 101Tc 2.05E5 5.15E3 5.20E1 103Ru 2.66E2 1.33E2 5.17E3 2.66E0 106Ru 3.67E1 1.84E1 1.12E3 3.67E-1 129MTe 5.60E2 2.00E4 5.59E0 129Te 3.03E2 1.27E4 3.31E0 132Te 6.30E5 3.21E6 6.23E3 129I 2.83E-8 9.76E-5 3.16E-10 131I 1.77E5 2.12E6 1.76E3 132I 8.53E5 3.45E6 7.83E3 133I 9.03E5 1.57E6 8.67E3 134I 4.66E5 1.75E5 1.77E3 135I 7.73E5 7.35E5 6.80E3 134Cs 2.26E3 1.44E5 2.26E1 135Cs 4.19E-5 1.97E-2 5.95E-7 136Cs 1.52E3 2.80E4 1.51E1 137Cs 3.39E3 2.21E5 3.39E1 138Cs 3.29E5 6.54E4 6.60E2 137MBa 2.99E3 2.07E5 3.17E1
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-12 Table 11.2-1 Liquid Waste Management System Radioisotope Inventory Equipment Drain Subsystem (Continued)
Radioisotope Inventory (µCi)
Radioisotope Waste Collector Tanka Waste Filtera Waste Demineralizera Waste Sample Tanka 139Ba 3.67E5 1.98E5 2.00E3 140Ba 1.24E5 2.29E6 1.24E3 141Ba 2.64E5 1.50E4 1.52E2 142Ba 2.32E5 2.14E3 2.16E1 141Ce 1.18E3 5.99E2 3.04E4 1.22E1 143Ce 3.98E2 1.94E2 4.80E2 3.88E0 144Ce 4.94E2 2.47E2 1.48E4 4.94E0 140La 2.07E4 2.28E6 2.29E2 141La 3.66E4 4.61E4 4.60E2 142La 2.34E4 3.08E4 3.11E2 143Pr 5.37E2 2.69E2 1.71E4 5.37E0 144Pr 4.40E2 2.46E2 1.48E4 4.91E0 147Nd 1.92E2 9.59E1 1.52E3 1.92E0 239NP 2.98E6 1.13E7 2.93E4 24Na 1.80E4 2.52E4 1.70E2 32P 2.77E2 5.54E3 2.76E0 51Cr 6.99E3 3.49E3 1.10E5 6.98E1 54Mn 5.65E2 2.82E2 1.70E4 5.65E0 56Mn 1.58E5 5.67E4 5.57E4 1.13E3 58Co 7.04E4 3.52E4 1.68E6 7.03E2 60Co 7.07E3 3.53E4 2.26E5 7.07E1 59Fe 1.12E3 5.61E2 2.30E4 1.12E1 65Ni 9.40E2 3.36E2 3.30E2 6.73E0 65Zn 2.82E1 1.67E3 2.82E-1 69MZn 2.63E2 3.52E2 2.47E0 110MAg 8.47E2 4.24E2 2.52E4 8.47E0 187W 3.16E4 1.53E4 2.99E4 3.05E2 a The radioisotope inventory listed above for the waste collector tank, waste filter, waste demineralizer, and waste sample tank is assumed to be applicable to the floor drain collector tank, floor drain filter, floor drain demineralizer, and floor drain sample tank, respectively.
This is done for the purpose of shielding analysis. In actuality, the radionuclide inventory in any component of the floor drain system is discussed in Sections 11.2.2.2.1 and 11.2.2.2.2.
The values from the equipment drain subsystem are maximum due to cross-ties for alternate processing.
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-13 Table 11.2-2 Liquid Waste Management System Radioisotope Inventory Chemical Waste Subsystem Radioisotope Inventory (µCi)
Radioisotope Chemical Waste Tank DSC Waste Tanka DSC Waste Measuring Tankb Distillate Tank Decon.
Solution Concentrator 83Br 84Br 85Br 89Sr 1.11E3 2.82E3 1.74E3 1.11E0 1.48E3 90Sr 7.87E1 2.00E2 1.23E2 7.87E-2 1.05E2 91Sr 92Sr 90Y 91Y 91MY 92Y 95Zr 1.43E1 3.65E1 2.25E1 1.43E-2 1.92E1 97Zr 95Bv 99Mo 7.87E3 2.00E4 1.23E4 7.87E0 1.05E4 99MTc 101Tc 103Ru 106Ru 129MTe 1.43E1 3.65E1 2.25E1 1.43E-2 1.92E1 129Te 132Te 1.75E4 4.45E4 2.75E4 1.75E1 2.34E4 129I 131I 4.65E3 1.13E4 6.95E3 4.65E0 5.92E3 132I 133I 134I 135I 134Cs 5.75E1 1.46E2 9.02E1 5.75E-2 7.68E1 135Cs 136Cs 3.94E1 1.00E2 6.19E1 3.94E-2 5.27E1 137Cs 8.60E1 2.19E2 1.35E2 8.60E-2 1.15E2
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-14 Table 11.2-2 Liquid Waste Management System Radioisotope Inventory Chemical Waste Subsystem (Continued)
Radioisotope Inventory (µCi)
Radioisotope Chemical Waste Tank DSC Waste Tanka DSC Waste Measuring Tankb Distillate Tank Decon.
Solution Concentrator 138Cs 137MBa 139Ba 140Ba 3.22E3 8.18E3 5.05E3 3.22E0 4.30E3 141Ba 142Ba 141Ce 1.40E1 3.56E1 2.20E1 1.40E-2 1.87E1 143Ce 1.25E1 3.17E1 1.96E1 1.25E-2 1.67E1 144Ce 1.25E1 3.17E1 1.96E1 1.25E-2 1.67E1 140La 141La 142La 143Pr 1.36E1 3.44E1 2.12E1 1.36E-2 1.81E1 144Pr 147Nd 5.01E0 1.27E1 7.85E0 5.01E-3 6.69E0 239Np 8.60E4 2.19E5 1.35E5 8.60E1 1.15E5 24Na 32P 7.18E0 1.82E1 1.13E1 7.18E-3 9.58E0 51Cr 1.79E2 4.54E2 2.80E2 1.79E-1 2.38E2 54Mn 1.43E1 3.65E1 2.25E1 1.43E-2 1.92E1 56Mn 58Co 1.79E3 4.54E3 2.80E3 1.79E0 2.38E3 60Co 1.79E2 4.54E2 2.80E2 1.79E-1 2.38E2 59Fe 2.87E1 7.26E1 4.48E1 2.87E-2 3.82E1 65Ni 65Zn 7.18E-1 1.82E0 1.13E0 7.18E-4 9.58E-1 69MZn 110MAg 2.15E1 5.46E1 3.37E1 2.15E-2 2.87E1 187W a Decontamination solution concentrator waste tank.
b Decontamination solution concentrator waste measuring tank.
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-15 Table 11.2-3 Liquid Waste Management System Radioisotope Inventory RWCU and Condensate Filter Demineralizers Radioisotope Inventory (µCi)
Radioisotope RWCU Filter Demineralizer Condensate Filter Demineralizer 83Br 2.50E6 2.30E5 84Br 9.00E5 9.12E4 85Br 3.00E4 5.42E3 89Sr 1.40E7 3.00E5 90Sr 1.10E6 2.56E4 91Sr 3.20E7 2.13E5 92Sr 1.60E7 9.12E4 90Y 1.10E6 2.09E4 91Y 4.54E4 91MY 2.20E7 1.28E5 92Y 9.12E4 95Zr 1.80E5 2.59E4 97Zr 2.40E4 8.19E1 95Nb 5.60E5 2.97E4 99Mo 5.50E7 3.04E6 99MTc 2.40E7 3.18E6 101Tc 1.90E6 1.04E4 103Ru 9.00E4 1.16E4 106Ru 1.20E4 1.85E3 129MTe 1.50E6 3.60E3 129Te 2.29E3 132Te 3.70E7 1.20E6 129I 4.89E-6 131I 8.50E7 1.34E7 132I 5.80E7 2.96E6 133I 1.40E8 1.19E7 134I 1.40E7 1.35E6 135I 6.50E7 5.55E6 134Cs 7.50E5 1.77E4 135Cs 2.48E-2 136Cs 4.20E5 7.37E3 137Cs 1.20E6 2.67E4 138Cs 5.50E6 3.23E4 127MBa 1.20E6 2.50E4
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-16 Table 11.2-3 Liquid Waste Management System Radioisotope Inventory RWCU and Condensate Filter Demineralizers (Continued)
Radioisotope Inventory (µCi)
Radioisotope RWCU Filter Demineralizer Condensate Filter Demineralizer 139Ba 1.20E7 7.23E4 140Ba 3.60E7 6.03E5 141Ba 3.00E6 1.63E4 142Ba 1.60E6 9.94E3 141Ce 1.80E5 2.86E4 143Ce 5.00E4 2.40E3 144Ce 1.60E5 2.47E4 140La 4.10E7 5.60E5 141La 1.63E4 142La 9.94E3 143Pr 1.60E5 2.74E4 144Pr 2.47E4 147Nd 5.50E4 5.65E3 239Np 5.00E8 4.27E6 24Na 1.50E6 9.56E3 32P 9.50E4 1.40E3 51Cr 2.60E6 2.80E5 54Mn 2.20E5 2.83E4 56Mn 6.00E6 2.69E5 58Co 2.60E7 3.27E6 60Co 2.80E6 3.61E5 59Fe 4.30E5 4.96E4 65Ni 3.80E4 1.59E3 65Zn 1.10E4 2.16E2 69MZn 2.00E4 1.34E2 110MAg 3.40E5 4.24E4 187W 3.60E6 1.49E5
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-17 Table 11.2-4 Liquid Waste Management System Radioisotope Inventory Spent Resin and Condensate Backwash Receiving Tanks Radioisotope Inventory (µCi)
Radioisotope Spent Resin Tank Condensate Backwash Receiving Tank 83Br 3.15E4 2.30E5 84Br 9.19E3 9.12E4 85Br 4.17E-4 5.42E3 89Sr 1.88E6 3.00E5 90Sr 2.12E5 2.56E4 91Sr 1.10E6 2.13E5 92Sr 2.48E5 9.12E4 90Y 2.00E5 2.09E4 91Y 5.10E5 4.54E4 91MY 7.31E5 1.28E5 92Y 2.37E5 9.12E4 95Zr 1.31E4 2.59E4 97Zr 1.70E1 8.19E1 95Nb 1.69E4 2.97E4 99Mo 6.13E5 3.04E6 99MTc 2.02E6 3.18E6 101Tc 5.15E3 1.04E4 103Ru 5.17E3 1.16E4 106Ru 1.12E3 1.85E3 129MTe 2.00E4 3.60E3 129Te 1.27E4 2.29E3 132Te 3.21E6 1.20E6 129I 9.76E-5 4.89E-6 131I 2.12E6 1.34E7 132I 3.45E6 2.96E6 133I 1.57E6 1.19E7 134I 1.75E4 1.35E6 135I 7.35E4 5.55E6 134Cs 1.44E4 1.77E4 135Cs 1.97E-2 2.48E-2 136Cs 2.80E4 7.37E3 137Cs 2.21E5 2.67E4 138Cs 6.54E4 3.23E4 137MBa 2.07E5 2.50E4
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-18 Table 11.2-4 Liquid Waste Management System Radioisotope Inventory Spent Resin and Condensate Backwash Receiving Tanks (Continued)
Radioisotope Inventory (µCi)
Radioisotope Spent Resin Tank Condensate Backwash Receiving Tank 139Ba 1.98E5 7.23E4 140Ba 2.29E6 6.03E5 141Ba 1.50E4 1.63E4 142Ba 2.14E3 9.94E3 141Ce 3.04E4 2.86E4 143Ce 4.80E2 2.40E3 140Ce 1.48E4 2.47E4 141La 2.28E6 5.60E5 141La 4.61E4 1.63E4 142La 3.08E4 9.94E3 143Pr 1.71E4 2.74E4 144Pr 1.48E4 2.47E4 147Nd 1.52E3 5.65E3 239Np 1.13E7 4.27E6 24Na 2.52E4 9.56E3 32P 5.54E3 1.40E3 51Cr 1.10E5 2.80E5 54Mn 1.70E4 2.83E4 56Mn 5.57E4 2.69E5 58Co 1.68E6 3.27E6 60Co 2.26E5 3.61E5 59Fe 2.30E4 4.96E4 65Ni 3.30E2 1.59E3 65Zn 1.67E3 2.16E2 69MZn 3.52E2 1.34E2 110MAg 2.52E4 4.24E4 187W 2.99E4 1.49E5
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-19 Table 11.2-5 Liquid Waste Management System Radioisotope Inventory Phase Separators Radioisotope Inventory (µCi)
Radioisotope RWCU Phase Separator Condensate Phase Separator Waste Sludge Phase Separator 83Br 4.95E6 2.26E5 84Br 1.71E6 7.04E4 85Br 3.73E4 8.21E2 89Sr 3.48E8 2.94E6 90Sr 3.95E7 3.23E5 91Sr 6.40E7 2.21E5 92Sr 3.17E7 8.98E4 90Y 3.95E7 3.15E5 91Y 5.66E6 4.76E5 91MY 4.40E7 1.35E5 92Y 2.33E5 9.57E4 95Zr 4.83E6 2.55E5 3.70E1 97Zr 4.70E4 7.14E1 4.53E-1 95Nb 1.41E7 3.29E5 3.96E1 99Mo 1.93E8 5.23E6 1.35E4 99MTc 1.27E8 2.17E6 8.76E3 101Tc 3.41E6 7.67E-2 103Ru 2.06E6 1.36E5 1.74E1 106Ru 4.09E5 2.14E4 2.45E0 129MTe 3.15E7 3.48E-4 129Te 1.82E7 2.07E3 132Te 1.43E8 2.40E6 129I 1.29E-1 6.20E-5 131I 6.70E8 5.31E7 132I 1.87E8 4.16E6 133I 3.00E8 1.33E7 134I 2.72E7 1.18E6 135I 1.30E8 5.69E6 134Cs 2.63E7 2.19E5 135Cs 1.98E-1 3.48E-1 136Cs 4.00E6 4.07E4 137Cs 4.31E7 3.37E5 138Cs 1.05E7 2.50E4
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-20 Table 11.2-5 Liquid Waste Management System Radioisotope Inventory Phase Separators (Continued)
Radioisotope Inventory (µCi)
Radioisotope RWCU Phase Separator Condensate Phase Separator Waste Sludge Phase Separator 137MBa 4.00E7 3.14E5 139Ba 2.36E7 6.74E4 140Ba 4.18E8 3.33E6 141Ba 5.51E6 1.01E4 142Ba 2.79E6 4.69E3 141Ce 3.80E6 2.37E5 7.78E1 143Ce 1.22E5 2.88E3 1.46E1 144Ce 5.37E6 2.83E5 3.29E1 140La 4.78E8 3.64E6 141La 3.86E4 5.32E2 142La 4.89E4 6.33E2 143Pr 5.68E6 3.26E5 3.59E1 144Pr 5.08E6 2.83E5 3.29E1 147Nd 5.61E5 2.66E4 1.18E1 239Np 1.57E9 6.92E6 24Na 3.07E6 1.02E4 32P 1.19E6 8.19E3 51Cr 4.93E7 2.15E6 4.50E2 54Mn 7.43E6 3.26E5 3.76E1 56Mn 1.19E7 2.52E5 1.52E3 58Co 7.14E8 3.27E7 4.64E3 60Co 9.98E7 4.30E6 4.72E2 59Fe 1.03E7 4.50E5 7.35E1 65Ni 7.52E4 1.49E3 9.01E0 65Zn 3.63E5 2.57E3 69MZn 4.06E4 1.41E2 110MAg 1.14E7 4.84E5 5.64E1 187W 7.95E6 1.63E5 9.81E2
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-21 Table 11.2-6 Annual Average Concentration of Radionuclides in Liquid Effluent Nuclide Effluent Concentration
(µCi/ml) 10 CFR 20 Table II
(µCi/ml)
Fraction of 10 CFR 20 Effluent/10 CFR 20 24Na 1.3E-9 5E-5 0.000026 32P 5.2E-11 9E-6 0.00000575 51Cr 1.3E-9 5E-4 0.0000026 54Mn 1.6E-11 3E-5 0.000000533 56Mn 1.4E-9 7E-5 0.00002 55Fe 2.8E-10 1E-4 0.0000028 59Fe 8E-12 1E-5 0.00000008 58Co 5.4E-11 2E-5 0.0000027 60Co 1.1E-10 3E-6 0.0000367 65Ni 8E-12 1E-4 0.00000008 64Cu 4E-9 2E-4 0.00002 65Zn 5.4E-11 5E-6 0.000011 69mZn 2.8E-10 6E-5 0.00000467 69Zn 3E-10 8E-4 0.000000375 187W 5.4E-11 3E-5 0.0000018 239Np 1.6E-9 2E-5 0.00008 83Br 7.2E-11 9E-4 0.00000008 84Br 6E-12 4E-4 0.000000015 89Rb 4.2E-11 9E-4 0.0000000467 89Sr 2.8E-11 8E-6 0.0000035 91Sr 4.4E-10 2E-5 0.000022 91mY 2.8E-10 2E-3 0.00000014 91Y 1.4E-11 8E-6 0.00000175 92Sr 3E-10 4E-5 0.0000075 92Y 6.2E-10 4E-5 0.0000155 93Y 4.6E-10 2E-5 0.000023 98Nb 1.6E-11 2E-4 0.00000008 99Mo 4.6E-10 2E-5 0.000023 99mTc 1.8E-9 1E-3 0.0000018 101Tc 4E-12 2E-3 0.000000002 103Ru 6E-12 3E-5 0.0000002
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-22 Table 11.2-6 Annual Average Concentration of Radionuclides in Liquid Effluent (Continued)
Nuclide Effluent Concentration
(µCi/ml) 10 CFR 20 Table II
(µCi/ml)
Fraction of 10 CFR 20 Effluent/10 CFR 20 103mRh 6E-12 6E-3 0.000000001 104Tc 1.2E-11 4E-4 0.00000003 105Ru 1.1E-10 7E-5 0.00000165 105mRh 1.2E-10 105Rh 3.8E-11 5E-5 0.00000076 129mTe 1E-11 7E-6 0.00000150 129Te 6E-12 4E-4 0.00000016 131mTe 2E-11 8E-6 0.0000026 131Te 4E-12 8E-5 0.00000005 131I 1.4E-9 1E-6 0.0014 132Te 2E-12 9E-6 0.000000233 132I 7E-10 1E-4 0.000007 133I 3.6E-9 7E-6 0.000510 134I 2.9E-10 4E-4 0.0000007 134Cs 1.6E-9 9E-7 0.00175 135I 1.7E-9 3E-5 0.0000580 136Cs 9.9E-10 6E-6 0.000165 137Cs 3.6E-9 1E-6 0.0036 137mBa 3.4E-9 138Cs 1.5E-9 4E-4 0.0000037 139Ba 1E-10 2E-4 0.0000005 140Ba 1E-10 8E-6 0.0000131 140La 2.3E-11 9E-6 0.00000256 141La 3.6E-11 5E-5 0.00000071 141Ce 8E-12 3E-5 0.000000280 142La 7.6E-11 1E-4 0.00000076 143Ce 6E-12 2E-5 0.0000003 143Pr 1E-11 2E-5 0.0000005 All others 1.5E-11 1E-8 0.0015 Total 0.009020094
COLUMBIA GENERATING STATION Amendment 59 FINAL SAFETY ANALYSIS REPORT December 2007 LDCN-06-000 11.2-23 Table 11.2-7 Tank Design Features Component High Level Alarm Overflows and Drains Floor drain collector tank Yes (RCR)
Floor drain sump, W-2 Waste sludge phase separator Yes (RCR)
Floor drain sump, W-2 Floor drain sample tank Yes (RCR)
Floor drain sump, W-2 Waste collector tank Yes (RCR)
Floor drain sump, W-2 Spent resin tank Yes (RCR)
Floor drain sump, W-2 Waste surge tank Yes (RCR)
Equipment drain sump, W-3 Waste sample tanks Yes (RCR)
Equipment drain sump, W-3 Detergent drain tanksb Noa Chemical waste sump, W-4 Chemical waste tanks Yes (RCR)
Chemical waste sump, W-4 Distillate tanksb Noa Chemical waste sump, W-4 Nonoperational decontamination solution concentrator waste tanksb No Chemical waste sump, W-4 Condensate backwash receiving tank Yes (RCR)
Equipment drain sump, W-3 Condensate phase separators Yes (RCR)
Equipment drain sump, W-3 Decontamination solution concentrator waste measuring tankc Noa Decontamination solution concentrator waste tanks RWCU phase separators Yes (RCR)
Equipment drain sump, W-3 Condensate storage tanks Yes (MCR)
Floor drain sump, T4 a Alarms not installed.
LEGEND b Nonoperational.
RCR - radwaste control room c Not used.
MCR - main control room
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-24 Table 11.2-8 Equipment Drain Subsystem Sources Source Startup Flows (gpd)
Regular Daily Flows (gpd)
Irregular Flows (gpd)
Maximum Daily Flows (gpd)
Equipment drains Drywell 3,860 3,860 28,800 Reactor building 3,755 3,755 14,400 Turbine building 5,726 5,726 5,726 Radwaste building 1,000 1,000 1,000 Reactor hydrotest and water level reduction to operating state 56,720 0
0 RHR system flush water 4,000a 0
Condensate demineralizer backwash 27,000 13,500b 40,500c Cleanup demineralizer backwash 2,430 1,215d Water inleakage to condenser 0
0 14,400 Total 100,491 14,341 104,826 a Occurs every shutdown prior to placing the RHR system in operation for shutdown cooling.
b Under normal operating conditions, one condensate filter demineralizer would be precoated every 4 days.
c The maximum daily flow is based on a main condenser inleakage of 10 gpm, which corresponds to 3 condensate demineralizer precoatings daily and maximum leak and drain inflows. Up to 36 gpm of condenser inleakage can be accommodated. This requires precoating of one condensate demineralizer every 3 hr. This inleakage rate would result in overloading the equipment drain subsystem but could be tolerated for short periods of time during location and repair of the leak.
d Under normal operating conditions, each cleanup demineralizer may be precoated every 6.8 days.
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-25 Table 11.2-9 Floor Drain Subsystem Sources Source Regular Daily Flows (gpd)
Irregular Flows (gpd)
Maximum Daily Flows (gpd)
Floor drains Drywell 700 28,800 Reactor building 2,000 15,000 Radwaste building 1,000 1,000 Turbine building 2,000 2,000 Waste sludge phase separator decant 0
8,489a 8,489 Total 5,700 8,489 55,289 a Under normal operating conditions, the waste sludge phase separator tank is decanted every 3-4 days.
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-26 Table 11.2-10 Chemical Waste Subsystem Sources Source Regular Daily Flow (gpd)
Irregular Flow (gpd)
Maximum Daily Flow (gpd)
Detergents drains/shop decontamination solutions 1,000 2,000 Laboratory drains 500 500 Decontamination drains reactor and turbine buildings 1,000 1,000 From floor drain or equipment drain subsystem 15,000 15,000 Filter demineralizer chemical cleaning solutions Infrequent 2,000 2,000 Battery room drains Infrequent 100 100 Total 1,500 20,600
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-27 Table 11.2-11 Radwaste System Process Flow Diagram Data Equipment Drain Subsystem Flow path 1
2 3
4 5
6 8
Batches/day (normal) 8.5 4.1 1.1 6.3 1.0/6.8 4.0/7.4 1.0/30.0 Batches/day (maximum) 63.4 15.8 1.1 6.3 1.0 4.0/2.0 Volume/batch (gal) 455 909 909 909 2430 13,500 4000 Normal daily volume (gal) 3860 3755 1000 5726 Normal activity (µCi/cm3) 5.16E-2 1.30E-2 7.18E-5 1.91E-5 1.59E-2 7.18E-6 9.22E-7 Maximum daily volume (gal) 28,800 14,400 1000 5726 2430 27,000 4000 Maximum activity (µCi/cm3) 1.72E0 4.32E-1 2.39E-3 1.26E-2 5.32E-1 3.59E-4 3.08E-5 Flow rate (gal/minute) 50 50 50 50 53 450 Batch Daily activity (µCi/day)
Normal 7.19E5 1.76E5 2.59E2 3.94E2 Maximum 2.51E7 6.14E6 9.05E3 2.73E3 4.89E6 3.67E4 4.66E2
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-28 Table 11.2-11 Radwaste System Process Flow Diagram Data (Continued)
Equipment Drain Subsystem (Continued)
Flow path 9
33 12 14 17 18 19 Batches/day (normal) 1.0 1.0 1.0 1.0 1.5 2.2 1.1 Batches/day (maximum) 7.0 7.0 7.0 7.0 63.4 16.5 1.1 Volume/batch (gal) 15,000 15,000 15,000 15,000 455 909 909 Normal daily volume (gal) 15,000 15,000 15,000 15,000 700 2000 1000 Normal activity (µCi/cm3) 1.16E-2 5.81E-3 1.16E-4 1.16E-4 7.18E-6 1.05E-6 1.44E-5 Maximum daily volume (gal) 104,826 104,826 104,826 104,826 28,800 15,000 1000 Maximum activity (µCi/cm3) 3.59E-1 3.53E-1 3.53E-3 3.53E-3 6.84E-2 1.00E-3 4.78E-4 Flow rate (gal/minute) 190 190 190 190 50 100 50 Daily activity (µCi/day)
Normal 6.30E5 3.14E5 6.30E3 6.30E3 1.81E1 7.57E0 5.18E1 Maximum 2.04E7 2.00E7 2.03E5 2.04E5 1.81E5 7.57E3 1.81E3
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-29 Table 11.2-11 Radwaste System Process Flow Diagram Data (Continued)
Equipment Drain Subsystem (Continued)
Flow path 20 117 21 23 107 108 Batches/day (normal) 2.2 10./3.4 1.0/2.6 1.0/2.6 1.0/2.6 1.0/2.6 Batches/day (maximum) 2.2 1.0 3.7 3.74 3.7 3.7 Volume/batch (gal) 909 8489 15,000 15,000 15,000 15,000 Normal daily volume (gal) 2000 5700 5700 5700 5700 Normal activity (µCi/cm3) 7.18E-7 7.18E-6 1.00E-6 4.99E-5 1.00E-6 1.00E-6 Maximum daily volume (gal) 2000 8489 55,489 55,489 55,489 55,489 Maximum activity (µCi/cm3) 2.39E-5 3.59E-4 1.08E-2 1.08E-2 1.08E-4 1.08E-4 Flow rate (gal/minute) 50 50 190 190 190 190 Daily activity (µCi/day)
Normal 5.18E0 2.56E3 1.03E3 2.06E1 2.06E1 Maximum 1.81E2 2.33E5 2.33E5 2.33E3 2.33E3
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-30 Table 11.2-11 Radwaste System Process Flow Diagram Data (Continued)
Waste Surge Subsystem Flow path 104 37 Batches/day (normal) 1.0/yr 1.0/yr Batches/day (maximum) 1.0 1.0 Volume/batch (gal) 56,720 56,720 Normal daily volume (gal)
Normal activity (µCi/cm3) 7.18E-6 7.18E-6 Maximum daily volume (gal) 56,720 56,720 Maximum activity (µCi/cm3) 3.59E-4 3.59E-4 Flow rate (gal/minute)
Batch 190
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-31 Table 11.2-11 Radwaste System Process Flow Diagram Data (Continued)
Chemical Waste Subsystem Flow path 27 109 120 121 122 Batches/day (normal) 1.0 Batches/day (maximum) 2.0 2.0 2.0 1.0 3.7 Volume/batch solids(lb) 581 1162 314 liquids (gal) 1000 12,153 12,153 615 168 Normal daily volume (gal) 1000 Normal activity solids (µCi/batch) liquids (µCi/cm3) 1.05E-5 2.76E-3 2.71E-3 1.07E-1 1.07E-1 Maximum daily volume (gal) 2000 24,306 24,306 Maximum activity solids (µCi/batch) liquids (µCi/cm3) 1.05E-5 2.71E-3 1.07E-1 1.07E-1 Flow rate (gal/minute) 25 190 10 31 20
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-32 Table 11.2-11 Radwaste System Process Flow Diagram Data (Continued)
Waste Sludge Subsystem (Condensate Backwash)
Flow path 56 58 60 6
Batches/day (normal) 4.0/7.4 4.0/7.4 1/18.5 4/7.4 Batches/day (maximum) 4.0 4.0 1
4.0/2.0 Volume/batch solids (lb) 330 330 3300 liquids (gal) 13,500 13,500 7527 13,500 Normal daily volume (gal) 7300 7300 Normal activity solids (µCi/batch) 2.20E6 2.20E6 1.26E7 liquids (µCi/cm3) 7.18E-6 7.18E-6 7.18E-6 7.18E-6 Maximum daily volume (gal) 54,000 54,000 7527 27,000 Maximum activity solids (µCi/batch) 5.26E7 5.26E7 2.67E7 liquids (µCi/cm3) 3.59E-4 3.59E-4 3.59E-4 3.59E-4 Flow rate (gal/minute) 2500 450 20 450
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-33 Table 11.2-11 Radwaste System Process Flow Diagram Data (Continued)
Waste Sludge Subsystem (Cleanup Backwash)
Flow path 54 59 5
Batches/day (normal) 2.0/6.8 1.0/60 1.0/6.8 Batches/day (maximum) 2.0 1.0/60 1.0 Volume/batch solids (lb) 29.7 524 liquids (gal) 1215 1196 2430 Normal daily volume (gal) 360 Normal activity solids(µCi/batch) 2.55E7 1.19E8 liquids (µCi/cm3) 1.59E-2 1.59E-2 1.59E-2 Maximum daily volume (gal) 2430 1196 2430 Maximum activity solids (µCi/batch) 7.68E8 1.80E8 liquids (µCi/cm3) 5.32E-1 5.32E-1 5.32E-1 Flow rate (gal/minute) 270 20 53
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-34 Table 11.2-11 Radwaste System Process Flow Diagram Data (Continued)
Waste Sludge Subsystem (Spent Resin)
Flow path 64 119 69 71 Batches/day (normal) 1.0/66 1.0/67 1.0/165 Batches/day (maximum) 1.0/29 1.0/49 1.0/100 Volume/batch solids (lb) 1539 1539 1539 1539 liquids (gal) 746 746 746 3510 Normal activity solids (µCi/batch) 2.39E6 6.15E3 1.16E2 liquids (µCi/cm3) 7.18E-6 7.18E-6 7.18E-6 7.18E-6 Maximum activity solids (µCi/batch) 2.74E7 2.34E5 1.26E2 liquids (µCi/cm3) 3.59E-4 3.59E-4 3.59E-4 3.59E-4 Flow rate (gal/minute) 37 37 37 20
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-35 Table 11.2-11 Radwaste System Process Flow Diagram Data (Continued)
Equipment Drain Subsystem Flow path 61 63 62 65 Batches/day (normal) 1.0 1.0/3.4 1.0/5.2 1.0/3.4 Batches/day (maximum) 2.9 1.1/1.0 1.0/5.2 1.0 Volume/batch solids (lb) 41.36 41.36 59.4 220 liquids (gal) 1692 1692 2430 501 Normal daily volume (gal) 1692 Normal activity solids (µCi/batch) 3.30E4 8.42E1 1.47E4 4.87E4 liquids (µCi/cm3) 7.18E-6 7.18E-6 7.18E-6 7.18E-6 Maximum daily volume (gal) 4906 1861 501 Maximum activity solids (µCi/batch) 3.30E4 8.42E1 1.47E6 7.33E5 liquids (µCi/cm3) 3.59E-4 3.59E-4 3.59E-4 9.88E-4 Flow rate (gal/minute) 376 376 540 20
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-36 Table 11.2-11 Radwaste System Process Flow Diagram Data (Continued)
NOTES:
Process Diagram, Figure 11.2-1, forms part of this data.
The following definitions are used for this data:
Normal volume -
Expected flow during steady state normal operation Maximum volume - Maximum expected flow during unsteady state operation such as startup, shutdown, etc.
Normal activity -
Activity level expected during operation with no fuel leaks and corrosion product reactor water activity concentration of 0.1 µCi/cm3 Maximum activity - Activity level expected during operation with fuel leak rate equivalent to reactor water activity concentration of 2.3 µCi/cm3 and design basis noble radiogas release rate of 100,000 µCi/sec (corrosion and fission products present)
Maximum volume and maximum activity are not concurrent.
For activity values: E-1 = number x 10-1; E1 = number x 101 E-4 = number x 10-4; E4 = number x 104 Fractional values on tables denote the number of items per occurrence divided by the number of days between each occurrence (i.e., 1/30 batches/day means one batch processed every 30 days).
Waste system input activities are based on a reactor water-to-steam partition coefficient of 1.0E-3.
Values for design purposes only. Actual flows and activities may differ.
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-37 Table 11.2-12 Radwaste Process Equipment Design Basis Equipment Radioactivity Decontamination Factor Deep bed demineralizers Soluble Insoluble 100 50 Precoat filters Soluble Insoluble 1
2 Evaporators (influent/distillate)a 1000 a Concentration factor (influent/bottoms) = 0.6/32.
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-38 Table 11.2-13 Liquid Radwaste Equipment Material of Construction Quantity Size or Capacity Remarks EQUIPMENT DRAIN SUBSYSTEM Waste collector tank Carbon steel 1
20,000 gal Note 11 Waste collector pump Stainless steel 1
190 gal/minute @ 155 ft TDH Waste sample tanks Carbon steel 2
20,000 gal Note 11 Waste sample pumps Stainless steel 2
190 gal/minute @ 100 ft TDH Waste collector filter Carbon steel 1
188 ft2 of filter area Notes 3, 4 Waste filter hold pump Stainless steel 1
75 gal/minute @ 50 ft TDH Note 3 Waste demineralizer Carbon steel 1
65 ft3 resin bed Note 2 Waste surge tank Carbon steel 1
75,000 gal Note 11 Waste surge pump Stainless steel 1
190 gal/minute @ 155 ft TDH FLOOR DRAIN SUBSYSTEM Floor drain collector tank Carbon steel 1
20,000 gal Note 11 Floor drain collector pump Stainless steel 1
190 gal/minute @ 155 ft TDH Floor drain sample tank Carbon steel 1
20,000 gal Note 11 Floor drain sample pump Stainless steel 1
190 gal/minute @ 100 ft TDH Floor drain filter Carbon steel 1
188 ft2 of filter area Notes 3, 4 Floor drain filter hold pump Stainless steel 1
75 gal/minute @ 50 ft TDH Note 3 Floor drain demineralizer Carbon steel 1
65 ft3 resin bed Note 2
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-39 Table 11.2-13 Liquid Radwaste Equipment (Continued)
Material of Construction Quantity Size or Capacity Remarks CHEMICAL WASTE SUBSYSTEM Detergent drain tank Carbon steel 2
1600 gal Note 12 Detergent drain pumps Stainless steel 2
27 gal/minute @ 90 ft TDH Detergent drain filter Carbon steel 1
50 gal/minute Chemical waste tanks Stainless steel 2
15,000 gal Note 12 Chemical waste pumps Stainless steel 2
285 gal/minute @ 200 ft TDH Concentrator feed pumps Stainless steel 2
30 gal/minute @ 95 ft TDH Concentrator (evaporator)
Stainless steel 2
10 gal/minute Note 6 Heating element Stainless steel/carbon steel 2
Note 10 Concentrator recycle pump Stainless steel 2
2300 gal/minute @ 40 ft TDH Note 5 Concentrator condenser Stainless steel/carbon steel 2
Note 7 Distillate tanks Stainless steel 2
15,000 gal Note 12 Distillate pumps Stainless steel 2
142 gal/minute @ 230 ft TDH Polishing demineralizer Carbon steel 1
65 ft3 resin bed Note 2 AUXILIARY EQUIPMENT Waste precoat tank Carbon steel 1
210 gal Notes 4, 8 Waste precoat pump Ductile iron 1
325 gal/minute @ 50 ft TDH Note 3 Waste filter aid tank Carbon steel 1
630 gal Notes 4, 8 Waste filter aid metering pump Stainless steel 2
0 to 154 gal/hr @ 145 psi Resin addition tank Stainless steel 1
1200 gal Note 12 Chemical addition tanks Carbon steel 2
200 gal Note 9 Chemical addition pumps Carpenter 20 steel 2
79 gal/hr
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.2-40 Table 11.2-13 Liquid Radwaste Equipment (Continued)
NOTES:
- 1. Unless otherwise noted, the design pressure of the equipment is 150 psig, design temperature is 150°F.
- 2. Vessel is rubber lined, internals are stainless steel.
- 3. Design temperature is 220°F.
- 4. Vessel is lined with phenolic/epoxy cross linked, alkaline polymerized coating, internals are stainless steel.
- 5. Design temperature is 300°F.
- 6. Design pressure is 30 psig, design temperature is 274°F.
- 7.
Design flow is: coolant inlet-750 gpm @ 105°F, outlet -120°F; design pressure: shell side - 30 psig, tube side - 150 psig; design temperature - 274°F.
- 8. Design pressure is atmospheric.
- 9. Vessel is lined with acid-resistant high-bake phenolic coating.
- 10. Design flows: shell side - 6300 lb/hr @ 274°F, tube side - 2300 gpm @ 218°F; design pressures: shell side -
60 psig, tube side - 75 psig; design temperature - 307°F.
- 11. Tank design pressure is atmospheric plus static head pressure, design temperature is 140°F.
- 12. Tank design pressure is atmospheric plus static head pressure, design temperature is 150°F.
11.2-41 COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 Table 11.2-14 Annual Releases of Radioactive Material as Liquid Nuclide Half-Life (days)
Concentration in Primary Coolant
(µCi/ml)
High Purity (Ci)
Low Purity (Ci)
Total Laws (Ci)
Adjusted Total (Ci/yr)a Total (Ci/yr)
CORROSION AND ACTIVATION PRODUCTS 24Na 6.25E-1 8.79E-3 0.00036 0.00043 0.00079 0.00688 0.00692 32P 1.43E1 2.06E-4 0.00001 0.00002 0.00003 0.00027 0.00027 51Cr 2.78E1 5.14E-3 0.00027 0.00052 0.00081 0.00704 0.00703 54Mn 3.03E2 6.18E-5 0.00000 0.00001 0.00001 0.00008 0.00008 56Mn 1.07E-1 4.28E-2 0.00052 0.00034 0.00085 0.00747 0.00745 55Fe 9.50E2 1.03E-3 0.00005 0.00010 0.00017 0.00143 0.00147 59Fe 4.50E1 3.08E-5 0.00000 0.00000 0.00000 0.00004 0.00004 58Co 7.13E1 2.06E-4 0.00001 0.00002 0.00003 0.00028 0.00028 60Co 1.92E2 4.12E-0 0.00002 0.00004 0.00006 0.00058 0.00058 65Ni 1.07E-1 2.57E-4 0.00000 0.00000 0.00000 0.00004 0.00004 64Cu 5.33E-1 2.91E-2 0.00111 0.00128 0.00239 0.02098 0.02098 65Zn 2.45E2 2.06E-4 0.00001 0.00002 0.00003 0.00028 0.00028 69mZn 5.57E-1 1.94E-3 0.00007 0.00009 0.00017 0.00146 0.00147 69Zn 3.96E-2 0.0 0.00008 0.00009 0.00018 0.00153 0.00157 187W 9.96E-1 2.98E-4 0.00001 0.00002 0.00003 0.00028 0.00028 239Np 2.35E0 7.10E-3 0.00036 0.00060 0.00094 0.00831 0.00790 FISSION PRODUCTS 83Br 1.00E-1 2.42E-3 0.00003 0.00002 0.00004 0.00039 0.00039 84Br 2.21E-2 3.67E-3 0.00000 0.00000 0.00000 0.00003 0.00003 89Rb 1.07E-2 3.60E-3 0.00001 0.00002 0.00002 0.00022 0.00022 89Sr 5.20E1 1.03E-5 0.00001 0.00001 0.00002 0.00015 0.00015 91Sr 4.03E-1 3.82E-3 0.00013 0.00014 0.00026 0.00233 0.00231
11.2-42 COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 Table 11.2-14 Annual Releases of Radioactive Material as Liquid (Continued)
Nuclide Half-Life (days)
Concentration in Primary Coolant
(µCi/ml)
High Purity (Ci)
Low Purity (Ci)
Total Laws (Ci)
Adjusted Total (Ci/yr)a Total (Ci/yr) 91mY 3.47E-2 0.0 0.00008 0.00008 0.00017 0.00146 0.00147 91Y 5.88E1 4.12E-5 0.00000 0.00001 0.00001 0.00007 0.00007 92Sr 1.13E-1 8.60E-3 0.00012 0.00007 0.00018 0.00159 0.00157 92Y 1.47E-1 5.29E-3 0.00021 0.00016 0.00038 0.00328 0.00325 93Y 4.25E-1 3.83E-3 0.00014 0.00014 0.00027 0.00241 0.00241 98Nb 3.54E-2 3.11E-3 0.00001 0.00000 0.00001 0.00008 0.00008 99Mo 2.798E0 2.04E-3 0.00010 0.00018 0.00028 0.00244 0.00241 99mTc 2.5E-1 1.85E-2 0.00054 0.00054 0.00107 0.00893 0.00937 101Tc 9.72E-3 6.56E-2 0.00000 0.00000 0.00000 0.00002 0.00002 103Ru 3.96E1 2.06E-5 0.00000 0.00000 0.00000 0.00003 0.00003 103mRh 3.96E-2 0.0 0.00000 0.00000 0.00000 0.00003 0.00003 104Tc 1.25E-2 5.87E-2 0.00000 0.00000 0.00001 0.00006 0.00006 105Ru 1.85E-1 1.80E-3 0.00004 0.00003 0.00006 0.00055 0.00058 105mRh 5.21E-4 0.0 0.00004 0.00003 0.00006 0.00056 0.00059 105Rh 1.50E0 0.0 0.00001 0.00001 0.00002 0.00018 0.00019 129mTe 3.40E1 4.11E-5 0.00000 0.00000 0.00001 0.00005 0.00005 129Te 4.79E-2 0.0 0.00000 0.00000 0.00000 0.00003 0.00003 131mTe 1.25E0 1.00E-4 0.00000 0.00001 0.00001 0.00010 0.00010 131Te 1.74E-2 0.0 0.00000 0.00000 0.00000 0.00002 0.00002 131I 8.05E0 5.11E-3 0.00027 0.00049 0.00077 0.00643 0.00671 132Te 3.25E0 1.02E-5 0.00000 0.00000 0.00000 0.00001 0.00001 132I 9.58E-2 2.41E-2 0.00026 0.00016 0.00041 0.00345 0.00367 133I 8.75E-1 1.93E-2 0.00084 0.00115 0.00199 0.01667 0.01783 134I 3.67E-2 5.26E-2 0.00010 0.00006 0.00017 0.00144 0.00147
11.2-43 COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 Table 11.2-14 Annual Releases of Radioactive Material as Liquid (Continued)
Nuclide Half-Life (days)
Concentration in Primary Coolant
(µCi/ml)
High Purity (Ci)
Low Purity (Ci)
Total Laws (Ci)
Adjusted Total (Ci/yr)a Total (Ci/yr) 134Cs 7.49E2 3.09E-5 0.00008 0.00081 0.00089 0.00741 0.00776 135I 2.79E-1 1.77E-2 0.00050 0.00044 0.00094 0.00788 0.00829 136Cs 1.30E1 2.05E-5 0.00005 0.00051 0.00057 0.00473 0.00493 137Cs 1.10E4 7.21E-5 0.00020 0.00188 0.00206 0.01730 0.01783 137M Ba 1.77E-3 0.0 0.00018 0.00175 0.00193 0.01618 0.01678 138Cs 2.24E-2 7.34E-3 0.00022 0.00065 0.00087 0.00724 0.00755 139Ba 5.76E-2 8.09E-3 0.00004 0.00002 0.00006 0.00053 0.00056 140Ba 1.28E1 4.11E-4 0.00002 0.00004 0.00006 0.00053 0.00056 140La 1.67E0 0.0 0.00000 0.00001 0.00001 0.00011 0.00011 141La 1.62E-1 0.0 0.00001 0.00001 0.00002 0.00017 0.00018 141Ce 3.24E1 3.08E-5 0.00000 0.00000 0.00000 0.00004 0.00004 142La 6.39E-2 4.08E-3 0.00003 0.00002 0.00004 0.00036 0.00038 143Ce 1.38E0 3.01E-5 0.00000 0.00000 0.00000 0.00003 0.00003 143Pr 1.37E1 4.11E-5 0.00000 0.00000 0.00001 0.00005 0.00005 All others 1.32E-2 1.38E-2 0.00000 0.00001 0.00007 0.00007 Total (except tritium) 4.31E-01 0.00719 0.01307 0.02026 0.17962 0.17834 Total release 13.0 13.0 a Adjusted total includes an additional 0.15 ci/yr with the same isotopic distribution as the calculated source term to account for anticipated occurrences such as operator errors resulting in unplanned releases.
Amendment 57 December 2003 Columbia Generating Station Final Safety Analysis Report Radwaste System Process Diagram Draw. No.
2G11-04,6 Rev.
8 Figure 11.2-1
Form No. 960690ai Columbia Generating Station Final Safety Analysis Report 11.2-2 74 M532 Flow Diagram Radioactive Waste System Equipment Drain Processing Rev.
Figure Draw. No.
Amendment 61 December 2011
Amendment 62 December 2013 Form No. 960690ai LDCN-12-020 Columbia Generating Station Final Safety Analysis Report 11.2-3 75 M531 Flow Diagram Radioactive Waste System Floor Drain Processing Rev.
Figure Draw. No.
Flow Diagram Chemical Waste Processing Amendment 57 December 2003 Columbia Generating Station Final Safety Analysis Report Draw. No. M533-1 Rev.
23 Figure 11.2-4.1
Amendment 57 December 2003 Flow Diagram Chemical Waste Processing Columbia Generating Station Final Safety Analysis Report Draw. No.
M533-2 Rev. 21 Figure 11.2-4.2
Amendment 57 December 2003 Columbia Generating Station Final Safety Analysis Report Flow Diagram Chemical Waste Processing Draw. No.
M533-3 Rev.
29 Figure 11.2-4.3
COLUMBIA GENERATING STATION Amendment 58 FINAL SAFETY ANALYSIS REPORT December 2005 LDCN-03-069 11.3-1 11.3 GASEOUS WASTE MANAGEMENT SYSTEMS 11.3.1 DESIGN BASES The objective of the gaseous waste management system is to process and control the release of gaseous radioactive effluents to the site environs so as to maintain as low as reasonably achievable the exposure of persons in unrestricted areas to radioactive gaseous effluents, during normal and anticipated operational occurrences. This is to be accomplished while maintaining occupational exposure as low as is reasonably achievable (ALARA) and without limiting plant operation or availability.
The gaseous waste management systems are designed to limit the dose to offsite persons from routine station releases to significantly less than the limits specified in 10 CFR 20 and to operate within the emission rate limits established in the Technical Specifications.
To evaluate the offgas system design compliance with the limits of 10 CFR 20, an annual average noble radiogas source term (based on 30-minute decay) of 100,000 Ci/sec of the 1971 Mixture as discussed in Section 11.1 is used. The noble radiogas effluent release rate from the charcoal adsorbers is about 49-59 Ci/sec based upon 30 scfm air inleakage and injection. The isotopic composition is given in Table 11.3-1 in units of Ci/sec and Ci/yr.
To evaluate that the annual average exposure at the site boundary during normal operation and anticipated operational occurrences from gaseous effluents does not exceed the dose objectives of Appendix I to 10 CFR 50, an average source term release rate derived from field measurements (1993-2003) is used.
Equipment and components used to collect, process, or store gaseous radioactive waste are not designed as Seismic Category I. To evaluate that equipment failure will not result in offsite whole body doses exceeding 0.5 rem in two hours, the Technical Specification release rate limit was used, consistent with the guidance presented in Reference 11.3-7.
The gaseous radwaste equipment is selected, arranged, and shielded to maintain occupational exposure ALARA. The system was designed prior to the issuance of Regulatory Guide 8.8.
However, the system incorporates substantially the guidance provided in this regulatory guide.
The gaseous effluent treatment system conforms to the requirements of General Design Criteria 60 and 64 as specified in Section 3.1.
A list of the major offgas system components and design features is provided in Table 11.3-2.
Equipment and piping is designed and constructed in accordance with the requirements of the applicable codes as given in Tables 3.2-1 and 3.2-2.
The quality group classifications of the various systems are shown in Table 3.2-1. Seismic category, safety class, quality assurance requirements, and principal construction codes
COLUMBIA GENERATING STATION Amendment 58 FINAL SAFETY ANALYSIS REPORT December 2005 LDCN-03-069 11.3-2 information are contained in Section 3.2. The system is designed to Quality Group Classification D+.
11.3.2 SYSTEM DESCRIPTION 11.3.2.1 Main Condenser Steam Jet Air Ejector RECHAR System The offgas from the main condenser steam jet air ejector (SJAE) is treated by means of a system utilizing catalytic recombination and charcoal adsorption (RECHAR system) (see Figure 11.3-1). Descriptions of the major process components including design temperature and pressure are given in Table 11.3-2 and in the following.
Noncondensable radioactive offgas is continuously removed from the main condenser by the air ejector during plant operation. The air ejector offgas will normally contain activation gases, principally 16N, 19O, and 13N. The 16N and 19O have short half-lives and are readily decayed. 13N with a 10-minute half-life is present in small amounts that are further reduced by decay. Activation gas source terms are presented in Table 11.1-4.
The air ejector offgas will also contain radioactive noble gases including parents of biologically significant 89Sr, 90Sr, 140Ba, and 137Cs. The concentration of these noble gases depends on the amount of tramp uranium in the coolant and on the cladding surfaces (usually extremely small) and the number and size of fuel cladding defects.
A main condenser offgas treatment system has been incorporated in the plant design to reduce the radioactive gaseous effluents from the station. The offgas system uses a catalytic recombiner to recombine hydrogen and oxygen. After cooling (to approximately 130°F) to strip the condensables and reduce the volume, the remaining noncondensables (principally air with traces of krypton and xenon) are delayed in a holdup line. The gas is cooled to 45°F and processed through a HEPA filter. The gas is then passed through a desiccant dryer that reduces the dewpoint to approximately -90°F. Charcoal adsorption beds selectively adsorb and delay the xenon and krypton from the bulk carrier gas (principally dry air). With an air inleakage of 30 scfm, this treatment system results in a delay of 15 hr for krypton and 9.5 days for xenon. After the delay, the gas is again passed through a HEPA filter and discharged to the environment through the reactor building elevated release duct.
Figure 11.3-1 is the process flow diagram for the system. The process data for startup and normal operating conditions are submitted as proprietary data under separate cover as Table 11.3-3. The information supporting the process data is presented in Reference 11.3-2.
The system is mechanically capable of processing three times the source terms of Table 11.3-1 without affecting delay time of the noble gases.
Table 11.3-1 also lists isotopic activities at the discharge of the system, from which the decontamination factor for each noble gas isotope can be determined.
COLUMBIA GENERATING STATION Amendment 58 FINAL SAFETY ANALYSIS REPORT December 2005 LDCN-03-069 11.3-3 The flow diagram is shown in Figure 11.3-2. The main process routing is indicated by a heavy line.
The basis for sizing the recombiner is to maintain the hydrogen concentration below 4%
(including steam) at the inlet and below 1% at the outlet on a dry basis. The exit hydrogen concentration is normally well below the 1% maximum allowed. The hydrogen generation rate of the reactor is based on data from nine boiling water reactors (BWR). The hydrogen generation rate is given in Table 11.3-3.
The krypton and xenon holdup time is closely approximated by the following equation:
T K M V
D
=
where:
T = holdup time of a given gas, seconds.
KD = dynamic adsorption coefficient for the given gas, cm gram 3
M = weight of charcoal, grams V = flow rate of the carrier gas, cm sec 3
Dynamic adsorption coefficient values for xenon and krypton used to determine gaseous effluent releases are discussed in Reference 11.3-1. Moisture has a detrimental effect on adsorption coefficients. To prevent moisture from reaching the charcoal, fully redundant, adsorbent (-90°F dewpoint) air dryers are supplied. There are redundant moisture analyzers that will alarm on breakthrough of the dryer beds; however, breakthrough is not expected since the dryer beds will be regenerated on a time basis. The system is slightly pressurized, which together with very stringent leak rate requirements, prevents leakage of moist air into the charcoal.
After the hydrogen and oxygen are removed by the recombiner, the remaining carrier gas is primarily nitrogen with a small percentage of oxygen due to the air inleakage from the main condenser and air injection from the HWC system. Analyses have shown that the system can maintain condenser vacuum at combined air injection and air inleakage rates as high as 93 scfm. Reference 11.3-3, Par. S1 (c) (2) indicates that with certain conditions of stable operation and suitable construction, noncondensables (not including radiological decomposition products) should not exceed 6 scfm per condenser shell for large condensers. Dilution air is not added to the system unless the air inleakage is less than 6 scfm. In that event, 6 scfm is
COLUMBIA GENERATING STATION Amendment 58 FINAL SAFETY ANALYSIS REPORT December 2005 11.3-4 added to provide for dilution of residual hydrogen from the recombiner. An initial bleed of oil-free air is added on startup until the recombiner reaches operating temperature.
The charcoal adsorbers design process flow sheet is for an ambient temperature. Operation at ambient temperature is sufficient to reduce gaseous radioactivity levels to a fraction of that allowed by 10 CFR 50 Appendix I. The decay heat is sufficiently small that, even in the no-flow condition, there is no significant loss of adsorbed noble gases due to temperature rise in the adsorbers. The adsorbers are located in a shielded room and maintained at ambient room temperature. A radiation monitor is provided to monitor the radiation level in the air handling room of the charcoal bed vault for high gas activity from a system leak. High radiation will cause an alarm in the control room.
Channeling in the charcoal adsorbers is prevented by supplying an effective flow distributor on the inlet, having long columns and having a high bed-to-particle diameter ratio of approximately 500. Underhill has stated that channeling or wall effects may reduce efficiency of the holdup bed if this ratio is not greater than 12 (Reference 11.3-4). During transfer of the charcoal into the charcoal adsorber vessels, radial sizing of the charcoal will be minimized by pouring the charcoal (by gravity or pneumatically) over a cone or other instrument to spread the granules over the surface.
A valve is provided to bypass the charcoal adsorbers. The main purpose of this bypass is to protect the charcoal during preoperational and startup testing when gas activity is zero or very low.
It may be desirable to use the bypass for short periods during startup or normal operations.
This bypass mode would not be used for normal operation unless some unforeseen system malfunction would necessitate shutting down the power plant or operating in the bypass mode and remaining within the technical specification radioactivity release limits. The radioactivity released is controlled by a process monitor upstream of the vent isolation valve that will cause the bypass valve to close on a high radiation alarm. This interlock can be defeated only by a key lock switch. In addition, there is a high-high-high alarm setpoint on the same monitor that will cause isolation of the offgas system if established release rate limits are reached.
Leakage of radioactive gases from the system is limited by welding piping connections where possible and using bellows stem seals or equivalent leakage control valving. The system operates at a maximum of 7 psig during startup and less than 2 psig during normal operation so that the differential pressure to cause leakage is small.
Hydrogen concentration of gases from the air ejector is kept below the flammable limit by maintaining adequate process steam flow for dilution at all times. This steam flow rate is monitored and alarmed in the main control room.
COLUMBIA GENERATING STATION Amendment 58 FINAL SAFETY ANALYSIS REPORT December 2005 LDCN-03-069 11.3-5 Two parallel independent hydrogen analyzers are used to measure the hydrogen content of the offgas process flow downstream of the offgas condenser. The hydrogen concentration percentage output from the analyzers is indicated and recorded in the main control room along with independent alarm annunciation for a high hydrogen concentration. Each hydrogen analyzer continuously withdraws a sample of the process offgas, conditions the gas to a constant pressure, analyzes the hydrogen content, and returns the sample gas to the main condenser. The main condenser vacuum provides the pumping force to withdraw the sample gas from the offgas process line and through the hydrogen analyzer system. The analyzer element is a thermal conductivity cell type unit and does not serve as an ignition source to a detonable hydrogen-oxygen mixture.
Piping and tubing 2 in. and under is field routed, but required to be in specified space envelopes for shielding and in-plant exposure consideration. In the offgas system this includes drain lines, steam lines, and sample lines which are shown in Figure 11.3-2.
There are several liquid seals to prevent gas escape through drains shown in Figure 11.3-2.
These seals are protected against permanent loss of liquid by an enlarged section downstream of the seal that can hold the seal volume and will drain by gravity back into the loop after a momentary pressure surge has passed. Each seal has a manual valve that is used to fill the loop with condensate after receiving a loop seal low level alarm.
Iodine input into the offgas system is small by virtue of its retention in reactor water and condensate. The iodine remaining is essentially removed by adsorption in the charcoal. This is supported by the fact that 2-in. charcoal filters remove more than 90% of the influent iodine, whereas this system has approximately 76 ft of charcoal in the flow path.
Particulates are removed with a 99.95% efficiency by a HEPA filter prior to the gas entering the charcoal adsorbers. The noble gas decays within the interstices of the activated charcoal and daughters are entrapped there. The charcoal serves as an excellent filter for particulates and essentially no particulates exit from the charcoal. The charcoal is followed with a HEPA filter which is a safeguard against escape of charcoal dust. Particulate activity discharged from this system is essentially zero.
With an airflow of about 30 scfm and the charcoal adsorbers bypassed, the delay time of the system decreases to approximately 10 minutes. This bypass line is only intended to be used during preoperational testing, and initial system startup operation until proper functioning of upstream equipment is established. This prevents possible degradation of the charcoal due to the introduction of excessive moisture or other contaminants.
In the unlikely event it is necessary to bypass the charcoal adsorbers to continue operation, the bypassing operation shall be allowed only if the radioactive effluents are within the release limits.
COLUMBIA GENERATING STATION Amendment 58 FINAL SAFETY ANALYSIS REPORT December 2005 LDCN-03-069 11.3-6 The isotopic inventory of each equipment piece, based on the source term discussed in Section 11.1, is given in Reference 11.3-5.
Performance of a similar system operating at ambient temperatures and the results of related experimental testing are discussed in Reference 11.3-2. The Tsuruga and Fukushima 1 plants in Japan have similar recombiners in service. Similar systems (ambient temperature charcoal) are in service at Dresden 2 and 3, Pilgrim, Quad Cities 1 and 2, Nuclenor, Hatch, Browns Ferry 1, 2, and 3, and Duane Arnold.
Design provisions are incorporated which preclude the uncontrolled release of radioactivity to the environment as a result of any single operator error or of any single failure. A comprehensive discussion of single failures is provided in Table 11.3-5.
Design precautions taken to prevent uncontrolled releases of radioactivity include the following:
- a.
The system design eliminates ignition sources so that a hydrogen detonation is highly unlikely even in the event of a recombiner failure;
- b.
The system pressure boundary is detonation resistant;
- c.
All discharge paths to the environment are monitored--the normal effluent path by the process radiation monitoring system and equipment areas by the area radiation monitoring system; and
- d.
Dilution steam flow to the SJAE is monitored and alarmed. Valve control logic causes the air ejector suction valves to close on low steam flow.
11.3.2.2 Other Radioactive Gas Sources There are three buildings that contain radioactive gas sources. They are the reactor building, the turbine generator building, and the radwaste building. The ventilation systems for these three buildings are described in Section 9.4. Building volumes and ventilation flow rates are shown in Table 11.3-8. The sources of gaseous radioactivity in these buildings are discussed below. In-plant airborne radioactivity concentrations are discussed in Section 12.2.2.
The primary containment is divided into two sections which are designated as the drywell and suppression chamber. These are separated by the drywell floor which serves as a pressure barrier between the drywell and suppression chamber.
Radioactive halogens and noble gases can be introduced into the drywell atmosphere from two sources. One source is the leakage that occurs from the valves, especially the main steam isolation valves (MSIVs), the inner refueling bellows seal support drains and the main
COLUMBIA GENERATING STATION Amendment 58 FINAL SAFETY ANALYSIS REPORT December 2005 11.3-7 recirculation pumps. This leakage is collected by means of leak-off lines which are directed to the drywell equipment drain sump.
The other source of activity results when a pressure transient causes the main steam relief valves to open with the resulting flow of steam into the suppression pool. When this occurs, there is a pressure buildup in the suppression chamber atmosphere. A tabulation of the expected relative frequency of pressure relief valve venting to the suppression pool is provided in Table 11.3-10. If the pressure differential across the drywell floor is greater than 0.5 psi, the vacuum breaker valves relieve this pressure into the drywell atmosphere. Thus, radioactivity in the suppression chamber atmosphere is introduced into the drywell. The drywell atmosphere is purged to the environment via the reactor building elevated release duct when access is required, either directly or through the standby gas treatment system, considering airborne radiation levels and release limits.
The reactor building ventilation system supplies fresh air to the secondary containment and exhausts air through the reactor building elevated release duct. There is a small amount of activity in the secondary containment atmosphere that emanates from the various reactor support systems. The reactor building ventilation exhaust is monitored and a radiation level, set by administrative control to ensure Technical Specifications compliance, will cause automatic heating, ventilating, and air-conditioning (HVAC) system isolation, startup of the standby gas treatment system (SGTS), and an alarm in the control room.
There are three sources of nontreated radioactive gas sources in the turbine generator building which are as follows:
- a.
Gland seal steam leakage and condenser exhaust,
- b.
Equipment leakage, and
- c.
Main condenser offgas during startup.
The activity from these sources is presented in Table 11.3-7.
Gland seal leakage and condenser exhaust contribute essentially no airborne radioactivity releases due to use of clean steam as discussed in Section 10.4. During startup, the mechanical vacuum pumps remove the gas present inside the main condenser. The exhaust from these pumps is discharged through the reactor building elevated release duct. Due to radioactive decay during shutdown, only a small amount of activity is exhausted by the vacuum pumps during startup.
Sources of gaseous radioactivity in the radwaste building include,
- a.
Offgas system leakage,
- b.
Liquid leakage to the radwaste building,
COLUMBIA GENERATING STATION Amendment 58 FINAL SAFETY ANALYSIS REPORT December 2005 11.3-8
- c.
Liquid waste management system tank vents, and
- d.
Hydropneumatic transfer of resins.
Measures taken to minimize leakage from the offgas system are described in Section 11.3.2.1.
Liquid leakage from equipment and floor drains in the radwaste building is collected in sumps.
The sumps and tanks containing liquid radwaste are vented to the radwaste building exhaust system described in Section 9.4.3.2. The air blow during the backwash of the spent powdered resins to the phase separators generates airborne radioactivity which is vented to the radwaste building filtered exhaust system.
11.3.2.3 Cost-Benefit Analysis The cost-benefit analysis is discussed in Section 11.2.3.4.
11.3.2.4 Design Features of the Offgas System Design features of other gaseous waste management systems may be found in Section 9.4.
11.3.2.4.1 Maintainability Design features which reduce or ease required maintenance include the following:
- a.
Redundant components for all active, in-process equipment pieces, and
- b.
No rotating equipment in the process stream and elsewhere in the system only where maintenance can be performed while the system is in operation.
11.3.2.4.2 Pressure Boundaries Design features and requirements which reduce leakage and releases of radioactive material include the following:
- a.
Extremely stringent leak rate requirements placed on all equipment, piping, and instruments, and enforced by requiring as-installed leak tests of the entire process system,
- b.
Use of welded joints except where servicing access to equipment and instrumentation access dictates use of flanged joints,
- c.
Valve types with extremely low leak rate characteristics, i.e., bellows seals double stem seal, or diaphragm,
COLUMBIA GENERATING STATION Amendment 58 FINAL SAFETY ANALYSIS REPORT December 2005 11.3-9
- d.
Use of loop seals with enlarged discharge section to avoid siphoning and to be self-refilling by gravity following a pressure surge, and
- e.
Stringent seat-leak characteristics for valves in lines discharging to the environment via other systems.
11.3.2.4.3 Building Seismic Design The offgas system is located in the turbine generator and radwaste buildings. The portion of the turbine generator building housing the offgas system is a modified Seismic Category II structure designed to withstand the effects of a safe shutdown earthquake (SSE) and maintain its structural integrity. The portion of the radwaste building housing the offgas system is a Seismic Category I structure. The seismic classification of the turbine generator and radwaste buildings are discussed in Sections 3.8.4.1.3 and 3.8.4.1.2, respectively.
11.3.2.4.4 Construction of Process Systems Pressure retaining components of process systems utilize welded construction to the maximum practicable extent. Process piping systems include the first root valve on sample and instrument lines. Process lines are not less than 0.75 in. nominal pipe size. Sample and instrument lines are not considered as portions of the process systems. Flanged joints or suitable rapid disconnect fittings are not used except where maintenance requirements clearly indicate that such construction is preferable. Screwed connections in which threads provide the only seal are not used. Screwed connections backed up by seal welding or mechanical joints are used only on lines of 0.75 in. nominal pipe size or less. In lines 0.75 in. or greater, but less than 2.5 in. nominal pipe size, socket type welds are used. In lines 2.5 in. nominal pipe size and larger, pipe welds are of the butt joint type.
11.3.2.4.5 Instrumentation and Control The offgas system is monitored by flow, temperature, pressure, and humidity instrumentation, and by hydrogen analyzers to ensure correct operation and control. Table 11.3-4 lists the process parameters that are instrumented to alarm in the control room and indicates whether the parameters are recorded or just indicated.
The radioactivity of the gas entering and leaving the offgas system is continuously monitored.
Thus, system performance is known to the operator at all times. A radiation monitor after the offgas condenser continuously monitors radioactivity release from the reactor and input to the charcoal adsorbers. This radiation monitor is used to provide an alarm on high radiation in the offgas. A sample rack with two radiation monitors is also provided at the outlet of the charcoal adsorbers to continuously monitor the radioactivity from the adsorber beds. These radiation monitors are used to isolate the offgas system on high radioactivity to prevent gas of
COLUMBIA GENERATING STATION Amendment 58 FINAL SAFETY ANALYSIS REPORT December 2005 11.3-10 unacceptably high activity from entering the reactor building elevated release duct. Only one monitor is required to be operable.
The offgas system at the SJAE is sampled periodically in accordance with the Technical Specifications. Provision is made for sampling and periodic analysis of the influent and effluent gases for purposes of determining their compositions. This information is used in calibrating the monitors and in relating the release to calculated offsite doses. Process radiation instrumentation is described in detail in Sections 11.5 and 7.6.1.1.
11.3.2.4.6 Detonation Resistance The pressure boundary of the system is designed to be detonation resistant. The pressure vessels are designed to withstand 350 psig static pressure, and piping and valves are designed to resist dynamic pressures encountered in long runs of piping at the design temperature. This analysis is covered in a proprietary report submitted to the NRC (Reference 11.3-6).
By this procedure a designer obtains the required wall thickness for specific equipment to sustain a hydrogen and oxygen detonation. The wall thickness is then translated by using the appropriate code calculation to the corresponding equipment that must contain the detonation static pressure. The method assumes the absence of simultaneous secondary events such as earthquakes.
11.3.2.4.7 Operator Exposure Criteria and Controls This system is normally operated from the main control room. Equipment and process valves containing radioactive fluid are placed in shielded cells maintained at a pressure negative to normally occupied areas. Ventilation air flows from areas of low airborne contamination to areas of higher airborne contamination. Operating offgas process equipment does not require personnel access. Redundant equipment is located in separate cells, minimizing exposure of maintenance personnel. No process fluid is passing through instrumentation panels. Signals from the process streams are transmitted to the instrumentation panels by means of electrical signal converters. Design features minimizing occupational exposure are discussed in Sections 11.3.2.4.1 and 12.3.1.3.
11.3.2.4.8 Equipment Malfunction Malfunction analyses indicating consequences and design precautions taken to accommodate failure of various components of the system are given in Table 11.3-5.
COLUMBIA GENERATING STATION Amendment 58 FINAL SAFETY ANALYSIS REPORT December 2005 11.3-11 11.3.2.5 Offgas System Operating Procedure 11.3.2.5.1 Prestartup Preparations Prior to starting the main condenser SJAEs, the glycol coolant is chilled to near 35°F and is circulated through the cooler condenser, a desiccant dryer is regenerated and valved in, the offgas condenser cooling water is valved in, and the recombiner heaters are turned on.
11.3.2.5.2 Startup As the reactor is pressurized, preheater steam is supplied and air is bled through the preheater and recombiner. The recombiner is preheated to at least 300°F with this air bleed and/or by admitting steam to the final SJAE. With the recombiners preheated and the desiccant dryer and charcoal adsorbers valved in, the SJAE string is started. The bleed air is terminated. As the condenser is pumped down and the reactor power increases, the recombiner inlet stream is diluted to less than 4% hydrogen by volume by a fixed steam supply, and the offgas condenser outlet is maintained at less than 1% hydrogen by volume.
11.3.2.5.3 Normal Operation After startup, the noncondensables pumped by the SJAE will stabilize. Recombiner performance is closely followed by the recorded temperature profile in the recombiner catalyst bed. The hydrogen effluent concentration is measured by a hydrogen analyzer.
Normal operation is terminated following a normal reactor shutdown or a scram by terminating steam to the SJAEs and the preheater.
11.3.2.6 Offgas System Performance Tests This system is used on a routine basis and does not require specific testing to ensure operability. Monitoring equipment will be calibrated and maintained on a specific schedule and on indication of malfunction.
11.3.2.6.1 Recombiner Recombiner performance is continuously monitored and recorded by catalyst bed thermocouples that monitor the bed temperature profile and by a hydrogen analyzer that measures the hydrogen concentration of the effluent.
COLUMBIA GENERATING STATION Amendment 58 FINAL SAFETY ANALYSIS REPORT December 2005 11.3-12 11.3.2.6.2 Prefilter These particulate filters were tested at the time of filter installation using dioctylphthalate (DOP) aerosol to determine whether an installed filter meets the minimum in-place efficiency 99.95% particle retention.
The DOP from filter testing is not allowed to enter into the desiccant or the activated charcoal.
This equipment is isolated during filter DOP testing and is bypassed until the process lines have been purged clear of test material. Because the DOP may have a detrimental effect on the desiccant and charcoal, the prefilter will not be periodically tested. This is justified because the main function of this prefilter is to prevent the long-lived daughters of the radioactive xenons generated in the holdup pipe from depositing in the downstream equipment.
Leakage through the filter would be unimportant to environmental release.
11.3.2.6.3 Desiccant Gas Dryer Desiccant gas dryer performance is continuously monitored by an on-stream humidity analyzer.
11.3.2.6.4 Charcoal Performance The ability of the charcoal to delay the noble gases can be continuously evaluated by comparing radioactivity measured and recorded by the process activity monitors at the exit of the offgas condenser and at the exit of the charcoal adsorbers.
Grab sample points are located upstream and downstream of the first charcoal bed and downstream of the last charcoal bed and can be used for periodic sampling if the monitoring equipment indicates degradation of system delay performance.
11.3.2.6.5 Post Filter On installation these particulate filters were tested using a DOP aerosol test or equivalent, as described in Section 11.3.2.6.2.
11.3.3 RADIOACTIVE RELEASES 11.3.3.1 Release Points The reactor building elevated release duct serves the following systems:
Offgas system, Mechanical vacuum pump and gland seal condenser exhaust, Reactor building ventilation exhaust,
COLUMBIA GENERATING STATION Amendment 58 FINAL SAFETY ANALYSIS REPORT December 2005 11.3-13 Containment purge, and Standby gas treatment system.
The reactor building elevated release duct location is shown in reactor building general arrangement drawings in Section 1.2.
The radwaste building ventilation exhausts through three louver houses 67 ft above plant grade.
The location is shown on Figure 1.2-17.
The exhaust from the turbine generator building ventilation system is through four exhaust fans located on the radwaste building, 119 ft above plant grade. Their location is shown on Figure 1.2-16 (part plan of roof at el. 542 ft-0 in.) and in Figure 1.2-17.
The height, flow rate, heat content, and dimensions of the three release points are shown on Table 11.3-6.
11.3.3.2 Dilution Factors The dispersion and dilution of gaseous radioactive effluents released from the plant depends on the meteorology of the site and its environs. To determine these parameters, onsite meteorological data has been obtained and analyzed as described in Section 2.3. Annual atmospheric dilution factors have been calculated to determine resultant annual doses and concentrations of radionuclides from normal operation.
The building ventilation exhaust ducts do not rise above the buildings; therefore, atmospheric releases for dose analysis purposes were considered ground level.
11.3.3.3 Estimated Releases Releases of radioactive material in gaseous effluents for initial plant licensing were calculated using the GALE code presented in NUREG-0016 to show compliance with 10 CFR 20, Appendix B, and 10 CFR 50, Appendix I, for normal operation plus anticipated operational occurrences. The operational parameters including source terms were those presented in Appendix B. The values obtained are presented in Table 11.3-7. These values were used with the meteorology data from Section 2.3.5 to calculate maximum concentrations at the restricted area boundary and maximum individual dose offsite. These data provide maximum annual average (/Q) values and does not include a building wake factor.
Restricted area boundary concentrations used for this initial licensing analysis are tabulated by radionuclide and compared with 10 CFR 20 limits in Table 11.3-9. The estimated annual dose to persons offsite is presented in Section 5.2 of the Environmental Report and is well within the numerical guidelines of 10 CFR 50, Appendix I.
COLUMBIA GENERATING STATION Amendment 58 FINAL SAFETY ANALYSIS REPORT December 2005 LDCN-03-069 11.3-14 Since becoming operational, releases of radioactive materials in gaseous effluents have been determined using actual flow rates and quantitative and qualitative analyses. Doses due to radioactive materials in gaseous effluents are determined to show Technical Specifications compliance at specified intervals. Compliance is reported in the Annual Radioactive Effluent Release Report. Doses are ascertained using the NRC GASPAR II computer code, current meteorology (or historical meteorology if current data are unavailable), and parameters outlined in the Offsite Dose Calculation Manual.
Tritium contamination of the auxiliary boiler and associated components has resulted in release paths which were not intended (see Section 9.4.16.2). The released radioactivity attributable to the worst case tritium concentration (2E + 06 Ci/liter) in the boiler water is an insignificant portion of the total activity released in liquid and gaseous effluents and has been analyzed to result in a correspondingly insignificant radiation dose. The tritium concentration levels and makeup water volume are monitored and evaluated to ensure that tritium effluent releases from the plant are adequately quantified.
11.
3.4 REFERENCES
11.3-1 NUREG-0016 (BWR-GALE Code), January 1979 11.3-2 Miller, C. W., Experimental and Operational Confirmation of Off-Gas System Design Parameters, NEDO-10751, January 1973 (Proprietary).
11.3-3 Standards for Steam Surface Condensers, Sixth Edition, Heat Exchange Institute, New York, NY, 1970.
11.3-4 Underhill, Dwight, et al., Design of Fission Gas Holdup Systems, Processing of the Eleventh AEC Air Cleaning Conference, 1979, p. 217.
11.3-5 Miller, C. W., et al., A General Justification for Classification of Effluent Treatment System Equipment as Group D, NEDO-10734, February 1973.
11.3-6 Nesbitt, L. B., Design Basis for New Gas Systems, NEDE-11146, July 1971 (Proprietary).
11.3-7 NUREG-0800 USNRC Standard Review Plan, Revision 2, July 1981, Branch Technical Position ETSB 11-5.
COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 11.3-15 Table 11.3-1 Design Air Ejector Offgas Release Rates (30 cfm inleakage) a T=0 T=30 Minutes Normal Discharge from Charcoal Adsorbers Additional Discharge from Charcoal Adsorbers During Startup Isotope Half-life
µCi/sec
µCi/sec
µCi/sec Ci/yrb
µCi/sec Ci/startup 83m Kr 1.86 hr 3.4 x 103 2.9 x 103 85m Kr 4.4 hr 6.1 x 103 5.6 x 103 4.3 1.2 x 102 1.1 x 101 1.4 85Krc 10.74 yr 10-20 10-20 10-20 280-560 0
0 87Kr 76 minutes 2.0 x 104 1.5 x 104 88Kr 2.79 hr 2.0 x 104 1.8 x 104 2.1 x 10-1 6.0 1.4 1.7 x 10-1 89Kr 3.18 minutes 1.3 x 105 1.8 x 102 90Kr 32.3 sec 2.8 x 105 91Kr 8.6 sec 3.3 x 105 92Kr 1.84 sec 3.3 x 105 93Kr 1.29 sec 9.9 x 104 94Kr 1.0 sec 2.3 x 104 95Kr 0.5 sec 2.1 x 103 97Kr 1 sec 1.4 x 101 131m Xe 11.96 days 1.5 x 101 1.5 x 101 1.3 3.7 x 101 3.0 x 10-2 1.07 x 10-1 133m Xe 2.26 days 2.9 x 102 2.8 x 102 133Xe 5.27 days 8.2 x 103 8.2 x 103 3.3 x 101 9.4 x 102 1.9 6.8 135m Xe 15.7 minutes 2.6 x 104 6.9 x 103 135Xe 9.16 hr 2.2 x 104 2.2 x 104 137Xe 3.82 minutes 1.5 x 105 6.7 x 102 138Xe 14.2 minutes 8.9 x 104 2.1 x 104 139Xe 40 sec 2.8 x 105 140Xe 13.6 sec 3.0 x 105 141Xe 1.72 sec 2.4 x 105 142Xe 1.22 sec 7.3 x 104 143Xe 0.96 sec 1.2 x 104 144Xe 9 sec 5.6 x 102 Totals 2.5 x 106 1.0 x 105 49-59 1383-1663 14.3 8.5 a Based on the 1971 mixture.
b This is based on curies present at time of release. No decay in environment is included.
c Estimated from experimental observations.
COLUMBIA GENERATING STATION Amendment 54 FINAL SAFETY ANALYSIS REPORT April 2000 LDCN-98-139 11.3-16 Table 11.3-2 Offgas System Major Equipment Items Offgas Preheaters - two required Construction: Stainless steel tubes and carbon steel shell. 350 psig shell design pressure, 1000 psig tube design pressure. 400°F shell design temperature, 575°F tube design temperature.
Catalytic Recombiners - two required Construction: Stainless steel cartridge, carbon steel shell. Catalyst cartridge containing a precious metal catalyst on metal base. Catalyst cartridge to be replaceable without removing vessel. 350 psig design pressure, 900°F design temperature.
Offgas Condenser - one required Construction: Low alloy steel shell. Stainless steel tubes. 350 psig shell design pressure.
250 psig tube design pressure, 900°F shell design temperature, 150°F tube design temperature.
Water Separator - one required Construction: Carbon steel shell, stainless steel wire mesh. 350 psig design pressure, 250°F design temperature.
Cooler-Condenser - two required Construction: Stainless steel shell. Stainless steel tubes. 100 psig tube design pressure, 350 psig shell design pressure. 32/150°F tube design temperature, 32/150°F shell design temperature.
Moisture Separators (downstream of cooler-condenser) - two required Construction: Carbon steel shell, stainless steel wire mesh. 350 psig design pressure, 32/150°F design temperature.
Desiccant Dryer - four required Construction: Carbon steel shell packed with Type 3A molecular sieve or equivalent.
350 psig design pressure, 32°F/ 500°F design temperature.
Desiccant Regeneration Skid - two required
COLUMBIA GENERATING STATION Amendment 54 FINAL SAFETY ANALYSIS REPORT April 2000 LDCN-98-139 11.3-17 Table 11.3-2 Offgas System Major Equipment Items (Continued)
Dryer Chiller - two required Construction: Carbon steel shell, stainless steel tubes, design temperature 32°F/500°F, design pressure 50 psig.
Regenerator Blower - two required Construction: Electrical, design pressure 50 psig design temperature 32°F/150°F.
Dryer Heater - two required Construction: Electrical, design temperature 32°F/500°F, design pressure 50 psig.
Glycol Cooler Skid - one required Glycol Storage Tank - one required Construction: Carbon steel 3000 gal. Water-filled hydrostatic design pressure.
32°F design temperature. API-650.
Glycol Solution Refrigerators and Motor Drives - three required Construction: Conventional refrigeration units. Glycol solution exit temperature 35°F.
Glycol Pumps and Motor Drives - three required Construction: Cast iron, 0°F design temperature.
Prefilters and After Filters - two required of each type Construction: Carbon steel shell. High-efficiency, moisture-resistant filter element. Flanged shell. 350 psig design pressure. -50/150°F design temperature.
Charcoal Adsorbers - eight beds Construction: Carbon steel. Approximately 4-ft. O.D. x 21-ft vessels each containing approximately 3 tons of activated carbon. Design pressure 350 psig, design temperature
-50/250°F.
COLUMBIA GENERATING STATION Amendment 60 FINAL SAFETY ANALYSIS REPORT December 2009 LDCN-07-041,09-009 11.3-18 Table 11.3-3 Process Data For The Offgas (RECHAR) System The Information On This Page Is Proprietary And Was Submitted Under Separate Cover (CVI DWG 02N64-04,11,1, Rev. 4 or 02N64-04,11,2, Rev. 2)
COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 11.3-19 Table 11.3-4 Offgas System Alarmed Process Parameters Control Room Parameters Indicated Recorded Air ejector discharge pressure - high X
Preheater discharge temperature - low X
Recombiner catalyst temperature - high/low X
Offgas condenser water level (dual) - high/low X
Offgas condenser gas discharge temperature - high (local)
X H2 analysis (offgas condenser discharge) - dual - high X
Offgas condenser discharge radiation - high X
Gas flow - high/low X
Cooler - condenser discharge temperature - high/low X
Glycol solution temperature - high/low X
Glycol solution level - low Gas drier discharge humidity - high (local)
X Prefilter dP - high X
Charcoal adsorber temperature - high X
Charcoal train flow - high/low X
After filter dP - high X
Offgas (charcoal bed discharge) radiation - high X
Steam flow - low X
Desiccant dryer outlet temperature - high/low X
Dryer chiller outlet temperature - high (local)
X Dryer heater temperature - high Dryer heater outlet temperature - high (local)
X Loop seals water level - low
COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 11.3-20 Table 11.3-5 Equipment Malfunction Analysis Equipment Item Malfunction Consequences Design Precautions Steam jet air ejectors Low flow of motive high-pressure steam When the hydrogen and oxygen concentrations exceed 4 and 5 vol %,
respectively, the process gas becomes flammable.
Alarm provided on steam for low steam flow. Recombiner temperature alarm.
Inadequate steam flow will cause overheating and deterioration of the catalyst.
Steam flow to be held at constant maximum flow regardless of plant level during operation.
Wear of steam supply nozzle of ejector Increased steam flow to recombiner. This could reduce degree of recombination at low power levels.
Low temperature alarms on preheater exit (recombiner inlet). Recombiner outlet H2 analyzers.
Preheaters Steam leak Would further dilute process offgas. Steam consumption would increase.
Spare preheater.
Low pressure steam supply Recombiner performance would fall off at low power level and hydrogen content of recombiner gas discharge may increase, eventually to a combustible mixture.
Low-temperature alarms on preheater exit (recombiner inlet). Recombiner outlet H2 analyzers.
Recombiners Catalyst gradually deactivates Temperature profile changes through catalyst. Eventually excess H2 would be detected by H2 analyzer or by gas flowmeter. Eventually the stripped gas could become combustible.
Temperature probes in recombiner and H2 analyzer provided. Spare recombiner.
Catalyst gets wet at start H2 conversion falls off and H2 is detected by downstream analyzers. Eventually the gas could become combustible.
Condensate drains, temperature probes in recombiner. Air bleed system at startup.
Recombiner thermal blanket, spare recombiner, and heater. Hydrogen analyzer.
COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 11.3-21 Table 11.3-5 Equipment Malfunction Analysis (Continued)
Equipment Item Malfunction Consequences Design Precautions Offgas condenser Cooling water leak The coolant (reactor condensate) would leak to the process gas (shell) side. This would be detected if drain well liquid level increases. Moderate leakage would be of no concern from a process standpoint. (The process condensate drains to the hotwell).
None Liquid level instruments fail If both drain valves fail to open, water will build up in the condenser and pressure drop will increase.
Two independent drain systems, each provided with high and low-level alarms.
The high P, if not detected by instrumentation, could cause pressure buildup in the main condenser and eventually initiate a reactor scram. If a drain valve fails to close, gas will recycle to the main condenser, increase the load on the SJAE, and increase operating pressure of the main condenser.
Water separator Corrosion of wire mesh element Higher quantity of water collected in holdup line and routed to radwaste.
Stainless steel mesh specified.
Holdup line Corrosion of line Leakage to soil of gaseous and liquid fission products.
Outside of pipe dipped and wrapped.
0.25-in. corrosion allowance.
Cooler-condenser Corrosion of tubes Glycol-water solution would leak into process (shell) side and be discharged to clean radwaste. If not detected at radwaste, the glycol solution would discharge to the reactor condensate system.
Stainless-steel tubes specified. Low level alarm glycol tank level. Spare cooler condenser provided.
COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 11.3-22 Table 11.3-5 Equipment Malfunction Analysis (Continued)
Equipment Item Malfunction Consequences Design Precautions Cooler-condenser (continued)
Icing up of the tubes Shell side of cooler could plug up with ice, gradually building up pressure drop. If this happens, the spare unit could be activated.
Complete blockage of both units would increase P and lead to a reactor scram.
Design glycol-H2O solution temperature well above freezing point. Spare unit provided. Temperature indication and low alarms on glycol temperature and process gas temperature.
Glycol refrigeration machines Mechanical failure If both spare units fail to operate, the glycol solution temperature will rise and the dehumidification system performance will deteriorate. This will require rapid regeneration cycles for the desiccant beds and may raise the gas dewpoint as it is discharged from the drier.
Two spare refrigerators during normal operation are provided. Glycol solution temperature alarms provided. Gas moisture detectors provided downstream of gas driers.
Moisture separators Corrosion of wire mesh Increased moisture would be retained in process gas routed to gas driers element.
Over a long period, the desiccant drier cycle period would deteriorate as a result of moisture pickup. Pressure drop across prefilter may increase if filter media is wetted.
Stainless steel mesh specified. Spare unit provided. High P alarm on prefilter.
Prefilters Loss of integrity of filter media More radioactivity would deposit on the drier desiccant. This would increase the radiation level in the drier vault and make maintenance more difficult, but would not affect releases to the environment.
Spare unit provided in separate vault. P instrumentation provided.
COLUMBIA GENERATING STATION Amendment 58 FINAL SAFETY ANALYSIS REPORT December 2005 LDCN-03-009 11.3-23 Table 11.3-5 Equipment Malfunction Analysis (Continued)
Equipment Item Malfunction Consequences Design Precautions Desiccant drier Moisture breakthrough Increased moisture in air entering charcoal adsorbers would decrease adsorption effectiveness, thus reducing radioisotope retention time.
Drier cycles on timer. Redundant gas humidity analyzers and alarms supplied.
Redundant gas drier system supplied. Gas drier and first charcoal bed can be bypassed through alternate drier to second charcoal bed.
Desiccant regeneration equipment Mechanical failure Inability to regenerate desiccant.
Redundant, shielded desiccant beds and drier equipment is supplied.
Charcoal adsorbers Charcoal accumulates moisture Charcoal performance will deteriorate gradually as moisture deposits. Holdup times for krypton and xenon would decrease, and plant emissions would increase. Provisions made for drying charcoal as required during annual outage.
Highly instrumented, mechanically simple gas dehumidification system with redundant equipment.
After filters Loss of integrity of filter media Probably of no real consequence. The charcoal media itself should be a good filter at the low air velocity.
P instrumentation provided. Spare unit provided.
System Internal detonation Release of radioactivity if pressure boundary fails.
Main process equipment and piping are designed to contain a detonation.
Earthquake damage Release of radioactivity.
Dose consequences are within 10 CFR 20 limits. Analysis is included in Reference 11.3-5.
COLUMBIA GENERATING STATION Amendment 62 FINAL SAFETY ANALYSIS REPORT December 2013 LDCN-13-025 11.3-24 Table 11.3-6 Release Point Data Note: Refer to ODCM Table 3-13.
COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 11.3-25 Table 11.3-7 Gaseous Waste System Release Gaseous Release Ratea (Ci/yr)
Nuclide Coolant Conc.
(µCi/g)
Containment Building Turbine Building Reactor Building Radwaste Building Gland Seal Air Ejector Mechanical Vac Pump Total 83mKr 1.200E-03 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 85mKr 2.000E-03 3.1E 00 7.1E 01 3.1E 00 0.0 0.0 2.1E 00 0.0 8.0E 01 85Kr 6.300E-06 0.0 0.0 0.0 0.0 0.0 2.8E 02 0.0 2.8E 02 87Kr 6.900E-03 3.1E 00 2.0E 02 3.1E 00 0.0 0.0 0.0 0.0 2.1E 02 88Kr 6.900E-03 3.1E 00 2.4E 02 3.1E 00 0.0 0.0 0.0 0.0 2.4E 02 89Kr 4.300E-02 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 131mXe 4.900E-06 0.0 0.0 0.0 0.0 0.0 5.2E 00 0.0 5.2E 00 133mXe 9.400E-05 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 133Xe 2.700E-03 6.9E 01 2.9E 02 6.9E 01 1.0E 01 0.0 2.3E 01 2.3E 03 2.8E 03 135mXe 8.800E-04 4.8E 01 6.8E 02 4.8E 01 0.0 0.0 0.0 0.0 7.8E 02 135Xe 7.600E-03 3.6E 01 6.6E 02 3.6E 01 4.5E 01 0.0 0.0 3.5E 02 1.1E 03 137Xe 4.900E-02 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 138Xe 2.900E-02 7.3E 00 1.5E 03 7.3E 00 0.0 0.0 0.0 0.0 1.5E 03 Total noble gases 7.0E 03 131I 3.618E-03 1.8E-02 2.0E-01 1.8E-01 5.0E-02 0.0 0.0 3.0E-02 4.8E-01 133I 1.549E-02 7.1E-02 8.0E-01 7.1E-01 1.8E-01 0.0 0.0 0.0 1.8E-00 Tritium gaseous release 7.1E 01 NOTE: 0.0 appearing in the table indicates release is less than 1.0 Ci/yr for noble gas, 0.0001 Ci/yr for iodine.
COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 11.3-26 Table 11.3-7 Gaseous Waste System Release (Continued)
Airborne Particulate Release Rate (Ci/yr)
Nuclide Containment Building Turbine Building Reactor Building Radwaste Building Mechanical Vac Building Total 51Cr 3.1E-06 1.4E-02 3.1E-04 9.4E-05 0.0 1.4E-02 54Mn 3.1E-05 5.2E-04 3.1E-03 4.7E-04 0.0 4.3E-03 59Fe 4.2E-06 5.2E-04 4.2E-04 1.6E-04 0.0 1.1E-03 58Co 6.3E-06 6.3E-04 6.3E-04 4.7E-05 0.0 1.4E-03 60Co 1.0E-04 2.1E-03 1.0E-02 9.4E-04 0.0 1.5E-02 65Zn 2.1E-05 2.1E-04 2.1E-03 1.6E-05 0.0 2.3E-03 89Sr 9.4E-07 6.3E-03 9.4E-05 4.7E-06 0.0 6.4E-03 90Sr 5.2E-08 2.1E-05 5.2E-06 3.1E-06 0.0 2.9E-05 95Zr 4.2E-06 1.0E-04 4.2E-04 5.2E-07 0.0 5.2E-04 124Sb 2.1E-06 3.1E-04 2.1E-04 5.2E-07 0.0 5.2E-04 134Cs 4.2E-05 3.1E-04 4.2E-03 4.7E-05 3.1E-06 4.6E-03 136Cs 3.1E-06 5.2E-05 3.1E-04 4.7E-06 2.1E-06 3.8E-04 137Cs 5.8E-05 6.3E-04 5.8E-03 9.4E-05 1.0E-05 6.6E-03 140Ba 4.2E-06 1.1E-02 4.2E-04 1.0E-06 1.1E-05 1.1E-02 141Ce 1.0E-06 6.3E-04 1.0E-04 6.3E-05 0.0 8.0E-04 a Estimated release based on GALE code evaluation.
COLUMBIA GENERATING STATION Amendment 54 FINAL SAFETY ANALYSIS REPORT April 2000 LDCN-98-139 11.3-27 Table 11.3-8 Building Volume and Ventilation Rates Building Free Air Volume (ft3)
Ventilation Rate (cfm)
Secondary containment (reactor building) 3.5 x 106 80,000 Radwaste building 2.0 x 106 83,000 Turbine building 5.7 x 106 360,000 Primary containment (drywell) 2.0 x 105 10,500a Primary containment (wetwell) 1.4 x 105 7,500a a During primary containment purge only.
COLUMBIA GENERATING STATION Amendment 54 FINAL SAFETY ANALYSIS REPORT April 2000 LDCN-98-139 11.3-28 Table 11.3-9 Maximum Sector Annual Average Concentrations of Gaseous Radioactive Materials at the Original Restricted Area Boundary Nuclide Annual Average Release Rate (Ci/sec)
Boundary Concentrationa
(µCi/cm3)
Derived Air Concentration (DAC)b (µCi/cm3)
Concentration/
DAC 3H 2.3 E-6 1.8 E-11 1 E-7 0.00018 85mKr 2.5 E-6 1.9 E-11 1 E-7 0.0002 85Kr 9.0 E-6 6.9 E-11 7 E-7 0.000099 87Kr 6.6 E-6 5.1 E-11 2 E-8 0.002 88Kr 8.0 E-6 6.2 E-11 9 E-9 0.00069 131mXe 1.7 E-7 1.3 E-12 2 E-6 0.0000006 133Xe 9.0 E-5 6.9 E-10 6 E-7 0.0011 135mXe 2.4 E-5 1.9 E-10 4 E-8 0.0047 135Xe 3.7 E-5 2.8 E-10 7 E-8 0.0041 138Xe 4.6 E-5 3.6 E-10 2 E-8 0.018 131I 1.6 E-8 1.3 E-13 2 E-10 0.0006 133I 5.7 E-8 4.4 E-13 1 E-9 0.00044 51Cr 4.3 E-10 3.4 E-15 3 E-8 0.00000011 54Mn 1.3 E-10 9.7 E-16 1 E-9 0.00000097 59Fe 3.7 E-11 2.8 E-16 5 E-10 0.00000057 58Co 4.3 E-11 3.4 E-16 1 E-9 0.00000034 60Co 4.3 E-10 3.4 E-15 5 E-11 0.000067 65Zn 7.3 E-11 5.7 E-16 4 E-10 0.0000015 89Sr 2.0 E-10 1.6 E-15 1 E-9 0.0000016 90Sr 9.3 E-13 7.2 E-18 6 E-12 0.0000013 95Zr 1.7 E-11 1.3 E-16 4 E-10 0.0000003 124Sb 1.7 E-11 1.3 E-16 3 E-10 0.0000004 134Ca 1.5 E-10 1.1 E-15 2 E-10 0.0000058 136Cs 1.1 E-11 8.9 E-17 9 E-10 0.000000099 137Cs 2.1 E-10 1.6 E-15 2 E-10 0.0000079 140Ba 3.7 E-10 2.8 E-15 2 E-9 0.0000015 141Ce 2.5 E-11 1.9 E-16 1 E-9 0.00000019 MPC 0.03 a /Q factor of 7.7 x 10-6 at 0.5 miles distance in SE sector used. No building wake factor included; meteorological data from 4/74 through 3/75.
b 10 CFR 20, Appendix B, to 20.1001-20.2401, Table II Column I.
COLUMBIA GENERATING STATION Amendment 54 FINAL SAFETY ANALYSIS REPORT April 2000 LDCN-98-139 11.3-29 Table 11.3-10 Frequency and Quantity of Steam Discharged to Suppression Pool Event Frequency Category Quantity of Steam (lb/event)
- 1. RCIC test (monthly)
Moderate 29,000
- 2. RCIC test (vessel injection at startup)
Moderate 116,000
- 3. Inadvertent RCIC injection Moderate 5,000
- 4. SRV test Moderate 118,000
- 5. Inadvertent SRV opening Moderate 118,000
- 6. Trip of both recirculation pumps Moderate 260,000a
- 7. Turbine trip Moderate 18,000
- 8. Generator load rejection Moderate 18,000
- 9. Pressure regulator failure - open Moderate 256,000a
- 10. Recirculation flow control failure - decreasing Moderate 260,000a
- 11. Loss of all feedwater flow Moderate 267,000a
- 12. Inadvertent closure - all MSIV Moderate 271,000a
- 13. Loss of condenser vacuum Moderate 291,000a
- 14. Feedwater control failure - maximum demand Moderate 270,000a
- 15. Loss of auxiliary transformer Moderate 251,000a
- 16. Loss of all grid connections Moderate 280,000a
- 17. Turbine trip w/o bypass Moderate 126,000a
- 18. Generator load rejection w/o bypass Moderate 127,000a
- 19. Stuck open SRV Moderate 817,000 Notes: Events 1, 2, and 3 based on steam flow quantity during test mode per RCIC system process diagram.
Events 4 and 5 assuming test and inadvertent opening at 1000 psi reactor pressure for 10 minutes.
Events 6 through 18 based on event description from Chapter 15.
Event 19 based on results from 251 Standard Plant Suppression Pool Response Analyses.
a Isolation event. It is assumed that SRV cycling is terminated at T = 30 minutes and reactor depressurization.
Amendment 54 April 2000 Columbia Generating Station Final Safety Analysis Report Offgas System - Low Temperature Draw. No. 02N64-04,6,1 Rev. 3 Figure 11.3-1
Form No. 960690ai Columbia Generating Station Final Safety Analysis Report 11.3-2.1 78 M535-1 Offgas System P&ID Rev.
Figure Draw. No.
Amendment 62 December 2013
Form No. 960690ai Columbia Generating Station Final Safety Analysis Report 11.3-2.2 67 M535-2 Offgas System P&ID Rev.
Figure Draw. No.
Amendment 61 December 2011
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 LDCN-02-000 11.4-1 11.4 SOLID WASTE MANAGEMENT SYSTEM 11.4.1 DESIGN BASIS Power plant operation results in various solid radioactive wastes that require disposal. These wastes can be in the form of wet solids, such as powdered ion exchange resins from filter demineralizers, expended bead resins from deep bed demineralizers, small quantities of miscellaneous liquid, and miscellaneous dry materials such as paper, rags, plastic, and laboratory wastes.
The objective of the solid waste management system is to collect, monitor, process, and package these waste products in a suitable form for offsite shipment and burial. In designing the system to meet the stated objective, the following criteria were applied:
The system has the capacity to handle the volumes of waste from normal operations and anticipated operational occurrences. The expected annual volumes of wet solid wastes are shown in Table 11.4-1.
The system is designed to process the quantity of waste and concentration of radionuclides listed in Table 11.4-3 while maintaining occupational exposure as low as is reasonably achievable (ALARA). This is done by controlling the pipe run locations for shielding and exposure considerations, placing the process equipment in shielded areas, by providing remote operating stations, and by performing dewatering operations in radiation shields if required.
The radwaste building shielding is designed for the highest radioactivity source, reactor water cleanup (RWCU) resins. The equipment layout is shown in general arrangement drawings in Section 1.2. Table 11.4-2 lists capacities, design pressure, and design temperature of the major equipment.
In keeping with the ALARA philosophy and Appendix I to 10 CFR 50, the solid waste management systems contribution to offsite doses is minimized by filtration and by directing the ventilation air flow from areas of low airborne contamination to areas of higher airborne contamination. The filtered ventilation radioactive releases are discussed in Section 11.3.
The solid waste management system operations and procedures are designed to limit the dose to offsite persons from station operations to significantly less than the limits specified in 10 CFR Part 20. Water separated in processing is returned to the liquid waste management system for treatment as described in Section 11.2.2.1 and shown in Figure 11.2-1.
The system can accommodate a variety of shipping container sizes and shapes with and without shields. Provisions are made for the detection and removal of loose surface contamination on the waste containers. The radiation levels of the waste containers are monitored so that
COLUMBIA GENERATING STATION Amendment 61 FINAL SAFETY ANALYSIS REPORT December 2011 LDCN-08-026 11.4-2 provisions can be made to ensure that shipping regulation radiation levels are not exceeded.
Compliance with applicable regulations, e.g., 10 CFR Parts 61 and 71 and 49 CFR is discussed in Sections 11.4.2.9 and 11.4.3.
The safety class, quality group classification, quality class, and seismic category of radwaste systems are specified in Table 3.2-1. The solid waste management system is not designed to Seismic Category I. It is located in the Seismic Category I portion of the radwaste building.
The seismic classification of the radwaste building is discussed in Section 3.8.4.1.2.
See Section 3.1.2.6.4 for a discussion of systems provided to meet General Design Criterion 63.
11.4.2 SYSTEM DESCRIPTION A portable solid waste management system is used by Columbia Generating Station (CGS), as described in the following subsections.
It is required by 10 CFR 61 that, if certain activity criteria are exceeded, wet solid wastes be stabilized by solidification or processed to remove free standing liquids with containment in high integrity containers (HICs). The HICs may provide stability alone or in conjunction with an engineered barrier at the disposal site. The presently installed plant system is designed to interface with the portable dewatering/drying system which, when coupled with HICs, meet the requirements for stabilization in compliance with 10 CFR 61.
There are two resin dewatering systems used at CGS: the Resin Drying System (RDS) and the Self Engaging Dewatering System (SEDS). The resin dewatering systems are vendor provided with NRC approved topical reports (TP-02-P-A, Revision 1 for the RDS, and CNSI-DW-1118-01-P-A for the SEDS), and the systems are operated according to the technical requirements of this report. The types and quantities of waste to be processed are described below. The NRC licensed shipping casks and associated liners are used for processing, transporting, and disposing of wet solid wastes when required.
System operation is closely monitored by Energy Northwest personnel. If a vendor operates the dewatering system, the vendor will be required to submit their operating procedures for Energy Northwest review and approval. The vendor procedures will either be incorporated into a CGS procedure or will be approved as is by CGS prior to use.
Dewatering of resins to meet applicable dewatering criteria is conducted in accordance with approved procedures inside the radwaste building in the liner storage area or in shipping casks on trucks, where any spills are routed to existing floor drain sumps and the building ventilation filtration system ensures no unfiltered airborne releases occur from dewatering activities.
COLUMBIA GENERATING STATION Amendment 54 FINAL SAFETY ANALYSIS REPORT April 2000 LDCN-99-000 11.4-3 11.4.2.1 General The sources of the various radioactive wet resin waste inputs to the system are shown in Figure 11.2-1. Table 11.2-11 shows the design basis expected frequency of input, the quantities of solids generated, the radioactivity level of the solids after accumulation, and the volume of liquid used in sluicing accumulated solids to the processing equipment. The excess liquid is subsequently returned to the liquid waste management system.
These values are based on experience from operational BWR nuclear power stations.
Figure 11.4-1 shows the solid waste management system up to and including the portable portion of the system described in the vendors topical reports. The phase separation and concentration portions of the system are shown on Figures 5.4-22, 10.4-5, 11.2-2, and 11.2-3.
Tanks containing radioactive waste are provided with overflow connections which direct any overflow to drain sumps.
The solid waste processing areas are located in the radwaste building, where wet and dry solid wastes may be processed. Wet solid wastes include backwash resin from the RWCU system, the condensate filter demineralizer system, the fuel pool filter demineralizers, the floor drain and equipment drain filter demineralizers, and spent resin from the floor drain demineralizer and the waste demineralizer. Dry solid wastes include items such as rags, paper, plastics, small equipment parts, and laboratory wastes.
11.4.2.2 Radwaste Disposal System For Reactor Water Cleanup Resin The backwash discharge from the cleanup filter demineralizers is collected and concentrated in two 4500-gal cleanup phase separators which are located below the cleanup demineralizers in the radwaste building. After several backwashes are accumulated, the waste is transferred to the portable dewatering system.
The cleanup phase separators are designed to concentrate the resin from 0.5% by weight solids to approximately 5% by weight solids by sedimentation and decantation of the slurry. While the working separator is filling, the other previously filled tank is held isolated to the extent practicable to allow for additional decay of resin activity.
After each backwash batch is received by the working separator, the batch is allowed to settle for a period of time and the decantate is then transferred by pumping to the waste collector tank. When sufficient resin has accumulated, the working separator is isolated and allowed to stand for a period to permit radioactive decay. At the end of this decay period the sludge is fluidized to approximately 5% weight solids and transferred by pumping to the portable dewatering system.
COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 11.4-4 11.4.2.3 Radwaste Disposal System For Condensate Demineralizer Resin The backwash discharge from the condensate filter demineralizers is collected in the condensate backwash receiving tank which is located below the condensate filter demineralizers in the radwaste building. After collection, the waste is transferred by pumping to one of the two condensate phase separators for processing.
Operation of the condensate phase separators is similar to that for the cleanup phase separators.
Backwash resin is received at 0.5% by weight solids and concentrated to approximately 5% by weight solids, allowed to stand for a period of radioactive decay and then decanted and transferred by pumping to the portable dewatering system.
11.4.2.4 Radwaste Disposal System For Fuel Pool, Floor Drain, and Waste Collector Filter Resin Backwash resin wastes from the fuel pool filter demineralizers, floor drain, and waste collector filter demineralizers are backwashed to the waste sludge phase separator tank. The waste sludge phase separator is designed to concentrate the resin from 0.5% by weight solids to approximately 5% by weight solids by sedimentation and decantation.
After each backwash batch is received by the separator, it is allowed to settle for a period of time and the decantate is then transferred by pumping to the floor drain collector tank.
When an appropriate quantity of resin is accumulated, the resin is fluidized to approximately 5% by weight solids and transferred by pumping to the portable dewatering system.
11.4.2.5 Radwaste Disposal System For Spent Resin Spent bead resins from the floor and equipment drain polishing demineralizers are hydropneumatically transferred to the spent resin tank. The tank is designed to retain one batch of resins plus resin transfer water plus freeboard.
The decay time of any single batch is governed by the need to make the spent resin tank available to receive a subsequent batch from an alternate demineralizer. The frequency of spent resin discharge from the floor and equipment drain polishing demineralizers is estimated to be about once every 2 months. Each batch of the spent resin is transferred at approximately 40% by weight solids to the portable dewatering system.
11.4.2.6 Resin Container Handling and Storage Filled containers from the dewatering operation in the container storage area are lifted by a crane and placed on a track-riding dolly. The dolly moves the containers from the storage area to the loading area where another crane lifts the container onto the truck for offsite shipment.
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 LDCN-02-000 11.4-5 Alternatively, the dewatering operation for high activity resin waste can be performed in a cask on or off the truck bed. General locations and arrangements are shown in Figure 1.2-13.
11.4.2.7 Miscellaneous Dry Solid Waste System Dry active waste may consist of air filtration media, miscellaneous paper, plastic and rags from contaminated areas, contaminated clothing, tools and equipment parts which cannot be effectively decontaminated, solid laboratory wastes, and other similar materials. The radioactivity of much of this waste is low enough to permit handling by contact. Compressible wastes may be compacted into metal containers to reduce their volumes. Alternately, container vans (C-vans) or other containers suitable for shipment may be used for dry radioactive waste shipped to a vendor for volume reduction services.
A relatively small quantity of high activity compactable and noncompactable dry active radioactive waste (DAW) may be loaded into the open top or encapsulation liners. Other containers whose geometry is compatible with shipment in shielded shipping casks may be used.
A locally controlled compactor system, if used, will include the following features: hydraulic pump with motor, hydraulic oil storage, high-efficiency filters, fan, and accessories.
Ventilation air will be pulled across the top of the containers and then through high-efficiency filters by a fan during the compression process and exhausted to the radwaste building exhaust system described in Section 9.4.
Solid wastes and other nonliquid radioactive material and C-vans may be stored temporarily near the truck loading area outside the radwaste building, on the outdoor curbed pad adjacent to the radwaste building, or other suitable location. Noncompressible solid wastes are packaged in containers suitable for the waste. Low activity waste can be stored until enough is accumulated to permit economical transportation to an offsite disposal site or to a vendor for volume reduction of the waste prior to disposal.
Irradiated reactor components consisting of spent control rod blades, fuel channels, in-core ion chambers, and other equipment are stored in the spent fuel storage pool to allow for radioactive decay prior to shipment.
The packaging of dry solid wastes will be administratively controlled to ensure the 10 CFR 61 and/or burial facility free standing liquid criteria are met.
11.4.2.8 Expected Volumes The design basis expected frequency of solids input, the quantities of solids generated, and the radioactivity of the solids after accumulation are shown in Table 11.2-11. Table 11.4-3 shows the expected solids production rate and significant nuclides associated with each batch of
COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 11.4-6 dewatered waste. The distribution of these nuclides (dependent on the concentration in the reactor water) corresponds to the design basis offgas noble gas release rate as described in Section 11.3.1.
Table 11.4-1, excluding dry and compacted waste, shows the expected annual container production of solid wastes based on the process diagram data inputs. No decay after container filling operations has been considered.
11.4.2.9 Packaging Radioactive wastes are packaged and shipped from CGS in containers that meet the requirements established in 49 CFR 171-180 for the Department of Transportation and 10 CFR 71 for the NRC.
Packaging of wastes being dewatered is typically performed remotely behind shielding as described below. Empty containers may be brought into the processing area using the dolly and filled with waste for processing. The quantity of wastes packaged in the container is controlled by operating procedures.
Dewatered liners are capped, surveyed for surface contamination, and decontaminated as necessary prior to shipment.
11.4.2.10 Storage Facilities The general arrangement drawings in Section 1.2 show the layout of the radwaste handling areas in the radwaste building.
For the liners presently in use (of up to 210 ft3 capacity), the storage area can accommodate about 15 filled liners. High activity containers can be stored to allow for 6 months decay prior to shipment if necessary. It is expected, however, that most radwaste containers will be shipped within 1 to 3 months of generation.
11.4.2.11 Shipment The following describes a typical loading sequence for liners: A truck containing the cask is moved into the truck loading area. The dolly is moved to the storage area loading station and a capped container of waste is placed on the dolly by the storage area crane. The dolly is moved back to the truck loading area where the liner is lifted into the cask, and the cask lid is placed on the cask. The cask is decontaminated if necessary for shipment. Similar operations are performed when loading unshielded containers onto the truck. Dewatering of high activity wastes can also be performed in liners in cask in place on the shipping truck.
COLUMBIA GENERATING STATION Amendment 55 FINAL SAFETY ANALYSIS REPORT May 2001 LDCN-00-026 11.4-7 Any unshielded containers found to have external contamination exceeding 49 CFR limits are decontaminated. Further smear tests and cleaning are carried out as required until the activity on the container is within acceptable limits.
Radwaste tank failure and spent fuel cask drop incidents are discussed in Sections 15.7.3 and 15.7.5, respectively.
11.4.2.12 Process Monitoring Process monitoring is performed by the dewatering system operator and the operator in the radwaste control room. They are in communication during waste transfer to the dewatering system. The dewatering system processing is monitored by remote closed-circuit TV cameras and other instrumentation as described in the topical reports for the process.
Each RWCU phase separator is equipped with one level indicating device for total liquid level.
The total liquid level indicator utilizes an air bubbler and a pressure sensing level transmitter which drives a 0-100% level gauge and a high-level alarm in the radwaste control room. The level transmitter also drives a level indicator on the local control panel and provides control functions for the decant pump, the resin discharge pump, and the phase separator inlet selector valve.
The waste sludge phase separator has total liquid level indication. It uses an air bubbler and a pressure-sensing level transmitter. In addition to the level gauge and high-level alarm in the radwaste control room, the level transmitter provides control inputs to the decant pump, the stop and flush circuit on the sludge discharge pump, and the discharge valves from the waste collector and floor drain collector tanks to the waste sludge phase separator.
The condensate phase separators level instrumentation is the same as that described for the RWCU phase separators. Level indication for the spent resin tank is essentially the same as that described for the RWCU phase separators. The concentrated waste measuring and waste mixing tanks are not in service.
11.4.3 PROCESS CONTROL PROGRAM 11.4.3.1 Objective The objectives of the process control program are to characterize and classify radwaste and ensure the complete solidification of all wet wastes being solidified and to ensure that dewatered wet wastes and disposal packages meet the free standing liquid and stability requirements of 10 CFR 61. To meet these objectives, the process control program has incorporated the recommendations set forth in NUREG-0800 and Branch Technical Position -
ETSB 11-3.
COLUMBIA GENERATING STATION Amendment 55 FINAL SAFETY ANALYSIS REPORT May 2001 LDCN-00-026 11.4-8 11.4.3.2 Process Control Program To ensure that acceptable waste forms are produced for disposal in compliance with the requirements in 10 CFR 61, the process control program provides for characterization of individual waste streams, classification of final waste products, proper disposal packaging, and verification that waste dewatering and/or solidification has been successful. In addition, nonstable waste form processing, waste storage, handling, and transportation activities take place under the process control program to ensure compliance with all applicable regulations in 10 CFR Parts 20, 61, and 71.
Stability of waste form at Columbia Generating Station is normally achieved through the combined properties of dewatered media and HICs or HICs plus engineered barriers. If solidification for stability is performed at Columbia Generating Station, it will be done in accordance with approved procedures to meet applicable disposal site license conditions and other applicable requirements.
Other processing methods such as portable deionization, solidification for nonstable waste form, evaporation, filtration, etc., may be used to process nonhazardous radioactively contaminated liquids. If these activities will result in the disposal of waste at a licensed burial site, they will be conducted in accordance with approved procedures to ensure that applicable disposal site license conditions and other requirements are met. Solidification agents listed in the burial facility license may be used to ensure free-standing liquid criteria are achieved.
The process control program contains the current formulas, sampling, analyses, test, and determinations to be made to ensure that processing and packaging of solid radioactive wastes based on demonstrated processing of actual or simulated wet solid wastes will be accomplished in such a way as to ensure compliance with 10 CFR Parts 20, 61, and 71, state regulations, burial ground requirements, and other requirements governing the disposal of solid radioactive wastes.
Changes to the process control program are documented, and records of reviews performed are retained for the duration of the operating license. This documentation contains sufficient information to support the change together with the appropriate analyses or evaluations justifying the change and a determination that the change will maintain the overall conformance of the solidified waste product to the existing requirements of federal, state, and other applicable regulations. Changes become effective after review and acceptance in accordance with the Operational Quality Assurance Program Description (OQAPD).
The radioactive waste process control program incorporates the following elements:
- a.
Waste stream descriptions,
- b.
Process controls,
- c.
Characterization,
COLUMBIA GENERATING STATION Amendment 61 FINAL SAFETY ANALYSIS REPORT December 2011 LDCN-08-026 11.4-9
- d.
Processing and stabilization,
- e.
- Sampling,
- f.
Scaling factors,
- g.
Classification,
- h.
Computer code usage,
- i.
Analytical methods,
- j.
Packaging,
- k.
- l.
- Shipping,
- m.
Documentation,
- n.
Equipment maintenance and calibration,
- o.
Minimization and segregation,
- p.
- Storage,
- q.
Trending, and
- r.
Reporting.
Plant procedures implement the process control program.
11.4.3.3 Process Control Systems The transfer of wet solid wastes to the processing system is monitored and controlled from the process control panel in the radwaste control room. The resin transfer system interfaces with the portable dewatering system at the point of connection with the dewatering equipment.
At the interface point, the applicable dewatering system is operated per the technical requirements of the NRC-approved topical report and is designed to ensure that processed waste in conjunction with the dewatering HIC or liner is prepared for burial and meets the 10 CFR Part 61 criteria. The process control program is described and controlled by procedure. The dewatering systems control panels are in a remote location shielded from the waste processing resin containing components. It is designed for automatic operation and provides indication and alarm for liner level, temperature, pressure, and other operating parameters.
If a waste processing vendor is used, they are monitored by Energy Northwest to ensure that applicable procedures, Energy Northwest or vendor, are being followed and that an acceptable end product is formed as described in the procedure used.
11.4.3.4 Waste Characterization The wet wastes at CGS to be processed are characterized in individual streams for RWCU resins, equipment drain radioactive (EDR) and floor drain radioactive (FDR) powdered resins, EDR and FDR bead resins, and condensate resins. The four major systems producing wastes are described below.
COLUMBIA GENERATING STATION Amendment 61 FINAL SAFETY ANALYSIS REPORT December 2011 LDCN-08-026 11.4-10
- a.
Floor drain system - Wastes from the turbine building, reactor building, and radwaste building floor drain sumps are routinely monitored and collected for processing in the floor drain collector tank. The floor drain filter and demineralizer sludges are combined with equipment drain filters and sludges to form a mixture which is sampled prior to processing. Similarly, the EDR/FDR bead (polishing) resins are also sampled prior to processing.
- b.
Equipment drain system - Wastes from the turbine building, reactor building, and radwaste building equipment drain sumps are routinely monitored and collected in the waste collector tank. Sludges and resins from the high purity filter demineralizers are sampled prior to processing as described above in the FDR system description.
- c.
Condensate filter demineralizer system - The condensate polishing filter demineralizers use pressure precoated ion exchange media filters. Resins are sampled prior to processing.
- d.
Reactor water cleanup filter demineralizer system - The RWCU filter demineralizers use pressure precoated ion exchange media filters. Resins are sampled prior to processing.
Accumulations in collection tanks and phase separators will be tracked to aid in determining processing schedules and potential problems in system operation by tracking volumes.
Selected coolant isotopic concentrations are trended to provide early indication of changes important to waste classification.
The waste streams in the foregoing systems are characterized by a periodic sampling and analysis program that establishes plant-specific isotopic correlation factors and relationships for inferring concentrations (i.e., scaling factors) of all 10 CFR 61 nuclides from easy to measure gamma-emitting species.
Individual waste stream activities and concentrations are determined for each batch prior to shipment for disposal. The evaluation of historical evidence is used as a screen to determine the appropriate disposal container followed by a formal evaluation based on actual samples or dose to curie determinations as appropriate.
11.4.3.5 Processing Methods (Wet Wastes)
The dewatering units are portable systems containing all necessary equipment and controls for removing the free water from ion-exchange resins and filter media.
COLUMBIA GENERATING STATION Amendment 61 FINAL SAFETY ANALYSIS REPORT December 2011 LDCN-08-026 11.4-11 Containers used for dewatering are furnished to CGS with factory installed internals functionally identical to those used during qualification testing. The determination of functionally identical may be performed by the vendor in accordance with their NRC approved Quality Assurance program or by CGS in accordance with the Quality Assurance program. The internals are free-standing and self-supporting, without protuberances which might damage the container. A fill head interfaces with the container and liner dewatering internals. The dewatering equipment is operated using the labeled controls on the control panel.
The resins that are below the Class A limits of 10 CFR 61 are normally dewatered in carbon steel containers. Resins exceeding Class A limit are dewatered in HICs to provide waste form stability.
The RDS process includes use of moisture indicators and the SEDS process uses dewatering verification to verify that free liquid criteria are met.
11.4.3.6 Control Instrumentation and Sampling Program Processing of radwaste at CGS is conducted using instrumentation and controls for each batch to ensure that (a) suitable, well characterized waste is delivered to the various waste processing subsystems, (b) adequate process control information is provided to system operators to ensure adherence to proper operating parameter limits, such as tank levels, flow rates, release concentrations, etc., and (c) sufficient information is available to limit personnel exposures in conformance with the ALARA program.
The control instrumentation used at CGS includes in-process instruments, as well as portable radiation monitoring instruments.
The sampling program at CGS is a twofold program. Individual waste streams are characterized and classified by CGS personnel with the responsibility for shipping radioactive waste. Additionally, samples are sent to an offsite laboratory on a periodic basis to validate scaling factors.
11.4.3.7 Maintenance and Calibration The control of the waste processing system is ensured by a thorough preventative and corrective maintenance program described in plant procedures for scheduled maintenance systems and maintenance work requests.
The control instrumentation is an integral part of the process system. The instruments providing the controlling functions are calibrated on a predetermined schedule and after each maintenance activity as applicable.
COLUMBIA GENERATING STATION Amendment 61 FINAL SAFETY ANALYSIS REPORT December 2011 LDCN-08-026 11.4-12 The periodic verification of calibration or recalibration assures that the process control program associated instruments are maintained and that conditions within the system are known.
The maintenance and calibration activities are performed in accordance with written procedures.
11.4.3.8 Waste Processing System Capacity Wastes can be dewatered in up to 210 ft3 liners in approximately 8 to 12 hr. This gives two shift operation a processing capacity of at least 100,000 ft3 of waste per year. Similar processing capacity is available from portable solidification equipment which could be moved onsite if solidification to provide stabilization became necessary.
Dry wastes are segregated and monitored to reduce volumes where practicable. The expected design basis volume of radwaste is approximately 20,000 ft3/year, however, actual volumes have been reduced to less than 10,000 ft3/year. Forced outages and refueling outages increase volume but can be limited by preplanning material usage.
The radwaste processing capacity at CGS is sized to provide the needed capacity for anticipated occurrences and normal operation. This includes wet wastes, liquids, and solid wastes. Table 11.4-1 lists some of the major flowrates and capacities for several of the waste processes. Table 11.4-2 tabulates the major equipment items in the permanently installed waste processes.
11.4.3.9 Waste Storage Capacity The storage capacity for DAW is adequate due to containerization allowing outside storage prior to shipping.
For the liners currently in use (up to 210 ft3 capacity), approximately 15 liners can be readily accommodated. This storage space is available for the portable waste processing system and to store processed liners. Sufficient casks and transport packages have been factored into the planning to allow shipment of processed radwaste at a rate to preclude storage problems.
11.4.3.10 Compliance With ALARA Principles
- a.
Facility layout for the portable dewatering equipment - The portable dewatering systems are designed to meet Regulatory Guide 8.8. The waste container filling, capping, and decontamination operations are either performed remotely from a control area or as quickly as possible to minimize exposures. The system operator can view container filling and processing operations using a television monitoring system to prevent overfilling the waste container.
COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 11.4-13 The portable system is located to limit the exposure of personnel to high dose rate piping and is designed to minimize the accumulation of crud deposits in the system. Piping and pumps are designed to allow complete flushing and, when possible, piping is flushed prior to maintenance. The control area is located in a relatively low radiation area away from the dewatering operation. Equipment with clean components is segregated from the areas containing waste except in the processing area. This allows maintenance on non-contaminated equipment to be performed in low radiation areas.
The placement of the portable processing system was determined based on criteria from Regulatory Guide 8.8 on ALARA and quality assurance provisions from Regulatory Guide 1.143. Processing radiation shields, in-cask processing and/or careful planning of processing activities contribute to efforts to minimize exposures from radwaste system operations.
- b.
Plant layout for ALARA - The installed radwaste processing system (excluding the portable dewatering system) was designed for remote operation from the radwaste control room in the 467-ft elevation of the radwaste building. The control room is designed with visual aids mimicking the processes being controlled. This allows for visual indication of processing status.
- c.
Exposure control - The radwaste operators control the processing of radioactive waste from the radwaste control room that is located in a low radiation area.
Most radwaste processing system components and systems can be remotely aligned from the radwaste control room without going into the radiation areas.
This allows flexibility of operation and ensures processing capacity is maintained with reduced exposure to personnel. The systems and components can be flushed remotely from the control room reducing radiation levels for maintenance activities, also helping meet the ALARA concept.
The installed systems at CGS are sized with the capacity to process peak volumes of waste to reduce the effluents offsite, meeting criteria of 10 CFR 50, Appendix I.
The processing control from a remote control room and the ability to process all waste streams meets the intent of ALARA for both onsite and offsite.
COLUMBIA GENERATING STATION Amendment 61 FINAL SAFETY ANALYSIS REPORT December 2011 LDCN-10-018 11.4-14 11.4.3.11 Unanticipated Wastes The waste streams at CGS have been characterized for normal expected waste components.
Periodically, there may be waste produced from operations such as decontamination or cleaning that have not been characterized.
These wastes are classified and processed for disposal based on the practical experience of the CGS staff. It is unlikely that any wastes will be produced at CGS that cannot be prepared for disposal in accordance with 10 CFR 61. When changes in the system or process do occur that are out of the ordinary, processing requirements will be determined on a case-by-case basis.
11.4.3.12 Waste Classification Waste is classified at CGS to determine if wastes meet 10 CFR 61 Class A, B, or C. The individual waste stream will be sampled and analyzed for nuclides in Tables 1 and 2 of 10 CFR 61 to establish the waste classification. This analysis may in many instances use scaling factors to tie difficult to measure nuclides, to more easily identified gamma emitting nuclides. The requirements for the determination of these scaling factors is administratively controlled by plant procedure.
11.4.3.13 Waste Packaging and Shipping The radioactive waste shipped from CGS for disposal or further processing is containerized, prepared, and shipped in accordance with applicable state, DOT, and NRC regulations.
COLUMBIA GENERATING STATION Amendment 54 FINAL SAFETY ANALYSIS REPORT April 2000 Table 11.4-1 Waste Processing Systems Capacities LDCN-98-139 11.4-15 Waste Processing Systems Flow Rates and Capacities Liquid Waste EDR subsystem 14,341 to 104,826 gpd EDR storage 135,000 gal FDR subsystem 5700 to 55,289 gpd FDR storage 40,000 gal Chemical waste subsystem 1500 to 20,600 gpd Chemical waste storage 65,000 gal Filter sludge and chemical waste concentrates Normal 8000 to 16,000 ft3/year Processed volume for disposal 8000 to 16,000 ft3/year Portable solidification system Normal 200 ft3/day Maximum 100,000 ft3/yeara Storage 72 50-ft3 liners Dry compactible waste Compactible radwaste 20,000 ft3/year Dewatering system Normal 200 ft3/12-hr shift Maximum 100,000 ft3/yeara a Figured on two shifts with increase in personnel.
Table 11.4-2 Solid Waste Management System Major Equipment Items Equipment Number Required Construction Design Pressure Design Temperature Capacity COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 11.4-16 Cleanup phase separators 2
Stainless steel shell and internals Atmospheric 250°F 4500 gal each Cleanup sludge discharge mixing pump 1
Stainless steel 150 psig 150°F 210 gpm at 170 ft TDH Cleanup decant pump 1
Stainless steel 150 psig 150°F 53 gpm at 50 ft TDH Condensate backwash receiving tank 1
Stainless steel shell and internals Atmospheric 150°F 19,000 gal Condensate backwash transfer pump 1
Stainless steel 150°F 450 gpm at 50 ft TDH Condensate phase separator 2
Epoxy-coated carbon steel shell, stainless steel internals Atmospheric 250°F 23,500 gal each Condensate sludge discharge mixing pump 1
Stainless steel 150 psig 150°F 420 gpm at 160 ft TDH Condensate decant pump 1
Stainless steel 150 psig 150°F 450 gpm at 50 ft TDH Waste sludge phase separator tank 1
Epoxy-coated carbon steel, stainless steel internals Atmospheric 150°F 13,000 gal Waste decant pump 1
Stainless steel 150 psig 150°F 53 gpm at 50 ft TDH Waste sludge discharge mixing pump 1
Stainless steel 150 psig 150°F 210 gpm at 105 ft TDH
Table 11.4-2 Solid Waste Management System Major Equipment Items (Continued)
Equipment Number Required Construction Design Pressure Design Temperature Capacity COLUMBIA GENERATING STATION Amendment 57 FINAL SAFETY ANALYSIS REPORT December 2003 LDCN-02-029 11.4-17 Spent resin tank 1
Stainless steel shell and internals Atmospheric 150°F 1200 gal Spent resin pump 1
Stainless steel 150 psig 150°F 21 gpm at 105 ft TDH Decontamination solution concentrated waste tanka 2
Stainless steel shell and internals Atmospheric 150°F 700 gal each Decontamination solution concentrated waste pumpa 1
Stainless steel 150 psig 150 °F 30 gpm at 70 ft TDH Concentrated waste measuring tanka 1
Stainless steel Atmospheric 150°F 400 gal Transfer dollyb 1
a Not in service.
b Track riding dolly for transfer of waste containers between the storage area and truck shipping area.
Table 11.4-3 Significant Isotope Activity in Dewatered Waste Stream Clean up Sludge Waste Sludge Equipment Drain Resin Floor Drain Resin Condensate Sludge Batch Solid Production 524 lb/60 days 220 lb/3.4 days 1539 lb/66 days 1539 lb/67 days 3300 lb/18.5 days Isotopes Ci/ft3 COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 11.4-18 89Sr 0.63 9.0 x 10-3 6.5 x 10-5 4.8 x 10-3 90Sr 0.16 1.0 x 10-3 7.2 x 10-6 8.4 x 10-4 91Sr 5.2 x 10-3 3.7 x 10-5 92Sr 0.46 1.0 x 10-3 3.4 x 10-5 7.1 x 10-6 90Y 0.16 1.0 x 10-3 3.4 x 10-5 8.4 x 10-4 91Y 0.023 2.3 x 10-3 1.7 x 10-3 91mY 3.6 x 10-3 92Y 1.0 x 10-3 95Zr 0.29 8.1 x 10-4 4.2 x 10-4 95Nb 0.44 1.1 x 10-3 8.4 x 10-4 6.3 x 10-4 99Mo 2.0 x 10-3 2.9 x 10-3 2.4 x 10-5 1.3 x 10-4 99mTc 0.0015 1.3 x 10-3 9.7 x 10-3 1.1 x 10-4 1.3 x 10-4 103Ru 2.1 x 10-4 122Sb 0.020 2.0 x 10-4 1.1 x 10-5 129mTe 0.038 1.3 x 10-4 6.9 x 10-7 129Te 0.024 132Te 1.6 x 10-2 1.3 x 10-4 1.3 x 10-4 83Br 1.3 x 10-4 4.5 x 10-6
Table 11.4-3 Significant Isotope Activity in Dewatered Waste (Continued)
Stream Clean up Sludge Waste Sludge Equipment Drain Resin Floor Drain Resin Condensate Sludge Batch Solid Production 524 lb/60 days 220 lb/3.4 days 1539 lb/66 days 1539 lb/67 days 3300 lb/18.5 days Isotopes Ci/ft3 COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 11.4-19 131I 0.077 7.8 x 10-4 1.01 x 10-2 7.4 x 10-5 2.3 x 10-2 132I 1.7 x 10-3 3.5 x 10-5 1.3 x 10-4 133I 7.3 x 10-3 7.7 x 10-5 134I 8.4 x 10-4 4.7 x 10-5 135I 3.6 x 10-3 5.7 x 10-5 134Cs 0.17 3.0 x 10-3 6.0 x 10-4 4.9 x 10-6 4.2 x 10-4 136Cs 0.0078 1.3 x 10-4 137Cs 0.18 4.4 x 10-3 1.0 x 10-3 7.6 x 10-6 8.4 x 10-4 138Cs 2.1 x 10-4 137mBa 0.17 1.0 x 10-3 6.3 x 10-4 139Ba 8.4 x 10-4 3.9 x 10-5 140Ba 0.076 1.0 x 10-2 2.6 x 10-5 2.7 x 10-3 141Ce 1.3 x 10-4 3.8 x 10-3 144Ce 0.019 1.3 x 10-4 4.7 x 10-6 6.3 x 10-4 140La 0.087 3.9 x 10-5 1.0 x 10-2 2.9 x 10-3 141La 2.1 x 10-4 142La 1.3 x 10-4 143Pr 0.022 1.3 x 10-4 8.4 x 10-4
Table 11.4-3 Significant Isotope Activity in Dewatered Waste (Continued)
Stream Clean up Sludge Waste Sludge Equipment Drain Resin Floor Drain Resin Condensate Sludge Batch Solid Production 524 lb/60 days 220 lb/3.4 days 1539 lb/66 days 1539 lb/67 days 3300 lb/18.5 days Isotopes Ci/ft3 COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 11.4-20 144Pr 0.019 1.3 x 10-4 6.3 x 10-4 239Np 5.4 x 10-2 4.5 x 10-4 51Cr 1.8 1.5 x 10-2 4.4 x 10-4 4.1 x 10-6 3.1 x 10-3 54Mn 0.089 2.1 x 10-3 1.3 x 10-4 7.0 x 10-5 6.6 x 10-4 56Mn 2.3 x 10-4 2.2 x 10-4 7.8 x 10-6 58Co 1.8 3.3 x 10-3 8.4 x 10-3 6.1 x 10-5 6.2 x 10-2 60Co 0.65 2.4 x 10-2 1.1 x 10-3 9.2 x 10-6 9.7 x 10-3 59Fe 0.018 2.6 x 10-4 1.3 x 10-4 8.3 x 10-7 8.8 x 10-4 65Zn 2.1 7.4 x 10-2 3.5 x 10-4 2.3 x 10-4 4.4 x 10-4 110mAg 0.14 8.8 x 10-6 1.3 x 10-4 9.0 x 10-6 1.1 x 10-3 187W 1.5 x 10-4 1.3 x 10-4 1.4 x 10-6 Total 9.67 1.4 x 10-1 1.7 x 10-1 1.7 x 10-3 1.2 x 10-1
Table 11.4-4 Expected Annual Production of Solids COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 11.4-21 ft3/year Normal Activity Ci/Containera Maximum Activity Ci/Containera Cleanup filter demineralizer sludge 720 1196 1820 Condensate filter demineralizer sludge 7460 19 40 Waste floor drain and fuel pool filter demineralizer sludge 1000 0.2 3.4 Waste demineralizer resin 540 29 330 Total volume (ft3) 9720 a Based on 164 ft3 of dewatered resin per container
Form No. 960690ai Columbia Generating Station Final Safety Analysis Report 11.4-1 30 M536 Flow Diagram Radioactive Waste Disposal Solids Handling System Rev.
Figure Draw. No.
Amendment 61 December 2011
COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 11.5-1 11.5 PROCESS AND EFFLUENT RADIOLOGICAL MONITORING AND SAMPLING SYSTEMS The process and effluent radiological monitoring and sampling systems are provided to allow determination of the content of radioactive material in various gaseous and liquid process and effluent streams. The design objective and criteria are primarily determined by the system designation of either
- a.
Instrumentation systems required for safety, or
- b.
Instrumentation systems required for plant operation.
11.5.1 DESIGN BASIS 11.5.1.1 Design Objectives The process and effluent radiological monitoring and sampling system is designed to provide for compliance with the requirements of 10 CFR Part 50 including the General Design Criteria (GDC) of Appendix A and provides the monitoring and sampling required to make measurements, evaluations, and reports recommended by Regulatory Guide 1.21, Revision l.
11.5.1.1.1 Systems Required for Safety The main objective of radiation monitoring systems (RMS) required for safety is to initiate appropriate protective action to limit the release of radioactive materials from the reactor vessel and reactor building if predetermined radiation levels are exceeded in major process/effluent streams and to limit inflow of airborne radioactivity to the control room following an accidental release. Additional objectives are to have these systems available under all operating conditions, including accidents and postaccidents, and to provide control room personnel with an indication of the radiation levels in the major process/effluent streams plus alarm annunciation if high radiation levels are detected.
The RMS provided to meet these objectives are
- a.
- b.
Reactor building ventilation exhaust plenum RMS,
- c.
Control room fresh air intake RMS, and
- d.
Standby service water RMS.
11.5.1.1.2 Systems Required for Plant Operation The main objective of the RMS is to provide operating personnel with measurement of the content of radioactive materials in all effluent and important process streams. This allows demonstration of compliance with Technical Specifications by providing gross radiation level
COLUMBIA GENERATING STATION Amendment 58 FINAL SAFETY ANALYSIS REPORT December 2005 LDCN-04-052 11.5-2 monitoring and collection of halogens and particulates on cartridges and filters (gaseous effluents). Additional objectives are to initiate discharge valve isolation on the offgas, liquid radwaste, or drain systems if predetermined release rates are exceeded and to provide for sampling at certain radiation monitor locations to allow determination of specific radionuclide content.
The RMS provided to meet these objectives are
- a.
For gaseous process streams
- 1.
Offgas pretreatment RMS,
- 2.
Offgas post-treatment RMS,
- 3.
Charcoal bed vault RMS, and
- 4.
Mechanical vacuum pump exhaust RMS.
- b.
For gaseous effluent streams
- 1.
Reactor building elevated release duct RMS,
- 2.
Turbine generator building ventilation release duct RMS, and
- 3.
Radwaste building ventilation release duct RMS.
- c.
For liquid process streams
- 1.
Standby service water RMS and
- 2.
Reactor building closed cooling water RMS.
- d.
For liquid effluent streams
- 1.
Radwaste effluent RMS,
- 2.
Circulating water (blowdown) RMS,
- 3.
Standby service water RMS, and
- 4.
Plant service water (TSW) RMS.
- e.
For primary containment monitoring
- 1.
Leak detection RMS and
- 2.
Loss-of-coolant accident (LOCA) tracking RMS.
COLUMBIA GENERATING STATION Amendment 58 FINAL SAFETY ANALYSIS REPORT December 2005 11.5-3 11.5.1.2 Design Criteria 11.5.1.2.1 Systems Required for Safety The design criteria for the RMS required for safety are that the systems shall:
- a.
Withstand the effect of natural phenomena (e.g., earthquakes) without loss of capability to perform their functions,
- b.
Perform its intended safety function in the environment resulting from normal and postulated accident conditions,
- c.
Meet the reliability, testability, independence, and failure mode requirements of engineered safety features,
- d.
Provide continuous output on control room panels,
- e.
Permit checking of the operational availability of each channel during reactor operation with provision for calibration function and instrument checks,
- f.
Ensure an extremely high probability of accomplishing its safety function in the event of anticipated operational occurrences,
- g.
Initiate prompt protective action prior to exceeding Technical Specifications
- limits,
- h.
Provide warning of increasing radiation levels indicative of abnormal conditions by alarm annunciation,
- i.
Insofar as practical, provide self-monitoring of components to the extent that power failure or component malfunction causes annunciation and channel trip,
- j.
Register full scale output if radiation detection exceeds full scale, and
- k.
Have sensitivities and ranges compatible with anticipated radiation levels.
The applicable GDC are 1, 2, 3, 4, 13, 19, 20, 21, 22, 23, 24, 29, 60, and 64 (see Section 3.1). The systems shall meet the design requirements for Safety Class 2, Seismic Category I systems, along with the quality assurance requirements of 10 CFR Part 50, Appendix B.
COLUMBIA GENERATING STATION Amendment 58 FINAL SAFETY ANALYSIS REPORT December 2005 11.5-4 11.5.1.2.2 Systems Required for Plant Operation The design criteria for operational RMS are that the systems shall
- a.
Provide continuous indication of radiation levels in the main control room,
- b.
Provide warning of increasing radiation levels indicative of abnormal conditions by alarm annunciation,
- c.
Insofar as practical, provide self-monitoring of components to the extent that power failure or component malfunction causes annunciation and, for systems initiating protective action, channel trip,
- d.
Monitor a sample representative of the bulk stream or volume,
- e.
Have provisions for calibration, function and instrumentation checks,
- f.
Have sensitivities and ranges compatible with anticipated radiation levels and Technical Specifications limits, and
- g.
Register full scale output if radiation detection exceeds full scale.
The RMS monitors discharges from the gaseous and liquid radwaste treatment systems and nonradioactive sumps have provisions to alarm and to initiate automatic closure of the effluent discharge valves on the affected treatment systems prior to exceeding the normal operation limits specified in the Technical Specifications. Additionally, the primary containment monitoring system meets the criteria, except for item g.
The applicable GDC are 13, 60, and 64 (see Section 3.1).
11.5.2 SYSTEM DESCRIPTION 11.5.2.1 Systems Required for Safety Information on these systems is presented in Tables 11.5-1 and 11.5-2 and the arrangements shown in Figures 11.5-1 through 11.5-4. The equipment is designed to Quality Class I and Seismic Category I requirements. High reliability is further achieved by the use of redundancy as noted below.
11.5.2.1.1 Main Steam Line Radiation Monitoring System This system monitors the gamma radiation level exterior to the main steam lines. The normal radiation level is produced primarily by coolant activation gases plus smaller quantities of
COLUMBIA GENERATING STATION Amendment 58 FINAL SAFETY ANALYSIS REPORT December 2005 11.5-5 fission gases being transported with the steam. In the event of a gross release of fission products from the core, this monitoring system provides signals to the following:
- a.
Reactor water sample valves,
- b.
Mechanical vacuum pumps,
- c.
Mechanical vacuum pumps isolation valves,
- d.
Gland seal exhausters, and
- e.
Control room annunciators.
The system consists of four redundant instrument channels. Each channel consists of a local detector (gamma-sensitive ion chamber) and a control room radiation recorder and a readout module with an auxiliary trip unit. Power for two channels (A and C) is supplied from the reactor protection system (RPS) bus A and for the other two channels (B and D) from RPS bus B. Channels A and C are physically and electrically independent of channels B and D.
The detectors are located near the main steam lines in the steam tunnel as it enters the turbine building. The detectors are geometrically arranged so that this system is capable of detecting significant increases in radiation level with any number of main steam lines in operation.
Each radiation monitor has four trip circuits: two upscale (high-high and high), one downscale (low), and one inoperative. Each trip is visually displayed on the affected radiation readout module. A high-high or inoperative trip results in a channel trip in the auxiliary unit which is an input to the reactor water sample valves, mechanical vacuum pump shutdown, and discharge valve closure. A high trip actuates a main steam line (MSL) high control room annunciator common to all channels. A downscale and inoperative trip actuates a MSL downscale/inoperative control room annunciator common to all channels. High and low trips do not result in a channel trip. Each radiation monitor displays the measured radiation level.
Arrangement details are shown in Figure 11.5-1.
11.5.2.1.2 Reactor Building Exhaust Plenum Radiation Monitoring System This system monitors the radiation level of the reactor building ventilation system exhaust plenum prior to its discharge from the building into the elevated release duct. A high radioactivity level in the exhaust system could be due to fission gases from a leak or an accident.
The system consists of four redundant instrument channels. Each channel consists of a local detection assembly (a sensor and converter unit containing a Geiger-Mueller (GM) tube and electronics) and a control room radiation readout module. The 120-V ac power for channels (A and B) is provided from Division 1, and for channels (C and D) from Division 2 power panels; the multipoint strip chart recorder supplied from the Division 2 uninterruptible power supply (UPS) power panel records the output of all four channels. The detection assemblies
COLUMBIA GENERATING STATION Amendment 59 FINAL SAFETY ANALYSIS REPORT December 2007 LDCN-05-009 11.5-6 are located outside the exhaust air plenum upstream of the secondary containment discharge isolation valves. The distance upstream from the inboard discharge isolation valve is such that, at the maximum design flow, the transport time from the detector location to the inboard discharge valve is greater than the total time required to respond to trip level radiation and close the inboard discharge valve before exceeding 10 CFR 50.67 dose limits (see Section 9.4.2.3).
Each radiation monitor has two trip circuits: one upscale (high-high) and one downscale/inoperative (fail safe design). Two-out-of-two upscale/downscale trips (channels A and B) initiates closure of the reactor building ventilation outboard isolation valves and the primary containment outboard purge and vent valves, and initiates startup of standby gas treatment (SGT) system train B. The same condition for channels C and D initiates closure of the corresponding inboard valves and initiates startup of SGT train A.
An upscale trip is displayed on the affected radiation readout module and actuates a reactor building vent high-high radiation control room annunciator common to all channels.
A downscale trip is also displayed on the radiation readout module and actuates a reactor building vent downscale control room annunciator common to all channels.
An additional trip signal for high radiation alarm is provided by the recorder and actuates a reactor building vent high radiation control room annunciator. Each radiation monitor displays the measured radiation level.
Arrangement details are shown in Figure 11.5-2.
11.5.2.1.3 Control Room Fresh Air Intake Radiation Monitoring System This monitoring system measures the radioactivity in the two remote fresh air intake lines to the main control room. In the event of a release of abnormal gaseous radioactivity from the plant and the transporting of this radioactivity by wind currents to the remote air intakes, the monitoring system provides an alarm in the control room. The system consists of two divisionally separated channels. Each channel consists of redundant local detectors (beta scintillation type) and redundant control room indicator-trip units, alarms, and output to a recorder.
Required 120-V ac supply for Division 1 and 2 equipment in both the main control room and remote locations is provided on a divisional basis by 120/240-V ac critical (Class 1E) instrumentation power system.
Gas samples are withdrawn from sample probes in a continuously flowing section of the fresh air intake pipelines. These samples run in stainless steel tubing to local sample racks located on the 441-ft level of the radwaste building. The four divisionally separated local cabinets each have a detector and preamplifier, blower, and sample flow rate measuring equipment.
COLUMBIA GENERATING STATION Amendment 59 FINAL SAFETY ANALYSIS REPORT December 2007 11.5-7 The detectors are housed in lead shields to minimize the effects of background radiation and enhance response to low level radioactivity. Associated radiation readout modules and recorders are mounted in the main control room.
Each radiation monitor has three trip circuits: one upscale for high radiation, one upscale for high-high radiation, and one downscale for instrument inoperative. All alarms annunciate in the main control room.
Arrangement details are shown in Figure 11.5-3.
11.5.2.l.4 Standby Service Water Radiation Monitoring System This system monitors gamma radiation levels of the service water liquid process and effluent streams.
Each monitor system consists of a gamma scintillation detector inserted into an offline chamber to which a process stream sample is piped. The detector locations are selected to obtain a reasonable geometry and are positioned away from crud trap and associated high background regions. Lead shielding is provided to further reduce background levels.
At each liquid offline detector location, a continuous sample from the liquid process pipe passes through a shielded detection assembly for gross radiation monitoring and then is returned to the process pipe. The detection assembly consists of a detector mounted in a shielded sample chamber. The local radiation monitor and the meter in the control room display the measured gross radiation level. The sample chamber and lines can be drained to allow assessment of background buildup. The flow meter at the sample rack provides local sample line flow indication.
Sample flow for each detector is from the standby service piping downstream of each of the two residual heat removal (RHR) heat exchanger (loops A and B). These monitors are designed to detect any primary coolant leakage into the standby service water through the RHR heat exchanger, during operation of the RHR heat exchangers in the shutdown heat removal mode.
Additional details are shown in Figure 11.5-4.
11.5.2.2 Systems Required for Plant Operation All systems associated with the plant process cycle provide for indication and recording of radiation levels in the main control room in conjunction with alarm annunciation features.
Information on these systems is presented in Tables 11.5-1 and 11.5-2 and the arrangements are shown in Figures 11.5-2 and 11.5-4 through 11.5-10.
COLUMBIA GENERATING STATION Amendment 61 FINAL SAFETY ANALYSIS REPORT December 2011 LDCN-08-014 11.5-8 11.5.2.2.1 Gaseous Process and Effluent Radiation Monitoring System 11.5.2.2.1.1 Offgas Pretreatment Radiation Monitoring System. This system monitors radioactivity at the outlet of the water separator downstream of the catalytic recombiners. The monitor detects the radiation level which is attributable to the fission gases produced in the reactor and transported with steam through the turbine to the condenser.
A continuous sample is extracted from the offgas pipe via a stainless steel sample line that is then passed through a sample chamber and a sample panel before being returned to the suction side of the steam jet air ejector (SJAE). The sample chamber is a steel pipe which is internally polished to minimize plateout. It can be purged with room air to check detector response by using a three-way solenoid-operated valve. The valve is controlled by a switch located in the main control room. The sample panel measures and indicates sample line flow.
The detector is a gamma-sensitive ionization chamber mounted external to the sample chamber.
The channel has a logarithmic radiation readout module which provides a system alarm output and is provided with a recorder.
The 120-V ac UPS power for count ratemeter and trip auxiliary circuit is supplied from critical Division 2 panel; strip chart recorder receives reliable (Division B) instrument power, and local 120-V ac for the offgas sample and vial sampler control panel.
The radiation readout module has four trip circuits: two upscale (high-high and high), one downscale (low), and one inoperative. The trip outputs are used for alarm function only.
Each trip is displayed on the radiation monitor and actuates a control room annunciator: offgas high-high, offgas high, and offgas downscale/inoperative. Sample line flow is displayed at the sample panel.
The radiation level output by the monitor can be directly correlated to the concentration of the noble gases by using the semiautomatic vial sampler panel to obtain a grab sample. To draw a sample, a serum bottle is inserted into a sample chamber, the sample lines are evacuated, and a solenoid-operated sample valve is opened to allow offgas to enter the bottle. After the sampling bottle is removed, the sample is analyzed in the counting room with a multichannel gamma analyzer to determine the concentration of the various noble gas radionuclides.
A correlation between the observed activity and the monitor reading permits calibration of the monitor.
For arrangement details see Figure 11.5-5.
11.5.2.2.1.2 Offgas Posttreatment Radiation Monitoring System. This system monitors radioactivity in the offgas piping downstream of the offgas system charcoal vessels and upstream of the offgas system discharge valve. A continuous sample is extracted from the
COLUMBIA GENERATING STATION Amendment 61 FINAL SAFETY ANALYSIS REPORT December 2011 11.5-9 offgas system piping, passed through the offgas posttreatment sample panels for monitoring and sampling, and returned to the offgas system piping. Each sample panel has a cartridge and filter (one for particulate collection and one for halogen collection) in series with filter bypass capabilities (with respect to flow) with two identical continuous gross radiation detection assemblies. Each gross radiation detection assembly consists of a shielded chamber, a radiation detector, and a check source. Two radiation monitors in the main control room display the measured gross radiation level.
The sample panels and shielded chambers can be purged with room air to check detector response by using solenoid valves that can be operated from the control room or at the sample panels. The sample panels measure and indicate sample line flow. A solenoid operated check source for each detection assembly operated from the control room or locally can be used to check operability of the gross radiation channel.
Channel A monitor receives reliable (Division A) 120-V ac power and channel B is supplied with Division 2 power; the +/-24-V dc auxiliary trip circuits are supplied internally from the monitor power supply. Control room chart recorder receives reliable (Division B) instrument power. Offgas posttreatment sample panel 11A is provided 120-V ac (Division A) power and offgas posttreatment sample panel 11B is provided 120-V ac (Division B) power.
Each radiation readout module has four trip circuits: two upscale (high-high-high, and high),
one downscale (low), and one inoperative. Each trip is visually displayed on the radiation monitor. The first three trips actuate corresponding control room annunciators: offgas posttreatment high-high-high radiation, offgas posttreatment high radiation, and offgas posttreatment downscale. A high-high trip from the recorder actuates an offgas posttreatment high radiation annunciator in the main control room. High or low sample flow measured at the sample panel actuates a control room offgas posttreatment trouble annunciator.
A trip auxiliary unit in the control room takes the high-high-high and downscale trip outputs and, if its logic is satisfied, initiates closure of the offgas system discharge and drain valves.
The logic is satisfied if two high-high-high, one high-high-high and one downscale, or two downscale trips occur. The high-high-high trip setpoints are determined such that valve closure is initiated prior to exceeding Technical Specifications limits. Any one high upscale trip initiates closure of the offgas system bypass line valve and initiates opening of the charcoal adsorber treatment line valve.
Grab sampling functions required for isotopic analysis and gross monitoring calibrations can be performed at each redundant sample panel.
For arrangement details see Figure 11.5-5.
11.5.2.2.1.3 Offgas Charcoal Bed Vault Radiation Monitoring System. The charcoal bed vault air handling room is monitored for an increase in the gross gamma radiation level from
COLUMBIA GENERATING STATION Amendment 61 FINAL SAFETY ANALYSIS REPORT December 2011 11.5-10 leakage of radioactive noble gases out of the treatment system. The channel includes a sensor, indicator, trip unit, and a locally mounted auxiliary unit. The detector is mounted outside of the air handling room door. The insulated door only attenuates 80 keV gamma (133Xe) by approximately 40%. An indicator and trip unit is located in the main control room. The channel provides for sensing and readout, both local and remote, of gamma radiation over a range of six logarithmic decades (10+0 to 10+6 mR/hr).
The indicator and trip unit has one adjustable upscale trip circuit for alarm and one downscale trip circuit for instrument inoperative which annunciates in the main control room. The trip circuits are capable of convenient operational verification by means of test signals or through the use of portable gamma sources. Power is supplied from the channel A power supply of the reactor handling ventilation exhaust plenum RMS.
For arrangement details see Figure 11.5-2.
11.5.2.2.1.4 Mechanical Vacuum Pump Exhaust Radiation Monitoring System. The radiation monitor on the mechanical vacuum pump exhaust is designed to alarm, stop, and isolate the mechanical vacuum pumps in the case of high level of radioactive gases in air being exhausted to the reactor building elevated release duct. The mechanical vacuum pump is operated during plant startups to remove bulk air from the condenser and is secured at the point where the steam jet air ejection suction is available and condenser offgases are routed through the recombiner charcoal process treatment system. In addition to monitoring discharges via the mechanical vacuum pumps, the turbine gland seal air exhauster system is continuously monitored via this process radiation monitoring system. Clean sealing steam is used on the turbine gland seals to maintain the releases of radionuclides to as low as is reasonably achievable (ALARA) limits. The monitor complies with GDC 64 and is Quality Class II and Seismic Category II.
The channel includes an energy-compensated GM detector, a readout module, and recorder in the main control room. The channel provides for sensing and readout, both local and remote, of gamma radiation over a range of four logarithmic decades (10-2 to 102 mR/hr).
The indicator and trip unit has two adjustable trip circuits. The upscale trip circuit generates a high radiation alarm and stops the mechanical vacuum pumps. The adjustable downscale trip circuit generates an instrument alarm.
For arrangement details see Figure 11.5-6.
11.5.2.2.1.5 Reactor Building Elevated Release Duct Radiation Monitoring System. This monitoring system measures radioactivity in the reactor building elevated release duct from the gland seal and mechanical vacuum pumps, the treated offgas effluent, the SGTS exhaust, and the exhaust air from the reactor building ventilation. This system consists of two main subsystems, an offline sampling system and an inline gamma radiation monitoring system.
COLUMBIA GENERATING STATION Amendment 62 FINAL SAFETY ANALYSIS REPORT December 2013 LDCN-09-046 11.5-11 The sampling system is used to comply with Regulatory Guide 1.21, Revision 1, and as such satisfies GDC 64. A continuous representative sample is extracted from the elevated release duct through an isokinetic probe, passes down a 50-ft vertical tube, through a filter to collect particulates, and through an impregnated charcoal cartridge to collect iodine. The sample travels through a flow indicator and then a sample pump prior to being returned downstream to the sampling point. Samples are analyzed at least weekly to determine the quantities of the specific radionuclides released. The sample flow rate is indicated and totalized locally and the exhaust duct flow is also indicated locally. Both of these variables are recorded and alarmed in the control room and are input to the transient data acquisition system (TDAS). Arrangement details are shown in Figure 11.5-6. Table 11.5-3 lists sampling frequencies and required sensitivities.
The gamma radiation monitoring system uses three separate detectors. The low range detector is used to satisfy Regulatory Guide 1.21, Revision 1, and as such, complies with GDC 64.
The intermediate and high range detectors, along with the LOCA detectors of Section 11.5.2.2.3.2, are used to satisfy NUREG-0737 and Regulatory Guide 1.97, Revision 2, requirements and, as such, comply with GDC 13 and 64. This system is an EG&G ORTEC Gamma Spectroscopy system. It uses inline detectors to provide an isotopic analysis of the reactor building elevated release duct effluents. Two cryogenically cooled, high purity germanium coaxial detectors provide a range of 1.8 x 10-5 to 7.8 x 104 Ci/cm3 with overlap.
- a.
Intermediate range Approximately 1.8 x 10-5 to 1.8 x 100 Ci/cm3 (133Xe)
- b.
High range Approximately 7.8 x 10-1 to 7.8 x 104 Ci/cm3 (133Xe)
These detectors provide approximately 40% efficiency to a 1332.5 keV gamma [compared to a 3 in. x 3 in. NaI (T1) detector at 25 cm]. Both detectors monitor activity through the release duct and are mounted in the reactor building at elevation 618 ft 7 in. Lead enclosures provide shielding from postaccident background radiation. Collimator design and detector locations ensure representative sampling.
A third high efficiency detector is located inside the release duct to monitor low level normal operation activity. The usable range for this detector is approximately 2.71 x 10-8 to 2.71 x10-3 Ci/cm3. The high efficiency detector provides approximately120% efficiency to 1332.5 keV gamma [compared to a 3 in. x 3 in. NaI (T1) detector at 25 cm].
The postaccident system consists of a computer controlled acquisition and analysis loop, located in radwaste building el. 525 ft, feeding an additional computer located in the control room. Either computer can control detector, signal processing, and spectral analysis functions.
Commercial application software from ORTEC is used for both the control of the detection process and nuclide identification. The libraries which are used for nuclide identification are
COLUMBIA GENERATING STATION Amendment 61 FINAL SAFETY ANALYSIS REPORT December 2011 11.5-12 based on Tables 11.3-8 and 15.6-10 and 15.6-11. The control room computer is used for system status monitoring and data output. System status is monitored and alarmed.
This system provides two types of information and each has its different response time. Gross gamma, in counts/sec, originates at the local acquisition and analysis panel from a log count-rate meter fed directly from the spectroscopic amplifier. This real time signal is then input directly to the trending recorder and TDAS system. The recorder updates its digital display and alarm information every 6 sec. This conforms to the requirement in Regulatory Guide 1.97 to monitor noble gas as a Type C and E, Category 2 variable.
Effluent isotopic information availability is controlled by the detector counting times, which are a function of stack activity. Counting times are increased during periods of low stack activity and will decrease for periods of high activity. System responses will be the sum of the detector counting and data transmission times. Accurate response times for both sets of data will be determined via field testing. This conforms to the requirement in Regulatory Guide 1.97 to monitor particulate and halogen release as a Type E, Category 3 variable.
This system will satisfy the requirements of Regulatory Guide 1.97, Revision 2, and NUREG-0737 for normal and postaccident monitoring of noble gases, particulates, and halogens. All equipment is qualified to operate in the required postaccident environment and is supplied by reliable battery-backed power. It is designed to meet the pertinent sections of ANSI N42.18-1980 (formerly ANSI N13.10), Specification and Performance of On-Site Instrumentation for Continuously Monitoring Radioactivity in Effluents. Additionally, guidelines from ANSI N42.14-1991, Calibration and Use of Germanium Spectrometers for the Measurement of Gamma-Ray Emission Rates of Radionuclides, are used to monitor system performance as part of the surveillance and calibration process. In situ calibration uses National Institute of Standards and Technology (NIST) traceable standards. Additionally, transfer calibrations may be performed on gas samples drawn from the reactor stack and analyzed on NIST referenced equipment when sufficient stack gas activity is present.
Table 11.5-1 lists the sensitivity and range of each detector. Arrangement details are shown in Figure 11.5-11.
These detectors provide continuous monitoring with overlap from normal plant operation (typically in the mid 10-8 decade with no failed fuel) to a worst case DBA LOCA with an expected containment activity of approximately 2.92 x 104 Ci/cm3.
The system has built-in electronic test circuits. Calibration curves have been developed from the calibration data equating activity observed on the monitor to the Ci/cm3 concentration in the effluent. Initial system calibration parameters were established by comparisons between analysis done via the inline system and an NIST traceable gamma spectroscopy system.
Calibration procedures use transfer and linearity standards. Electrical power for this
COLUMBIA GENERATING STATION Amendment 61 FINAL SAFETY ANALYSIS REPORT December 2011 LDCN-11-000 11.5-13 monitoring system is from a reliable power supply. Also see Figure 11.5-11, and Table 11.5-1.
11.5.2.2.1.6 Turbine Generator Building Ventilation Release Duct Radiation Monitoring System. This monitoring system measures the radioactivity in the turbine building exhaust prior to its discharge to the environment and in doing so complies with Regulatory Guide 1.21, Revision 1, GDC 64, and NUREG-0737. This monitor detects the fission and activation products from the steam which may leak from the turbine or the other primary components in the building. The gaseous activity in the exhaust is expected to normally be below detectable levels. The particulate and iodine activity is typically accumulated on a filter and cartridge respectively for a week to obtain sufficient activity to be detectable. These filters are analyzed to determine the quantities of specific radionuclides present and the results, together with the gaseous activity strip chart recorder, provide a permanent record of radioactivity released to the environment.
A continuous representative sample is extracted from the exhaust vent through a multi-ported isokinetic probe, down a 30-ft tube to pass through a filter paper to collect particulates, and through an impregnated charcoal cartridge to collect iodine. The sample travels through two gas monitors, a local flow indicator, and then a sample pump prior to being exhausted to the radwaste building roof area by the turbine building exhaust fans. The sample flow rate is automatically adjusted to compensate for effluent flow changes.
The gas monitors are mounted in lead-shielded chambers. Each gas channel consists of the local detector and preamplifier with count rate meter and a recorder in the main control room.
Arrangement details are shown on Figure 11.5-7.
The normal sample flows through the extended range (10-2 Ci/cm3 to 10+3 Ci/cm3) gas channel and through the low range (10-6 Ci/cm3 to 10-1 Ci/cm3) gas channel, providing an overall range of 10-6 Ci/cm3 to 103 Ci/cm3 with one decade of overlap. The normal-range channel is equipped with a radioactive test source while the extended-range channel has a built-in electronic test circuit. Calibration curves have been developed from the calibration data equating activity observed on the monitor to the Ci/cm3 concentration in the effluent.
Initial system calibration was based on factory calibrations using NBS traceable 133Xe and 85Kr standards. Current calibration procedures use transfer and linearity standards.
These monitors have no control functions. The low range monitor has two adjustable trip circuits, one high and one high-high for high radiation alarm, plus a low trip for instrument inoperative that annunciates in the main control room. The extended range monitor has a low alarm for instrument inoperative that annunciates in the control room. The reliable power for normal/high range radiation monitor(s) and recorder(s) is provided from Division A power panel and backed by standby power.
COLUMBIA GENERATING STATION Amendment 61 FINAL SAFETY ANALYSIS REPORT December 2011 LDCN-11-000 11.5-14 11.5.2.2.1.7 Radwaste Building Ventilation Release Ducts Radiation Monitoring System.
This monitor system measures the radioactivity in the radwaste building ventilation air exhaust as it is being discharged to the environment and in doing so complies with Regulatory Guide 1.21, Revision 1, GDC 64, and NUREG-0737. Radioactivity originates from radwaste tank vents, from primary water processing equipment, and from laboratory sampling hoods, as well as various cubicles having liquid process treatment systems within the building.
A continuous sample is drawn from each of the two out of three exhaust fans that are operating. The sampling uses isokinetic probes with a fixed flow rate expected to be isokinetic over the normal ventilation operating range. The representative sample is withdrawn through a multi-ported duct probe, through a tube passing through a particulate filter, and through a charcoal cartridge to collect particulate and iodine samples, which are removed at least weekly for laboratory radiochemical analyses. The filtered air sample streams from the operable exhaust fans are combined to pass through two gas monitors.
The gas monitors are mounted in lead shielded chambers. Each gas channel consists of a local detector and preamplifier with countrate meter and a recorder in the main control room. The normal sample flows through the extended range (10-2 Ci/cm3 to 10+3 Ci/cm3) gas channel and through the low range (10-6 Ci/cm3 to 10-1 Ci/cm3) gas channel.
Arrangement details are shown in Figure 11.5-7.
These monitors have no control functions. The low-range monitor has two adjustable trip circuits, one high and one high-high for high radiation alarming, plus a low for instrument inoperative that annunciates in the main control room. The extended range monitor has a low alarm for instrument inoperative that annunciates in the control room. The reliable power for normal/high range radiation monitor(s) and recorder(s) is provided from Division A, power panel and backed by standby power.
11.5.2.2.1.8 NRC Safety Evaluation Report, NUREG-0892 Acceptance. System comparisons to ANSI 13.10 (redesignated as ANSI N42.18) have been performed.
An inline gamma spectroscopy system provides an isotopic analysis of all effluents exiting the reactor building elevated release duct. See Section 11.5.2.2.1.5, Figure 11.5-11, and Table 11.5-1.
Particulate/iodine sampling of the other buildings (radwaste and turbine) exhausts will be handled by the normal effluent samplers where the postaccident release concentration is quite low.
COLUMBIA GENERATING STATION Amendment 60 FINAL SAFETY ANALYSIS REPORT December 2009 11.5-15 If there were a reactor accident with a core fission product release, the reactor building (secondary containment) immediately isolates. The atmosphere is maintained at a 0.25 in. H2O vacuum by the SGT system. The only potential airborne contamination that could reach the other buildings is from the SGT system bypass leakage pathways as listed in Table 6.2-16.
Shielding needed for the radwaste and turbine building normal effluent sampling systems was evaluated using assumptions consistent with the discussion in Appendix J (see Sections J.2 and J.3). For the purpose of defining the shielding requirements for the radwaste and turbine building, an iodine concentration of 3.7 x 10+4 Ci/cm3 is assumed in the inleakage air. This iodine concentration is based on a 50% core inventory release to the drywell atmosphere and a 50% plate-out factor. This plate-out factor is conservative for determining sample shielding requirements. With 0.35 scfh bypass leakage into the radwaste building, the building exhaust (83,000 cfm) concentration will be 2.6 x 10-3 Ci/cm3, ignoring building volume dilution. The normal effluent sampler operates at 3 cfm; therefore, the charcoal cartridge 30 minutes accumulation would be 6.7 mCi. This would result in a dose rate of 21 mR/hr at 1 ft from the cartridge. Doubling the dose rate to account for particulates yields 42 mR/hr at 1 ft from the sample assembly. Because of the high exhaust flow rate (260,000 cfm) and less inleakage (0.24 scfh), the turbine building exhaust is less concentrated. The radwaste and turbine building normal effluent sampling systems are adequate for postaccident sampling and no shielding is necessary (see Section 11.5.2.2.1.5). The evaluation for shielding was not repeated for the implementation of the alternative source term (AST).
11.5.2.2.2 Liquid Process and Effluent Radiation Monitoring System These systems monitor gamma radiation levels of liquid process and effluent streams.
Each monitor system consists of a gamma scintillation detector inserted into either a well in the process piping or a sump or an offline chamber to which a process stream sample is piped.
The detector locations are selected to obtain a reasonable geometry and are positioned away from crud traps and associated high background regions. Lead shielding is provided to further reduce background levels.
At each liquid offline detector location a continuous sample is extracted from the liquid process pipe, passed through a shielded detection assembly for gross radiation monitoring, and then returned to the process pipe. The detection assembly consists of a detector mounted in a shielded sample chamber equipped with a check source. The meter and recorder in the control room displays the measured gross radiation level. The sample chamber and lines can be drained to allow assessment of background buildup. The flow meter at the sample rack provides local sample line flow indication. A solenoid-operated check source operated from the control room is used to check operability of the channel response.
The critical +/-24-V dc for monitor(s) is supplied from Division 1 (and 2) power panels, except for the plant service water monitor which receives 120-V ac from Division A panel, reliable
COLUMBIA GENERATING STATION Amendment 60 FINAL SAFETY ANALYSIS REPORT December 2009 11.5-16 power is provided for control room strip chart recorders, sample control panel receives local 120-V ac.
The detectors local preamplifier unit is designed to remain fully operational in the expected environment. If exposed to radiation transients which exceed the channel range, the channel maintains full scale deflection and returns to normal functioning when the transient has subsided.
Each radiation monitor, except for the circulating water, has four trip circuits: two upscale (high-high and high), one downscale (low), and one inoperative. Each trip is visually displayed on the affected radiation monitor. Two of these trips actuate corresponding control room annunciators: one upscale (high radiation) and the downscale for the affected liquid monitoring channel. High or low sample flow measured at the sample panel actuates a control room high-low flow annunciator for the affected liquid channel.
All alarms are annunciated in a control room. Liquid monitoring system details are given in Table 11.5-2 and the monitor arrangements are shown in Figure 11.5-4.
11.5.2.2.2.1 Standby Service Water Radiation Monitoring System. See Section 11.5.2.1.4.
11.5.2.2.2.2 Reactor Building Closed Cooling Water Radiation Monitoring System. The radiation detector is located offline and samples the closed cooling water piping side of the reactor closed cooling water system (RCC) heat exchangers.
The monitor system is a diagnostic tool to verify that no inleakage of primary plant water has occurred from the reactor water cleanup system nonregenerative heat exchanger system which uses RCC as coolant. Since the RCC is a closed system, inleakage would be detected by the monitor system.
11.5.2.2.2.3 Radwaste Effluent Radiation Monitoring System. This monitor system measures the radioactivity in the radwaste effluent discharge prior to its entering the cooling tower blowdown line.
Liquid waste can be discharged from several radwaste processed water tanks such as the floor drain sample tank, waste sample tanks, or distillate drain tanks. These tanks contain water that has been processed through one or more treatment systems such as evaporation, filtration, and ion exchange. Prior to the discharge from any tank, the liquid in the appropriate tank is sampled and analyzed in the laboratory for radioactivity. Based on this analysis, discharge is permitted as specified in the Offsite Dose Calculation Manual (ODCM).
The radiation detector is located offline and samples the common discharge line from the liquid radwaste system through which all liquid radwaste is discharged to the blowdown line. The
COLUMBIA GENERATING STATION Amendment 60 FINAL SAFETY ANALYSIS REPORT December 2009 11.5-17 piping arrangement is designed so that the sample well can be flushed to lower background levels.
The high-high upscale trip on the radwaste effluent radiation monitor is used to initiate closure of the radwaste system discharge valve. The trip point is set such that closure is initiated prior to exceeding ODCM limits for liquid effluents. The high upscale trip actuates an annunciator in the radwaste control room as well as the main control room.
11.5.2.2.2.4 Circulating Water and Plant Service Water Radiation Monitoring Systems. The circulating water monitor is located on the discharge side of the circulating water pumps for the main condenser in the coolant blowdown line to the Columbia River. The location of this monitor permits detection of radioactive material leaking to the circulating water from any source, including the TSW system. If an alarm condition exists, circulating water blowdown to the Columbia River is terminated by automatic closure of the circulating water blowdown valve in the circulating water pump house (see Section 9.2.1.2), and it annunciates in the control room.
During plant outages, water is discharged to the river via temporary pumps installed in the circulating water pump house and connected to the blowdown line. Automatic termination of blowdown is not provided for this temporary arrangement. The only possible source of radiation would be through the TSW system which is monitored for radiation. There is about a 2-hr holdup time in the circulating water pipe giving ample time for blowdown to be manually secured if an alarm is received.
The TSW radiation monitor is located in the TSW return header to the circulating water system. The monitor is an offline type that continuously measures the radioactivity level of the TSW returning flow to the circulating water system. The radiation detector is lead shielded to minimize background radiation effects. The signal from the detector is displayed on a readout module and recorded in the main control room.
11.5.2.2.3 Primary Containment Radiation Monitoring System This monitoring system is composed of two parts, a sensitive two-channel leak detection system and a four-channel high activity LOCA tracking system.
11.5.2.2.3.1 Leak Detection Monitors. This monitoring system measures the radioactivity in the drywell and in doing so complies with Regulatory Guide 1.45, Revision 0, and GDC 30.
The radioactivity in the drywell is from coolant and corrosion activation products plus fission products produced in the reactor and released through leaks.
This monitoring system has two redundant subsystems, each having two detectors, individually monitoring particulates, and noble gas activity. Additionally a charcoal sample cartridge is provided to trap halogen gases. The detectors are housed in divisionally separated sample
COLUMBIA GENERATING STATION Amendment 60 FINAL SAFETY ANALYSIS REPORT December 2009 LDCN-06-048 11.5-18 racks located in a reactor building sample room. The sample racks have incorporated blowers and flow controls to withdraw gas samples from the primary containment atmosphere via stainless steel sampling lines and vent back to the containment. The environment in which the local cabinets are located is maintained to limit upper temperature excursions that may occur in the reactor building during an accident. Associated radiation readout modules and recorders are mounted in the main control room along with alarm annunciators.
Required 120-V ac supply for Division 1 and 2 equipment in both the main control room and the reactor building sample room is provided on a divisional basis by the 120/240-V ac critical (Class 1E) instrumentation power system.
The two-channel detector assemblies are provided with lead shielding to minimize the effects of background radiation to ensure high sensitivity. The detectors are of the beta scintillation type and are provided with check sources to verify system operability. The particulate detector views a fixed filter collector on which airborne particulates are trapped. The noble gas detector views a fixed volume of gas.
Each radiation monitor has three trip circuits: one upscale Hi to alarm and close sample line valve, one upscale Alert, and one downscale for instrument inoperative. All alarms annunciate in the main control room. This monitoring subsystem provides no control function and is a diagnostic tool which enables the main control room operator to take appropriate action.
Arrangement details are shown in Figure 11.5-9.
11.5.2.2.3.2 Loss-of-Coolant Accident Tracking Radiation Monitoring Systems (Containment Drywell). The LOCA monitoring systems, CMS-RE-27E and CMS-RE-27F, monitor the drywell atmosphere from inside the drywell; while CMS-RE-27A and CMS-RE-27B monitor the drywell atmosphere through penetrations in the bioshield wall. These four monitors provide LOCA monitoring for abnormal radioactivity levels following an accident condition involving rupture of the reactor coolant boundary.
The in-containment LOCA monitors CMS-RE-27E and CMS-RE-27F, located at approximately 517 ft level Azimuth 291° and 515 ft level Azimuth 51.5° respectively, track long-term decreases in containment radioactivity that take place with decay and decontamination and comply with GDC 13 and 64. The in-containment LOCA monitors each contain a Victoreen Model 877-1 ionization chamber with a range of 1 to 107 R/hr. These two detectors are qualified and meet the criteria of Table II.F.1-3 of NUREG 0737, including calibration with a high level gamma source. The chambers will respond to low energy gamma radiation such as 81 keV from 133Xe fulfilling the Regulatory Guide 1.97, Revision 2 criteria.
The LOCA monitors, CMS-RE-27A and CMS-RE-27B, are housed in the bioshield wall and are against the containment steel shell. These monitors will monitor the drywell radiation in conjunction with the in-containment LOCA monitors CMS-RE-27E and CMS-RE-27F. The
COLUMBIA GENERATING STATION Amendment 60 FINAL SAFETY ANALYSIS REPORT December 2009 LDCN-06-033 11.5-19 LOCA monitors, while not required for plant operation, are used to monitor the drywell in the post-LOCA situation.
The LOCA monitoring systems (CMS-RE-27A, CMS-RE-27B, CMS-RE-27E, and CMS-RE-27F) are redundant and separately supplied with power from Division 1 and 2 in both the main control room and remote locations.
Each ionization chamber is wired to a local monitor. Output from each local monitor is wired to a monitor located in the main control room. Radiation levels within the primary containment for each LOCA monitoring system are recorded in the main control room.
Each monitor has alarm circuitry and indication for high radiation and for instrument inoperative that annunciate in the main control room. This monitoring subsystem provides no control function and is a diagnostic tool which enables the main control room operator to take appropriate action.
Arrangement details are shown in Figure 11.5-10.
11.5.2.3 Sampling The following sections present a detailed description of the radiological sampling procedures, frequencies and objectives for all plant process and effluent sampling. This sample program provides the means to show compliance with the ODCM for the process radiation monitoring system and radwaste system.
11.5.2.3.1 Process Sampling Section 9.3.2 describes the design of sampling facilities provided for general sampling. The sample frequency, type of analyses, analytical sensitivity, and the purpose of the sample are summarized in Table 11.5-4 for each liquid process sample location and in Table 11.5-5 for each gas process sample location. The analytical procedures used in sample analysis are presented in Section 11.5.2.3.3. These samples serve to monitor radioactivity levels within various plant systems.
11.5.2.3.2 Effluent Sampling Effluent sampling of all potentially radioactive liquid and gaseous effluent paths is conducted on a regular basis to verify the adequacy of effluent processing to meet the discharge limits to unrestricted areas. This effluent sampling program will be of such a comprehensive nature as to provide the information for the effluent measuring and reporting programs required by 10 CFR Part 50.36a in annual reports to the NRC. The frequency of the periodic sampling and analysis described herein is normal and will be increased if effluent levels approach
COLUMBIA GENERATING STATION Amendment 60 FINAL SAFETY ANALYSIS REPORT December 2009 11.5-20 Technical Specifications limits. Tables 11.5-3 and 11.5-6 summarize the sample and analysis schedules which correspond to Regulatory Guide 1.21, Revision 1, guidance.
11.5.2.3.3 Analytical Procedures Samples of process and effluent gases and liquids will be analyzed in the laboratory by the following techniques: gross beta counting, gross alpha counting, gamma spectrometry, liquid scintillation counting, and radiochemical separations.
Instrumentation which is available in the laboratory for the measurement of radioactivity includes a single channel analyzer, alpha counter, beta counter, liquid scintillation counter, and multichannel gamma spectrometer.
Samples for beta counting are evaporated to dryness on metal planchets prior to counting.
Sample volume, counting geometry, and counting time are chosen to achieve the required measurement sensitivities. Correction factors are applied for sample-detector geometry, self-absorption and counter-resolving time.
Gross beta and gross alpha analyses of liquid effluent samples may be performed with an internal proportional counter. The samples are prepared for counting by evaporation onto metal planchets. Gross beta counting is also performed using a liquid scintillation counter.
Sample volume and counting times are chosen to achieve the required measurement sensitivity.
When possible, sample volume is selected to maintain a sample residue thickness of less than 1 mg/cm2. Correction factors are applied for self-absorption.
Gamma ray spectrometry is used for isotopic analyses of gaseous, airborne particulate and iodine, and liquid samples. High-resolution germanium solid-state detectors are available for this purpose. The detectors are calibrated against NIST traceable gamma ray standards for a variety of sample detector geometries. The gamma spectra are resolved using a software program developed for computerized spectrum resolution.
Gaseous tritium samples are collected by condensations or adsorption, and the resultant liquid is analyzed by liquid scintillation counting techniques.
Radiochemical separations are used for the routine analysis of 89Sr and 90Sr.
11.5.2.3.4 Inservice Inspection, Calibration, and Maintenance During reactor operation, checks of system operability are made by observing channel behavior. At monthly intervals during reactor operation, the response of each detector supplied with a remotely activated check source or LED source simulator will be recorded together with the instrument background count rate to ensure proper functioning of the
COLUMBIA GENERATING STATION Amendment 60 FINAL SAFETY ANALYSIS REPORT December 2009 11.5-21 monitor. Any detector whose response is observed to be inconsistent with that expected for power operation and is not supplied with a remotely activated check source or LED source simulator will be checked with a portable source or by comparison of detector response to system activity. An exception to the portable source check requirement will be allowed for those detectors mounted in areas that are deemed hazardous to personnel.
The system has electronic testing and calibrating equipment, which permits channel testing without relocating or dismantling channel components. An internal trip test circuit, adjustable over the full range of the readout meter, is used for testing. Each channel is tested prior to performing a calibration check. Verification of valve operation, ventilation diversion, or other trip functions is done at this time if it can be done without jeopardizing the plant safety. The tests are performed in conformance with the ODCM test frequencies.
The continuous radiation monitors are calibrated to commercial radionuclide standards traceable to the NIST. Each continuous monitor is calibrated during the refueling outage or every 18 months as required by the ODCM, using standard sources with NIST traceability.
A calibration can also be performed by using liquid or gaseous radionuclide standards or by comparison analysis of particulate, iodine, liquid, or gaseous grab samples with laboratory instruments.
11.5.3 EFFLUENT MONITORING AND SAMPLING The implementation of the requirements of GDC 64 concerning monitoring of gaseous effluent discharge paths for radioactivity is discussed in Section 11.5.2.2.1. Section 11.5.2.2.2 provides applicable discussions for liquid effluent radiation monitors.
11.5.4 PROCESS MONITORING AND SAMPLING The implementation of the requirements of GDC 60 concerning automatic closure of isolation valves in gaseous and liquid effluent discharge paths is discussed in Sections 11.5.2.1 and 11.5.2.2. Section 11.5.2.2.1 provides a discussion of gaseous process radiation monitors.
Section 11.5.2.2.2.2 provides a discussion of liquid process radiation monitors.
COLUMBIA GENERATING STATION Amendment 58 FINAL SAFETY ANALYSIS REPORT December 2005 LDCN-04-043,05-000 11.5-23 Table 11.5-1 Process and Effluent Radiation Monitoring System (Gaseous and Airborne Monitors)
Monitor Detector Location (Number of Channels)
Type Efficiency/
Sensitivity Range Principal Radionuclides Measured Expected Activity Upscale Setpoints Alarms Trips A. SAFETY-RELATED SYSTEMS Main steam line radiation monitors MS-RE-3A, 3B, 3C, and 3D Adjacent to steam lines (4)
-ion chamber 3 x 10-10 amp/R/h 100 - 106 mR/h (6 dec. log)
Coolant activation gases Steam line activity defined in Table 11.1-4 Above full power background, below trip N/A Reactor building exhaust plenum radiation monitors REA-RE-9A, 9B, 9C, and 9D Inline (4)
GMb 10 102 mR/hr (4 dec. log)
Reactor bldg.
activity defined in Table 11.3-7 Above background, below trip Tech Specs Control room fresh air intakes WOA-RE-31A, 31B, 32A, and 32B Offline (4)
-scint 2 x 10-6 Ci/cm3 101 x 107 cpm (6 dec. log) 133Xe a Below monitor range Above background, below low trip Tech Specs B. SYSTEMS REQUIRED FOR PLANT OPERATION Offgas pretreatment radiation monitor OG-RE-2
- Offline, adjacent to sample chamber (1)
-ion chamber 3 x 10-10 amp/R/h 100 - 106 mR/h (6 dec. log)
Noble gas fission products Offgas activity defined in Table 11.3-1 Above background Tech Specs Offgas posttreatment radiation monitors OG-RE-601A and OG-RE-601B Offline (2)
-scint, Part.
- Filter, Iodine Filter 4.08 x 105 cpm/Ci/
mL 100 - 107 cpm (2 x 10-5 to 24 Ci/cc)
(7 dec. log) 133Xe a Offgas activity defined in Table 11.3-1 Above background ODCM
LDCN-09-046 11.5-24 COLUMBIA GENERATING STATION Amendment 62 FINAL SAFETY ANALYSIS REPORT December 2013 Table 11.5-1 Process and Effluent Radiation Monitoring System (Gaseous and Airborne Monitors) (Continued)
Monitor Detector Location (Number of Channels)
Type Efficiency/
Sensitivity Range Principal Radionuclides Measured Expected Activity Upscale Setpoints Alarms Trips Charcoal bed vault radiation monitor OG-RE-11 Charcoal bed vault (1)
GM N/A 100 - 106 mR/h (6 dec. log)
Noble gas Charcoal bed inventory defined in Section 11.3 Above background N/A Mechanical vacuum pump discharge AR-RE-21 Inline (1)
GM 10 106 mR/hr (4 dec. log) 133Xe Within monitor range Above background ODCM Reactor building elevated discharge radiation monitor PRM-RE-1A Inline (1)
HP Ge 3.69 x 108 cps/Ci/cm3 2.71 x 10-8 to 2.71 x 10-3 Ci/cm3 133Xe a RB activity Table 11.3-7 ODCM N/A PRM-RE-1B Inline (1)
HP Ge 5.5 x 105 cps/Ci/cm3 1.8 x 10-5 to 1.8 x 100 Ci/cm3 133Xe a LOCA Table 15.6-10 and 15.6-11 N/A N/A PRM-RE-1C Inline (1)
HP Ge 1.28 x 101 cps/Ci/cm3 7.8 x 10-1 to 7.8 x 104 Ci/cm3 133Xe a LOCA Table 15.6-10 and 15.6-11 N/A N/A Particulate filter Offline Filter N/A from 10-12 Ci/cm3 emittersc ODCM Table 6.2.2.1.2-1 N/A N/A Iodine filter Offline Charc.
cart.
N/A from 10-12 Ci/cm3 emitters ODCM Table 6.2.2.1.2-1 N/A N/A
LDCN-11-000 11.5-25 COLUMBIA GENERATING STATION Amendment 61 FINAL SAFETY ANALYSIS REPORT December 2011 Table 11.5-1 Process and Effluent Radiation Monitoring System (Gaseous and Airborne Monitors) (Continued)
Monitor Detector Location (Number of Channels)
Type Efficiency/
Sensitivity Range Principal Radionuclides Measured Expected Activity Upscale Setpoints Alarms Trips Turbine bldg. vent.
exhaust radiation TEA-RE-13 TEA-RE-13A Offline (2)
-scint part. filterc iodine filter 50 cpm/
pCi/cm 3
101 -107 cpm (6 dec. log) 133Xe a
Turbine bldg.
activity defined in Table 11.3-7 ODCM N/A
-scint 10 10-3 Ci/cm3 133Xe (5 dec. log) 133Xe a
LOCA mixture of F.P. activity see Table 15.6-9 Radwaste bldg. vent.
exhaust radiation WEA-RE-14 WEA-RE-14A Offline (2)
-scint part. filterc iodine filter 50 cpm/
pCi/cm 3
101 -107 cpm (6 dec. log) 133Xe a
Radwaste bldg.
activity defined in Table 11.3-7 ODCM N/A
-scint 10-2 -103 Ci/cm3 133Xe (5 dec. log) 133Xe a
LOCA mixture of F.P. activity see Table 15.6-9 Primary containment LOCA monitors Adjacent to containment steel walls
-ion chambers amp/R/h R/h (6 dec. log)
Fission product gases Within monitor range Above background N/A CMS-RE-27A, 27B Outside(2) 1 x 10-10 amp/R/h 10-2 x 104 R/h (6 dec. log) b CMS-RE-27E, 27F Inside (2) 7 x 10-11 amp/R/h 100 - 107 R/h (6 dec. log)
LDCN-06-048 11.5-26 COLUMBIA GENERATING STATION Amendment 60 FINAL SAFETY ANALYSIS REPORT December 2009 Table 11.5-1 Process And Effluent Radiation Monitoring System (Gaseous And Airborne Monitors) (Continued)
Monitor Location (Number of Channels)
Type Efficiency/
Sensitivity Range Principal Radionuclides Measured Expected Activity Upscale Setpoints Alarms Trips Primary containment radiation monitor Offline Containment discussed in Section 12.2 Particulate CMS-RE-12-1A CMS-RE-12-1B (2)
Part. filter
-scint N/A 10 10-6 µCi/cc (6 dec. log)
Fission gas daughter and corrosion activation product d Above background, below trip Full scale Gas CMS-RE-12-3A CMS-RE-12-3B (2)
-scint N/A 10 10-1 µCi/cc (6 dec. log)
Above background, below trip Full scale a Sensitivity based on this radionuclide.
b Not required for plant operation.
c Composite of particulate filters analyzed for 89Sr and 90Sr.
d For particulate, Cs-137 is the fission product radionuclide used for converting counts per minute to µCi/cc. For gas, Kr-85 is the fission product radionuclide used for converting counts per minute to µCi/cc. The monitors display units of µCi/cc.
LDCN-06-015,06-041 11.5-27 COLUMBIA GENERATING STATION Amendment 59 FINAL SAFETY ANALYSIS REPORT December 2007 Table 11.5-2 Process and Effluent Radiation Monitoring System (Liquid Monitors)
Upscale Setpoints Monitor Detector Location (Number of Channels)
Type Range Principal Radionuclides Measured Expected Activity Alarms Trips Residual heat removal standby service water radiation monitor SW-RE-4, 5 Offline (2)
-scint 10 106 cps (7 dec. log) 137Cs a 60Co Less than minimum detector sensitivity Above background Not applicable Reactor building closed cooling water radiation monitor RCC-RE-7 Offline (1)
-scint 10 106 cps (7 dec. log) 137Cs a 60Co Less than minimum detector sensitivity Above background Not applicable Radwaste effluent radiation monitor FDR-RE-6 Offline (1)
-scint 10 106 cps (7 dec. log) 137Cs a 60Co Section 11.2 Above background ODCMb Circulating water effluent radiation monitor CBD-RE-8 Inline (1)
-scint 10-1 -106 cps (7 dec. log) 137Cs a 60Co Less than minimum detector sensitivity Above background Section 11.5.2.2.2.4 Plant service water radiation monitor TSW-RE-5 Offline (1)
-scint 1.0E-08 to 1.0E-02 µCi/cc (6 dec. log) 137Cs a 60Co Less than minimum detector sensitivity Above background Not applicable a Sensitivity based on this radionuclide.
b The alarm point will be set, based upon the activity, radionuclides, and dilution factor so that the concentration in the discharge line is less than 10 CFR 20 Appendix B, Table II, Column 2 limits.
11.5-28 COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 Table 11.5-3 Radiological Analysis Summary of Gaseous Effluent Samples Sensitivity Grab Sample Sample Description Frequency Analysis Ci/ml Purpose Reactor building elevated release exhaust Weekly Gamma spectruma Radioiodinesb 10-11 10-10 Effluent record Quarterly 89Sr and 90Src 10-11 Monthly Gross alpha Tritium 10-11 10-11 Radwaste building exhaust As above As above Effluent record Turbine building exhaust As above As above Effluent record a On particulate filter b On charcoal cartridge c On composite of particulate filters
COLUMBIA GENERATING STATION Amendment 54 FINAL SAFETY ANALYSIS REPORT April 2000 LDCN-98-139 11.5-29 Table 11.5-4 Radiological Analysis Summary of Liquid Process Samples Sensitivity Grab Sample Sample Description Frequency Analysis
µCi/ml Purpose Reactor coolant In accordance with Technical Specifications 131I, 133I 10-6 Evaluate fuel cladding integrity Gamma spectrum 10-6 Determine radionuclides present in system Reactor water cleanup system Periodically Gamma spectrum 10-6 Evaluate cleanup efficiency Condensate storage tanks Weekly Gamma spectrum 10-6 Tank inventory Fuel pool filter - demineralizer inlet and outlet Periodically Gamma spectrum 10-6 Evaluate system performance Waste collector tank Batcha Gamma spectrum 10-6 Evaluate system performance Floor drain collector tank Batcha Gamma spectrum 10-6 Evaluate system performance Chemical waste tank Batcha Gamma spectrum 10-6 Evaluate system performance Detergent drain tank (2)
Batcha Gamma spectrum 10-6 Tank inventory aAnalysis performed on an infrequent basis as needed to evaluate equipment performance or unusual water chemistry.
11.5-30 COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 Table 11.5-5 Radiological Analysis Summary of Gaseous Process Samples Sensitivity Grab Sample Sample Description Frequency Analysis
µCi/ml Purpose Containment atmosphere (drywell)
Periodically Gamma spectruma 10-11 Evaluate prior to discharge Prior to entry Gamma spectrum 10-10 Determine need for respiratory equipment Offgas pretreatment monitor sample Periodically Gamma spectrum 10-6 Determine offgas activity Offgas posttreatment sample Periodically Gamma spectruma,b Gamma spectrumc 10-10 10-6 Determine offgas system cleanup performance a On particulate filter b On charcoal cartridge c Noble gas
11.5-31 COLUMBIA GENERATING STATION Amendment 53 FINAL SAFETY ANALYSIS REPORT November 1998 Table 11.5-6 Radiological Analysis Summary of Liquid Effluent Samples Sensitivity Grab Sample Sample Description Frequency Analysis
µCi/ml Purpose Floor drain sample tank Batcha Gamma spectrum 10-6 Effluent discharge record Waste sample tanks (2)
Batcha Gamma spectrum 10-6 Effluent discharge record Liquid radwaste effluent (composite of all tanks discharged)
Monthlyb Quarterlyb Gross alpha Tritium 89Sr/90Sr 10-7 10-5 10-8 Effluent discharge record Circulating water discharge line Weekly grab of continuously collected proportional sample Gross or Gamma Spectrum Tritium 10-6 10-5 Effluent discharge record (backup sample) a If tank is to be discharged, analyses will be performed on each batch. If tank is not to be discharged, analyses will be performed periodically to evaluate equipment performance.
b If liquids were discharged during the previous month or quarter, as applicable.
Chamber Main Steam Line Monitors 900547.32 11.5-1 Figure Amendment 53 November 1998 Form No. 960690 Draw. No.
Rev.
Monitor Recorder Power-Supply Monitor Recorder Power-Supply MG-1 MC-7A Reactor Water Sample Valve Annunciator on Panel H13-P602 Ion Chamber "A"
Ion Chamber "C"
Reactor Water Sample Valve Annunciator on Panel H13-P602 Monitor Recorder Power-Supply Monitor Recorder Power-Supply MG-2 MC-8A Reactor Water Sample Valve Annunciator on Panel H13-P602 Ion Chamber "B"
Ion "D"
Mech. Vac. Pump and Valve Interlock Reactor Water Sample Valve Annunciator on Panel H13-P602 Backup Power Supply PP-7A Mech. Vac. Pump and Valve Interlock Mech. Vac. Pump and Valve Interlock Mech. Vac. Pump and Valve Interlock Columbia Generating Station Final Safety Analysis Report
Reactor Building Exhaust Plenum Monitors and Charcoal Bed Vault Monitor 900547.48 11.5-2 Figure Amendment 53 November 1998 Form No. 960690 Draw. No.
Rev.
A B
C D
Annunciators H13-P602 Recorder Annunciators H13-P602 Aux Unit Det Charcoal Bed Vault PP-8AA PP-7AA Reactor Building Exhaust Plenum Monitor Monitor Monitor Monitor Power Supply Monitor Interlocks to standby gas treatment system "B" purge and vent valves (outbo), Reactor Bldg vent system (outbo) valves.
Interlocks to standby gas treatment system "A" purge and vent valves (Inbo), Reactor Bldg vent system (Inbo) valves.
Columbia Generating Station Final Safety Analysis Report
Control Room Fresh Air Intake Monitors 900547.49 11.5-3 Figure Amendment 53 November 1998 Form No. 960690 Draw. No.
Rev.
Pre Amp Monitor Recorder Annunciator Pre Amp Monitor Annunciator Pre Amp Monitor Recorder Annunciator Pre Amp Monitor Annunciator "A"
"B" "C"
"D" Line B Line A Div. I Div. II Trip Fresh Air Samples Detector Columbia Generating Station Final Safety Analysis Report
Columbia Generating Station Final Safety Analysis Report Draw. No.
Rev.
Figure Amendment 59 December 2007 Form No. 960690FH LDCN-06-015 Process and Effluent Liquid Radiation Monitors 900547.50 11.5-4 Local Monitor Monitor Annunciator on Panel H13-P602 Scintillation Detector Detector Well Pre Amp Monitor Annunciator on Panel H13-P602 Scintillation Detector Detector Well Instrument Bus "A" Recorder on Panel H13-P604 Pre Amp Monitor Annunciator on Panel H13-P602 Scintillation Detector Detector Well Instrument Bus "B" Recorder on Panel H13-P600 Pre Amp Monitor Annunciator on Panel H13-P602 Scintillation Detector Detector Well Instrument Bus "B" Recorder on Panel H13-P600 Pre Amp Monitor Annunciator on Panels H13-P602
& G11-P001 Detector Well Instrument Bus "A" Pre Amp Monitor Annunciator on Panel H13-P602 Scintillation Detector Detector Well Instrument Bus "B" Recorder on Panel H13-P600 Effluent Valve Interlock Scintillation Detector Reactor Building Closed Cooling Water Monitor Radwaste Effluent Monitor Circulating Water (Blowdown) Monitor Standby Service Water (RHR Loop A)
Monitor Plant Service Water Monitor Standby Service Water (RHR Loop B)
Monitor Recorder on Panel BD-RAD-24
900547.51 Columbia Generating Station Final Safety Analysis Report Offgas Pretreatment and Posttreatment Radiation Monitors Draw. No.
Rev.
Figure Amendment 58 December 2005 11.5-5 Form No. 960690FH LDCN-04-043 To SJAE Inlet After Filter Bypass Microprocessor Recorder Monitor Monitor Detector Filter Collector E-PP-8AA (MC-8A)
Monitor Recorder From Recombiner From 2nd Stage SJAE Sample Chamber To Vial Sampler Ion Chamber MC-8A Annunciator Panel H13-P602 Annunciator Panel H13-P602 Offgas Treatment System Computers E-PP-US (MC-7A)
Sample Chamber Detector Sample Chamber Microprocessor
Mechanical Vacuum Pumps Exhaust Monitor and Reactor Building Elevated Release Stack Monitor 950021.32 11.5-6 Figure Amendment 53 November 1998 Form No. 960690 Draw. No.
Rev.
Reactor Building Ventilation Release Duct Monitor Mechanical Vacuum Pumps Exhaust Monitor Trip Mechanical Pumps To Elevated Release Stack Annunciator From Mechanical Vacuum Pumps 14" Ar(2)-1 Aux.
Unit Monitor Recorder Detector Control Room Annunciator Filter Collectors FE RB Elevated Release Stack dPT FE FIT Rec FI Isokinetic Probe Columbia Generating Station Final Safety Analysis Report
Detector Detector Detector Detector Figure Form No. 960690 LDCN-11-000 Draw. No.
Rev.
960690.01 Turbine and Radwaste Building Ventilation Release Duct Monitors 11.5-7 Filter Collector (Typ)
Radwaste Building Ventilation Release Ducts Monitor Preamp Monitor Monitor Preamp Computer Annunciator On Panel H13-P602 Turbine Building Exhaust Duct Turbine Building Ventilation Release Duct Monitor Isokinetic Probe Filter Collector (Typ)
Columbia Generating Station Final Safety Analysis Report Amendment 61 December 2011 Recorder Preamp Monitor Monitor Preamp Computer Annunciator On Panel H13-P602 Recorder
970187.20 11.5-8 Figure Amendment 57 December 2003 Draw. No.
Rev.
DELETED Form No. 960690 LDCN-02-005 Columbia Generating Station Final Safety Analysis Report
Primary Containment Leak Detection Monitor 970187.21 11.5-9 Figure Amendment 60 December 2009 Form No. 960690 Draw. No.
Rev.
Drywell Recorder Charcoal Cartridge Particulate Detector Gaseous Detector Annunciator Columbia Generating Station Final Safety Analysis Report Local Monitor Local Monitor Remote Monitor Remote Monitor LDCN-06-048
Amendment 60 December 2009 Primary Containment and Elevated Release Stack LOCA Tracking 950021.33 11.5-10 Figure Form No. 960690 Draw. No.
Rev.
Columbia Generating Station Final Safety Analysis Report Annunciator Computer Annunciator Primary Containment Steel Wall CMS-RE-27E Inside El. 524' CMS-RE-27F CMS-RE-27A Outside CMS-RE-27B Bio-shield Wall To Annunciator To Computer Recorder To Computer Recorder Local Monitor Ion Chambers Computer Log Amp HV Power Supply Indicator Trip Unit Recorder Log Amp HV Power Supply Indicator Trip Unit Recorder To Annunciator Local Monitor Monitor Monitor LDCN-06-033
Columbia Generating Station Final Safety Analysis Report Draw. No.
Rev.
Figure Amendment 58 December 2005 Form No. 960690FH LDCN-05-000 Elevated Release Duct RB 618' 7" RB 611' 10" Flow PRM-COMP-1 RW 525' Control Room T
Hi Rad PRM-RR-3 PRM-CPL-1 PRM-RE-1A Cryostat Detector T
T PRM-RE-1C Cryostat Detector PRM-RE-1B Cryostat Detector RB 618' 7" Intermediate Range Signal Processing High Range Signal Processing Low Range Signal Processing PRM-CP-1 RB 606' PRM-C-1B Compressor PRM-C-1C Compressor PRM-C-1A Compressor PRM-CAB-1 Elevated Release Stack LOCA Monitoring 950021.29 11.5-11 PRM-COMP-3
COLUMBIA GENERATING STATION Amendment 58 FINAL SAFETY ANALYSIS REPORT December 2005 LDCN-03-056 11.6-1 11.6 POSTACCIDENT SAMPLING SYSTEM 11.6.1 DESIGN BASIS Columbia Generating Station is using a General Electric postaccident sampling system (PASS) capable of sampling the primary containment and reactor building atmosphere and of obtaining liquid samples from the reactor, RHR loops and various reactor building sumps. This system is designed to obtain grab samples which may be analyzed onsite or transported to offsite facilities for more detailed analysis if necessary. The sample station is located in the radwaste building and is shielded to reduce radiation exposure rates to the operator. All remote-operated valves are controlled from this area. Lead pigs are provided for radiation protection when transporting samples either to onsite facilities or offsite.
All valves used are fully qualified for the environment in which they are located inside and outside reactor containment. Power for the postaccident sampling equipment is supplied from Division 1 and Division 2 critical power sources and will be available during accident conditions.
License Amendment No. 184 removed the requirement for PASS from the Technical Specifications effective January 27, 2003. While this amendment removes the Technical Specification requirements for PASS, it requires a commitment for contingency plans for obtaining and analyzing highly radioactive samples from the Reactor Coolant System, suppression pool, and containment atmosphere. Until further changes are made to the PASS hardware it will be operated as described in this FSAR Section. This operation meets the commitment for contingency plans for sampling.
11.6.2 SYSTEM DESCRIPTION Gas samples will be obtained from locations in the drywell, the suppression pool atmosphere, and from the secondary containment atmosphere. The sample system is designed to operate at pressures ranging from subatmospheric to maximum design pressures of the primary and secondary containment. Heat-traced sample lines are used outside the primary containment to prevent precipitation of moisture and resultant loss of particulates and iodines in the sample lines. The gas samples may be passed through a particulate filter and silver zeolite cartridge for determination of particulate activity and iodine activity by subsequent analysis of the samples on a gamma spectrometer system. Alternatively, the sample flow bypasses the particulate/iodine sampler, is chilled to remove moisture, and a 15-ml grab sample can be taken for determination of gaseous radioactivity and for gas composition by gas chromatography. This size sample vial has been adopted for all gas samples to be consistent with present offgas sample vial counting factors.
Reactor coolant samples will be obtained from two points in the jet pump pressure instrument system when the reactor is at pressure. The jet pump pressure system has been determined to
COLUMBIA GENERATING STATION Amendment 58 FINAL SAFETY ANALYSIS REPORT December 2005 11.6-2 be an optimum sample point for accident conditions. The pressure taps are well protected from damage and debris. If the recirculation pumps are secured, the water level will be raised about 18 in. above normal. This provides natural circulation of the bulk coolant past the taps.
Also, the pressure taps are located sufficiently low to permit sampling at a reactor water level even below the lower core support plate.
A single sample line is also connected to both loops in the RHR system. This provides a means of obtaining a reactor coolant sample when the reactor is depressurized and at least one of the RHR loops is operated in the shutdown cooling mode. Similarly, a suppression pool liquid sample can be obtained from the RHR loop lined up in the suppression pool cooling mode. Samples from the five drain sumps in the reactor building are also available.
The sample system isolation valves are controlled from the local control panel. The sample system is designed for a purge flow of 1 gpm, which is sufficient to maintain turbulent flow in the sample line. Purge flow is returned to the suppression pool. The high flush flow also serves to alleviate cross-contamination of the samples when switching from one sample point to another.
All liquid samples are taken into septum bottles mounted on sampling needles. The sample station is basically a bypass loop on the sample purge line. In the normal lineup, the sample flows through a conductivity cell (readable range 0.1 to 1000 S/cm) and then through a ball valve bored out to 0.10-ml volume. Flow through the sample panel is established, the valve is rotated 90°, and a syringe is used to flush the sample plus a measured volume of diluent (generally 10 ml) through the valve and into the sample bottle. This provides a dilution of 100:1 to the sample. Alternatively, the valve sampling sequence can be repeated 10 times to provide a 1-ml sample diluted 10:1. The sample is transported to the laboratory for further dilution and subsequent analysis. Alternatively, the sample flow can be diverted through a 70-ml bomb to obtain a large pressurized volume. This 70-ml volume can be circulated and depressurized into a known volume gas expansion chamber. The pressure change in this chamber will be used to calculate the total dissolved gases in the reactor coolant. A grab sample of these gases may be taken through a septum port for subsequent analysis.
Ten milliliter aliquots of this degassed liquid can also be taken for on or offsite chemical analyses requiring a relatively large sample. A radiation monitor in the liquid sample enclosure monitors liquid flow from the sample station to provide immediate assessment of the sample activity level. This monitor also provides information as to the effectiveness of the demineralized water flushing of the sample system following sample operation. The control instrumentation is installed in two 2 ft x 2 ft x 6 ft high standard cabinet control panels. One panel contains the conductivity and radiation level readouts. Another control panel contains the flow, pressure and temperature indicators, and the various control valves and switches.
A graphic display panel, installed directly below the main control panel, shows the status of the pumps and valves at all times. The panel also indicates the relative position of the pressure
COLUMBIA GENERATING STATION Amendment 58 FINAL SAFETY ANALYSIS REPORT December 2005 LDCN-03-056 11.6-3 gauges and other items of concern to the operator. The use of this panel will improve operator comprehension and assist in trouble-shooting operation.
Appropriate sample handling tools, a gas sampler vial positioner and gas vial cask are available to the operator at the sampling station. The gas vial is installed and removed by use of the vial positioner through the front of the gas sampler. The vial is then manually placed down in the cask with the positioner which allows the vial to be maintained about 3 ft from the individual performing the operation.
The small-volume (10 ml) liquid sample is remotely obtained through the bottom of the sample station by use of the small-volume cask and cask positioner. The cask positioner holds the cask and positions the cask directly under the liquid sampler. The sample vial is manually raised within the cask to engage the hypodermic needles. When the sample vial has been filled, the bottle is manually withdrawn into the cask. The sample vial is always contained within lead shielding during this operation. The cask is then lowered and sealed prior to transport to the laboratory.
A large-volume cask and cask positioner is available for transporting large liquid samples.
A 21-ml bottle is contained within a lead shielded cask. This sample bottle is raised from its location in the cask to the sample station needles for bottle filling. The sample station will only deliver 10 ml to this sample bottle. When filled, the bottle is withdrawn into the cask.
The sample bottle is always shielded by 5 to 6 in. of lead when in position under the sample station and during the fill and withdraw cycles, thus reducing operator exposure.
The cask is transported to the required position under the sample station by a dolly cask positioner. When in position this cask is hydraulically elevated approximately 1.5 in. by a small hand pump for contact with the sample station shielding under the liquid sample enclosure floor. The sample bottle is raised, held, and lowered by a simple push/pull cable.
The cask is sealed by a threaded top plug that inserts above the sample bottle. The weight of this large-volume cask is approximately 700 lb.
The particulate filters and iodine cartridges are removed via a drawer arrangement. The quantity of activity which is accumulated on the cartridges is controlled by a combination of flow orificing and time sequence control of the flow valve opening. In addition, the deposition of iodine is monitored during sampling using a radiation detector installed adjacent to the cartridge. These samples will hence be limited to activity levels which will normally not require shielded sample carriers to transport the samples to the laboratory.
Based on information developed by General Electric, Energy Northwest has developed plant-specific procedures for the determination of the extent of core damage under accident conditions using inplant radiation and hydrogen monitors. This meets the commitment for ability to determine fuel damage, postaccident.