Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B Seismic Walkdown Checklists (Swcs), AC Distribution Panel. Pages 271 - 360
ML13008A036
Person / Time
Site: Beaver Valley
Issue date: 10/23/2012
From: Guerra E M, Helffrich A L
Paul C. Rizzo Associates, ABS Consulting, FirstEnergy Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
References
PNL-ACI-EI, L-12-283
Download: ML13008A036 (90)


Text

Lf iY Paul C. Rizzo Associates, Inc.ENGINEERS

& CON!SULTAN-M Seismic Walkdown Checklist (SWC)Sheet 271 of 439 N U Status: W)Equipment ID No. PNL-ACI-El Equip. Class 20. Instrument and Control Panels Equipment Description AC Distribution Panel Location:

Bldg.SRVB Floor El. 713 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Wall-mounted panel (size -36"x48"x,16"), anchored with eight 1/2" diameter anchor bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

I X Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I

[Z) Paul C. Rizzo Associates, Inc.ENGNEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Sheet 272 of 439 N U Status: W Equipment ID No. PNL-ACI-El Equipment Description AC Equip. Class 20. Instrument and Control Panels Distribution Panel Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block walls in the area have been qualifiedper IE 80-11 review. Respective block walls include: SBI-lJ, SB1-12 and SBI-15.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I T Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 10/1/2012 Adam L. Helffrich Date: 10/1/2012 Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Sheet 273 of 439 N U Status: (2)Equipment IDNo. PNL-DCI-3 Equipment Description Di Equip. Class 20. Instrument and Control Panels stribution Panel Location:

Bldg.SRVB Floor El. 735 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Tall (-6'-6" x 40"x 16") panel floor/wall mounted. Anchored to wall with 4-1/2" diam anchor bolts at top and anchored to floor by 4-1/2" diam anchor bolts at front.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage configuration confirmed with Calculation PNL-DC1-3 and 52233-C-015.

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N I X I I Y N U N/A X Y N U N/A X Y N U N/A X Y N U N/A x Y N U XI X Q Paul C. Rizzo Associates, Inc.ENGINEERS

& COhcisTA(SC Seismic Walkdown Checklist (SWC)Sheet 274 of 439 N U Status: (2)Equipment ID No. PNL-DC 1-3 Equipment Description Di Equip. Class 20. Instrument and Control Panels stribution Panel Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I -I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 10/1/2012 Adam L. Helffrich Date: 10/1/2012 Adam L. Helffrich Date: 10/1/2012 C. Rizzo Associates, Inc.ENGINEERS

& CONSULTA1NTS Seismic Walkdown Checklist (SWC)Equipment ID No. PNL-DC1-3 Equip. Class 20. Instrument and Control Panels Equipment Description Distribution Panel Other supporting or relevant documents and photos (if any): Sheet 275 of 439 Status: (2)N U File Name: 2-61-3-1-18.jpeg

==

Description:==

Component Plate ID File Name: 2-62-3-1-18.jpeg

==

Description:==

General view of openned panel L Q Paul C. Rizzo Associates, Inc.ENGINEEMS

& COPMULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. PNL-DCI-3 Equip. Class 20. Instrument and Control Panels Equipment Description Distribution Panel Sheet 276 of 439 Status: W)N U File Name: 2-63-3-1-1M.jpeg

==

Description:==

View of channel mounting base tile Name: 2-b4-i-1-I1jpeg

==

Description:==

View of typical wall anchorage configuration L Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTAN-M Seismic Walkdown Checklist (SWC)Sheet 277 of 439 N U Status: (W Equipment ID No. PNL-DGEA-I Equip. Class 20. Instrument and Control Panels Equipment Description Diesel Generator Excitation Aux Relay Location:

Bldg.DGBX Floor El. 735 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of'judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Small panel (24"x 30"x 16") mounted on wall. Panel is welded to 3/8" plates at top and bottom with a minimum of 12" of 1/8"fillet welds. Each 3/8" plate is anchored to wall with 4-3/8" diam anchor bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Sketch in PNL-DGEA-1 SEWS shows actual anchorage configuration (see also Calc.52233-C-022).

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N XL I II IZ Y N U N/A x Y N U N/A x Y N U N/A x 7T777-7 Y N U N/A x Y N U x L QPaul C. Rizzo Associates, Inc.ENGSmEEW d & COhcULTAN(S Seismic Walkdown Checklist (SWC)Sheet 278 of 439 N U Status: (9)Equipment ID No. PNL-DGEA-I Equip. Class 20. Instrument and Control Panels Equipment Description Diesel Generator Excitation Aux Relay Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I Other Adverse Conditions 1 1. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 10/1/2012 Adam L. Helffrich Date: 10/1/2012 L C Paul C. Rizzo Associates, Inc.ENGINER$ & CONSULTANS Seismic Walkdown Checklist (SWC)Equipment ID No. PNL-DGEA-I Equip. Class 20. Instrument and Control Panels Equipment Description Diesel Generator Excitation Aux Relay Other supporting or relevant documents and photos (if any): Sheet 279 of 439 Status: W N U File Name: 2-61-4-1-20.jpeg

==

Description:==

Component Plate ID File Name: 2-62-4-1-20.jpeg

==

Description:==

General view of component Pll Paul C. Rizzo Associates, Inc.U.GINEfl.S

& CONSIULTAN" Seismic Walkdown Checklist (SWC)Equipment ID No. PNL-DGEA-I Equip. Class 20. Instrument and Control Panels Equipment Description Diesel Generator Excitation Aux Relay Sheet 280 of 439 Status: (Y N U rue iName: z-o3-,4-i-Lujpeg

==

Description:==

View of typical wall anchorage configuration File Name: 2-64-4-1-20.jpeg

==

Description:==

View of flexible attached line

'4C Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Sheet 281 of 439 N U Status: W Equipment ID No. PNL-DIGEN-I Equip. Class 20. Instrument and Control Panels Equipment Description DIG #I Electric Control Cabinet Location:

Bldg.DGBX Floor El. 735 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Panel welded to channel with -4" @ 7" of 3/16" to 1/4" welds around the inside perimeter of its base framing. Channels are welded to embed with -4" @ 7" of 3/16" to 1/4" welds.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Sketch in PNL-DIGEN-1 SEWS shows actual anchorage configuration (see also anchorage calc. 52233-C-025)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N X I I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I

'6Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONShlLTA1STS Seismic Walkdown Checklist (SWC)Sheet 282 of 439 N U Status: (Y)Equipment ID No. PNL-DIGEN-1 Equip. Class 20. Instrument and Control Panels Equipment Description D/G #1 Electric Control Cabinet Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 10/1/2012 Adam L. Helffrich Date: 10/1/2012 Paul C. Rizzo Associates, Inc.ENGINEERS

& COMILTA"t$

Seismic Walkdown Checklist (SWC)Equipment ID No. PNL-DIGEN-I Equip. Class 20. Instrument and Control Panels Equipment Description D/G #1 Electric Control Cabinet Other supporting or relevant documents and photos (if any): Sheet 283 of 439 Status: W N U File Name: 2-61-5-1-20.jpeg

==

Description:==

Component Plate ID File Name: 2-62-5-1-20.jpeg

==

Description:==

General view of component L--' Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. PNL-DIGEN-1 Equip. Class 20. Instrument and Control Panels Equipment Description D/G #1 Electric Control Cabinet Sheet 284 of 439 Status: W N U File Name: 2-94-5-1-20.jpeg

==

Description:==

View of small attached line File Name: 2-95-5-1-20.jpeg

==

Description:==

General view inside of component LCQ Paul C. Rizzo Associates, Inc.& CONSULTANnh Seismic Walkdown Checklist (SWC)Equipment ID No. PNL-DIGEN-1 Equip. Class 20. Instrument and Control Panels Equipment Description D/G #1 Electric Control Cabinet Sheet 285 of 439 Status: W N U Pie Name: 2-Yb-3-I-20.jpeg

==

Description:==

View of stitch weld detail for cabinet embeddment connection X < Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Sheet 286 of 439 N U Status: W Equipment ID No. PNL-DIGEN-2 Equip. Class 20. Instrument and Control Panels Equipment Description DIG #2 Electric Control Cabinet Location:

Bldg.DGBX Floor El. 735 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Panel welded to channel with -4" @ 7" of 3/16" to 1/4" welds around the inside perimeter of its base framing. Channels are welded to embed with -4" @ 7" of 3/16" 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Sketch in PNL-DIGEN-2 SEWS shows actual anchorage configuration (See also calculation 52233-C-025).

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N X I EI1 Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x ---I I Q Paul C. Rizzo Associates, Inc.ENeINEERSt

& ChcSULTist SWC)Seismic Walkdown Checklist (SWC)Sheet 287 of 439 Status: (W) N U Equipment ID No. PNL-DIGEN-2 Equip. Class 20. Instrument and Control Panels Equipment Description D/G #2 Electric Control Cabinet Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x T -I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 10/1/2012 Adam L. Helffrich Date: 10/1/2012 L ? Paul C. Rizzo Associates, Inc.ENGIEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. PNL-DIGEN-2 Equip. Class 20. Instrument and Control Panels Equipment Description D/G #2 Electric Control Cabinet Other supporting or relevant documents and photos (if any): Sheet 288 of 439 Status: (Y)N U File Name: 2-61-2-1-21 .jpeg

Description:

Component Plate ID File Name: 2-62-2-1-21.jpeg

==

Description:==

General view of component L Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Sheet 289 of 439 Status: (Y) N U Equipment ID No. PNL-DIGEN-2 Equip. Class 20. Instrument and Control Panels Equipment Description D/G #2 Electric Control Cabinet File Name: 2-6 3-2-1-21.jpeg

==

Description:==

View of flexible attached line File Name: 2-64-2-1-21 .jpeg

Description:

General view inside of component L Q Paul C. Rizzo Associates, Inc.41EINEEMS

& CONSULTANnT Seismic Walkdown Checklist (SWC)Equipment ID No. PNL-DIGEN-2 Equip. Class 20. Instrument and Control Panels Equipment Description D/G #2 Electric Control Cabinet Sheet 290 of 439 Status: (N U File Name: 2-73-2-1-21 .jpeg

Description:

View of stitch weld detail for cabinet embeddment connection LUZQ Paul C. Rizzo Associates, Inc.ENCINEERS V. CONSUlTANTS Seismic Walkdown Checklist (SWC)Sheet 291 of 439 N U Status: W)Equipment IDNo. PNL-VITBUSI-2 Equip. Class 14. Distribution Panels Equipment Description Vital Bus Channel 11 (White); Bus Location:

Bldg.SRVB Floor El. 735 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Wall mounted panel (-6'x 30"x 10"). Anchored with 4-5/8" diam anchor bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N LIZIIZ Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U X 0 L Paul C. Rizzo Associates, Inc.EO1NGIERS

&

Seismic Walkdown Checklist (SWC)Sheet 292 of 439 N U Status: W Equipment ID No. PNL-VITBUS1-2 Equip. Class 14. Distribution Panels Equipment Description Vital Bus Channel II (White); Bus Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block wall SB-3-9 in the area has been evaluated per IE80-11 program. Control room ceiling's main runners are supported by wires at -4' spacing. Each ceiling tile (i.e., ege grating) is tied to the main runners at each of its four corners with tie wraps.Judged no interaction concern.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 10/1/2012 Adam L. Helfftich Date: 10/1/2012 Adam L. Helffrich Date: 10/1/20 12 L Q Paul C. Rizzo Associates, Inc.ENGINEE & CONSULTAN-Seismic Walkdown Checklist (SWC)Equipment ID No. PNL-VITBUSI-2 Equip. Class 14. Distribution Panels Equipment Description Vital Bus Channel II (White); Bus Other supporting or relevant documents and photos (if any): Sheet 293 of 439 Status: W)N U File Name: 2-61-1-1-18.jpeg

==

Description:==

Component Plate ID w I! 14 i12i File Name: 2-62-1-1-18.jpeg

==

Description:==

General view of component L Q Paul C. Rizzo Associates, Inc.'4Ir ENGINES & CONSULTANMT Seismic Walkdown Checklist (SWC)Equipment ID No. PNL-VITBUS1-2 Equip. Class 14. Distribution Panels Equipment Description Vital Bus Channel II (White); Bus Sheet 294 of 439 Status: (Y)N U File Name: 2-63-1-1-18.jpeg

==

Description:==

View of top entry conduits File Name: 2-64-1-I-118Jpeg

==

Description:==

Block wall identified in the vicinity of the component I Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Sheet 295 of 439 N U Status: W)Equipment IDNo. PNL-VITBUSI-3 Equip. Class 14. Distribution Panels Equipment Description Vital Bus Channel III (Blue); Bus Location:

Bldg.SRVB Floor El. 735 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for docymenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Wall mounted panel (-6'x 30"x 10'". Anchored with 4-5/8" diam anchor bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?Brocken washer at one anchor location judged acceptable.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

EIWX Y N U N/A X Y N U N/A X Y N U N/A x Y N U N/A X Y N U x I[ZQ Paul C. Rizzo Associates, Inc.ENGINEtRS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Sheet 296 of 439 Status: W) N U Equipment ID No. PNL-VITBUS1-3 Equip. Class 14. Distribution Panels Equipment Description Vital Bus Channel III (Blue); Bus Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block wall identified around 6' away. Control room ceiling's main runners are supported by wires at -4' spacing. Each ceiling tile (i.e., ege grating) is tied to the main runners at each of its four corners with tie wraps. Judged no interaction concern.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 10/1/2012 Adam L. Helffrich Date: 10/1/2012 Adam L. Helifrich Date: 10/1/2012 C. Rizzo Associates, Inc.

& CO)NSULTM..

Seismic Walkdown Checklist (SWC)Equipment ID No. PNL-VITBUSI-3 Equip. Class 14. Distribution Panels Equipment Description Vital Bus Channel III (Blue); Bus Sheet 297 of 439 Status: (W)N U Other supporting or relevant documents and photos (if any): rlue Name: /--2-1-1i.jpeg

==

Description:==

Component Plate ID Vlie Name: 2-02-z- 1 -I Z.jpeg

Description:

General view of component

[lv Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. PNL-VITBUS1-3 Equip. Class 14. Distribution Panels Equipment Description Vital Bus Channel III (Blue); Bus Sheet 298 of 439 Status: (2)N U lvle Name: L-o3-z-1-i .jpeg

Description:

View of top entry conduits Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSLJTANTh Seismic Walkdown Checklist (SWC)Sheet 299 of 439 N U Status: (Y Equipment ID No. PT-IRW-I 13A Equip. Class 18. Instrument (on) Racks Equipment Description Primary Component Cooling Water Heat Exchanger Inlet, Press Transmitter Location:

Bldg.AXLB Floor El. 735 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Mounted on 2 1/2" diam, -5' tallpost.

Post anchored with 4-3/8" diam anchor bolts.Weight is around 20 lbs and attached with two torqued 3/8" diam U-bolts to the post.Eventhough the U-bolts work in friction they are judged adequate since they are torqued and equipment was tug tested 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N II x Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I I --" Paul C. Rizzo Associates, Inc.ENGINEERS

r. CONSULTANX" Seismic Walkdown Checklist (SWC)Sheet 300 of 439 N U Status: (Y Equipment ID No. PT-I RW- 113A Equip. Class 18. Instrument (on) Racks Equipment Description Primary Component Cooling Water Heat Exchanger Inlet, Press Transmitter Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 10/1/2012 Adam L. Helffrich Date: 10/1/2012 Paul C. Rizzo Associates, Inc. Sheet 301 of 439 ENGINEERS

& CONSILTAN'I Seismic Walkdown Checklist (SWC) Status: N U Equipment ID No. PT-1RW-1 13A Equip. Class 18. Instrument (on) Racks Equipment Description Primary Component Cooling Water Heat Exchanger Inlet, Press Transmitter Other supporting or relevant documents and photos (if any): rile Name: 2-01-1-1-43jpeg

==

Description:==

Component Plate ID rile Name: 2-b2-1-1-43.Jpeg

==

Description:==

General view of component L2--QPaul C. Rizzo Associates, Inc.NOGINEEU & COMULTAN'T Seismic Walkdown Checklist (SWC)Sheet 302 of 439 N U Status: W Equipment ID No. QS-P-1B Equipment Description Equip. Class 5. Horizontal Pumps Quench Spray Pump Location:

Bldg.SFGB Floor El. 735 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Mounted on concrete pad Anchored with 4-3/4" diam anchor bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N I X Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A I I I x I Y N U x I Q Paul C. Rizzo Associates, Inc.ENGINEMI & CONSU1TATN Seismic Walkdown Checklist (SWC)Sheet 303 of 439 N U Status: Equipment ID No. QS-P- I B Equipment Description Equip. Class 5. Horizontal Pumps Quench Spray Pump Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Nozzles identified to be well supported.
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A X Y N U N/A X Y N U N/A X Y N U x --T I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x II I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 10/1/2012 Adam L. Heliffrich Date: 10/1/2012 L Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. QS-P-IlB Equ Equipment Description Quench Spr, Sheet 304 of 439 Status: (Y N U ip. Class 5. Horizontal Pumps sy Pump Other supporting or relevant documents and photos (if any): tile Name: 2-bi-/-i-MJ.jpeg

==

Description:==

Component Plate ID rite Nrame: z-OL-/-i-3u.jpeg

==

Description:==

General view of component Fl' Paul C. Rizzo Associates, Inc.ENGINEERS

r. CONSULIANTh Seismic Walkdown Checklist (SWC)Equipment ID No. QS-P-I1B Equ: Equipment Description Quench Spr, Sheet 305 of 439 Status: (Y)N U ip. Class 5. Horizontal Pumps ay Pump File Name: 2-63-7-i-50.jpeg

==

Description:==

View of flexible attached lines File Name: 2-64-7-1-50.jpeg

==

Description:==

Typical frame anchorage configuration L QPaul C. Rizzo Associates, Inc.ESW GINEEd S & CONSt T(SWC Seismic Walkdlown Checklist (SWC)Sheet 306 of 439 Status: ()N U Equipment ID No. REAC-TR-SWGR-1 A Equip. Class 2. Low Voltage Switchgear Equipment Description Reactor Trip SWGR Location:

Bldg. SRVB Manufacturer, Model, Etc.Floor El. 713 Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

This is a 1 section SWGR. 4-1/2" diam anchor bolts identified for anchorage configuration.

Component identified to be attached to adjacent SWGR. Gap next to opposite set of SWGR found to be adequate (-3/4'9.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Calculation 52233-C-003 Anchorage Calc confirms anchorage configuration

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

LIIINI Y N U N/A x Y N U N/A x Y N U N/A x I Y N U N/A x I Y N U x I I I L D Paul C. Rizzo Associates, Inc.IENGINE1RS

& CVN)h~&t T AN1'S Sheet 307 of 439 Seismic Walkdown Checklist (SWC)Equipment ID No. REAC-TR-SWGR-IA Equip. Class 2. Low Voltage Switchgear Status: W N U Equipment Description Reactor Trip SWGR Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U I x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 10/1/2012 Adam L. Helffrich Date: 10/1/2012 L Q Paul C. Rizzo Associates, Inc.ONWiMSR$ & CONSULTAN-S Seismic Walkdown Checklist (SWC)Equipment ID No. REAC-TR-SWGR-IA Equip. Class 2. Low Voltage Switchgear Equipment Description Reactor Trip SWGR Sheet 308 of 439 Status: (W)N U Other supporting or relevant documents and photos (if any): File Name: 2-61-1-1-33.jpeg

==

Description:==

Component Plate ID lile Name: z-oz-1-i-ii.jpeg

==

Description:==

General view of component L Paul C. Rizzo Associates, Inc.ENGINEERS

&

Seismic Walkdown Checklist (SWC)Equipment ID No. REAC-TR-SWGR-IA Equip. Class 2. Low Voltage Switchgear Equipment Description Reactor Trip SWGR Sheet 309 of 439 Status: W N U File Name: 2-63-1-1-33.jpeg

==

Description:==

View of top entry conduits rL -NQ Paul C. Rizzo Associates, Inc.ENGINEERS 6& CONSULTANTn Seismic Walkdown Checklist (SWC)Sheet 310 of 439 Status: W)N U Equipment ID No. RK- I PRI-PROC-12 Equip. Class 20. Instrument and Control Panels Equipment Description Primary Process Rack 12 Location:

Bldg. SRVB Floor El. 713 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

This panel is part of a 16-panel line up. All panels are bolted together.

Each panel is attached to I-beam at its base with 4-3/4" diam machine bolts. I-beam is anchored to concrete floor with 1/2" diam anchor bolts @ -30" spacing.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N~I z X Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A TI I I x Y N U x I I I I --- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Sheet 311 of 439 Status: N U Equipment ID No. RK-IPRI-PROC-12 Equip. Class 20. Instrument and Control Panels Equipment Description Primary Process Rack 12 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U X II I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 10/1/2012 Adam L. Helffrich Date: 10/1/2012 Sheet 312 of 439 Paul C. RiZZO Associates, Inc. N PatC lzo ý Status '.Seismic Walkdown Checklist (SWC)Equipment ID No. 5p1ROC-2 Equip. Class 20. Instrument and Control Panels Equipment DescriptionProcess Rack 12 Other supporting or relevant documents and photos (if any): U File Name: 2.61-2-1-49-Jpeg

==

Description:==

Component Plate ID leNameM6 2 .-49.jpeg Description.

General view of component Paul C. Rizzo Associates, Inc.IENGOINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Sheet 313 of 439 Status: W N U Equipment ID No. RK-AUX-RPTST-A Equip. Class 20. Instrument and Control Panels Equipment Description Auxiliary Safeguards Cabinet Train A Location:

Bldg. SRVB Floor El. 713 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

This panel is part of a 7-panel line up. A// panels are bolted together.

Each panel is attached to I-beam at its base with 4-3/4" diam machine bolts. I-beam is anchored to concrete floor with 1/2" diam anchor bolts @ -30" spacing.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Sketch in RK-A UX-RPTST-A SEWS anchorage configuration

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

LI I I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANhn Seismic Walkdown Checklist (SWC)Sheet 314 of 439 Status: (2) N U Equipment ID No. RK-AUX-RPTST-A Equip. Class 20. Instrument and Control Panels Equipment Description Auxiliary Safeguards Cabinet Train A Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 10/1/2012 Adam L. Helffrich Date: 10/1/2012 I Y Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTAN-T Seismic Walkdown Checklist (SWC)Equipment ID No. RK-AUX-RPTST-A Equip. Class 20. Instrument and Control Panels Equipment Description Auxiliary Safeguards Cabinet Train A Other supporting or relevant documents and photos (if any): Sheet 315 of 439 Status: W N U File Name: 2-61-1-1-49.jpeg

==

Description:==

Component Plate ID File Name: 2-62-1-1-49.jpeg

==

Description:==

General view of component L Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Sheet 316 of 439 Status: T N U Equipment ID No. RK-AUX-RPTST-A Equip. Class 20. Instrument and Control Panels Equipment Description Auxiliary Safeguards Cabinet Train A l1le Name:

==

Description:==

General view inside of component rue Name: z-to+-i-i-qy.jpeg

==

Description:==

View of base frame connection to floor wide flange beams L Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANJ-S Seismic Walkdown Checklist (SWC)Equipment ID No. RK-AUX-RPTST-A Equip. Class 20. Instrument and Control Panels Equipment Description Auxiliary Safeguards Cabinet Train A Sheet 317 of 439 Status: (Y)N U File Name: 2-73-1-1-49.jpeg

==

Description:==

View of connection point between adjacent cabinets LX-Q Paul C. Rizzo Associates, Inc.ENGINEERa S & COhklt(ANW3 Seismic Walkdown Checklist (SWC)Sheet 318 of 439 N U Status: ()Equipment ID No. RK-NUC-INS-I Equip. Class 20. Instrument and Control Panels Equipment Description Nuclear Instrumentation Rack Location:

Bldg.SRVB Floor El. 735 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Attached to perimeter channel flange at concrete floor with 12-3/8" diam machine bolts. The channels at front and back are welded to embed steel.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Calculation 52233-C-023 confirms the anchorage configuration.

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N I x I I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x L Q Paul C. Rizzo Associates, Inc.ENGINEER &

Seismic Walkdown Checklist (SWC)Sheet 319 of 439 Status: W) N U Equipment ID No. RK-NUC-INS-I Equip. Class 20. Instrument and Control Panels Equipment Description Nuclear Instrumentation Rack Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x T --F Other Adverse Conditions 1 I. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x II Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 10/1/2012 Adam L. Helffrich Date: 10/1/2012 Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANT$

Seismic Walkdown Checklist (SWC)Equipment ID No. RK-NUC-INS-l Equip. Class 20. Instrument and Control Panels Equipment Description Nuclear Instrumentation Rack Other supporting or relevant documents and photos (if any): Sheet 320 of 439 Status: (2)N U File Name: 2-61-4-1-18.jpeg

==

Description:==

Component Plate ID Pile Name:

==

Description:==

General view of component

[ Y Paul C. Rizzo Associates, Inc.

& CONSLLTTAN' Seismic Walkdown Checklist (SWC)Equipment ID No. RK-NUC-INS-I Equip. Class 20. Instrument and Control Panels Equipment Description Nuclear Instrumentation Rack Sheet 321 of 439 Status: (Y)N U rue IName: Z-o3 1-Rijpeg

==

Description:==

General view inside of component-0 File Name: 2-6 4-4-1-18.jpeg

==

Description:==

View of anchorage between cabinet housing and base frame LCQ Paul C. Rizzo Associates, Inc.EN(NEEG S & CONSUI.TAJJT3 Seismic Walkdown Checklist (SWC)Sheet 322 of 439 N U Status: (2)Equipment ID No. RK-VV-REL-B Equip. Class 20. Instrument and Control Panels Equipment Description-Stop Valve Replay Rack B Location:

Bldg.SRVB Floor El. 713 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

This panel is part of a 7-panel line up. All panels are bolted together.

Each panel is attached to I-beam at its base with 4-3/4" diam machine bolts. I-beam is anchored to concrete floor with 1/2" diam anchor bolts @ -30" spacing.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

LILN Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A I I I I x Y N U x L I-Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTAN-T Seismic Walkdown Checklist (SWC)Sheet 323 of 439 N U Status: (Equipment ID No. RK-VV-REL-B Equip. Class 20. Instrument and Control Panels Equipment Description Stop Valve Replay Rack B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 10/1/2012 Adam / L .'ich Adam L. Helffrich Date: 10/1/2012 Paul C. Rizzo Associates, Inc.ENOINEERS

& LCOSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. RK-VV-REL-B Equip. Class 20. Instrument and Control Panels Equipment Description Stop Valve Replay Rack B Other supporting or relevant documents and photos (if any): Sheet 324 of 439 Status: W N U File Name: 2-61-3-1-49.jpeg

==

Description:==

Component Plate ID File Name: 2-62-3-1-49.jpeg

==

Description:==

General view of component I Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTA-TS Seismic Walkdown Checklist (SWC)Sheet 325 of 439 N U Status: (2)Equipment ID No. RK-VV-REL-B Equip. Class 20. Instrument and Control Panels Equipment Description Stop Valve Replay Rack B File Name: 2-63-3-1-49.jpeg

==

Description:==

General view inside of component Pile Name: 2-64-3-1-49.jpeg

==

Description:==

View of anchorage between cabinet housing and base frame 1 Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTAN"S Seismic Walkdown Checklist (SWC)Equipment ID No. RK-VV-REL-B Equip. Class 20. Instrument and Control Panels Equipment Description Stop Valve Replay Rack B Sheet 326 of 439 Status: (Y)N U File Name: 2-73-3-1-49.jpeg

==

Description:==

View of anchorage between base frame and floor beam File Name: 2-94-3-l-49.jpeg

==

Description:==

LK-- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTAN'TS Seismic Walkdown Checklist (SWC)Sheet 327 of 439 N U Status: ()Equipment ID No. RS-P-2B Equipment Description Equip. Class 6. Vertical Pump Outside Recirculation Spray Pumps Location:

Bldg.SFGB Floor El. 732 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Pump is supported at its base.from the wall by two braced and heavily anchored brackets.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N jI iz Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I L qg Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTAPAT Seismic Walkdown Checklist (SWC)Sheet 328 of 439 N U Status: (2)Equipment ID No. RS-P-2B Equipment Description Equip. Class 6. Vertical Pump Outside Recirculation Spray Pumps Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 10/1/2012 Adam L. Helffirich Date: 10/1/2012 Adam L. Helffrich Date: 10/1/20 12 Bt- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTAXIS Seismic Walkdown Checklist (SWC)Equipment ID No. RS-P-2B Equi Equipment Description Outside Rec Sheet 329 of 439 Status: ()N U ip. Class 6. Vertical Pump irculation Spray Pumps Other supporting or relevant documents and photos (if any): File Name: 2-64-1-1-0O.jpeg

==

Description:==

Component Plate ID rite 1-4ame: /-o1-i-i-iu.Jpeg

==

Description:==

General view of component Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. RS-P-2B Equ Equipment Description Outside Rec Sheet 330 of 439 Status: Y)N U ip. Class 6. Vertical Pump irculation Spray Pumps File Name: 2-62-1 10.jpeg

==

Description:==

Anchorage configuration for pump's bottom section File Name: 2-63-1-1-10.jpeg

==

Description:==

View of hung support for attached pipe line LXQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTAN"S Seismic Walkdown Checklist (SWC)Sheet 331 of 439 N U Status: W Equipment ID No. RW-57 Equipment Description Equip. Class OD. Other-Check Valve or Manual Valve RP RW PP (I WR-P- IA) Discharge Check Valve Location:

Bldg.INTS Floor El. 705 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Inline check valve on-14" diam pipe line. No degraded condition identified

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Mild surface corrosion identified on bolts. Judged not a concern.4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

LI Y N U N/A I7 IxI Y N U N/A x Y N U N/A x Y N U N/A I I I I x I Y N U x L --- Paul C. Rizzo Associates, Inc.ENGIME & CONSULTANTS Seismic Walkdown Checklist (SWC)Sheet 332 of 439 N U Status: (Y)Equipment ID No. RW-57 Equipment Description Equip. Class OD. Other-Check Valve or Manual Valve RP RW PP (I WR-P- I A) Discharge Check Valve Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 10/1/2012 Adam L. Helffrich Date: 10/1/2012 Paul C. Rizzo Ass ENGINEEWS

& CONSUITAN-M Seismic Walkdown Checklist Equipment ID No. RW-57 Equipment Description ociates, Inc.Sheet 333 of 439 (SWC) Status: ( N Equip. Class OD. Other-Check Valve or Manual Valve RP RW PP (1WR-P-1 A) Discharge Check Valve U Other supporting or relevant documents and photos (if any): File Name: 2-61-4-1-27.jpeg

==

Description:==

Component Plate ID File Name: 2-62-4-1-27jpeg

==

Description:==

General view of component LX Paul C. Rizzo Ass ENGINEERS

& CONSULTATS Seismic Walkdown Checklist Equipment ID No. RW-57 Equipment Description ociates, Inc.Sheet 334 of 439 (SWC) Status: N Equip. Class 0D. Other-Check Valve or Manual Valve RP RW PP (IWR-P- 1A) Discharge Check Valve U File Name: 2-63-4-1-27.jpeg

==

Description:==

View of valve location on main line LKQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Sheet 335 of 439 N U Status: W Equipment ID No. RW-183 Equip. Class OD. Other-Check Valve or Manual Valve Equipment Description PRI CCW HXS (ICC-E-1AB)

RW SUP HDR CROSS CONN, RW-183 MANUAL VALVE Location:

Bldg.AXLB Floor El. 735 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Inline check valve on-24" diam pipe line. No degraded condition identified.

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Mild surface corrosion identified on bolts. Judged not a concern.4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N Y N U N/A Y N U N/A Y N U N/A Y N U N/A Y N U XI L Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANT Seismic Walkdown Checklist (SWC)Sheet 336 of 439 N U Status: W)Equipment ID No. RW-183 Equip. Class OD. Other-Check Valve or Manual Valve Equipment Description PRI CCW HXS (ICC-E-1AB)

RW SUP HDR CROSS CONN, RW-183 MANUAL VALVE Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 10/1/2012 Adam L. Helffrich Date: 10/1/2012

[Z- Paul C. Rizzo Associates, Inc.LNGINEMRS

& CONSULTANTM Seismic Walkdown Checklist (SWC)Equipment ID No. RW-183 Equ Equipment Description PRI CCW H Sheet 337 of 439 Status: (2)N U ip. Class OD. Other-Check Valve or Manual Valve[XS (l CC-E-lAB)

RW SUP HDR CROSS CONN, RW-183 MANUAL VALVE Other supporting or relevant documents and photos (if any): File Name: 2-61-1-1-46.jpeg

==

Description:==

Component Plate ID File Name: 2-62-1-1-46.jpeg

==

Description:==

General view of component Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTAMn' Seismic Walkdown Checklist (SWC)Sheet 338 of 439 N U Status: W Equipment ID No. SAF-SW-65 Equipment Description V Equip. Class 20. Instrument and Control Panels ital Bus Inverter #1 AC Power Disconnect Switch Location:

Bldg.SRVB Floor El. 713 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Component identified as a small panel (-1O"x 24"x 6'). 4-3/8" diam anchor bolts identified for column connection.

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N I X Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A I I I I x Y N U x L Q Paul C. Rizzo Associates, Inc.ENGINEERS

& ONSULI-TATS Seismic Walkdown Checklist (SWC)Sheet 339 of 439 N U Status: ()Equipment ID No. SAF-SW-65 Equipment Description Vi Equip. Class 20. Instrument and Control Panels ital Bus Inverter#

I AC Power Disconnect Switch Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 10/1/2012 Adam L. Helffrich Date: 10/1/2012 I ---- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. SAF-SW-65 Equip. Class 20. Instrument and Control Panels Equipment Description Vital Bus Inverter #1 AC Power Disconnect Switch Other supporting or relevant documents and photos (if any): Sheet 340 of 439 Status: (2)N U File Name: 2-62-5-1-25.jpeg

==

Description:==

General view of component L %Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. SAF-SW-65 Equip. Class 20. Instrument and Control Panels Equipment Description Vital Bus Inverter #1 AC Power Disconnect Switch Sheet 341 of 439 Status: (Y)N U File Name: 2-63-5-1-25.jpeg

==

Description:==

Bottom wall mounting configuration rvie Name: L-ot4-+)--I3.Jpeg

==

Description:==

Top wall mounting configuration L--QPaul C. Rizzo Associates, Inc.ENGINEERS

&

Seismic Walkdown Checklist (SWC)Sheet 342 of 439 N U Status: (D Equipment ID No. SI-P-IA Equipment Description Equip. Class 6. Vertical Pump Low Head Safety Injection Pump Location:

Bldg.SFGB Floor El. 751 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Pump is supported off of wall at base and braced at mid-height.

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

No signs of corrosion identified.

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

EIIEN Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x --T I L Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Sheet 343 of 439 N U Status: (2)Equipment ID No. SI-P-IA Equipment Description Equip. Class 6. Vertical Pump Low Head Safety Injection Pump Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A X Y N U N/A X Y N U N/A X Y N U x F -1 Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U X II I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 10/1/2012 A / / , /Adam L. Helifrich Date: 10/1/2012

[DCQ Paul C. Rizzo Associawts, Inc.ENGINEERS

&T CONULTA'TS Seismic Walkdown Checklist (SWC)Equipment ID No. SI-P-1A Equ Equipment Description Low Head S Sheet 344 of 439 Status: (2)N U ip. Class 6. Vertical Pump afety Injection Pump Other supporting or relevant documents and photos (if any): File Name: 2-95-1-1-31 .jpeg

Description:

Component Plate ID Vile Name: 2-b1-1-1-J I.jpeg

Description:

General view of component I ? Paul C. Rizzo Associates, Inc.

& Seismic Walkdown Checklist (SWC)Equipment ID No. SI-P-IA Equi Equipment Description Low Head S Sheet 345 of 439 Status: ()N U p. Class 6. Vertical Pump afetv Injection Pump v ile Name: 2-32--1 -31 .jpeg

Description:

Wall mounted brace detail Pile Name: 2-63-1-1-31.jpeg

==

Description:==

View of wall anchorage configuration for pump's bottom section Paul C. Rizzo Associates, Inc.ENGINERS & CONSULTAMST Seismic Walkdown Checklist (SWC)Equipment ID No. SI-P-lA Equi Equipment Description Low Head S Sheet 346 of 439 Status: W)N U p. Class 6. Vertical Pump afetv Iniection Pump tile Name: 2-64-1-1-3 1jpeg

Description:

Wall mounted brace detail rue Name: z-y4-1-i-i1 .jpeg

Description:

View of pipe line restraining tube section members DC Q Paul C. Rizzo Associates, Inc.ENGINfERS

& WONSULTAf$

Seismic Walkdown Checklist (SWC)Sheet 347 of 439 N U Status: (W)Equipment ID No. SI-TK-2 Equipment Description Equip. Class 21. Tanks and Heat Exchangers Boron Injection Tank Location:

Bldg.AXLB Floor El. 722 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Tank mounted on/obur legs, each leg anchored with 2-1 " diam anchor bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A I I I I x Y N U x L Paul C. Rizzo Associates, Inc.ENGTNEES &

Seismic Walkdown Checklist (SWC)Sheet 348 of 439 Status: (Y N U Equipment ID No. SI-TK-2 Equip.Class

21. Tanks and Heat Exchangers Equipment Description Boron Injection Tank Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Block wall AB-J-1 has been qualifiedper IE 80-11 review.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 10/1/2012 Adam L. Helffrich Date: 10/1/2012 Adam L. Helifrich Date: 10/ 1/20 12

[D ' Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANMS Seismic Walkdown Checklist (SWC)Equipment ID No. SI-TK-2 Equi Equipment Description Boron Inject Sheet 349 of 439 Status: W N U p. Class 21. Tanks and Heat Exchangers ion Tank Other supporting or relevant documents and photos (if any): File Name: 2-61-1-1-42.jpeg

==

Description:==

Component Plate ID File Name: 2-6 2-1-1-42.jpeg

==

Description:==

General view of component L-- Paul C. Rizzo Associates, Inc.ENGVEIS & Seismic Walkdown Checklist (SWC)Equipment ID No. SI-TK-2 Equ Equipment Description Boron Injece Sheet 350 of 439 Status: W)N U ip. Class 21. Tanks and Heat Exchangers tion Tank File Name: 2-63-1-1-42.jpeg

==

Description:==

Typical view of base anchorage configuration for each leg support hie Name: 2-b4-1-1-42jpeg

==

Description:==

Deficiency tag addressing paint of cubicle floor and walls L Q Paul C. Rizzo Associates, Inc.ENGINEERS

.CONSULtANTS Seismic Walkdown Checklist (SWC)Sheet 351 of 439 N U Status: W Equipment ID No. SV-MS-104B Equip. Class 7. Pneumatic-Operated Valve Equipment Description I B S/G Safety Vavle Location:

Bldg.SFGB Floor El. 768 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Valve.found in good condition.

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

KI l Y N U N/A Y N U N/A Y N U N/A Y N U N/A 7 x-Y N U xI l-- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Sheet 352 of 439 N U Status: W Equipment ID No. SV-MS-104B Equip. Class 7. Pneumatic-Operated Valve Equipment Description l B SIG Safety Vavle Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Attached lines identified with adequate flexibility.
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 10/1/2012 Adam L. Helffrich Date: 10/1/2012 L Q Paul C. Rizzo Associates, Inc.ENGINEERS

&

Seismic Walkdown Checklist (SWC)Equipment ID No. SV-MS- 104B Equip. Class 7. Pneumatic-Operated Valve Equipment Description lB S/G Safety Vavle Other supporting or relevant documents and photos (if any): Sheet 353 of 439 Status: (2)N U rite iName: /-Oi-,-i-_i.Jpeg

==

Description:==

Component Plate ID File Name: 2-6 2-4-1-32.jpeg

==

Description:==

General view of component Paul C. Rizzo Associates, Inc.ENGINEERS

&

Seismic Walkdown Checklist (SWC)Sheet 354 of 439 N U Status: W Equipment ID No. TCV-ICH-144 Equip. Class 7. Pneumatic-Operated Valve Equipment Description TCV-ICH-144 Location:

Bldg.AXLB Floor El. 722 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Small MOV on -6" diam line. Line is well supported near valve.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Valve identified in good condition.

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

EIZ Y N U N/A I X Y N U N/A Y N U Nx/A Y N U N/A Y N U N/A I I I I x I Y N U x I I I D -C- Paul C. Rizzo Associates, Inc.EGINEERS .& "NSULTA0TS Seismic Walkdown Checklist (SWC)Sheet 355 of 439 N U Status: W Equipment ID No. TCV-ICH-144 Equip. Class 7. Pneumatic-Operated Valve Equipment Description TCV- ICH- 144 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Attached lines identified with adequate flexibility.
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 10/1/2012 Adam L. Helffrich Date: 10/1/2012 Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. TCV-1CH-144 Equip. Class 7. Pneumatic-Operated Valve Equipment Description TCV- 1CH- 144 Sheet 356 of 439 Status: W)N U Other supporting or relevant documents and photos (if any): File Name: 2-61-1-1-41 .jpeg

Description:

Component Plate ID 1ile N ame: 2-62-1-1-4 I.jpeg

Description:

General view of component L O Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTAN TS Seismic Walkdown Checklist (SWC)Equipment ID No. TCV-1CH-144 Equip. Class 7. Pneumatic-Operated Valve Equipment Description TCV- ICH- 144 Sheet 357 of 439 Status: W)N U File Name: 2-63-1-1-41.jpeg

==

Description:==

View of flexible attached lines L Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Sheet 358 of 439 N U Status: (2)Equipment ID No. TI-IEE-301 Equipment Description E Equip. Class 19. Temperature Sensor E-Eg- 1 Cooling Water To Engine Temperat Location:

Bldg.DGBX Floor El. 735 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Sensor found to be rigidly mounted on Diesel Generator.

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

LIZX Y N U N/A x Y N U N/A x Y N U N/A Y N U N/A I I I I x I Y N U xI Paul C. Rizzo Associates, Inc.ENGINERS &

Seismic Walkdown Checklist (SWC)Sheet 359 of 439 N U Status: (Y)Equipment IDNo. TI-IEE-301 Equipment Description E Equip. Class 19. Temperature Sensor E-Eg- I Cooling Water To Engine Temperat Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

No interaction concern identified.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x [ ] )Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 10/1/2012 Adam L. Helffrich Date: 10/1/2012 L -- Paul C. Rizzo Associates, Inc.ENCINEIERS

& CONSUITANTS Seismic Walkdown Checklist (SWC)Equipment ID No. TI-I EE-301 Equip. Class 19. Temperature Sensor Equipment Description EE-Eg- I Cooling Water To Engine Temperat Sheet 360 of 439 Status: ()N U Other supporting or relevant documents and photos (if any): File Name: 2-61-1-1-19.jpeg

==

Description:==

Component Plate ID File Name: 2-62-1-1-19.jpeg

==

Description:==

General view of component