Deferral of Decision to Hold a Public Meeting to Discuss Responses to NRC Observations and Concerns Regarding Dresden Station Plan for External Flooding Events
ML13024A316
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 01/24/2013
From: Jamnes Cameron
NRC/RGN-III/DRP/B6
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
References
Download: ML13024A316 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 January 24, 2013 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

DEFERRAL OF DECISION TO HOLD A PUBLIC MEETING TO DISCUSS RESPONSES TO NRC OBSERVATIONS AND CONCERNS REGARDING DRESDEN STATION PLAN FOR EXTERNAL FLOODING EVENTS

Dear Mr. Pacilio:

On November 1, 2012, the NRC submitted a comprehensive list of our observations and concerns regarding Dresden Nuclear Power Stations response plan for external flooding events. By letter dated January 3, 2013, we acknowledged receipt of your December 1, 2012, letter which provided responses to those observations and concerns. The NRCs January 3, 2013, letter also included a number of follow-up questions and requested that you be prepared to discuss your response to those additional questions at a public meeting scheduled for January 29, 2013. After further consideration, the NRC has decided to cancel the proposed public meeting until the staff has had the opportunity to review your response to the follow-up questions. As a result, and based on my conversation with Mr. David Czufin, Site Vice President for Dresden Station, the NRC requests that you provide a written response to the follow-up questions contained in the NRCs January 3, 2013, letter by February 4, 2013.

Following the receipt and review of your written response, the NRC will make a determination on whether a public meeting to discuss Dresden Stations response plan for external flooding events continues to be warranted.

In addition to your December 1, 2012, response to our original letter transmitting our observations and concerns regarding Dresden Stations response plan for external flooding events, the NRC continues to review your November 27, 2012, letter, titled Exelon Generation Company, LLCs 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects... Insights from the Fukushima Dai-Ichi Accident, (ML12332A305), and is aware of your continued review and refinement of Dresden Stations flood mitigation strategies. The NRC understands that Exelon has enhanced the flood mitigation procedures for Dresden Station and has purchased additional flood mitigation equipment. Exelon displayed the flood mitigation equipment and provided an overview of the flood response plan during an open house for members of the public at Dresden Nuclear Power Station on December 15, 2012.

Although our observations and concerns do not constitute an immediate safety issue, and notwithstanding the enhancements you have made to the original external flooding response plan for Dresden Station, you should be able to demonstrate that your existing procedures and strategies would be successful in response to postulated external flooding events, up to and including those involving a probable maximum flood.

M. Pacilio In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and your response will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 630-829-9833 with any questions you may have regarding this letter.

Sincerely,

/RA/

Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket No. 50-237; 50-249 License No. DPR-19; DPR-25 cc: Distribution via ListServ

M. Pacilio In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and your response will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 630-829-9833 with any questions you may have regarding this letter.

Sincerely,

/RA/

Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket No. 50-237; 50-249 License No. DPR-19; DPR-25 cc: Distribution via ListServ DOCUMENT NAME: G:\DRPIII\Dres\Dresden-Postponement Public Meeting.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME JSteffes:dtp JCameron DATE 01/24/13 01/24/13 OFFICIAL RECORD COPY

Letter to M. Pacilio from J. Cameron dated January 24, 2013.

SUBJECT:

DEFERRAL OF DECISION TO HOLD A PUBLIC MEETING TO DISCUSS RESPONSES TO NRC OBSERVATIONS AND CONCERNS REGARDING DRESDEN STATION PLAN FOR EXTERNAL FLOODING EVENT DISTRIBUTION:

John Cassidy RidsNrrDorlLpl3-2 Resource RidsNrrPMDresden Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Tammy Tomczak ROPreports.Resource@nrc.gov